Power load and power grid interactive regulation and control method and system based on big data technology
Through the interactive regulation method of power load and power grid based on big data technology, the expected power consumption of municipal districts is predicted and the grid power supply plan is adjusted, which solves the problems of insufficient fault tolerance, high technical complexity and narrow application scope of the existing power load regulation system, and achieves a more efficient and stable power supply.
Patent Information
- Application Number
- CN202411751668.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-02
- Publication Date
- 2025-03-07
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN119582198A_ABST
Abstract
Description
Technical Field
[0001] The present invention discloses a method and system for interactively regulating electric load and power grid based on big data technology, and relates to the field of electric load regulation. Background Art
[0002] The existing interactive regulation process between power load and power grid has the following deficiencies:
[0003] Insufficient fault tolerance: The current power load control system has certain deficiencies in fault tolerance, which can easily cause system operation interruption or data loss. Especially in complex power systems, equipment failures or human errors often occur, resulting in weak data processing capabilities of existing power load control systems.
[0004] Technical complexity and maintenance cost: The interactive control system of electric power loads integrates data processing technologies such as power control, transmission control, and data mining. This makes the system's technical complexity high and requires the design of a variety of different mathematical models or calculation formulas, which places high demands on the technical level of maintenance personnel.
[0005] Narrow scope of application: The existing power load control system mostly operates only for a specific area or a single-phase power supply line. This processing method can control power for a specific area when the power of the upper power grid is sufficient. Once the power of the upper power grid is insufficient or a new power grid is built in the area, it will cause the original failure. Especially in complex power systems, this situation often occurs. Summary of the invention
[0006] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a method and system for interactive control of power load and power grid based on big data technology, aiming to solve the problem of low efficiency of power load control.
[0007] In order to achieve the above object, the present invention is implemented through the following technical solutions: A method for interactive control of power load and power grid based on big data technology includes:
[0008] Step S1: Obtain the number of all municipal districts in the target area, and obtain the historical power consumption corresponding to each municipal district; based on the historical power consumption, estimate the expected power consumption of each municipal district;
[0009] Step S2: Obtain the active power and reactive power of the municipal power grid in the target area, obtain the active power and reactive power supplied by the regional power grid in each municipal district, and obtain local power data;
[0010] Determine whether the power supply of the municipal power grid is sufficient based on expected power consumption and local power data;
[0011] If sufficient, the active power and reactive power of the regional power grid are adjusted according to the expected power consumption and local power data, and step S3 is skipped;
[0012] If it is insufficient, the ratio to be allocated for each city district is calculated according to the expected power consumption, and the process goes to step S3;
[0013] Step S3: Take the municipal power grid corresponding to the target area as the target power grid, mark the shortest power supply line from the provincial power grid in the target area to the target power grid as the target line; obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; adjust the ratio of each transformer on the target line according to the ratio to be allocated and the transmission line data to allocate power to each municipal area;
[0014] Step S4: Continuously obtain the current power consumption of the target area and adjust the power supply of the target area.
[0015] Furthermore, the specific steps of step S1 are as follows:
[0016] Step S11: obtaining the current month, recorded as m; obtaining the number of districts in the target area, recorded as mn;
[0017] The electricity consumption of all urban districts in the target area in the past three years in month m is obtained as the historical electricity consumption, and the following is obtained:
[0018] The electricity consumption of the first municipal district in the third year in month m (1,3) , the electricity consumption in month m of the second year (1,2) , the electricity consumption in month m of the first year (1,1) ;
[0019] The electricity consumption of the second district in the third year in month m (2,3) , the electricity consumption in month m of the second year is (2,2) , the electricity consumption in month m of the first year (2,1) ;
[0020] By analogy, the electricity consumption of the mnth district in the third year in month m is (mn,3) , the electricity consumption in month m of the second year (mn,2) , the electricity consumption in month m of the first year (mn,1) ;
[0021] Step S12: Obtain the electricity consumption of all city districts in month (m-1), denoted as ei (1) ,ei (2) ~ei (mn) ;
[0022] Among them, ei (1) represents the electricity consumption of the first municipal district in month (m-1); ei (2)represents the electricity consumption of the second city district in month (m-1); and so on, ei (mn) represents the electricity consumption of the mnth municipal district in month (m-1);
[0023] Step S13: Calculate the expected electricity consumption of the first city district, denoted as Ee (1) ;
[0024] Step S131: Calculate the trend coefficient of electricity consumption in the first municipal district, denoted as be (1) ; be (1) The calculation formula is:
[0025]
[0026] Calculate the deviation coefficient of electricity consumption in the first municipal district, denoted as ae (1) ;ae (1) The calculation formula is:
[0027]
[0028] Step S132: Calculate the coefficient of change of electricity consumption in the first city district, denoted as re (1) ;re (1) The calculation formula is:
[0029]
[0030] Taking [0, 0.01] as the error range, judge be (1) with re (1) Are they equal? Determine Ee (1) Calculation formula of
[0031] If be (1) with re (1) If they are equal, then Ee (1) The calculation formula is:
[0032] Ee (1) =be (1) ×ei (1) +ae (1) ;
[0033] If be (1) with re (1) If they are not equal, then Ee (1) The calculation formula is:
[0034] Ee (1) =ei (1) ×(re (1) × (1) ) 1 / 2 +ae (1) .
[0035] Furthermore, the subsequent steps of step S13 are as follows:
[0036] Step S14: Calculate the expected electricity consumption of the second city district, denoted as Ee (2) ;
[0037] Step S141: Calculate the trend coefficient of electricity consumption in the second municipal district, denoted as be (2) ; be (2) The calculation formula is:
[0038]
[0039] Calculate the deviation coefficient of electricity consumption in the second municipal district, denoted as ae (2) ;ae (2) The calculation formula is:
[0040]
[0041] Step S142: Calculate the coefficient of change of electricity consumption in the second city district, denoted as re (2) ;re (2) The calculation formula is:
[0042]
[0043] Taking [0, 0.01] as the error range, judge be (2) with re (2) Are they equal? Determine Ee (2) Calculation formula of
[0044] If be (2) with re (2) If they are equal, then Ee (2) The calculation formula is:
[0045] Ee (2) =be (2) ×ei (2) +ae (2) ;
[0046] If be (2) with re (2) If they are not equal, then Ee (2) The calculation formula is:
[0047] Ee (2) =ei (2) ×(re (2) × (2) ) 1 / 2 +ae (2) ;
[0048] Step S15: Similarly, calculate the expected power consumption of the mnth city district, denoted as Ee (mn) ;
[0049] Step S151: Calculate the trend coefficient of electricity consumption in the mnth municipal district, denoted as be (mn) ; be (mn) The calculation formula is:
[0050]
[0051] Calculate the deviation coefficient of electricity consumption in the mnth municipal district, denoted as ae (mn) ;ae (mn) The calculation formula is:
[0052]
[0053] Step S152: Calculate the coefficient of change of electricity consumption in the mnth municipal district, denoted as re (mn) ;re (mn) The calculation formula is:
[0054]
[0055] Taking [0, 0.01] as the error range, judge be (mn) with re (mn) Are they equal? Determine Ee (mn) Calculation formula of
[0056] If be (mn) with re (mn) If they are equal, then Ee (mn) The calculation formula is:
[0057] Ee (mn) =be (mn) ×ei (mn) +ae (mn) ;
[0058] If be (mn) with re (mn) If they are not equal, then Ee (mn) The calculation formula is:
[0059] Ee (mn) =ei (mn) ×(re (mn) × (mn) ) 1 / 2 +ae (mn) ;
[0060] Summarize the expected electricity consumption Ee of the 1st to mnth municipal districts (1) ~Ee (mn) , proceed to step S2.
