Replaceable intelligent tunnel composite lining structure and tunnel

By designing a replaceable intelligent tunnel composite lining structure, the third lining layer and drainage components of the spliced ​​structure are used to solve the problem of repairing traditional tunnel composite lining structures in harsh environments, and the rapid replacement and waterproof function of tunnel structures are realized. Improves the service life and safety of the tunnel.

CN119288538AActive Publication Date: 2025-01-10CENT SOUTH UNIV
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411590367.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-01-10
Estimated Expiration
2044-11-08

AI Technical Summary

Technical Problem

Traditional tunnel composite lining structures are difficult to quickly repair and replace under harsh geological environments, resulting in the impact of structural stability and safety, and insufficient waterproof performance, making it difficult to ensure the long-term service life of the tunnel.

Method used

A replaceable intelligent tunnel composite lining structure is designed, adopting a three-lined structure, in which the third lining layer is a prefabricated piece, including a plurality of spliced ​​structures of pipe rings and back cover block sets, which can be quickly disassembled and replaced, combined with drainage Components and monitoring mechanisms for rapid repair and waterproofing.

Benefits of technology

It realizes rapid replacement and repair of tunnel structures, improves the service life and safety of the tunnel, simplifies the construction process, reduces environmental impact, and ensures waterproof performance and structural health through monitoring mechanisms.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119288538A_ABST
    Figure CN119288538A_ABST
Patent Text Reader

Abstract

The invention provides a replaceable intelligent tunnel composite lining structure and a tunnel. The composite lining structure comprises a first lining layer, a second lining layer and a third lining layer which are sequentially arranged, the third lining layer comprises a plurality of first segment rings and a plurality of second segment rings, each first segment ring comprises a first segment ring main body part with a first notch and a first bottom sealing block set clamped in the first notch, and each second segment ring comprises a second segment ring main body part with a second notch; each second segment ring comprises a second segment ring main body part with a second notch and a second bottom sealing block set clamped in the second notch, the first segment ring main body parts and the second segment ring main body parts are each of a splicing structure, and the multiple first segment ring main body parts and the multiple second segment ring main body parts are alternately spliced in the extending direction of the tunnel; the first bottom sealing block sets and the second bottom sealing block sets are alternately arranged, and the adjacent first bottom sealing block sets and second bottom sealing block sets are arranged at intervals. According to the composite lining structure provided by the invention, the damaged block section can be quickly replaced, and effective reinforcement is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of tunnels, and in particular relates to a replaceable intelligent tunnel composite lining structure and a tunnel. Background Art

[0002] Tunnels have the advantages of shortening road mileage, reducing driving time and improving operational efficiency, and are widely used in highway and railway construction. With the annual increase in the number and mileage of highways and railways in my country, the geological environment faced by tunnel construction has become increasingly harsh. At present, highway tunnels and railway tunnels mainly use traditional composite lining structures, that is, the outer layer is sprayed concrete as the primary lining, the inner layer is cast concrete as the secondary lining, and a waterproof board is laid between the primary lining and the secondary lining. Both the existing composite lining structure and the waterproof board are permanent structures, and it is difficult to replace them in a timely and effective manner after damage.

[0003] Engineering practice shows that tunnels built in harsh geological environments such as fault zones, surrounding rock fracture zones and karst water-rich zones frequently suffer from diseases during operation. For example, uneven stratum settlement destroys the integrity of the structure, and complex geological effects such as freeze-thaw cycles and temperature changes lead to lining cracks and even tunnel collapse, which in turn forces the stability and durability of the tunnel structure to undergo a huge test and seriously affects traffic operation safety. Since the traditional composite lining structure cannot be repaired and replaced in time, it is not very suitable for tunnel construction under these complex conditions. At the same time, statistical results show that the traditional composite lining structure is made of cast-in-place concrete, and construction defects such as insufficient concrete vibration and irregular maintenance are difficult to avoid, which leads to voids behind the lining and reduces the safety of the structure. Once the traditional composite lining structure is damaged, there are no other safety reserve measures as a backup, which makes it difficult to ensure the safety of the tunnel during operation.

[0004] In addition, the traditional composite lining structure uses a permanent waterproof board between the primary lining and the secondary lining as the tunnel waterproof system. On the one hand, the primary lining and the secondary lining cannot be completely tightly fitted, which reduces the waterproof performance of the waterproof board. On the other hand, the waterproof board needs to be constructed on-site, which increases the difficulty and inconvenience of construction and makes it difficult to ensure the construction quality of the waterproof board. Moreover, once the waterproof board fails or the waterproof effect deteriorates due to durability or internal and external factors, the non-replaceable nature of the permanent waterproof board will further accelerate the damage to the tunnel structure and greatly reduce the service life of the tunnel.

[0005] In terms of tunnel lining structure defect monitoring and damage repair, traditional composite lining structure defect monitoring mainly adopts manual inspection, which not only consumes a lot of manpower and material resources, but also makes it difficult to ensure the reliability of lining disease monitoring results, which is not conducive to the early identification of lining diseases, and cannot provide safety warnings for tunnel repair and normal operation. At the same time, traditional composite lining structures currently mainly use grouting and sleeve lining to repair damaged linings locally, which requires a long period of tunnel closure construction, making it difficult to achieve fast, efficient, energy-saving and low-cost repair of tunnels, and it is also impossible to effectively reinforce damaged lining structures. Summary of the invention

[0006] The purpose of the present invention is to solve the technical problem of the inconvenience of replacing the existing damaged lining structure. The tunnel composite lining structure is designed as a three-lining structure, and the third lining layer with both waterproof and load-bearing functions is a spliced ​​structure in the longitudinal direction and the circumferential direction of the tunnel. The damaged blocks can be quickly replaced to achieve effective reinforcement and increase the service life of the tunnel.

[0007] To achieve the above object, the present invention provides a replaceable intelligent tunnel composite lining structure, the tunnel composite lining structure comprising:

[0008] A first lining layer, the first lining layer covers the circumferential surface of the surrounding rock, and the first lining layer is used to seal and constrain the surrounding rock;

[0009] a second lining layer, the second lining layer being arranged on an inner side of the first lining layer opposite to the surrounding rock;

[0010] A third lining layer, wherein the third lining layer is arranged on the inner side of the second lining layer away from the first lining layer, and the third lining layer is a prefabricated component, which includes a plurality of first segment rings and a plurality of second segment rings, wherein the first segment ring includes a first segment ring main body having a first notch, and a first bottom block group clamped in the first notch, and the second segment ring includes a second segment ring main body having a second notch, and a second bottom block group clamped in the second notch, the first segment ring main body and the second segment ring main body are both spliced ​​structures, and the first notch and the second notch are arranged opposite to each other, along the extension direction of the tunnel, a plurality of first segment ring main bodies and a plurality of second segment ring main bodies are alternately spliced, a plurality of first bottom block groups and a plurality of second bottom block groups are alternately arranged, and adjacent first bottom block groups and second bottom block groups are arranged at intervals.

[0011] In a specific embodiment, the first segment ring main body comprises two first inverted arch blocks located at the bottom and spaced apart to form the first notch, a first top block arranged opposite to the first bottom block group installed in the first notch, and two first middle blocks respectively sandwiched between the first top block and the two first inverted arch blocks, and the first inverted arch block and the first middle block and the first top block are all detachably connected;

[0012] The second segment ring body comprises two second inverted arch blocks located at the bottom and spaced apart to form the second notch, a second top block arranged opposite to the second bottom block group installed in the second notch, and two second middle blocks respectively sandwiched between the second top block and the two second inverted arch blocks, wherein the second inverted arch block and the second middle block as well as the second middle block and the second top block are all detachably connected;

[0013] The two first inverted arch blocks are spliced ​​with the two second inverted arch blocks respectively, the two first middle blocks are spliced ​​with the two second middle blocks respectively, and the first top block is spliced ​​with the second top block.

[0014] In a specific implementation, the first middle block and the second middle block are composed of two or more unit blocks spliced ​​together.

[0015] In a specific embodiment, the first intermediate block includes a first side wall block and a first arch ring block which are spliced ​​together, the first side wall block is detachably connected to the first inverted arch block, the first arch ring block is detachably connected to the first top block, and along the tunnel annular direction, the first inverted arch block on one side, the first side wall block on one side, the first arch ring block on one side, the first top block, the first arch ring block on the other side, the first side wall block on the other side, and the first inverted arch block on the other side are sequentially spliced ​​to form the first segment ring main body;

[0016] The second intermediate block includes a second side wall block and a second arch ring block that are spliced ​​together. The second side wall block is detachably connected to the second inverted arch block, and the second arch ring block is detachably connected to the second top block. Along the tunnel ring direction, the second inverted arch block on one side, the second side wall block on one side, the second arch ring block on one side, the second top block, the second arch ring block on the other side, the second side wall block on the other side, and the second inverted arch block on the other side are spliced ​​in sequence to form the second segment ring main body.

[0017] In a specific implementation, the first segment ring is a mirror-symmetrical structure, and the second segment ring is a mirror-symmetrical structure.

[0018] In a specific embodiment, the third lining layer also includes a drainage component, which includes a longitudinal drainage ditch extending along the extension direction of the tunnel, and a plurality of annular drainage grooves formed by being recessed inward from the surfaces of the plurality of first segment ring main bodies close to the second lining layer, and the plurality of annular drainage grooves are connected to the longitudinal drainage ditch, wherein the first bottom block, two of the first arch blocks and the second lining layer together form a first drainage outlet, the second bottom block, two of the second arch blocks and the second lining layer together form a second drainage outlet, and the plurality of the first drainage outlets and the plurality of the second drainage outlets are connected to form the longitudinal drainage ditch.

[0019] In a specific embodiment, the first lining layer is a shotcrete layer, the second lining layer is a cast-in-place reinforced concrete layer, the first segment ring and the second segment ring are both integrally cast by reinforced concrete and a waterproof board, and the waterproof board is arranged adjacent to the second lining layer.

[0020] In a specific embodiment, the tunnel composite lining structure also includes a monitoring mechanism for monitoring the waterproof performance and stress state of the third lining layer, and the monitoring mechanism includes a plurality of strain sensors and a plurality of water seepage sensors pre-buried in the third lining layer and communicatively connected to the monitoring system, wherein the first invert block, the first middle block, the first top block of each of the first segment ring main body parts and the second invert block, the second middle block, the second top block of each of the second segment ring main body parts are installed with at least one strain sensor and at least one water seepage sensor.

[0021] In a specific implementation, the plurality of strain sensors and the plurality of water seepage sensors are all arranged on a side of the waterproof board away from the second lining layer.

[0022] The present invention also provides a tunnel, which comprises the replaceable intelligent tunnel composite lining structure described above.

[0023] The beneficial effects of the present invention include at least:

[0024] 1. The replaceable intelligent tunnel composite lining structure provided by the present invention is a three-lining structure, comprising a first lining layer, a second lining layer and a third lining layer arranged in sequence, wherein the first lining layer covers the circumferential surface of the surrounding rock for sealing and constraining the surrounding rock, the third lining layer is a prefabricated component, having both waterproof and load-bearing functions, the third lining layer comprises a plurality of first segment rings and a plurality of second segment rings, the first segment ring comprises a first segment ring main body having a first notch, and a first bottom block group clamped in the first notch, the second segment ring comprises a second segment ring main body having a second notch, and a second bottom block group clamped in the second notch, the first segment ring main body and the second segment ring main body are both spliced ​​structures, and the first notch and the second notch are arranged opposite to each other, and along the extension direction of the tunnel, a plurality of the first segment ring main bodies and a plurality of the second segment ring main bodies are alternately spliced Then, a plurality of the first bottom sealing block groups and a plurality of the second bottom sealing block groups are alternately arranged and adjacent first bottom sealing block groups and second bottom sealing block groups are arranged at intervals; on the one hand, along the extension direction of the tunnel (longitudinal direction of the tunnel), the third lining layer is a splicing structure, so that the first segment ring and the second segment ring can be split; on the other hand, along the circumferential direction of the tunnel, the first segment ring main body and the second segment ring main body are a splicing structure, so that the first segment ring main body and the second segment ring main body can be split into a plurality of block segments, so that when the segments of the first segment ring main body and the second segment ring main body are damaged, the damaged segments can be replaced through disassembly, replacement and assembly steps, so as to realize the rapid replacement of the damaged segments, complete the repair of the third lining layer, and quickly restore the tunnel structure strength and performance, which has the advantages of short construction period and small impact on the environment, can quickly ensure the safety of the tunnel and further extend the service life of the tunnel.

[0025] 2. The replaceable intelligent tunnel composite lining structure provided by the present invention has a second lining layer as an auxiliary waterproofing layer, and a third lining layer as the main waterproofing layer. The third lining layer includes a longitudinal drainage ditch extending along the extension direction of the tunnel, and a plurality of annular drainage grooves formed by respectively inwardly recessing from the surface of the plurality of first segment ring main bodies close to the second lining layer. The plurality of annular drainage grooves are connected to the longitudinal drainage ditch. At the same time, the first bottom sealing block group and the second bottom sealing block group are arranged at intervals, and the plurality of first bottom sealing blocks of the first bottom sealing block group and the plurality of second bottom sealing blocks of the second bottom sealing block group are arranged at intervals. In this way, when the waterproof performance of the second lining layer is seriously attenuated or the waterproofing fails, the groundwater infiltrated into the second lining (second lining layer) of the tunnel can be merged into the longitudinal drainage ditch along the annular drainage groove. At the same time, the accumulated water (such as road surface water) inside the tunnel can also be introduced into the longitudinal drainage ditch through the gaps between the bottom sealing blocks or the bottom sealing block groups, and then discharged from the tunnel through the longitudinal drainage ditch. Thus, the accumulated water in the tunnel can be effectively discharged, avoiding the long-term deterioration of the tunnel structure performance by adverse factors such as local hydraulic action and groundwater corrosion.

[0026] 3. The replaceable intelligent tunnel composite lining structure provided by the present invention also includes a monitoring mechanism for monitoring the waterproof performance and stress state of the third lining layer, and the monitoring mechanism includes a plurality of strain sensors and a plurality of water seepage sensors pre-buried in the third lining layer and communicatively connected to the monitoring system, wherein the first invert block, the first middle block, the first top block of each of the first segment ring main body parts and the second invert block, the second middle block, the second top block of each of the second segment ring main body parts are installed with at least one strain sensor and at least one water seepage sensor; in this way, the water seepage data and pressure data of each block segment can be obtained in time through the strain sensor and the water seepage sensor, the monitoring system receives the data monitored in real time by the strain sensor and the water seepage sensor, and compares it with the preset threshold value, when the water seepage exceeds the preset value of the water seepage or the pressure measurement value exceeds the preset value of the pressure, the monitoring system issues an alarm, and the intelligent prediction of the replacement timing of each block segment in the first segment ring and the second segment ring can be realized, thereby ensuring the efficient and safe operation during the operation of the tunnel.

[0027] 4. In the present invention, the first segment ring and the second segment ring in the third lining layer are integrally cast by reinforced concrete and a waterproof board. Compared with the traditional method of applying a waterproof board between the first lining layer and the second lining layer, the waterproof board is pre-embedded in the third lining layer and constructed in an assembly manner, which is simple to construct and easy to ensure quality.