[0061] Furthermore, the specific steps of step S2 are as follows:
[0062] Step S21: Obtain the active power of the municipal power grid in the target area, recorded as Pc, and the reactive power, recorded as Qc; obtain the number of days in the current month, recorded as dc;
[0063] Calculate the power factor of the municipal power grid, recorded as Bc; the calculation formula of Bc is: Bc = Pc / Qc;
[0064] Get the active power of the regional power grid corresponding to the first municipal district and record it as Po (1) , reactive power is recorded as Qo (1) ;
[0065] The active power of the regional power grid corresponding to the second municipal district is recorded as Po (2) , reactive power is recorded as Qo (2) ;
[0066] By analogy, the active power of the regional power grid corresponding to the mnth municipal district is recorded as Po (mn) , reactive power is recorded as Qo (mn) ; mn represents the number of municipal districts in the target area;
[0067] Step S22: Obtain the expected electricity consumption Ee of the 1st to mnth municipal districts (1) ,Ee (2)) ~Ee (mn) ;
[0068] Calculate the power factor of the first city district and record it as Bo (1) , the expected active power is recorded as ePo (1) ;Bo (1) The calculation formula is: (1) =Po (1) / Qo (1) , ePo (1) The calculation formula is: ePo (1) =Ee (1) / dc;
[0069] The power factor of the second city district is denoted as Bo (2) , the expected active power is recorded as ePo (2) ;Bo (2) The calculation formula is: (2) =Po (2) / Qo (2) , ePo (2) The calculation formula is: ePo (2) =Ee (2) / dc;
[0070] By analogy, the power factor of the mnth district is denoted as Bo(mn) , the expected active power is recorded as ePo (mn) ;Bo (mn) The calculation formula is: (mn) =Po (mn) / Qo (mn) , ePo (mn) The calculation formula is: ePo (mn) =Ee (mn) / dc;
[0071] Step S23: Calculate ePo (1) ~ePo (mn) The sum of aPo and Pc is recorded as aPo; compare aPo with Pc to determine whether the power supply of the municipal power grid is sufficient;
[0072] If aPo<Pc, it means that the power supply of the regional power grid is sufficient, and the active power and reactive power of the regional power grid are adjusted according to the expected power consumption and local power data, and the process goes to step S24;
[0073] If aPo≥Pc, it means that the power supply of the power grid is insufficient, and the ratio to be allocated for each municipal district is calculated according to the expected power consumption, and the process goes to step S25;
[0074] Step S24: The power supply of the municipal power grid is sufficient;
[0075] Definition of relation 2-1: ePo (i) <Po (i) Among them, ePo (i) and Po (i) , respectively represent the expected active power and active power of the i-th municipal district; the value range of i is: 1~mn;
[0076] The expected active power ePo corresponding to the 1st to mnth municipal districts (1) ~ePo (mn) and active power Po (1) ~Po (mn) , substitute into equation 2-1;
[0077] The municipal districts that satisfy the relationship 2-1 are summarized as the quasi-allocated municipal districts, and the municipal districts that do not satisfy the relationship 2-1 are summarized as the municipal districts to be allocated;
[0078] The number of municipal districts to be allocated is recorded as mo, and the number of municipal districts to be allocated is recorded as mi; where mo+mi=mn;
[0079] According to the active power and reactive power of the municipal area to be allocated, the active power and reactive power of the municipal area to be allocated are adjusted, and step S3 is skipped;
[0080] Step S25: The power supply of the municipal power grid is insufficient; calculate ePo (1) :ePo (2) :……:ePo (mn) The value of is used as the ratio to be allocated for each city district, and the process goes to step S3;
[0081] The ratio to be allocated is denoted as bz (1) 、bz (2) ~bz (mn) , that is, ePo (1) :ePo (2) :……:ePo (mn) =bz (1) :bz (2) :……:bz (mn) .
[0082] Furthermore, the specific steps of step S24 are as follows:
[0083] Step S241: Record the active power of the quasi-allocated municipal area as: yP (1) ,yP (2) ~yP (mo) , reactive power is recorded as: yQ (1) ,yQ (2) ~yQ (mo) , the expected active power is recorded as: yPo (1) 、yPo (2) ~yPo (mn) , the power factor is recorded as: yB (1) ,yB (2) ~yB (mo) ;
[0084] Among them, yP (1) ,yQ (1) 、yPo (1) and yB (1) , respectively represent the active power, reactive power, expected active power and power factor of the first quasi-allocated municipal area;
[0085] Y (2) ,yQ (2) 、yPo (2) and yB (2) , respectively represent the active power, reactive power, expected active power and power factor of the second quasi-allocated municipal area;
[0086] By analogy, yP (mo) ,yQ (mo) 、yPo (mo) and yB (mo) , respectively represent the active power, reactive power, expected active power and power factor of the mo-th quasi-allocated municipal area;
[0087] The active power of the city area to be allocated is recorded as: nP (1) 、nP (2) ~nP (mi) , reactive power is recorded as: nQ (1) 、nQ (2) ~nQ (mi) , the expected active power is recorded as: nPo (1) 、nPo (2) ~nPo (mi) , power factor is recorded as: nB (1) , nB (2) ~nB (mi) ;
[0088] Among them, nP (1) 、nQ (1) 、nPo (1) and nB (1) , respectively represent the active power, reactive power, expected active power and power factor of the first municipal district to be allocated;
[0089] nP (2) 、nQ (2) 、nPo (2) and nB (2) , respectively represent the active power, reactive power, expected active power and power factor of the second municipal district to be allocated;
[0090] By analogy, nP (mi) 、nQ (mi) 、nPo (mi) and nB (mi) , respectively represent the active power, reactive power, expected active power and power factor of the mi-th municipal district to be allocated;
[0091] The active power of the quasi-allocated municipal areas and the municipal areas to be allocated shall meet the following requirements:
[0092] Reactive power meets:
[0093] The expected active power meets:
[0094] The power factor meets the following requirements:
[0095] Step S242: Define calculation formula 2-2: yP (i) -yPo (i) =Oe (i) ; Among them, yP (i) 、yPo(i) and Oe (i) , respectively represent the active power, expected active power and quasi-reduction power of the i-th quasi-allocated municipal area; the value range of i is: 1~mo;
[0096] Calculation 2-3: nPo (j) -nP (j) =Ie (j) ; Among them, nPo (j) 、nP (j) and Ie (j) , respectively represent the expected active power, active power and quasi-rise power of the jth municipal district to be allocated; the value range of j is: 1~mi;
[0097] yP (1) ~yP (mo) and yPo (1) ~yPo (mo) Substitute into the calculation formula 2-2 to calculate the quasi-reduction power Oe for the first to the moth quasi-allocated municipal areas. (1) , Oe (2) ~Oe (mo) ;
[0098] nP (1) ~nP (mi) and nPo (1) ~nPo (mi) Substitute into the calculation formula 2-3 to calculate the quasi-reduction power Ie of the 1st to mith quasi-allocated municipal areas (1) ,Ie (2) ~Ie (mi) .
[0099] Furthermore, the subsequent steps of step S242 are as follows:
[0100] Step S243: Calculate Oe (1) ~Oe (mo) The sum is denoted as aO, Ie (1) ~Ie (mi) The sum of is denoted as aI;
[0101] Compare the sizes of aO and aI. If aO>aI, the active power and reactive power of the municipal power grid are not adjusted, and step S244 is skipped to enter step S245.
[0102] If aO≤aI, the active power and reactive power of the municipal power grid are adjusted, and the process goes to step S244;
[0103] Step S244: adjusting the active power and reactive power of the municipal power grid;
[0104] Step S245: Do not adjust the active power and reactive power of the municipal power grid;
[0105] Calculate the attenuation multiple of the active power in the quasi-allocated municipal area, recorded as pj; the calculation formula of pj is: pj = (aO-aI) / aO;
[0106] The active power of the first quasi-allocated municipal area is changed from yP (1) Adjust to tP (1) , reactive power is given by yQ (1) Adjust to tQ (1) ;tP (1) The calculation formula is: tP (1) =yP (1) ×(1-pj);tQ (1) The calculation formula is: tQ (1) =tP (1) / yB (1) ;
[0107] The active power of the second quasi-allocated municipal area is changed from yP (2) Adjust to tP (2) , reactive power is given by yQ (2) Adjust to tQ (2) ;tP (2) The calculation formula is: tP (2) =yP (2) ×(1-pj);tQ (2) The calculation formula is: tQ (2) =tP (2) / yB (2) ;
[0108] By analogy, the active power of the moth quasi-allocated municipal area is changed from yP (mo) Adjust to tP (mo) , reactive power is given by yQ (mo) Adjust to tQ (mo) ;tP (mo) The calculation formula is: tP (mo) =yP (mo) ×(1-pj);tQ (mo) The calculation formula is: tQ (mo) =tP (mo) / yB (mo) ;
[0109] Step S246: The active power of the first city district to be allocated is changed from nP (1) Adjust to nPo (1) , reactive power is nQ (1) Adjust to pQ (1) ; pQ (1) The calculation formula is: pQ (1) =nP0 (1) / nB (1) ;
[0110] The active power of the second city district to be allocated is changed from nP (2) Adjust to nPo (2) , reactive power is nQ (2) Adjust to pQ (2) ; pQ (2) The calculation formula is: pQ (2) =nP0 (2) / nB (2) ;
[0111] Similarly, the active power of the mi-th city district to be allocated is changed from nP (mi) Adjust to nPo (mi) , reactive power is nQ (mi) Adjust to pQ (mi) ; pQ (mi) The calculation formula is: pQ (mi) =nP0 (mi) / nB (mi) .
[0112] Furthermore, the specific steps of step S244 are as follows:
[0113] Step S2441: Calculate the growth multiple of the active power of the municipal power grid, recorded as bu; the calculation formula of bu is: bu = (aI-aO) / aO; where bu≥α, α represents the correction parameter;
[0114] Calculate the adjusted active power of the municipal power grid, recorded as Pc1; the calculation formula of Pc1 is: Pc1 = Pc × (1 + bu);
[0115] Step S2442: Assuming the power factor of the municipal power grid is a fixed value, calculate the adjusted reactive power, which is recorded as Qc1; the calculation formula of Qc1 is: Qc1 = Pc1 / Bc;
[0116] Assuming the reactive power of the municipal power grid is a fixed value, calculate the adjusted power factor, which is recorded as Bc1; the calculation formula of Bc1 is: Bc1 = Pc1 / Qc;
[0117] Step S2443: Calculate the coefficient of change of the reactive power of the municipal power grid, denoted as gQ; the calculation formula of gQ is: gQ = (Qc1-Qc) / Qc;
[0118] Calculate the coefficient of change of the power factor of the municipal power grid, recorded as gB; the calculation formula of gB is: gB = (Bc1-Bc) / Bc;
[0119] The determined reactive power of the municipal power grid is recorded as Qc2; the value of Qc2 is determined by comparing gQ with gB;
[0120] If gQ ≥ gB, then the value of Qc2 is Bc1;
[0121] If gQ<gB, the value of Qc2 is Bc;
[0122] The active power of the municipal power grid is adjusted to Pc1, and the reactive power is adjusted to Qc2.