[0028] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A schematic cross-sectional structure diagram of a replaceable intelligent tunnel composite lining structure provided by an embodiment of the present invention;

[0030] Figure 2 A partial three-dimensional structural diagram of a third lining layer provided with a monitoring mechanism installed according to an embodiment of the present invention;

[0031] Figure 3 for Figure 2 A front view of the third lining layer shown;

[0032] Figure 4 for Figure 2 A schematic diagram of the three-dimensional structure of a first segment ring with a monitoring mechanism installed in the third lining layer is shown;

[0033] Figure 5 It is a cross-sectional view along line AA;

[0034] Figure 6It is a cross-sectional view along line BB;

[0035] Figure 7 for Figure 2 A schematic diagram of the three-dimensional structure of a first segment ring with a monitoring mechanism installed in the third lining layer is shown;

[0036] Figure 8 It is a cross-sectional view along the CC line;

[0037] Fig. 9 It is a cross-sectional view along line DD;

[0038] Fig.10 for Figure 4 A schematic diagram of the three-dimensional structure of the first arch ring block in the first segment ring is shown;

[0039] Fig.11 for Figure 4 A schematic diagram of the three-dimensional structure of the first side wall block in the first segment ring is shown;

[0040] Fig.12 is an exploded schematic diagram of a first side wall block in a first segment ring and a second side wall block in a second segment ring before being spliced;

[0041] Fig.13 A structural schematic diagram corresponding to the installation steps of the replaceable intelligent tunnel composite lining structure provided by the present invention;

[0042] Fig.14 A schematic structural diagram corresponding to multiple steps of replacing a damaged second arch ring block provided by the present invention. DETAILED DESCRIPTION

[0043] The embodiments of the present invention are described in detail below with reference to the accompanying drawings. However, the present invention can be defined and covered by various different implementations according to the claims.

[0044] In view of the defect that traditional tunnel composite lining structures cannot be repaired and replaced in time, the present invention provides a replaceable intelligent tunnel composite lining structure, which can quickly replace and repair damaged linings. It is suitable for various tunnel section types such as circular, horseshoe and flat three-center circular, and can be used for the construction of current highway tunnels and railway tunnels and the repair and reinforcement of existing highway tunnels and railway tunnels.

[0045] See also Figures 1 to 12 The present invention provides a replaceable intelligent tunnel composite lining structure, comprising a first lining layer 101, a second lining layer 102 and a third lining layer 103 arranged in sequence, and a monitoring mechanism 104 for monitoring the waterproof performance and stress state of the third lining layer 103, wherein the first lining layer 101 covers the circumferential surface of the surrounding rock 200, and the second lining layer 102 is sandwiched between the first lining layer 101 and the third lining layer 103.

[0046] In the present invention, the first lining layer 101 is a sprayed concrete layer with a thickness of 10cm to 20cm, which is used to seal the deformation of the surrounding rock 200 and constrain the deformation of the surrounding rock to a certain extent so that the surrounding rock can give full play to its active bearing capacity; the second lining layer 102 has a thickness of 40cm to 60cm, the third lining layer 103 has a thickness of 20cm to 60cm, and the sum of the thickness of the second lining layer 20 and the thickness of the third lining layer 30 is approximately 60cm to 100cm. The second lining layer 102 and the third lining layer 103 form a composite beam to jointly bear the main load of the tunnel, and leave a certain bearing margin to ensure the long-term operation safety of the tunnel.

[0047] Preferably, the second lining layer 102 is arranged on the inner side of the first lining layer 101 relative to the surrounding rock 200, and is a cast-in-place reinforced concrete layer. On the one hand, it bears the main load of the tunnel together with the third lining layer 103, and on the other hand, it also plays an auxiliary waterproofing role. More preferably, the concrete in the second lining layer 102 is cast with concrete of a higher water resistance grade to improve the waterproof performance.

[0048] In the present invention, the second lining layer 102 and the third lining layer 103 bear the load together, which reduces the thickness requirement of the cast-in-place concrete and can effectively avoid voids behind the primary lining (first lining layer) caused by construction defects such as insufficient vibration of the cast-in-place concrete and irregular maintenance.

[0049] It should be noted that, in the present invention, when the waterproof performance of the second lining layer 102 is seriously attenuated or fails in waterproofing, the third lining layer 103 plays a major role in tunnel waterproofing.

[0050] Preferably, the inner surface of the second lining layer 102 is smooth.

[0051] In the present invention, the second lining layer 102 is a cast-in-place reinforced concrete layer, the inner shape of which facing the third lining layer 103 is controllable and the inner outer surface can be smooth and dense, thereby providing a prerequisite for the design and assembly of precast concrete segments in the third lining layer and for making the second lining layer and the third lining layer fit tightly under external prestress.

[0052] In the present invention, the third lining layer 103 and the second lining layer 102 jointly bear the main load of the tunnel and also play a major waterproofing role.

[0053] Please refer to Figure 2The third lining layer 103 is a prefabricated component, which includes a plurality of first segment rings 30 and a plurality of second segment rings 40. The first segment ring 30 includes a first segment ring body 31 having a first notch 31A and a first bottom block group 32 clamped in the first notch 31A. The second segment ring 40 includes a second segment ring body 41 having a second notch 41A and a second bottom block group 42 clamped in the second notch 41A. The first segment ring body 31 and the second segment ring body 41 are both spliced ​​structures, and the first notch 31A and the second notch 41A are arranged opposite to each other. Along the extension direction of the tunnel, the plurality of first segment ring body 31 and the plurality of second segment ring body 41 are alternately spliced, the plurality of first bottom block groups 32 and the plurality of second bottom block groups 42 are alternately arranged, and the adjacent first bottom block groups 32 and the second bottom block groups 42 are arranged at intervals.

[0054] In the present invention, a plurality of the first segment ring main parts 31 and a plurality of the second segment ring main parts 41 are spliced ​​alternately, the first segment ring main parts 31 and the second segment ring main parts 41 are both spliced ​​structures, and the first bottom block group 32 is clamped in the first notch and the second bottom block group 42 is clamped in the second notch. In this way, when the various blocks spliced ​​to form the first segment ring main part 31 and / or the second segment ring main part 41 are damaged, a horizontal thrust is first applied by a jack to remove the first bottom block group 32 and / or the second bottom block group 42, and then the thrust of the jack is released to remove the various blocks of the first segment ring main part 31 and / or the second segment ring main part 41, and the damaged blocks are replaced, thereby completing the repair, which has the advantages of being convenient and quick.

[0055] It should be noted that the first segment ring main body 31 and the second segment ring main body 41 are both spliced ​​structures, which can be understood as the first segment ring main body 31 and the second segment ring main body 41 are both composed of multiple blocks spliced ​​together to form a whole.

[0056] In the present invention, the first notch 31A and the second notch 32A are provided to facilitate the installation of the jack to apply annular prestress, and the application of annular prestress mainly has the following four functions: ① ensuring that the first segment ring main body 31 and the second segment ring main body 41 are tightly spliced ​​in the annular upward sections; ② ensuring that the second lining layer and the third lining layer are tightly fitted; ③ preventing cracks in the third lining layer; ④ enhancing the penetration pressure of external water entering the tunnel.

[0057] Preferably, the first segment ring 30 and the second segment ring 40 are both integrally cast by reinforced concrete and a waterproof board, and the waterproof board is disposed adjacent to the second lining layer 102 .

[0058] In the present invention, the thickness of the waterproof board is 1 cm. The provision of the waterproof board is an important guarantee for the third lining layer 103 to have waterproof performance.

[0059] Preferably, along the extension direction of the tunnel, the width of the second segment ring 40 is the same as the width of the first segment ring 30, and the width value b1 is 1m to 3m.

[0060] Preferably, the first segment ring main body 31 includes two first inverted arch blocks 311 located at the bottom and relatively spaced to form the first notch 31A, a first top block 312 arranged opposite to the first bottom block group 32 installed in the first notch 31A, and two first middle blocks 313 respectively sandwiched between the first top block 312 and the two first inverted arch blocks 311, and the first inverted arch block 311 and the first middle block 313 and the first top block 312 are all detachably connected.

[0061] Preferably, the first middle block 313 is composed of two or more unit blocks spliced ​​together.

[0062] In an embodiment of the present invention, the first intermediate block 313 includes a first side wall block 3131 and a first arch ring block 3132 which are spliced ​​together. The first side wall block 3131 is detachably connected to the first inverted arch block 311, and the first arch ring block 3132 is detachably connected to the first top block 312. Along the circumferential direction of the tunnel, the first inverted arch block 311 on one side, the first side wall block 3131 on one side, the first arch ring block 3132 on one side, the first top block 312, the first arch ring block 3132 on the other side, the first side wall block 3131 on the other side, and the first inverted arch block 311 on the other side are sequentially spliced ​​to form the first segment ring main body 31.