[0123] Furthermore, the specific steps of step S3 are as follows:
[0124] Step S31: Obtain the active power Pc of the municipal power grid, where the voltage of the municipal power grid is recorded as Uc;
[0125] The municipal power grid in the target area is taken as the target power grid, and the shortest power supply line from the provincial power grid in the target area to the target power grid is marked as the target line;
[0126] The voltage of the provincial power grid in the target area is obtained, which is recorded as Uf, the active power is recorded as Pf, and the reactive power is recorded as Qf; the power factor of the provincial power grid in the target area is calculated, which is recorded as Bf; the calculation formula of Bf is: Bf = Pf / Qf;
[0127] Get the expected electricity consumption ePo of the 1st to mnth municipal districts (1) ~ePo (mn) of and aPo;
[0128] Step S32: Calculate the increase multiple of the active power of the municipal power grid, recorded as zl; zl = (aPo-Pc) / Pc; record the increased active power of the municipal power grid as Pc2, and the calculation formula of Pc2 is: Pc2 = Pc×(1+zl);
[0129] The adjusted active power of the provincial power grid in the target area is recorded as ePf; the size of Pc2 is compared with Uf to determine the value of ePf;
[0130] If Pc2≥Uf, the calculation formula of ePf is: ePf=Pf×(1+zl);
[0131] If Pc2<Uf, then the value of ePf is: Pf;
[0132] Calculate the adjusted power factor of the provincial power grid in the target area, recorded as eBf; the calculation formula of eBf is: eBf = Bf × (1 + zl);
[0133] The reactive power of the provincial power grid in the target area after adjustment is recorded as eQf; the calculation formula of eQf is: eQf = ePf / eBf;
[0134] Step S33: Obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data;
[0135] Taking the provincial power grid as the starting point, the first transformer on the target line is used as the starting transformer, and the last transformer is used as the receiving transformer;
[0136] Count the number of transformers other than the starting transformer and the receiving transformer on the target circuit, recorded as tr; obtain the transmission line length of the target circuit, recorded as ll;
[0137] According to the ratio to be allocated and the transmission line data, the ratio of each transformer on the target line is adjusted to allocate electricity to each municipal area;
[0138] Step S34: from the starting transformer to the first transformer, adjusting the transformation ratio of the first transformer;
[0139] Step S341: Obtain the length of the transmission line from the starting transformer to the first transformer, denoted as lr (o-1) ;
[0140] Calculate the distribution coefficient of the first transformer, denoted as β (1) β (1) The calculation formula is: (1) =lr (o-1) / ll;
[0141] Calculate the voltage drop from the starting transformer to the first transformer, denoted as ΔU (o-1) ; ΔU (o-1) The calculation formula is: ΔU (o-1) =(β (1) )×(Uf-Uc);
[0142] Step S342: Obtain the voltage of the first transformer (current) and record it as DU (1) , the transformation ratio is denoted as DB (1) ;
[0143] Judge the inequality: (DU (1) +ΔU (o-1) )≥Uf is true;
[0144] If it is established, the transformation ratio of the first transformer will not be adjusted;
[0145] If not, adjust the transformation ratio of the first transformer; the adjusted transformation ratio is recorded as GB (1) , GB (1) The calculation formula is:
[0146]
[0147] Furthermore, the subsequent steps of step S34 are as follows:
[0148] Step S35: from the first transformer to the second transformer, adjusting the transformation ratio of the second transformer;
[0149] Step S351: Obtain the length of the transmission line from the first transformer to the second transformer, denoted as lr (1-2) ;
[0150] Calculate the distribution coefficient of the first transformer, denoted as β (2) β (2) The calculation formula is: (1) =(lr (o-1) +lr (1-2) ) / ll;
[0151] Calculate the voltage drop from the first transformer to the second transformer, denoted as ΔU (1-2) ; ΔU (1-2) The calculation formula is: ΔU (1-2) =(β (2) )×(Uf-Uc);
[0152] Step S352: Obtain the voltage of the second transformer and record it as DU (2) , the transformation ratio is denoted as DB (2) ;
[0153] Judge the inequality: (DU (2) +ΔU (1-2) )≥(Uf-ΔU (o-1) ) is established;
[0154] If it is established, the transformation ratio of the second transformer will not be adjusted;
[0155] If not, adjust the transformation ratio of the second transformer; the adjusted transformation ratio is recorded as GB (2) , GB (2) The calculation formula is:
[0156]
[0157] Step S36: Similarly, from the tr-th transformer to the receiving transformer, the transformation ratio of the receiving transformer is adjusted;
[0158] Step S361: Obtain the length of the transmission line from the trth transformer to the receiving transformer, denoted as lr (tr-e) ;
[0159] Calculate the distribution coefficient of the receiving transformer, denoted as β (e) β (e) The calculation formula is: (e) =(lr (o-tr) +lr (tr-e) ) / ll; among them, lr (o-tr) represents the length of the transmission line from the starting transformer to the trth transformer;
[0160] Calculate the voltage drop from the trth transformer to the receiving transformer, denoted as ΔU (tr-e) ; ΔU (tr-e) The calculation formula is: ΔU (tr-e) =(β (e) )×(Uf-Uc);
[0161] Step S362: Obtain the voltage of the receiving transformer and record it as DU (e) , the transformation ratio is denoted as DB (e) ;
[0162] Judge the inequality: (DU (e) +ΔU (tr-e) )≥Uc whether it holds;
[0163] If this is true, the transformation ratio of the receiving transformer is not adjusted;
[0164] If not, adjust the transformation ratio of the receiving transformer; the adjusted transformation ratio is recorded as GB (e) , GB (e) The calculation formula is:
[0165]
[0166] Step S37: Active power Po of the 1st to mnth municipal districts (1) 、Po (2) ~Po (mn) ;
[0167] Get the expected active power ePo of the 1st to mnth municipal districts (1) ~ePo (mn) of and aPo;
[0168] Get the ratios to be allocated from the 1st to the mnth districts: bz (1) 、bz (2) ~bz (mn) ;
[0169] Calculate bz (1) 、bz (2) ~bz (mn) The combination of is written as abz;
[0170] The active power of the first municipal district is changed from Po (1) Adjust to [(bz (1) / abz)×aPo];
[0171] The active power of the second municipal district is Po (2) Adjust to [(bz (2) / abz)×aPo];
[0172] By analogy, the active power of the mnth district is Po (mn) Adjust to [(bz (mn) / abz)×aPo].
[0173] An interactive control system of power load and power grid based on big data technology includes:
[0174] Data acquisition module: used to obtain the number of all municipal districts in the target area and the historical power consumption of each municipal district; based on the historical power consumption, estimate the expected power consumption of each municipal district;
[0175] Power supply adjustment module: used to obtain the active power and reactive power of the municipal power grid in the target area, obtain the active power and reactive power of the regional power grid in each municipal district, and obtain local power data;
[0176] Determine whether the power supply of the municipal power grid is sufficient based on expected power consumption and local power data;
[0177] If sufficient, the active and reactive power of the regional power grid is adjusted according to the expected power consumption and local power data, and the transmission adjustment module is skipped;
[0178] If it is insufficient, the ratio to be allocated for each municipal district is calculated based on the expected electricity consumption;
[0179] Transmission adjustment module: used to take the municipal power grid corresponding to the target area as the target power grid, mark the shortest power supply line from the provincial power grid in the target area to the target power grid as the target line; obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; adjust the ratio of each transformer on the target line according to the ratio to be allocated and the transmission line data to allocate electricity to each municipal area;
[0180] Continuous adjustment module: used to continuously obtain the current power consumption of the target area and adjust the power supply of the target area.
[0181] Compared with the prior art, the present invention has the following beneficial effects:
[0182] Improve system efficiency and stability: By accurately predicting load changes, the present invention can adjust the power supply plan of the regional power grid or the superior power grid in the target area in advance to avoid over-generation or insufficient power supply, thereby reducing energy waste and improving the overall operating efficiency of the power system.
[0183] Improve the utilization rate of electric energy: The present invention achieves a balance between the user side and the power system supply side through demand-side management, improves the utilization rate of electric resources, avoids unnecessary waste of electricity, and achieves energy conservation; at the same time, the present invention can automatically control the load of the power grid system, has a wide detection range, does not require too much manpower and material resources, and reduces the maintenance funds of the power grid.
[0184] High data accuracy: The present invention has the functions of data collection, load control, supply and demand analysis, and power transmission adjustment, which can ensure the accuracy of data and the rationality of power grid regulation and realize standardized management. BRIEF DESCRIPTION OF THE DRAWINGS
[0185] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0186] Figure 1 It is a schematic diagram of the method of the present invention;
[0187] Figure 2 It is a schematic diagram of the system of the present invention;
[0188] Figure 3 This is a schematic diagram of the power supply circuit of the present invention. DETAILED DESCRIPTION
[0189] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0190] Embodiment 1
[0191] See also Figure 1 , a method for interactive control of power load and power grid based on big data technology includes:
[0192] Step S1: Obtain the number of all municipal districts in the target area, and obtain the historical power consumption corresponding to each municipal district; based on the historical power consumption, estimate the expected power consumption of each municipal district;
[0193] It should be noted that the "target area" in the present invention refers to the city-level area where the power load is regulated by using the present invention (a method and system for interactive regulation of power load and power grid based on big data technology);
[0194] The specific steps of step S1 are as follows:
[0195] Step S11: obtaining the current month, recorded as m; obtaining the number of districts in the target area, recorded as mn;
[0196] The electricity consumption of all urban districts in the target area in the past three years in month m is obtained as the historical electricity consumption, and the following is obtained:
[0197] The electricity consumption of the first municipal district in the third year in month m (1,3) , the electricity consumption in month m of the second year (1,2) , the electricity consumption in month m of the first year (1,1) ;
[0198] The electricity consumption of the second district in the third year in month m (2,3) , the electricity consumption in month m of the second year (2,2) , the electricity consumption in month m of the first year (2,1) ;
[0199] By analogy, the electricity consumption of the mnth district in the third year in month m is (mn,3) , the electricity consumption in month m of the second year (mn,2) , the electricity consumption in month m of the first year (mn,1) ;
[0200] Step S12: Obtain the electricity consumption of all city districts in month (m-1), denoted as ei (1) ,ei (2) ~ei (mn) ;
[0201] Among them, ei (1) represents the electricity consumption of the first municipal district in month (m-1); ei (2) represents the electricity consumption of the second city district in month (m-1); and so on, ei (mn) represents the electricity consumption of the mnth municipal district in month (m-1);
[0202] It should be noted that if month m is January, then month (m-1) is December of the previous year; for example, if month m is January 2024, then month (m-1) is December 2023;
[0203] Step S13: Calculate the expected electricity consumption of the first city district, denoted as Ee (1) ;
[0204] Step S131: Calculate the trend coefficient of electricity consumption in the first municipal district, denoted as be (1) ; be (1) The calculation formula is:
[0205]
[0206] Calculate the deviation coefficient of electricity consumption in the first municipal district, denoted as ae (1) ;ae (1) The calculation formula is:
[0207]
[0208] Step S132: Calculate the coefficient of change of electricity consumption in the first city district, denoted as re (1) ;re (1) The calculation formula is:
[0209]
[0210] Taking [0, 0.01] as the error range, judge be (1) with re (1) Are they equal? Determine Ee (1) Calculation formula of
[0211] If be (1) with re (1) If they are equal, then Ee (1) The calculation formula is:
[0212] Ee (1) =be (1) ×ei (1) +ae (1) ;
[0213] If be (1) with re (1) If they are not equal, then Ee (1) The calculation formula is:
[0214] Ee (1) =ei (1) ×(re (1) × (1) ) 1 / 2 +ae (1) ;
[0215] Step S14: Calculate the expected electricity consumption of the second city district, denoted as Ee (2) ;
[0216] Step S141: Calculate the trend coefficient of electricity consumption in the second municipal district, denoted as be (2) ; be (2) The calculation formula is:
[0217]
[0218] Calculate the deviation coefficient of electricity consumption in the second municipal district, denoted as ae (2) ;ae (2) The calculation formula is:
[0219]
[0220] Step S142: Calculate the coefficient of change of electricity consumption in the second city district, denoted as re (2) ;re (2) The calculation formula is:
[0221]
[0222] Taking [0, 0.01] as the error range, judge be (2) with re (2) Are they equal? Determine Ee (2) Calculation formula of
[0223] If be (2) with re (2) If they are equal, then Ee (2) The calculation formula is:
[0224] Ee (2) =be (2) ×ei (2) +ae (2) ;
[0225] If be (2) with re (2) If they are not equal, then Ee (2) The calculation formula is:
[0226] Ee (2) =ei (2) ×(re (2) × (2) ) 1 / 2 +ae (2) ;
[0227] Step S15: Similarly, calculate the expected power consumption of the mnth city district, denoted as Ee (mn) ;
[0228] Step S151: Calculate the trend coefficient of electricity consumption in the mnth municipal district, denoted as be (mn) ; be (mn) The calculation formula is:
[0229]
[0230] Calculate the deviation coefficient of electricity consumption in the mnth municipal district, denoted as ae (mn) ;ae (mn) The calculation formula is:
[0231]
[0232] Step S152: Calculate the coefficient of change of electricity consumption in the mnth municipal district, denoted as re (mn) ;re (mn) The calculation formula is:
[0233]
[0234] Taking [0, 0.01] as the error range, judge be (mn) with re (mn) Are they equal? Determine Ee (mn) Calculation formula of
[0235] If be (mn) with re (mn) If they are equal, then Ee (mn)The calculation formula is:
[0236] Ee (mn) =be (mn) ×ei (mn) +ae (mn) ;
[0237] If be (mn) with re (mn) If they are not equal, then Ee (mn) The calculation formula is:
[0238] Ee (mn) =ei (mn) ×(re (mn) × (mn) ) 1 / 2 +ae (mn) ;
[0239] Summarize the expected electricity consumption Ee of the 1st to mnth municipal districts (1) ~Ee (mn) , proceed to step S2.
[0240] Step S2: Obtain the active power and reactive power of the municipal power grid in the target area, obtain the active power and reactive power supplied by the regional power grid in each municipal district, and obtain local power data;
[0241] Based on the expected power consumption (for each municipal district) and local power data, determine whether the (continuous) power supply (i.e. active power) of the municipal power grid is sufficient;
[0242] If sufficient, the active power and reactive power of the regional power grid are adjusted according to the expected power consumption and local power data, and step S3 is skipped;
[0243] If it is insufficient, the ratio to be allocated for each city district is calculated according to the expected power consumption, and the process goes to step S3;
[0244] It should be noted that, because my country's national grid adopts a step-by-step power supply mode of "national grid - provincial grid - municipal grid - (county, district, town, etc.) regional grid" when supplying power to a certain area, the "regional grid" mentioned in the present invention means: within the target area, the lower-level grid that supplies power from the municipal grid to each municipal district;
[0245] The specific steps of step S2 are as follows:
[0246] Step S21: Obtain the active power of the municipal power grid in the target area, recorded as Pc, and the reactive power, recorded as Qc; obtain the number of days in the current month, recorded as dc;
[0247] Calculate the power factor of the municipal power grid, recorded as Bc; the calculation formula of Bc is: Bc = Pc / Qc;
[0248] Get the active power of the regional power grid corresponding to the first municipal district and record it as Po (1) , reactive power is recorded as Qo (1) ;
[0249] The active power of the regional power grid corresponding to the second municipal district is recorded as Po (2) , reactive power is recorded as Qo (2) ;
[0250] By analogy, the active power of the regional power grid corresponding to the mnth municipal district is recorded as Po (mn) , reactive power is recorded as Qo (mn) ; mn represents the number of municipal districts in the target area;
[0251] Step S22: Obtain the expected electricity consumption Ee of the 1st to mnth municipal districts (1) ,Ee (2)) ~Ee (mn) ;
[0252] Calculate the power factor of the first city district and record it as Bo (1) , the expected active power is recorded as ePo (1) ;Bo (1) The calculation formula is: (1) =Po (1) / Qo (1) , ePo (1) The calculation formula is: ePo (1) =Ee (1) / dc;
[0253] The power factor of the second city district is denoted as Bo (2) , the expected active power is recorded as ePo (2) ;Bo (2) The calculation formula is: (2) =Po (2) / Qo (2) , ePo (2) The calculation formula is: ePo (2) =Ee (2) / dc;
[0254] By analogy, the power factor of the mnth district is denoted as Bo (mn) , the expected active power is recorded as ePo (mn) ;Bo (mn) The calculation formula is: (mn) =Po (mn) / Qo (mn) , ePo (mn) The calculation formula is: ePo (mn) =Ee (mn) / dc;
[0255] Step S23: Calculate ePo (1) ~ePo (mn) The sum of aPo and Pc is recorded as aPo; compare aPo with Pc to determine whether the (continuous) power supply (i.e. active power) of the municipal power grid is sufficient;