[0063] In other embodiments, the first middle block 313 may also be a whole block or three or four or more unit blocks. The first middle block 313 of the present invention is composed of two unit blocks, which is determined based on factors such as production cost and installation convenience.

[0064] In this embodiment, the first segment ring main body 31 is composed of seven segments. In other embodiments, the first segment ring main body can also be composed of three segments, four segments, five segments, six segments, eight segments or other numbers of segments.

[0065] Preferably, the first segment ring main body 31 is composed of seven segments spliced ​​together.

[0066] When the first segment ring main body 31 is composed of seven segments, the assembly and disassembly of the first segment ring main body 31 are relatively convenient and quick, and the manufacturing cost is relatively low.

[0067] Preferably, the first segment ring main body 31 is a mirror-symmetrical structure.

[0068] That is, in the present invention, the two first inverted arch blocks 311 are arranged opposite to each other and have the same shape, the two first side wall blocks 3131 are arranged opposite to each other and have the same shape, and the two first arch ring blocks 3132 are arranged opposite to each other and have the same shape. It can also be understood that, as can be seen from the cross-sectional view, the two first inverted arch blocks 311, the two first side wall blocks 3131 and the two first arch ring blocks 3132 are all symmetrically arranged about the symmetry axis in the vertical direction of the first segment ring main body 31.

[0069] by Figure 4 The arrangement shown is a reference perspective, and the two first inverted arch blocks 311, the two first side wall blocks 3131 and the two first arch ring blocks 3132 are arranged symmetrically on the left and right.

[0070] In the present invention, the arc angle θ1 of the first capping block is 20°-40°, the arc angle θ2 of the first arch ring block is 50°-70°, the arc angle θ3 of the first side wall block is 35°-55°, and the arc angle θ4 of the first inverted arch block is 40°-60°.

[0071] In the present invention, the first invert block 311, the first side wall block 3131, the first arch ring block 3132 and the first top block 312 are specifically spliced ​​as follows:

[0072] The first inverted arch block 311 includes a first inverted arch block main body, a first overlapping portion extending from the first inverted arch block main body toward one end of the first side wall block 3132, and a plurality of first bolts embedded in the first overlapping portion, wherein the lower surface of the first overlapping portion abuts against the second lining layer and the thickness of the first overlapping portion is less than the thickness of the first inverted arch block main body.

[0073] The first side wall block 3131 includes a first side wall block main body 31311, a second overlap portion 31312 extending from the first side wall block main body 31311 toward one end of the first arch block 311, a third overlap portion 31313 extending from the first side wall block main body 31311 toward one end of the first arch ring block 3132, a plurality of first bolt holes 31314 penetrating the second overlap portion along the thickness direction of the second overlap portion and cooperating with a plurality of first bolts, and a plurality of second bolts 31315 pre-embedded in the third overlap portion, wherein the second overlap portion is overlapped on the first overlap portion and locked by a nut, the sum of the thickness of the second overlap portion and the first overlap portion is the same as the thickness of the first side wall block main body, the lower surface of the third overlap portion abuts against the second lining layer and the thickness of the third overlap portion is less than the thickness of the first side wall block main body.

[0074] The first arch ring block 3132 includes a first arch ring block main body 31321, a fourth overlapping portion 31322 extending from the first arch ring block main body 31321 toward one end of the first side wall block, a fifth overlapping portion 31323 extending from the first arch ring block main body toward one end of the first top block, a plurality of second bolt holes 31324 penetrating the fourth overlapping portion along the thickness direction of the fourth overlapping portion and cooperating with a plurality of second bolts, and a plurality of third bolts 31325 embedded in the fifth overlapping portion, wherein the fourth overlapping portion is overlapped on the third overlapping portion and is locked by a nut, the sum of the thickness of the fourth overlapping portion and the third overlapping portion is the same as the thickness of the first side wall block main body / the first arch ring block main body, the lower surface of the fifth overlapping portion abuts against the second lining layer and the thickness of the fifth overlapping portion is less than the thickness of the first arch ring block main body.

[0075] The first top block 312 includes a first top block main body, two sixth overlapping parts extending from both ends of the first top block main body, and a plurality of third bolt holes penetrating the sixth overlapping part along the thickness direction of the sixth overlapping part and cooperating with a plurality of third bolts. The two sixth overlapping parts are respectively overlapped on the fifth overlapping parts of the two first arch ring blocks and are locked by nuts. The sum of the thickness of the sixth overlapping part and the fifth overlapping part is the same as the thickness of the first top block main body.

[0076] It should be noted that when adjacent block segments are overlapped, bolts are passed through the bolt holes that match them and then tightened by nuts.

[0077] Preferably, the thickness of the main body of the first inverted arch block at one end close to the first side wall block, the sum of the thicknesses of the first overlapping portion and the second overlapping portion, the thickness of the main body of the first side wall block, the sum of the thicknesses of the third overlapping portion and the fourth overlapping portion, the thickness of the main body of the first arch ring block, and the sum of the thicknesses of the fifth overlapping portion and the sixth overlapping portion are all the same, and the cross-sectional thickness h1 is between 20 cm and 60 cm.

[0078] In this way, on the one hand, the construction difficulty of the first segment ring can be reduced and the production cost can be controlled. On the other hand, it is conducive to adjusting the local curvature of each block section of the first segment ring, that is, it can effectively deal with the influence of uneven confining pressure on the third lining layer without changing the local section thickness.

[0079] Preferably, the cross-sectional thickness h3 of the first overlapped portion, the second overlapped portion, the third overlapped portion, the fourth overlapped portion, the fifth overlapped portion and the sixth overlapped portion are all 0.5h1, and the arc length is not less than 50 cm. In this way, on the one hand, the blocks of the first segment ring main body 31 are more stably spliced ​​with each other in the tunnel circumferential direction, and on the other hand, the blocks of the first segment ring main body are spliced ​​with overlapping overlapped portions, which can extend the water seepage path and increase the penetration energy pressure when prestress is applied in the circumferential direction.

[0080] Preferably, the cross-sectional thickness h2 of the end of the main body of the first inverted arch block away from the first side wall block is greater than the cross-sectional thickness h1, and the ends of the two oppositely arranged first inverted arch blocks close to each other jointly form a corbel structure, which on the one hand provides a construction platform for applying annular prestress, and on the other hand can prevent the first inverted arch blocks from being damaged due to the large load they bear during the application of the annular prestress.

[0081] More preferably, h2 is 1.5h1 to 2.5h1.

[0082] In the present invention, the first arch block also includes a first step formed by being recessed inward from the end of the first side wall block away from the main body of the first arch block, and the first step portions of the two first arch blocks are arranged opposite to each other to jointly form the second gap 31A, and the two first steps are used to support the first bottom block group 32.

[0083] In the present invention, the first bottom sealing block group 32 is clamped in the first notch 31A to close the first segment ring main body 31. At the same time, it facilitates the application of annular prestress to the first segment ring main body, so as to give full play to the mechanical properties of the third lining layer. In addition, it can also provide preconditions for the removal of each block section in the first segment ring main body 31 and the setting of longitudinal drainage ditches.

[0084] Preferably, the first bottom sealing block group 32 includes two first bottom sealing blocks 321 disposed at an interval, and the first bottom sealing blocks 321 abut against the first steps of the two first inverted arch blocks.

[0085] Preferably, the distance between the two first bottom cover blocks 321 is 10 cm to 20 cm.

[0086] In this embodiment, along the extension direction of the tunnel, the width b2 of the first bottom sealing block 321 is 30 cm to 40 cm.

[0087] Preferably, the second segment ring main body 41 includes two second inverted arch blocks 411 located at the bottom and relatively spaced to form the second notch 41A, a second top block 412 arranged opposite to the second bottom block group 42 installed in the second notch 41A, and two second middle blocks 413 respectively sandwiched between the second top block 412 and the two second inverted arch blocks 411, and the second inverted arch block 411 and the second middle block 413 and the second top block 412 are all detachably connected.