[0256] If aPo<Pc, it means that the (continuous) power supply power (i.e., active power) of the regional power grid is sufficient, and the active power and reactive power of the regional power grid are adjusted according to the expected power consumption and local power data, and the process goes to step S24;
[0257] If aPo≥Pc, it means that the (continuous) power supply power (i.e., active power) of the power grid is insufficient, and the ratio of (power) to be allocated for each municipal area is calculated according to the expected power consumption, and the process goes to step S25;
[0258] Step S24: The (continuous) power supply (i.e., active power) of the municipal power grid is sufficient;
[0259] Definition of relation 2-1: ePo (i) <Po (i) Among them, ePo (i) and Po (i) , respectively represent the expected active power and active power of the i-th municipal district (in the target area); the value range of i is: 1~mn;
[0260] The expected active power ePo corresponding to the 1st to mnth municipal districts (1) ~ePo (mn) and active power Po (1) ~Po (mn) , substitute into equation 2-1;
[0261] The municipal districts that satisfy the relationship 2-1 are summarized as the quasi-allocated municipal districts, and the municipal districts that do not satisfy the relationship 2-1 are summarized as the municipal districts to be allocated;
[0262] The number of municipal districts to be allocated is recorded as mo, and the number of municipal districts to be allocated is recorded as mi; where mo+mi=mn;
[0263] According to the active power and reactive power of the municipal area to be allocated, the active power and reactive power of the municipal area to be allocated are adjusted, and step S3 is skipped;
[0264] Step S241: Record the active power of the quasi-allocated municipal area as: yP (1) ,yP (2) ~yP (mo) , reactive power is recorded as: yQ (1) ,yQ (2) ~yQ (mo) , the expected active power is recorded as: yPo(1) 、yPo (2) ~yPo (mn) , the power factor is recorded as: yB (1) ,yB (2) ~yB (mo) ;
[0265] Among them, yP (1) ,yQ (1) 、yPo (1) and yB (1) , respectively represent the active power, reactive power, expected active power and power factor of the first quasi-allocated municipal area;
[0266] Y (2) ,yQ (2) 、yPo (2) and yB (2) , respectively represent the active power, reactive power, expected active power and power factor of the second quasi-allocated municipal area;
[0267] By analogy, yP (mo) ,yQ (mo) 、yPo (mo) and yB (mo) , respectively represent the active power, reactive power, expected active power and power factor of the mo-th quasi-allocated municipal area;
[0268] The active power of the city area to be allocated is recorded as: nP (1) 、nP (2) ~nP (mi) , reactive power is recorded as: nQ (1) 、nQ (2) ~nQ (mi) , the expected active power is recorded as: nPo (1) 、nPo (2) ~nPo (mi) , power factor is recorded as: nB (1) , nB (2) ~nB (mi) ;
[0269] Among them, nP (1) 、nQ (1) 、nPo (1) and nB (1) , respectively represent the active power, reactive power, expected active power and power factor of the first municipal district to be allocated;
[0270] nP (2) 、nQ (2) 、nPo (2) and nB (2), respectively represent the active power, reactive power, expected active power and power factor of the second municipal district to be allocated;
[0271] By analogy, nP (mi) 、nQ (mi) 、nPo (mi) and nB (mi) , respectively represent the active power, reactive power, expected active power and power factor of the mi-th municipal district to be allocated;
[0272] The active power of the quasi-allocated municipal areas and the municipal areas to be allocated shall meet the following requirements:
[0273] Reactive power meets:
[0274] The expected active power meets:
[0275] The power factor meets the following requirements:
[0276] Step S242: Define calculation formula 2-2: yP (i) -yPo (i) =Oe (i) ; Among them, yP (i) 、yPo (i) and Oe (i) , respectively represent the active power, expected active power and quasi-reduction power of the i-th quasi-allocated municipal area; the value range of i is: 1~mo;
[0277] Calculation 2-3: nPo (j) -nP (j) =Ie (j) ; Among them, nPo (j) 、nP (j) and Ie (j) , respectively represent the expected active power, active power and quasi-rise power of the jth municipal district to be allocated; the value range of j is: 1~mi;
[0278] yP (1) ~yP (mo) and yPo (1) ~yPo (mo) Substitute into the calculation formula 2-2 to calculate the quasi-reduction power Oe for the first to the moth quasi-allocated municipal areas. (1) , Oe (2) ~Oe (mo) ;
[0279] nP (1)~nP (mi) and nPo (1) ~nPo (mi) Substitute into the calculation formula 2-3 to calculate the quasi-reduction power Ie of the 1st to mith quasi-allocated municipal areas (1) ,Ie (2) ~Ie (mi) ;
[0280] Step S243: Calculate Oe (1) ~Oe (mo) The sum is denoted as aO, Ie (1) ~Ie (mi) The sum of is denoted as aI;
[0281] Compare the sizes of aO and aI. If aO>aI, the active power and reactive power of the municipal power grid are not adjusted, and step S244 is skipped to enter step S245.
[0282] If aO≤aI, the active power and reactive power of the municipal power grid are adjusted, and the process goes to step S244;
[0283] Step S244: adjusting the active power and reactive power of the municipal power grid;
[0284] Step S2441: Calculate the growth multiple of the active power of the municipal power grid, recorded as bu; the calculation formula of bu is: bu = (aI-aO) / aO; where bu≥α, α represents the correction parameter;
[0285] Calculate the adjusted active power of the municipal power grid, recorded as Pc1; the calculation formula of Pc1 is: Pc1 = Pc × (1 + bu);
[0286] It should be noted that the loss rate of my country's ultra-high voltage transmission technology at a distance of 2,000 kilometers is only 6%, and at a transmission distance of 1,000 kilometers, the loss rate is between 3% and 5%; in order to ensure that "the growth multiple of the active power of the municipal power grid is meaningless" and the effective transmission of electric energy on the power grid, the present invention sets the value of α to 10%, and users or relevant technical personnel can adjust the value of α according to actual needs;
[0287] Step S2442: Assuming the power factor of the municipal power grid is a fixed value, calculate the adjusted reactive power, which is recorded as Qc1; the calculation formula of Qc1 is: Qc1 = Pc1 / Bc;
[0288] Assuming the reactive power of the municipal power grid is a fixed value, calculate the adjusted power factor, which is recorded as Bc1; the calculation formula of Bc1 is: Bc1 = Pc1 / Qc;
[0289] Step S2443: Calculate the coefficient of change of the reactive power of the municipal power grid, denoted as gQ; the calculation formula of gQ is: gQ = (Qc1-Qc) / Qc;
[0290] Calculate the coefficient of change of the power factor of the municipal power grid, recorded as gB; the calculation formula of gB is: gB = (Bc1-Bc) / Bc;
[0291] The determined reactive power of the municipal power grid is recorded as Qc2; the value of Qc2 is determined by comparing gQ with gB;
[0292] If gQ ≥ gB, then the value of Qc2 is Bc1;
[0293] If gQ<gB, the value of Qc2 is Bc;
[0294] Adjust the active power of the municipal power grid (in the target area) to Pc1 and the reactive power to Qc2;
[0295] Step S245: Do not adjust the active power and reactive power of the municipal power grid;
[0296] Calculate the attenuation multiple of the active power in the quasi-allocated municipal area, recorded as pj; the calculation formula of pj is: pj = (aO-aI) / aO;
[0297] The active power of the first quasi-allocated municipal area is changed from yP (1) Adjust to tP (1) , reactive power is given by yQ (1) Adjust to tQ (1) ;tP (1) The calculation formula is: tP (1) =yP (1) ×(1-pj);tQ (1) The calculation formula is: tQ (1) =tP (1) / yB (1) ;
[0298] The active power of the second quasi-allocated municipal area is changed from yP (2) Adjust to tP (2) , reactive power is given by yQ (2) Adjust to tQ (2) ;tP (2) The calculation formula is: tP (2) =yP (2) ×(1-pj);tQ (2) The calculation formula is: tQ (2) =tP (2) / yB (2) ;
[0299] By analogy, the active power of the moth quasi-allocated municipal area is changed from yP (mo) Adjust to tP (mo) , reactive power is given by yQ (mo) Adjust to tQ(mo) ;tP (mo) The calculation formula is: tP (mo) =yP (mo) ×(1-pj);tQ (mo) The calculation formula is: tQ (mo) =tP (mo) / yB (mo) ;
[0300] Step S246: The active power of the first city district to be allocated is changed from nP (1) Adjust to nPo (1) , reactive power is nQ (1) Adjust to pQ (1) ; pQ (1) The calculation formula is: pQ (1) =nP0 (1) / nB (1) ;
[0301] The active power of the second city district to be allocated is changed from nP (2) Adjust to nPo (2) , reactive power is nQ (2) Adjust to pQ (2) ; pQ (2) The calculation formula is: pQ (2) =nP0 (2) / nB (2) ;
[0302] Similarly, the active power of the mi-th city district to be allocated is changed from nP (mi) Adjust to nPo (mi) , reactive power is nQ (mi) Adjust to pQ (mi) ; pQ (mi) The calculation formula is: pQ (mi) =nP0 (mi) / nB (mi) ;
[0303] Step S25: The (continuous) power supply (i.e., active power) of the municipal power grid is insufficient; calculate ePo (1) :ePo (2) :……:ePo (mn) The value is used as the ratio of (electricity) to be allocated for each municipal area (within the target area), and the process goes to step S3;
[0304] The ratio to be allocated is denoted as bz (1) 、bz (2) ~bz (mn) , that is, ePo (1) :ePo (2) :……:ePo (mn) =bz(1) :bz (2) :……:bz (mn) .
[0305] Step S3: Take the municipal power grid corresponding to the target area as the target power grid, mark the shortest power supply line from the provincial power grid (or national power grid) in the target area to the target power grid as the target line; obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; adjust the ratio of each transformer on the target line according to the ratio to be allocated and the transmission line data, and allocate power to each municipal district (within the target area);
[0306] See also Figure 3 , the specific steps of step S3 are as follows:
[0307] Step S31: obtaining the active power Pc of the municipal power grid (in the target area); obtaining the voltage of the municipal power grid (in the target area) and recording it as Uc;
[0308] The municipal power grid in the target area is taken as the target power grid, and the shortest power supply line from the provincial power grid (or national power grid) in the target area to the target power grid is marked as the target line;
[0309] The voltage of the provincial power grid (or national power grid) in the target area is obtained, which is recorded as Uf, the active power is recorded as Pf, and the reactive power is recorded as Qf; the power factor of the provincial power grid (or national power grid) in the target area is calculated, which is recorded as Bf; the calculation formula of Bf is: Bf = Pf / Qf;
[0310] Get the expected electricity consumption ePo of the 1st to mnth municipal districts (1) ~ePo (mn) of and aPo;
[0311] Step S32: Calculate the increase multiple of the active power of the municipal power grid, recorded as zl; zl = (aPo-Pc) / Pc; record the increased active power of the municipal power grid as Pc2, and the calculation formula of Pc2 is: Pc2 = Pc×(1+zl);
[0312] The adjusted active power of the provincial power grid (or national power grid) in the target area is recorded as ePf; the size of Pc2 is compared with Uf to determine the value of ePf;
[0313] If Pc2≥Uf, the calculation formula of ePf is: ePf=Pf×(1+zl);
[0314] If Pc2<Uf, then the value of ePf is: Pf;
[0315] Calculate the adjusted power factor of the provincial power grid (or national power grid) in the target area, recorded as eBf; the calculation formula of eBf is: eBf = Bf × (1 + zl);
[0316] The reactive power of the provincial power grid (or national power grid) in the target area after adjustment is recorded as eQf; the calculation formula of eQf is: eQf = ePf / eBf;
[0317] Step S33: Obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data;
[0318] Taking the provincial power grid (or national power grid) as the starting point, the first transformer on the target line is used as the starting transformer, and the last transformer is used as the receiving transformer;
[0319] Count the number of transformers other than the starting transformer and the receiving transformer on the target circuit, recorded as tr; obtain the transmission line length of the target circuit, recorded as ll;
[0320] According to the ratio to be allocated and the transmission line data, the ratio of each transformer on the target line is adjusted to allocate electricity to each municipal area;
[0321] Step S34: from the starting transformer to the first transformer, adjusting the transformation ratio of the first transformer;
[0322] Step S341: Obtain the length of the transmission line from the starting transformer to the first transformer, denoted as lr (o-1) ;
[0323] Calculate the distribution coefficient of the first transformer, denoted as β (1) β (1) The calculation formula is: (1) =lr (o-1) / ll;
[0324] Calculate the voltage drop from the starting transformer to the first transformer, denoted as ΔU (o-1) ; ΔU (o-1) The calculation formula is: ΔU (o-1) =(β (1) )×(Uf-Uc);
[0325] Step S342: Obtain the voltage of the first transformer (current) and record it as DU (1) , the transformation ratio is denoted as DB (1) ;
[0326] Judge the inequality: (DU (1) +ΔU (o-1) )≥Uf is true;
[0327] If it is established, the transformation ratio of the first transformer will not be adjusted;
[0328] If not, adjust the transformation ratio of the first transformer; the adjusted transformation ratio is recorded as GB(1) , GB (1) The calculation formula is:
[0329]
[0330] Step S35: from the first transformer to the second transformer, adjusting the transformation ratio of the second transformer;
[0331] Step S351: Obtain the length of the transmission line from the first transformer to the second transformer, denoted as lr (1-2) ;
[0332] Calculate the distribution coefficient of the first transformer, denoted as β (2) β (2) The calculation formula is: (1) =(lr (o-1) +lr (1-2) ) / ll;
[0333] Calculate the voltage drop from the first transformer to the second transformer, denoted as ΔU (1-2) ; ΔU (1-2) The calculation formula is: ΔU (1-2) =(β (2) )×(Uf-Uc);
[0334] Step S352: Obtain the voltage of the second transformer (current) and record it as DU (2) , the transformation ratio is denoted as DB (2) ;
[0335] Judge the inequality: (DU (2) +ΔU (1-2) )≥(Uf-ΔU (o-1) ) is established;
[0336] If it is established, the transformation ratio of the second transformer will not be adjusted;
[0337] If not, adjust the transformation ratio of the second transformer; the adjusted transformation ratio is recorded as GB (2) , GB (2) The calculation formula is:
[0338]
[0339] Step S36: Similarly, from the tr-th transformer to the receiving transformer, the transformation ratio of the receiving transformer is adjusted;
[0340] Step S361: Obtain the length of the transmission line from the trth transformer to the receiving transformer, denoted as lr (tr-e) ;
[0341] Calculate the distribution coefficient of the receiving transformer, denoted as β(e) β (e) The calculation formula is: (e) =(lr (o-tr) +lr (tr-e) ) / ll; among them, lr (o-tr) represents the length of the transmission line from the starting transformer to the trth transformer;
[0342] Calculate the voltage drop from the trth transformer to the receiving transformer, denoted as ΔU (tr-e) ; ΔU (tr-e) The calculation formula is: ΔU (tr-e) =(β (e) )×(Uf-Uc);
[0343] Step S362: Obtain the voltage of the receiving transformer (current) and record it as DU (e) , the transformation ratio is denoted as DB (e) ;
[0344] Judge the inequality: (DU (e) +ΔU (tr-e) )≥Uc whether it holds;
[0345] If this is true, the transformation ratio of the receiving transformer is not adjusted;
[0346] If not, adjust the transformation ratio of the receiving transformer; the adjusted transformation ratio is recorded as GB (e) , GB (e) The calculation formula is:
[0347]
[0348] Step S37: Active power Po of the 1st to mnth municipal districts (1) 、Po (2) ~Po (mn) ;
[0349] Get the expected active power ePo of the 1st to mnth municipal districts (1) ~ePo (mn) of and aPo;
[0350] Get the ratios to be allocated from the 1st to the mnth districts: bz (1) 、bz (2) ~bz (mn) ;
[0351] Calculate bz (1) 、bz (2) ~bz (mn) The combination of is written as abz;
[0352] The active power of the first municipal district is changed from Po (1) Adjust to [(bz(1) / abz)×aPo];
[0353] The active power of the second municipal district is Po (2) Adjust to [(bz (2) / abz)×aPo];
[0354] By analogy, the active power of the mnth district is Po (mn) Adjust to [(bz (mn) / abz)×aPo].
[0355] Step S4: Continuously obtain the current power consumption of the target area and adjust the power supply of the target area.
[0356] Embodiment 2
[0357] See also Figure 2 , an interactive control system of power load and power grid based on big data technology includes: a data acquisition module, a power supply adjustment module, a power transmission adjustment module, a continuous adjustment module, a database and a server; wherein the data acquisition module, the power supply adjustment module, the power transmission adjustment module and the continuous adjustment module are connected to the database and the server respectively;
[0358] Data acquisition module: used to obtain the number of all municipal districts in the target area and the historical power consumption of each municipal district; based on the historical power consumption, estimate the expected power consumption of each municipal district;
[0359] Power supply adjustment module: used to obtain the active power and reactive power of the municipal power grid in the target area, obtain the active power and reactive power of the regional power grid in each municipal district, and obtain local power data;
[0360] Based on the expected power consumption (for each municipal district) and local power data, determine whether the (continuous) power supply (i.e. active power) of the municipal power grid is sufficient;
[0361] If sufficient, the active and reactive power of the regional power grid is adjusted according to the expected power consumption and local power data, and the transmission adjustment module is skipped;
[0362] If it is insufficient, the ratio to be allocated for each municipal district is calculated based on the expected electricity consumption;
[0363] Transmission adjustment module: used to take the municipal power grid corresponding to the target area as the target power grid, mark the shortest power supply line from the provincial power grid (or national power grid) in the target area to the target power grid as the target line; obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; adjust the ratio of each transformer on the target line according to the ratio to be allocated and the transmission line data, and allocate electricity to each municipal district (within the target area);
[0364] Continuous adjustment module: used to continuously obtain the current power consumption of the target area and adjust the power supply of the target area;
[0365] Database and server: used for data transmission and data calculation between data acquisition module, power supply adjustment module, power transmission adjustment module and continuous adjustment module.
[0366] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technical personnel in this field according to actual conditions. For example, if there are weight coefficients and proportional coefficients, their set sizes are to quantify each parameter to obtain a specific value, which is convenient for subsequent comparison. Regarding the size of the weight coefficient and the proportional coefficient, it is sufficient as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0367] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for interactive control of power load and power grid based on big data technology, characterized in that: The control method comprises: Step S1: Obtain the number of all municipal districts in the target area, and obtain the historical power consumption corresponding to each municipal district; based on the historical power consumption, estimate the expected power consumption of each municipal district; Step S2: Obtain the active power and reactive power of the municipal power grid in the target area, obtain the active power and reactive power supplied by the regional power grid in each municipal district, and obtain local power data; Determine whether the power supply of the municipal power grid is sufficient based on expected power consumption and local power data; If sufficient, the active power and reactive power of the regional power grid are adjusted according to the expected power consumption and local power data, and step S3 is skipped; If it is insufficient, the ratio to be allocated for each city district is calculated according to the expected power consumption, and the process goes to step S3; Step S3: Take the municipal power grid corresponding to the target area as the target power grid, mark the shortest power supply line from the provincial power grid in the target area to the target power grid as the target line; obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; adjust the ratio of each transformer on the target line according to the ratio to be allocated and the transmission line data to allocate power to each municipal area; Step S4: Continuously obtain the current power consumption of the target area and adjust the power supply of the target area.