[0088] Preferably, the second middle block 413 is composed of two or more unit blocks spliced ​​together.

[0089] In the present invention, the second middle block 313 is spliced ​​with the second side wall block 4131 and the second arch ring block 4132, the second side wall block 4131 is detachably connected to the second inverted arch block 411, and the second arch ring block 4132 is detachably connected to the second top block 412. Along the circumferential direction of the tunnel, the second inverted arch block 411 on one side, the second side wall block 4131 on one side, the second arch ring block 4132 on one side, the second top block 412, the second arch ring block 4132 on the other side, the second side wall block 4131 on the other side, and the second inverted arch block 411 on the other side are sequentially spliced ​​to form the second segment ring main body 41.

[0090] In other embodiments, the second middle block 413 may also be a whole block or three or four or more unit blocks. The second middle block 413 of the present invention is composed of two unit blocks, which is determined based on factors such as production cost and installation convenience.

[0091] In this embodiment, the second segment ring main body 41 is composed of seven segments. In other embodiments, the second segment ring main body can also be composed of three segments, four segments, five segments, six segments, eight segments or other numbers of segments.

[0092] Preferably, the second segment ring main body 41 is composed of seven segments spliced ​​together.

[0093] Preferably, the second segment ring main body 41 is a mirror-symmetrical structure.

[0094] That is, in the present invention, the two second arch blocks 411 are arranged opposite to each other and have the same shape, the two second side wall blocks 4131 are arranged opposite to each other and have the same shape, and the two second arch ring blocks 4132 are arranged opposite to each other and have the same shape. It can also be understood that, based on the cross-sectional view, the two second arch blocks 411, the two second side wall blocks 4131 and the two second arch ring blocks 4132 are all symmetrically arranged about the symmetry axis in the vertical direction of the second segment ring main body 41.

[0095] by Figure 7 The arrangement shown is a reference perspective, and the two second inverted arch blocks 411, the two second side wall blocks 4131 and the two second arch ring blocks 4132 are arranged symmetrically on the left and right.

[0096] In the present invention, the arc angle θ1 of the second capping block is 20°-40°, the arc angle θ2 of the second arch ring block is 50°-70°, the arc angle θ3 of the second side wall block is 35°-55°, and the arc angle θ4 of the second inverted arch block is 40°-60°.

[0097] In the present invention, the second inverted arch block 411, the second side wall block 4131, the second arch ring block 4132 and the second top block 412 are specifically spliced ​​as follows:

[0098] The second inverted arch block 411 includes a second inverted arch block main body, a first overlapping flange extending from the second inverted arch block main body toward one end of the second side wall block 4132, and a plurality of first connecting bolts embedded in the second overlapping portion, wherein the lower surface of the second overlapping portion abuts against the second lining layer and the thickness of the second overlapping portion is less than the thickness of the second inverted arch block main body.

[0099] The second side wall block 4131 includes a second side wall block main body, a second lap flange extending from the second side wall block main body toward one end of the second arch block main body, a third lap flange extending from the second side wall block main body toward one end of the second arch ring block, a plurality of first mounting holes penetrating the second lap flange along the thickness direction of the second lap flange and cooperating with a plurality of second bolts, and a plurality of second bolts pre-embedded in the third lap portion, wherein the second lap flange is overlapped on the first lap flange and is locked by a nut, the sum of the thickness of the second lap flange and the first lap flange is the same as the thickness of the second side wall block main body, the lower surface of the third lap flange is in contact with the second lining layer and the thickness of the third lap flange is less than the thickness of the second side wall block main body.

[0100] The second arch ring block 4133 includes a second arch ring block main body, a fourth lap flange extending from the second arch ring block main body toward one end of the second side wall block main body, a fifth lap flange extending from the second arch ring block main body toward one end of the second top block, a plurality of second mounting holes penetrating the fourth lap flange along the thickness direction of the fourth lap flange and cooperating with a plurality of second connecting bolts, and a plurality of third connecting bolts embedded in the fifth lap portion, wherein the fourth lap flange is overlapped on the third lap flange and is locked by a nut, the sum of the thickness of the fourth lap flange and the third lap flange is the same as the thickness of the second side wall block main body / the second arch ring block main body, the lower surface of the fifth lap flange is in contact with the second lining layer and the thickness of the fifth lap flange is less than the thickness of the second arch ring block main body.

[0101] The second top block 412 includes a second top block main body, two sixth lap flanges extending from both ends of the second top block main body, and a plurality of third mounting holes penetrating the sixth lap flange along the thickness direction of the sixth lap flange and cooperating with a plurality of third connecting bolts. The two sixth lap flanges are respectively overlapped on the fifth lap flanges of the two second arch ring blocks and are locked by nuts. The sum of the thickness of the sixth lap flange and the fifth lap flange is the same as the thickness of the second top block main body.

[0102] It should be noted that when adjacent block segments are overlapped, bolts are passed through the corresponding mounting holes and then tightened by nuts.

[0103] Preferably, the thickness of the second inverted arch block main body near one end of the second side wall block, the sum of the thickness of the second overlapping portion and the second overlapping portion overlapped together, the thickness of the second side wall block main body, the sum of the thickness of the third overlapping portion and the fourth overlapping portion overlapped together, the thickness of the second arch ring block main body, and the sum of the thickness of the fifth overlapping portion and the sixth overlapping portion overlapped together are all the same, and the cross-sectional thickness h1 is between 20 cm and 60 cm; in this way, on the one hand, the construction difficulty of the second segment ring can be reduced and the production cost can be controlled, and on the other hand, it is conducive to adjusting the local curvature of each block section of the second segment ring, that is, without changing the local cross-sectional thickness, the influence of uneven confining pressure on the third lining layer can be effectively dealt with.

[0104] Preferably, the cross-sectional thickness h3 of the first lap flange, the second lap flange, the third lap flange, the fourth lap flange, the fifth lap flange and the sixth lap flange is 0.5h1, and the arc length is not less than 50 cm. In this way, on the one hand, the blocks of the second segment ring body 31 are more stably spliced ​​in the tunnel circumferential direction, and on the other hand, the blocks of the second segment ring body are spliced ​​with overlapping lap flanges, which can extend the water seepage path and increase the penetration energy pressure when prestress is applied in the circumferential direction.

[0105] Preferably, the cross-sectional thickness h2 of the end of the main body of the second inverted arch block away from the second side wall block is greater than the cross-sectional thickness h1, and the two oppositely arranged second inverted arch blocks close to each other at one end jointly form a corbel structure, which on the one hand provides a construction platform for the jack to apply annular prestress, and on the other hand can prevent the second inverted arch blocks from being damaged due to the large load they bear during the application of the annular prestress.

[0106] More preferably, h2 is 1.5h1 to 2.5h1.

[0107] In the present invention, the second arch block also includes a second step formed by being recessed inward from the end of the second side wall block away from the main body of the second arch block, and the second step portions of the two second arch blocks are arranged opposite to each other to jointly form the second gap 41A, and the two second steps are used to support the second bottom block group 42.

[0108] In the present invention, the second bottom sealing block group 42 is clamped in the second notch 41A to close the second segment ring main body 41. At the same time, it is convenient to apply annular prestress to the second segment ring main body, so as to give full play to the mechanical properties of the third lining layer. In addition, it can also provide preconditions for the removal of each block section in the second segment ring main body 41 and the setting of longitudinal drainage ditches.

[0109] Preferably, the second bottom cover block group 42 includes four second bottom cover blocks 421 that are spaced apart from each other, and the second bottom cover blocks 421 abut against the second steps of two second invert blocks.

[0110] Preferably, the distance between two of the second bottom cover blocks 421 is 10 cm to 20 cm.

[0111] In this embodiment, along the extension direction of the tunnel, the width b2 of the second bottom sealing block 421 is 30 cm to 40 cm.