2. According to the method of interactive control of power load and power grid based on big data technology in claim 1, it is characterized in that: The specific steps of step S1 are as follows: Step S11: obtaining the current month, recorded as m; obtaining the number of districts in the target area, recorded as mn; The electricity consumption of all urban districts in the target area in the past three years in month m is obtained as the historical electricity consumption, and the following is obtained: The electricity consumption of the first municipal district in the third year in month m (1,3) , the electricity consumption in month m of the second year (1,2) , the electricity consumption in month m of the first year (1,1) ; The electricity consumption of the second district in the third year in month m (2,3) , the electricity consumption in month m of the second year (2,2) , the electricity consumption in month m of the first year (2,1) ; By analogy, the electricity consumption of the mnth district in the third year in month m is (mn,3) , the electricity consumption in month m of the second year (mn,2) , the electricity consumption in month m of the first year (mn,1) ; Step S12: Obtain the electricity consumption of all city districts in month (m-1), denoted as ei (1) ,ei (2) ~ei (mn) ; Among them, ei (1) represents the electricity consumption of the first municipal district in month (m-1); ei (2) represents the electricity consumption of the second city district in month (m-1); and so on, ei (mn) represents the electricity consumption of the mnth municipal district in month (m-1); Step S13: Calculate the expected electricity consumption of the first city district, denoted as Ee (1) ; Step S131: Calculate the trend coefficient of electricity consumption in the first municipal district, denoted as be (1) ; be (1) The calculation formula is: Calculate the deviation coefficient of electricity consumption in the first municipal district, denoted as ae (1) ;ae (1) The calculation formula is: Step S132: Calculate the coefficient of change of electricity consumption in the first city district, denoted as re (1) ;re (1) The calculation formula is: Taking [0, 0.01] as the error range, judge be (1) with re (1) Are they equal? Determine Ee (1) Calculation formula of If be (1) with re (1) If they are equal, then Ee (1) The calculation formula is: Sign in (1) =be (1) xhere (1) +yes (1) ; If be (1) with re (1) If they are not equal, then Ee (1) The calculation formula is: Sign in (1) =here (1) ×(re (1) xbe (1) ) 1 / 2 +yes (1) .
3. The method for interactively controlling power load and power grid based on big data technology according to claim 2 is characterized in that: The subsequent steps of step S13 are as follows: Step S14: Calculate the expected electricity consumption of the second city district, denoted as Ee (2) ; Step S141: Calculate the trend coefficient of electricity consumption in the second municipal district, denoted as be (2) ; be (2) The calculation formula is: Calculate the deviation coefficient of electricity consumption in the second municipal district, denoted as ae (2) ;ae (2) The calculation formula is: Step S142: Calculate the coefficient of change of electricity consumption in the second city district, denoted as re (2) ;re (2) The calculation formula is: Taking [0, 0.01] as the error range, judge be (2) with re (2) Are they equal? Determine Ee (2) Calculation formula of If be (2) with re (2) If they are equal, then Ee (2) The calculation formula is: Sign in (2) =be (2) xhere (2) +yes (2) ; If be (2) with re (2) If they are not equal, then Ee (2) The calculation formula is: Sign in (2) =here (2) ×(re (2) xbe (2) ) 1 / 2 +yes (2) ; Step S15: Similarly, calculate the expected power consumption of the mnth city district, denoted as Ee (mn) ; Summarize the expected electricity consumption Ee of the 1st to mnth municipal districts (1) ~Ee (mn) , proceed to step S2.
4. The method for interactively controlling power load and power grid based on big data technology according to claim 3 is characterized in that: The specific steps of step S2 are as follows: Step S21: Obtain the active power of the municipal power grid in the target area, recorded as Pc, and the reactive power, recorded as Qc; obtain the number of days in the current month, recorded as dc; Calculate the power factor of the municipal power grid, recorded as Bc; the calculation formula of Bc is: Bc = Pc / Qc; Get the active power of the regional power grid corresponding to the first municipal district and record it as Po (1) , reactive power is recorded as Qo (1) ; The active power of the regional power grid corresponding to the second municipal district is recorded as Po (2) , reactive power is recorded as Qo (2) ; By analogy, the active power of the regional power grid corresponding to the mnth municipal district is recorded as Po (mn) , reactive power is recorded as Qo (mn) ; mn represents the number of municipal districts in the target area; Step S22: Obtain the expected electricity consumption Ee of the 1st to mnth municipal districts (1) ~Ee (mn) ; Calculate the power factor of the first city district and record it as Bo (1) , the expected active power is recorded as ePo (1) ;Bo (1) The calculation formula is: (1) =Po (1) / Qo (1) , ePo (1) The calculation formula is: ePo (1) =Ee (1) / dc; By analogy, the power factor of the mnth district is denoted as Bo (mn) , the expected active power is recorded as ePo (mn) ;Bo (mn) The calculation formula is: (mn) =Po (mn) / Qo (mn) , ePo (mn) The calculation formula is: ePo (mn) =Ee (mn) / dc; Step S23: Calculate ePo (1) ~ePo (mn) The sum of aPo and Pc is recorded as aPo; compare aPo with Pc to determine whether the power supply of the municipal power grid is sufficient; If aPo<Pc, it means that the power supply of the regional power grid is sufficient, and the active power and reactive power of the regional power grid are adjusted according to the expected power consumption and local power data, and the process goes to step S24; If aPo≥Pc, it means that the power supply of the power grid is insufficient, and the ratio to be allocated for each municipal district is calculated according to the expected power consumption, and the process goes to step S25; Step S24: The power supply of the municipal power grid is sufficient; Definition of relation 2-1: ePo (i) <Po (i) Among them, ePo (i) and Po (i) , respectively represent the expected active power and active power of the i-th municipal district; the value range of i is: 1~mn; The expected active power ePo corresponding to the 1st to mnth municipal districts (1) ~ePo (mn) and active power Po (1) ~Po (mn) , substitute into equation 2-1; The municipal districts that satisfy the relationship 2-1 are summarized as the quasi-allocated municipal districts, and the municipal districts that do not satisfy the relationship 2-1 are summarized as the municipal districts to be allocated; The number of municipal districts to be allocated is recorded as mo, and the number of municipal districts to be allocated is recorded as mi; where mo+mi=mn; According to the active power and reactive power of the municipal area to be allocated, the active power and reactive power of the municipal area to be allocated are adjusted, and step S3 is skipped; Step S25: The power supply of the municipal power grid is insufficient; calculate ePo (1) :ePo (2) :……:ePo (mn) The value of is used as the ratio to be allocated for each city district, and the process goes to step S3; The ratio to be allocated is denoted as bz (1) 、bz (2) ~bz (mn) , that is, ePo (1) :ePo (2) :……:ePo (mn) =bz (1) :bz (2) :……:bz (mn) .
5. The method for interactively controlling power load and power grid based on big data technology according to claim 4 is characterized in that: The specific steps of step S24 are as follows: Step S241: Record the active power of the quasi-allocated municipal area as: yP (1) ~yP (mo) , reactive power is recorded as: yQ (1) ~yQ (mo) , the expected active power is recorded as: yPo (1) ~yPo (mn) , the power factor is recorded as: yB (1) ~yB (mo) ; Among them, yP (1) ,yQ (1) 、yPo (1) and yB (1) , respectively represent the active power, reactive power, expected active power and power factor of the first quasi-allocated municipal area; By analogy, yP (mo) ,yQ (mo) 、yPo (mo) and yB (mo) , respectively represent the active power, reactive power, expected active power and power factor of the mo-th quasi-allocated municipal area; The active power of the city area to be allocated is recorded as: nP (1) ~nP (mi) , reactive power is recorded as: nQ (1) ~nQ (mi) , the expected active power is recorded as: nPo (1) ~nPo (mi) , power factor is recorded as: nB (1) ~nB (mi) ; Among them, nP (1) 、nQ (1) 、nPo (1) and nB (1) , respectively represent the active power, reactive power, expected active power and power factor of the first municipal district to be allocated; By analogy, nP (mi) 、nQ (mi) 、nPo (mi) and nB (mi) , respectively represent the active power, reactive power, expected active power and power factor of the mi-th municipal district to be allocated; Step S242: Define calculation formula 2-2: yP (i) -yPo (i) =Oe (i) ; Among them, yP (i) 、yPo (i) and Oe (i) , respectively represent the active power, expected active power and quasi-reduction power of the i-th quasi-allocated municipal area; the value range of i is: 1~mo; Calculation 2-3: nPo (j) -nP (j) =Ie (j) Among them, nPo (j) 、nP (j) and Ie (j) , respectively represent the expected active power, active power and quasi-rise power of the jth municipal district to be allocated; the value range of j is: 1~mi; yP (1) ~yP (mo) and yPo (1) ~yPo (mo) Substitute into the calculation formula 2-2 to calculate the quasi-reduction power Oe for the first to the moth quasi-allocated municipal areas. (1) ~Oe (mo) ; nP (1) ~nP (mi) and nPo (1) ~nPo (mi) Substitute into the calculation formula 2-3 to calculate the quasi-reduction power Ie of the 1st to mith quasi-allocated municipal areas (1) ~Ie (mi) .
6. The method for interactively controlling power load and power grid based on big data technology according to claim 5 is characterized in that: The subsequent steps of step S242 are as follows: Step S243: Calculate Oe (1) ~Oe (mo) The sum is denoted as aO, Ie (1) ~Ie (mi) The sum of is denoted as aI; Compare the sizes of aO and aI. If aO>aI, the active power and reactive power of the municipal power grid are not adjusted, and step S244 is skipped to enter step S245. If aO≤aI, the active power and reactive power of the municipal power grid are adjusted, and the process goes to step S244; Step S244: adjusting the active power and reactive power of the municipal power grid; Step S245: Do not adjust the active power and reactive power of the municipal power grid; Calculate the attenuation multiple of the active power in the quasi-allocated municipal area, recorded as pj; the calculation formula of pj is: pj = (aO-aI) / aO; The active power of the first quasi-allocated municipal area is changed from yP (1) Adjust to tP (1) , reactive power is given by yQ (1) Adjust to tQ (1) ;tP (1) The calculation formula is: tP (1) =yP (1) ×(1-pj);tQ (1) The calculation formula is: tQ (1) =tP (1) / yB (1) ; By analogy, the active power of the moth quasi-allocated municipal area is changed from yP (mo) Adjust to tP (mo) , reactive power is given by yQ (mo) Adjust to tQ (mo) ;tP (mo) The calculation formula is: tP (mo) =yP (mo) ×(1-pj);tQ (mo) The calculation formula is: tQ (mo) =tP (mo) / yB (mo) ; Step S246: The active power of the first city district to be allocated is changed from nP (1) Adjust to nPo (1) , reactive power is nQ (1) Adjust to pQ (1) ; pQ (1) The calculation formula is: pQ (1) =nP0 (1) / nB (1) ; Similarly, the active power of the mi-th city district to be allocated is changed from nP (mi) Adjust to nPo (mi) , reactive power is nQ (mi) Adjust to pQ (mi) ; pQ (mi) The calculation formula is: pQ (mi) =nP0 (mi) / nB (mi) .
7. The method for interactively controlling power load and power grid based on big data technology according to claim 5 is characterized in that: The specific steps of step S244 are as follows: Step S2441: Calculate the growth multiple of the active power of the municipal power grid, recorded as bu; the calculation formula of bu is: bu = (aI-aO) / aO; where bu≥α, α represents the correction parameter; Calculate the adjusted active power of the municipal power grid, recorded as Pc1; the calculation formula of Pc1 is: Pc1 = Pc × (1 + bu); Step S2442: Assuming the power factor of the municipal power grid is a fixed value, calculate the adjusted reactive power, which is recorded as Qc1; the calculation formula of Qc1 is: Qc1 = Pc1 / Bc; Assuming the reactive power of the municipal power grid is a fixed value, calculate the adjusted power factor, which is recorded as Bc1; the calculation formula of Bc1 is: Bc1 = Pc1 / Qc; Step S2443: Calculate the coefficient of change of the reactive power of the municipal power grid, denoted as gQ; the calculation formula of gQ is: gQ = (Qc1-Qc) / Qc; Calculate the coefficient of change of the power factor of the municipal power grid, recorded as gB; the calculation formula of gB is: gB = (Bc1-Bc) / Bc; The determined reactive power of the municipal power grid is recorded as Qc2; the value of Qc2 is determined by comparing gQ with gB; If gQ ≥ gB, then the value of Qc2 is Bc1; If gQ<gB, the value of Qc2 is Bc; The active power of the municipal power grid is adjusted to Pc1, and the reactive power is adjusted to Qc2.
8. The method for interactively controlling power load and power grid based on big data technology according to claim 1 is characterized in that: The specific steps of step S3 are as follows: Step S31: Obtain the active power Pc of the municipal power grid, and the voltage of the municipal power grid is recorded as Uc; The municipal power grid in the target area is taken as the target power grid, and the shortest power supply line from the provincial power grid in the target area to the target power grid is marked as the target line; The voltage of the provincial power grid in the target area is obtained, which is recorded as Uf, the active power is recorded as Pf, and the reactive power is recorded as Qf; the power factor of the provincial power grid in the target area is calculated, which is recorded as Bf; the calculation formula of Bf is: Bf = Pf / Qf; Get the expected electricity consumption ePo of the 1st to mnth municipal districts (1) ~ePo (mn) of and aPo; Step S32: Calculate the increase multiple of the active power of the municipal power grid, recorded as zl; zl = (aPo-Pc) / Pc; record the increased active power of the municipal power grid as Pc2, and the calculation formula of Pc2 is: Pc2 = Pc×(1+zl); The adjusted active power of the provincial power grid in the target area is recorded as ePf; the size of Pc2 is compared with Uf to determine the value of ePf; If Pc2≥Uf, the calculation formula of ePf is: ePf=Pf×(1+zl); If Pc2<Uf, then the value of ePf is: Pf; Calculate the adjusted power factor of the provincial power grid in the target area, recorded as eBf; the calculation formula of eBf is: eBf = Bf × (1 + zl); The reactive power of the provincial power grid in the target area after adjustment is recorded as eQf; the calculation formula of eQf is: eQf = ePf / eBf; Step S33: Obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; The first transformer is used as the starting transformer and the last transformer is used as the receiving transformer; Count the number of transformers other than the starting transformer and the receiving transformer on the target circuit, recorded as tr; obtain the transmission line length of the target circuit, recorded as ll; According to the ratio to be allocated and the transmission line data, the ratio of each transformer on the target line is adjusted to allocate electricity to each municipal area; Step S34: from the starting transformer to the first transformer, adjusting the transformation ratio of the first transformer; Step S341: Obtain the length of the transmission line from the starting transformer to the first transformer, denoted as lr (o-1) ; Calculate the distribution coefficient of the first transformer, denoted as β (1) β (1) The calculation formula is: (1) =lr (o-1) / ll; Calculate the voltage drop from the starting transformer to the first transformer, denoted as ΔU (o-1) ; ΔU (o-1) The calculation formula is: ΔU (o-1) =(β (1) )×(Uf-Uc); Step S342: Obtain the voltage of the first transformer and record it as DU (1) , the transformation ratio is denoted as DB (1) ; Judge the inequality: (DU (1) +ΔU (o-1) )≥Uf is true; If it is established, the transformation ratio of the first transformer will not be adjusted; If not, adjust the transformation ratio of the first transformer; the adjusted transformation ratio is recorded as GB (1) , GB (1) The calculation formula is:
9. The method and system for interactive control of power load and power grid based on big data technology according to claim 8 is characterized in that: The subsequent steps of step S34 are as follows: Step S35: from the first transformer to the second transformer, adjusting the transformation ratio of the second transformer; Step S351: Obtain the length of the transmission line from the first transformer to the second transformer, denoted as lr (1-2) ; Calculate the distribution coefficient of the first transformer, denoted as β (2) β (2) The calculation formula is: (1) =(lr (o-1) +lr (1-2) ) / ll; Calculate the voltage drop from the first transformer to the second transformer, denoted as ΔU (1-2) ; ΔU (1-2) The calculation formula is: ΔU (1-2) =(β (2) )×(Uf-Uc); Step S352: Obtain the voltage of the second transformer and record it as DU (2) , the transformation ratio is denoted as DB (2) ; Judge the inequality: (DU (2) +ΔU (1-2) )≥(Uf-ΔU (o-1) ) is established; If it is established, the transformation ratio of the second transformer will not be adjusted; If not, adjust the transformation ratio of the second transformer; the adjusted transformation ratio is recorded as GB (2) , GB (2) The calculation formula is: Step S36: Similarly, from the tr-th transformer to the receiving transformer, the transformation ratio of the receiving transformer is adjusted; Step S37: Active power Po of the 1st to mnth municipal districts (1) ~Po (mn) ; Get the expected active power ePo of the 1st to mnth municipal districts (1) ~ePo (mn) of and aPo; Get the ratios to be allocated from the 1st to the mnth districts: bz (1) ~bz (mn) ; Calculate bz (1) ~bz (mn) The combination of is written as abz; The active power of the first municipal district is changed from Po (1) Adjust to [(bz (1) / abz)×aPo]; By analogy, the active power of the mnth district is Po (mn) Adjust to [(bz (mn) / abz)×aPo].
10. A power load and power grid interactive control system based on big data technology, applicable to a power load and power grid interactive control method based on big data technology as described in any one of claims 1 to 9, characterized in that: The control system comprises: Data acquisition module: used to obtain the number of all municipal districts in the target area and the historical power consumption of each municipal district; based on the historical power consumption, estimate the expected power consumption of each municipal district; Power supply adjustment module: used to obtain the active power and reactive power of the municipal power grid in the target area, obtain the active power and reactive power of the regional power grid in each municipal district, and obtain local power data; Determine whether the power supply of the municipal power grid is sufficient based on expected power consumption and local power data; If sufficient, the active and reactive power of the regional power grid is adjusted according to the expected power consumption and local power data, and the transmission adjustment module is skipped; If it is insufficient, the ratio to be allocated for each municipal district is calculated based on the expected electricity consumption; Transmission adjustment module: used to take the municipal power grid corresponding to the target area as the target power grid, mark the shortest power supply line from the provincial power grid in the target area to the target power grid as the target line; obtain the number of transformers, transformer ratio, and transmission line length on the target line to obtain transmission line data; adjust the ratio of each transformer on the target line according to the ratio to be allocated and the transmission line data to allocate electricity to each municipal area; Continuous adjustment module: used to continuously obtain the current power consumption of the target area and adjust the power supply of the target area.
Citation Information
Cited By
Line fault judgment system and method
CN120428036A
Incremental model establishment method capable of regulating and controlling electric power resources
CN120638436A