[0112] In the present invention, along the extension direction of the tunnel, the two first inverted arch blocks 311 and the two second inverted arch blocks 411 are respectively spliced ​​correspondingly, the two first side wall blocks 3131 and the two second side wall blocks 4131 are respectively spliced ​​correspondingly, the two first arch ring blocks 3132 and the two second arch ring blocks 4132 are respectively spliced ​​correspondingly, and the first top block and the second top block are spliced.

[0113] Preferably, the first inverted arch block 311, the first side wall block 3131, the first arch ring block 3132 and the first top block 312 are all type A segments, and the second inverted arch block 411, the second side wall block 4131, the second arch ring block 4132 and the second top block 412 are all type B segments, and the type A segments and the type B segments match each other.

[0114] Along the extension direction of the tunnel, the A-type segment has a structure in which the middle portion is thick and the two side portions are thin. At the same time, the lower surfaces of the two side portions and the lower surface of the middle portion are located on the same arc surface and the upper surfaces of the two side portions are arranged lower than the upper surface of the middle portion. A plurality of fastening bolts are pre-embedded on both sides of the A-type segment; the B-type segment also has a structure in which the middle portion is thick and the two side portions are thin. At the same time, the upper surfaces of the two side portions and the upper surface of the middle portion are located on the same arc surface and the lower surfaces of the two side portions are arranged lower than the lower surface of the middle portion. Through holes cooperating with fastening bolts are respectively opened on both sides of the B-type segment. When the A-type segment and the B-type segment are spliced, the B-type segment is laid on the A-type segment, and the fastening bolts pass through the through holes and are locked with nuts.

[0115] Preferably, the thickness of both side portions of the A-type segment and the B-type segment is 1 / 2 of the thickness of the middle portion.

[0116] Preferably, the widths of the two overlapping sides of the A-type pipe segment are the same, and the widths of the two overlapping sides of the B-type pipe segment are the same, and both are not less than 50 cm.

[0117] In the present invention, the matching of type A segments and type B segments can be understood as: the splicing of type A segments and type B segments is seamless splicing, that is, the width of both sides of the type A segments is the same as the width of both sides of the type B segments.

[0118] Please refer to Figures 4 to 9 ,as well as Fig.12 , Fig.12 This is an exploded schematic diagram of the first side wall block 3131 and the second side wall block 4131 before being assembled. Figure 5 and Fig.12 It can be seen that the two sides of the A-type segment are concave downward from the inner surface to form two first defective parts. Figure 8 and Fig.12It can be seen that two sides of the B-type segment are recessed inward from the outer surface to form two second defect portions, and the first defect portion and the second defect portion match each other.

[0119] It should be noted that the inner surface here refers to the surface of the first side wall block and the second side wall block away from the second lining layer, and the outer surface refers to the surface of the first side wall block and the second side wall block facing the second lining layer.

[0120] Combined with the above structural description of each block segment, in the present invention, the first defect portion is formed by the depression of the main body portion of each block segment of the first tube segment ring main body portion, and the second defect portion is formed by the depression of the main body portion of each block segment of the second tube segment ring main body portion.

[0121] Preferably, the third lining layer 103 also includes a drainage component 50, which includes a longitudinal drainage ditch 51 extending along the extension direction of the tunnel, and a plurality of annular drainage grooves 52 formed by being respectively recessed inward from the surfaces of the plurality of first segment ring main bodies 31 close to the second lining layer 102, and the plurality of annular drainage grooves 52 are connected to the longitudinal drainage ditch 51, wherein the first bottom block group 32, the two first inverted arch blocks 311 and the second lining layer 102 together form a first drainage outlet 511, and the second bottom block group 42, the two second inverted arch blocks 411 and the second lining layer 102 together form a second drainage outlet 512, and the plurality of first drainage outlets 511 and the plurality of second drainage outlets 512 are connected to form the longitudinal drainage ditch 51.

[0122] Preferably, along the extension direction of the tunnel, the annular drainage groove 52 is opened at the middle position of the first segment ring main body 31 .

[0123] Preferably, the circumferential length of the longitudinal drainage ditch 51 is 50 cm to 80 cm, and the height is greater than h3.

[0124] Preferably, the annular drainage groove 52 is a semicircular groove with a radius of 2 cm.

[0125] Preferably, the monitoring mechanism 104 includes a plurality of strain sensors 1041 and a plurality of water seepage sensors 1042 pre-buried in the third lining layer 103, wherein the first invert block 311, the first middle block 313, the first top block 312 of each of the first segment ring main body 31 and the second invert block 411, the second middle block 413, the second top block 412 of each of the second segment ring main body 41 are installed with at least one strain sensor and at least one water seepage sensor.

[0126] When the first intermediate block 313 is a splicing structure, each unit block spliced ​​to form the first intermediate block is installed with at least one strain sensor and at least one water seepage sensor; when the second intermediate block 413 is a splicing structure, each unit block spliced ​​to form the second intermediate block is installed with at least one strain sensor and at least one water seepage sensor.

[0127] In the present invention, each block segment of the first segment ring main body 31 and each block segment of the second segment ring main body 41 are pre-buried with strain sensors and water seepage sensors. In this way, the water seepage data and pressure data of each block segment can be obtained in time, the water seepage and structural damage conditions of the tunnel lining can be intelligently identified, and long-term unmanned monitoring of the health status of the tunnel structure can be achieved, providing technical support for tunnel maintenance during operation.

[0128] Preferably, the strain sensor 1041 and the water seepage sensor 1042 are arranged on a side of the waterproof board away from the second lining layer 102 .

[0129] The number of strain sensors and water seepage sensors installed on each block segment of the first segment ring main body and the second segment ring main body can be determined according to actual conditions. Preferably, relatively dense strain sensors and water seepage sensors are arranged at the connection points of each block segment along the circumferential direction of the tunnel.

[0130] Each of the strain sensors 1041 and each of the water seepage sensors 1042 are communicatively connected to the monitoring system. The monitoring system receives the real-time monitoring data of the strain sensors and the water seepage sensors, and compares the data with the preset thresholds. When the water seepage exceeds the preset water seepage value or the pressure measurement value exceeds the preset pressure value, the monitoring system issues an alarm, which can realize intelligent prediction of the replacement timing of each block segment in the first segment ring and the second segment ring, thereby ensuring efficient and safe operation during tunnel operation.

[0131] like Fig.13 As shown, the present invention also provides a construction method for a replaceable intelligent tunnel composite lining structure, the construction method comprising the following steps:

[0132] Step 1: After tunnel excavation, the first lining layer is immediately applied to restrain surrounding rock deformation as early as possible and provide guarantee for the safety of subsequent tunnel construction.

[0133] The structure after the first lining layer 101 is completed is shown in detail. Fig.13 (a) in .

[0134] Step 2: After the first lining layer is completed, start the second lining layer molding construction. After the molding is completed, clean and repair the inner surface of the second lining layer to ensure that the inner surface is smooth and flat.

[0135] The structure of the second lining layer 102 after construction is completed is detailed in Fig.13 (b) in .

[0136] During the molding process, it is recommended to use concrete with a higher impermeability grade, and the concrete should be fully vibrated during pouring to reduce the internal pores of the second lining layer. In addition, after the molding is completed, the inner surface of the second lining layer is cleaned and repaired to ensure that the inner surface is smooth and flat, in order to avoid stress concentration caused by the protrusion of the inner surface when the circumferential prestress is applied to the third lining layer, which will damage the structure of the third lining layer.

[0137] Step 3: assemble a plurality of first segment rings and a plurality of second segment rings inside the second lining layer 102 to complete the construction of the third lining layer 103 .

[0138] The steps of assembling any one of the first segment rings include:

[0139] Step 3-1: Position two first inverted arch blocks 311 and install the horizontal jack 300 in the first gap 31A formed by the two first inverted arch blocks 311 being spaced apart.

[0140] The structure of the two first inverted arch blocks 311 after positioning is detailed in Fig.13 (c) in .

[0141] Step 3-2: Install the first side wall block 3131, the first arch ring block 3132 and the first top block 312 in sequence from bottom to top and crosswise from left to right. During the installation process, overlap and align the block sections with each other, and tighten the nuts to complete the splicing of the first segment ring main body 31.

[0142] The structure of the first segment ring main body 31 after splicing is detailed in Fig.13 (d) in.

[0143] Step 3-3, use the horizontal jack 300 to apply horizontal thrust to apply annular prestress to the main body 31 of the first segment ring. When the horizontal thrust increases to the predetermined thrust, re-tighten the nuts at the overlapping grooves of each block segment and install the first bottom block group 32 to ensure that the first segment ring forms an effective annular prestress.

[0144] The structure of the first bottom sealing block group 32 after being installed in the first segment ring main body 31 is shown in detail. Fig.13 (e) in .

[0145] In the present invention, a horizontal thrust is applied by a horizontal jack 300, thereby imparting annular prestress to the main part of the first pipe ring. The annular prestress of the pipe segment mainly has the following four functions: 1. ensuring that the blocks in the annular direction are tightly spliced; 2. ensuring that the second lining layer and the third lining layer are tightly fitted; 3. preventing cracks from appearing in the third lining layer; and 4. enhancing the penetration pressure of external water entering the tunnel.

[0146] Step 3-4: remove the horizontal jack, and the installation of the first segment ring 30 is completed.

[0147] The structure of the first segment ring 30 after installation is detailed in Fig.13 (f) in.

[0148] The assembly steps of the second segment ring include:

[0149] First, two adjacent first segment rings are installed at a preset position;

[0150] Then install the second segment ring between the two adjacent first segment rings. Along the circumferential direction of the tunnel, the assembly steps of the second segment ring are the same as the assembly steps of the first segment ring. Along the extension direction of the tunnel, the second segment ring is spliced ​​with the two first segment rings on both sides thereof and locked with nuts.

[0151] In the present invention, all first segment rings can be installed at preset positions first, and then the second segment rings can be installed. At the same time, the first segment rings and the second segment rings can be installed alternately, and the installation of the second segment ring can only be carried out after the construction of two adjacent first segment rings is completed.

[0152] like Fig.14 As shown, the present invention also provides a method for replacing a damaged block segment in the third lining layer. When the damaged block segment is located in the target second segment ring, the steps of the replacement method include:

[0153] Step 1: Based on the monitoring data of the monitoring organization, determine the location information of the damaged segment according to the installation position of the strain sensor and / or water seepage sensor that feedbacks the abnormal data, and the location information includes the serial number of the target second segment ring and the serial number of the damaged segment.

[0154] Step 2: Install a horizontal jack 300 at the second notch of the target second segment ring corresponding to the damaged block.

[0155] Step 3: Use a horizontal jack to apply horizontal thrust. When the target second segment ring body 41 undergoes annular deformation and generates enough space for the second bottom sealing block group 42 to move, remove the second bottom sealing block 42.

[0156] Step 4: Release the horizontal thrust of the jack, and then remove the second top block and the second arch ring block from top to bottom and left to right, until the damaged block segment is removed.

[0157] Step 5: Replace the damaged blocks and flatten possible protrusions on the inner surface of the second lining layer. In addition, any cracks that may appear on the inner surface of the second lining can be properly repaired.

[0158] Step 6: Re-join the second segment ring to complete the repair of the damaged segment.

[0159] See also Fig.14 (a) Fig.14 (a) indicates that the damaged block is the second arch ring block 01 of a second segment ring; Fig.14 (b) and (c) correspond to installing a horizontal jack at the second notch. Fig.14 (d) corresponds to the removal of the second top block and the second arch ring block. Fig.14 (e) corresponds to the structure after the second top block and the second arch ring block are removed. Fig.14 (f) in the figure shows the structure after the damaged second arch ring block is replaced by a new second arch ring block.

[0160] When the damaged segment is located at the target first segment ring, the replacement method comprises the following steps:

[0161] Step 1: Based on the monitoring data of the monitoring organization, determine the location information of the damaged segment according to the installation position of the strain sensor and / or water seepage sensor that feedbacks the abnormal data, and the location information includes the serial number of the target first segment ring and the serial number of the damaged segment.

[0162] Step 2: Dismantle the two second segment rings adjacent to the target first segment ring according to the dismantling method of the second segment ring described above, then dismantle the target first segment ring, replace the damaged segments with new segments, and then assemble the new target first segment ring according to the splicing method of the first segment ring described above.

[0163] Step 3: After the new target first segment ring is assembled, assemble the two dismantled second segment rings.

[0164] The present invention also provides a tunnel, which comprises the replaceable intelligent tunnel composite lining structure described above.

[0165] Preferably, the cross-section of the tunnel is one of a circular shape, a horseshoe shape and a flat three-center circle.

[0166] Example

[0167] It should be noted that, in the embodiments, the characteristic names "primary lining" refers to the first lining layer, "secondary lining" refers to the second lining layer, and "tertiary lining" refers to the third lining layer.

[0168] The replaceable intelligent tunnel composite lining structure provided by the present invention is applied, and the implementation object is the reuse of existing abandoned tunnels. A highway reconstruction project needs to cross a section of mountain. There is an existing abandoned tunnel near the road selection line. Adhering to the principle of sustainable development, it is planned to reuse the abandoned tunnel. Tunnel survey data show that the tunnel is a straight tunnel, which was excavated in the 1970s and 1980s. It was used for civil air defense projects in the early days and was later abandoned due to various reasons. The stratum through which the tunnel passes is the sedimentary rock of the Neogene and Upper Pliocene. There are no adverse geological phenomena and special rock and soil, but there is abundant groundwater. The total length of the tunnel is about 300m, and the width of the tunnel is about 12.3m. Its lining structure is a second lining made of 10cm thick sprayed anchor lining and 50cm thick C30 reinforced concrete. The roadbed has been completed. At the same time, there is no collapse in the tunnel, only local weathering, cracking and water seepage. The overall stability is acceptable and can be used for highway reconstruction. Here, a replaceable intelligent tunnel composite lining structure is used to repair and reinforce it.

[0169] The specific operations are as follows:

[0170] (1) According to the requirements of the Code for Geotechnical Engineering Investigation (GB 50021-2001), an on-site investigation was conducted on the soil quality and hydrological distribution of the strata through which the tunnel passes. The investigation data showed that the thickness of the overlying soil layer of the tunnel was about 36.8m, and the average weight of the rock and soil was 19.8kN / m 3 , the average cohesion is 22.8 kPa, the average internal friction angle is 36.2° and the average moisture content is 23.2%.

[0171] (2) According to the requirements of the Highway Tunnel Design Code (JTG 3370.1-2018) and the relevant provisions of the first-class highway two-lane tunnel, the replaceable intelligent tunnel composite lining structure is designed. For the abandoned tunnel, the existing sprayed anchor lining can replace the primary lining in the replaceable intelligent tunnel composite lining structure, and the existing secondary lining can replace the secondary lining in the replaceable intelligent tunnel composite lining structure. As for the third lining, in the tunnel circumferential direction, the maximum cross-sectional thickness h1 is 40 cm, the arc angle θ1 of the first capping block and the second capping block is 30°, the arc angle θ2 of the first arch ring block and the second arch ring block is 60°, the arc angle θ3 of the first side wall block and the second side wall block is 44°, the arc angle θ4 of the first inverted arch block and the second inverted arch block is 50°, and the arc angle of the first bottom capping block and the second bottom capping block is 60°. θ5 is 22°. At the corbel structure of the first segment ring and the second segment ring, the maximum cross-sectional thickness is 80cm. Along the circumferential direction of the tunnel, the overlapping arc length of each segment is 50cm and the thickness is 40cm. Along the longitudinal direction of the tunnel (the direction of tunnel extension), the maximum longitudinal ring width of the A-type segment and the B-type segment is 2m (that is, the tunnel is equipped with a total of 100 groups of A-type segment rings and B-type segment rings). The overlapping length of the longitudinal ends of the A-type segment and the B-type segment ring is 50cm and the thickness is 40cm. The longitudinal drainage ditch has a circumferential length of 60cm and a thickness of 30cm. For the first bottom block and the second bottom block, their widths are both 40cm, and the interval is 10cm (a total of 600 bottom blocks are required for the tunnel). The three-lining pre-buried waterproof board, seepage sensor and strain sensor;

[0172] (3) Based on geological survey data and the design dimensions of the replaceable intelligent tunnel composite lining structure, the feasibility of the composite lining structure was verified in accordance with the stability evaluation standards of the "Highway Tunnel Design Code" (JTG 3370.1-2018). The results showed that the design can meet various stability requirements.

[0173] (4) Carry out corresponding construction work in accordance with the requirements of the Technical Specifications for Highway Tunnel Construction (JTG / T 3660-2020) and in combination with the construction characteristics of the replaceable intelligent tunnel composite lining structure.

[0174] (5) Remove the existing roadbed and perform grouting reinforcement on the local weathering, cracking and water seepage areas of the existing secondary lining. On this basis, further clean and repair the inner surface of the secondary lining to ensure that the inner surface is smooth and flat, providing a safe and reliable construction environment for the subsequent construction of the third lining.

[0175] (6) According to the three-lining construction process of the replaceable intelligent tunnel composite lining structure, the three-lining segments are spliced ​​and installed. During the application of the annular prestress, the deformation of the segments needs to be monitored with the help of relevant components to ensure that the annular prestress is effectively applied. If the annular prestress does not meet the design requirements, it needs to be re-applied;

[0176] (7) After the three linings are installed, the water seepage and strain sensors built into the segments are connected to an external monitoring system to monitor the health of the tunnel lining structure over a long period of time. Further, the tunnel subgrade and pavement construction is carried out, and the corresponding auxiliary facilities are installed, and the tunnel is put into use.

[0177] (8) During operation, if the lining of the third lining is partially damaged and reaches the set alarm threshold, the damaged lining can be quickly replaced and repaired according to the third lining replacement construction process in the above-mentioned replaceable intelligent tunnel composite lining structure.

[0178] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions and substitutions can be made without departing from the concept of the present invention, which should be regarded as belonging to the protection scope of the present invention.

Claims

1. A replaceable intelligent tunnel composite lining structure, characterized in that: The tunnel composite lining structure comprises: A first lining layer, the first lining layer covers the circumferential surface of the surrounding rock, and the first lining layer is used to seal and constrain the surrounding rock; a second lining layer, the second lining layer being arranged on an inner side of the first lining layer opposite to the surrounding rock; A third lining layer, wherein the third lining layer is arranged on the inner side of the second lining layer away from the first lining layer, and the third lining layer is a prefabricated component, which includes a plurality of first segment rings and a plurality of second segment rings, wherein the first segment ring includes a first segment ring main body having a first notch, and a first bottom block group clamped in the first notch, and the second segment ring includes a second segment ring main body having a second notch, and a second bottom block group clamped in the second notch, the first segment ring main body and the second segment ring main body are both spliced ​​structures, and the first notch and the second notch are arranged opposite to each other, along the extension direction of the tunnel, a plurality of first segment ring main bodies and a plurality of second segment ring main bodies are alternately spliced, a plurality of first bottom block groups and a plurality of second bottom block groups are alternately arranged, and adjacent first bottom block groups and second bottom block groups are arranged at intervals.

2. The replaceable intelligent tunnel composite lining structure according to claim 1 is characterized in that: The first segment ring body comprises two first inverted arch blocks located at the bottom and spaced apart to form the first notch, a first top block arranged opposite to the first bottom block group installed in the first notch, and two first middle blocks respectively sandwiched between the first top block and the two first inverted arch blocks, wherein the first inverted arch block and the first middle block as well as the first middle block and the first top block are all detachably connected; The second segment ring body comprises two second inverted arch blocks located at the bottom and spaced apart to form the second notch, a second top block arranged opposite to the second bottom block group installed in the second notch, and two second middle blocks respectively sandwiched between the second top block and the two second inverted arch blocks, wherein the first inverted arch block and the second middle block, and the second middle block and the second top block are all detachably connected; The two first inverted arch blocks are spliced ​​with the two second inverted arch blocks respectively, the two first middle blocks are spliced ​​with the two second middle blocks respectively, and the first top block is spliced ​​with the second top block.

3. The replaceable intelligent tunnel composite lining structure according to claim 2 is characterized in that: The first middle block and the second middle block are composed of two or more unit blocks spliced ​​together.

4. The replaceable intelligent tunnel composite lining structure according to claim 3 is characterized in that: The first intermediate block includes a first side wall block and a first arch ring block which are spliced ​​together, the first side wall block is detachably connected to the first inverted arch block, and the first arch ring block is detachably connected to the first top block, and along the tunnel ring direction, the first inverted arch block on one side, the first side wall block on one side, the first arch ring block on one side, the first top block, the first arch ring block on the other side, the first side wall block on the other side, and the first inverted arch block on the other side are sequentially spliced ​​to form the first segment ring main body; The second intermediate block includes a second side wall block and a second arch ring block that are spliced ​​together. The second side wall block is detachably connected to the second inverted arch block, and the second arch ring block is detachably connected to the second top block. Along the tunnel ring direction, the second inverted arch block on one side, the second side wall block on one side, the second arch ring block on one side, the second top block, the second arch ring block on the other side, the second side wall block on the other side, and the second inverted arch block on the other side are spliced ​​in sequence to form the second segment ring main body.

5. The replaceable intelligent tunnel composite lining structure according to claim 4 is characterized in that: The first segment ring is a mirror-symmetrical structure, and the second segment ring is a mirror-symmetrical structure.

6. The replaceable intelligent tunnel composite lining structure according to claim 2 is characterized in that: The third lining layer also includes a drainage component, which includes a longitudinal drainage ditch extending along the extension direction of the tunnel, and a plurality of annular drainage grooves formed by being recessed inward from the surfaces of the plurality of first segment ring main bodies close to the second lining layer, and the plurality of annular drainage grooves are connected to the longitudinal drainage ditch, wherein the first bottom block, the two first inverted arch blocks and the second lining layer together form a first drainage outlet, and the second bottom block, the two second inverted arch blocks and the second lining layer together form a second drainage outlet, and the plurality of first drainage outlets and the plurality of second drainage outlets are connected to form the longitudinal drainage ditch.

7. The replaceable intelligent tunnel composite lining structure according to any one of claims 2 to 6, characterized in that: The first lining layer is a shotcrete layer, the second lining layer is a cast-in-place reinforced concrete layer, the first segment ring and the second segment ring are integrally cast by reinforced concrete and a waterproof board, and the waterproof board is arranged adjacent to the second lining layer.

8. The replaceable intelligent tunnel composite lining structure according to claim 7 is characterized in that: The tunnel composite lining structure also includes a monitoring mechanism for monitoring the waterproof performance and stress state of the third lining layer, and the monitoring mechanism includes a plurality of strain sensors and a plurality of water seepage sensors pre-buried in the third lining layer and communicatively connected to the monitoring system, wherein the first invert block, the first middle block, the first top block of each of the first segment ring main body parts and the second invert block, the second middle block, the second top block of each of the second segment ring main body parts are installed with at least one strain sensor and at least one water seepage sensor.

9. The replaceable intelligent tunnel composite lining structure according to claim 8 is characterized in that: The plurality of strain sensors and the plurality of water seepage sensors are all arranged on a side of the waterproof board away from the second lining layer.

10. A tunnel, comprising the replaceable intelligent tunnel composite lining structure according to any one of claims 1 to 9.

Citation Information

Patent Citations

  • Test method for testing stratal elastic resistance to tunnel shrinkage compensating concrete lining

    CN107621538A

  • Tunnel-assembled lining structure and tunnel across large-scale active fault zone in strong earthquake zone

    CN108119166A

  • Spliced prefabricated secondary-lined mountain tunnel structure and prefabricated secondary-lined spliced trolley

    CN108561155A

  • Shield method water conservancy project pressure tunnel lining structure

    CN110985043A

  • Prefabricating and cast-in-place combined drilling and blasting method tunnel combined lining structure and construction method thereof

    CN114753860A