Nickel plating device for electroplating bottom plate

By setting up closed space and exhaust gas treatment equipment in the nickel plating table, the problem of incomplete waste gas treatment in the existing nickel plating process is solved, fully automatic closed production and zero pollution emissions are achieved, and the working environment safety and nickel plating effect are improved.

CN119640372AActive Publication Date: 2025-03-18WUXI ZHENHUA KAIXIANG TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510173757.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-18
Publication Date
2025-03-18
Estimated Expiration
2045-02-18

AI Technical Summary

Technical Problem

In the existing nickel plating process, the treatment pool is in an open or semi-open state, resulting in the failure to effectively treat the waste gas and causing pollution.

Method used

A nickel plating device for electroplating base plate is designed. The nickel plating table has a closed space. Each working pool and conveying mechanism are located in the closed space. Through the flow diversion channel, the airflow recovery channel and the exhaust gas treatment equipment, the comprehensive guidance and treatment of the exhaust gas are achieved.

Benefits of technology

It realizes fully automatic closed production and zero pollution emissions, improves the safety of the working environment, and improves the nickel plating effect and working efficiency through the cooperation of the limiting mechanism and the transfer mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119640372A_ABST
    Figure CN119640372A_ABST
Patent Text Reader

Abstract

The invention discloses an electroplating bottom plate nickel plating device which comprises a nickel plating table, a plurality of working pools and a conveying mechanism are arranged on the nickel plating table, the conveying mechanism is used for driving a hanging frame to move to the designated working pools, a closed space is formed in the nickel plating table, and all the working pools and the conveying mechanism are located in the closed space to work; a door plate is arranged at the opening of each working pool, and the door plates are configured to seal the working pools when the hanging rack is completely arranged in the working pools; a flow guide channel is formed in the position, close to an opening, in each working pool, waste gas treatment equipment is arranged in the nickel plating table and communicates with the flow guide channels, the whole nickel plating work is completed in a closed space, and full-automatic closed production is achieved. Waste gas in the working pool and overflowing out of the working pool is guided and treated in all directions, so that zero-pollution emission is realized, and the safety of a working environment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of semiconductor nickel plating, in particular to a nickel plating device for an electroplating bottom plate. Background Art

[0002] Semiconductors refer to materials whose electrical conductivity at room temperature is between that of conductors and insulators. Semiconductors are used in integrated circuits, consumer electronics, communication systems, photovoltaic power generation, lighting, high-power power conversion and other fields. For example, diodes are devices made of semiconductors. Whether from the perspective of science and technology or economic development, the importance of semiconductors is enormous. Most electronic products, such as computers, mobile phones or core units of digital recorders, are closely related to semiconductors. The raw materials used are oxygen-free copper base plates, which are made of oxygen-free copper and are processed through extrusion, stamping, machining, stress relief, cleaning and other processes; the processed oxygen-free copper base plates are subjected to: shot blasting → nickel plating → machining nickel removal → silver plating → warping → film pasting → sintering assembly → inspection → packaging → finished product, wherein the nickel plating process is: hanging → ultrasonic degreasing → cleaning → electrolytic degreasing → cleaning → acid activation → cleaning → impact nickel → cleaning → chemical nickel plating → cleaning → drying → hanging → drying. In the existing nickel plating process, the rack is clamped and transported to each treatment tank by a clamping and transporting device for the corresponding process. During the whole process, the treatment tank is in an open state or a semi-open state. The waste gas generated during the treatment process and the waste gas overflowing from the treatment tank are not effectively treated, which is easy to cause pollution. Therefore, a nickel plating device for electroplating base plates is urgently needed to solve the above problems. Summary of the invention

[0003] The purpose of the present invention is to provide a nickel plating device for electroplating a base plate, which can effectively solve the problems existing in the above-mentioned background technology.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions: a nickel plating device for electroplating a bottom plate, comprising a nickel plating table, on which a plurality of working pools and a conveying mechanism are arranged, wherein the conveying mechanism is used to drive a rack to move to a designated working pool, wherein a closed space is arranged inside the nickel plating table, and each working pool and the conveying mechanism are located in the closed space for operation; and A door panel is provided at the opening of each working pool, and the door panel is configured to seal the working pool when the hanger is completely placed in the working pool; A guide channel is provided near the opening in each of the working pools, and an exhaust gas treatment device is provided in the nickel plating station. The exhaust gas treatment device is connected to the guide channel and is used to guide the airflow in the working pool to flow in a specified direction; The conveying mechanism is arranged above the working pool and includes a circulating slideway and a plurality of sliders arranged in the circulating slideway. Each slider can slide along the circulating slideway to traverse all the working pools, and a clamping structure is installed on each slider. A transfer mechanism is installed on one side of each working pool. The transfer mechanism includes: A pallet for supporting the hanger, and the pallet is configured to be spliced with the hanger in the horizontal direction when it extends into the working pool. A vibration structure configured to drive the pallet extending into the working pool to vibrate in the horizontal direction. A sliding structure connected to the pallet for driving the pallet to extend into the working pool or move towards the conveying mechanism.

[0005] Preferably, the diversion channel includes: An air inlet hole located at the opening of the working pool and communicating with the working pool. A diversion cavity communicating with the air inlet hole, and two slopes are arranged in the diversion cavity. The two slopes are arranged in an inverted "entry" shape, and a break is arranged at the adjacent position of the two slopes; the air flow breaks away from the diversion cavity from the break. A connecting channel for connecting the break and the waste gas treatment equipment.

[0006] Preferably, one end of a slope extends to a position close to the air inlet hole, and the other end of the other slope extends to one side of the working pool, and a return hole is opened at the corresponding position of the working pool.

[0007] Preferably, an air flow recovery channel is opened at the top of the nickel plating table. The air flow recovery channel covers all the working pools, and the air flow recovery channel is connected to the waste gas treatment equipment through a connecting pipe.

[0008] Preferably, the clamping structure includes a U-shaped block. A limiting mechanism is arranged in the U-shaped block. A connecting rod is arranged at the corresponding position of the hanger and the U-shaped block. The limiting mechanism is configured to lock or unlock the connecting rod inserted into the U-shaped block.

[0009] Preferably, the limiting mechanism includes at least one cross bar arranged parallel to the opening of the U-shaped block. The cross bar is slidably installed in the U-shaped block, and one end of the cross bar extends into the notch of the U-shaped block. A triangular block is installed at the extending end of the U-shaped block; a spring is arranged on the cross bar, and the spring area drives the cross bar to move towards the notch of the U-shaped block. The connecting rod is provided with a first truncated cone block at one end facing the U-shaped block, and a second truncated cone block is coaxially provided on the connecting rod below the first truncated cone block. The first truncated cone block and the second truncated cone block are symmetrically arranged, and the second truncated cone block is slidably installed on the connecting rod.

[0010] Preferably, the support plate is mainly composed of two symmetrically arranged support rods, the sliding structure includes a screw rod arranged in the vertical direction, and a sliding block with a screw rod nut arranged on the screw rod, through holes are opened on the sliding block at positions corresponding to the two support rods, and the ends of the support rods pass through the through holes and are slidably arranged in the through holes along the horizontal direction; Both sides of the working pool are provided with grooves in the vertical direction, at least one of the grooves is provided with a top block, and the top block is configured to squeeze the two support rods to move away from each other when the two support rods enter the groove; and A splicing block is installed on each of the support rods, the top of the hanger is an inverted "mountain" shaped structure, the two support rods are respectively inserted into the two notches of the "mountain" shaped structure, and splicing holes are opened in the notches and at the positions of the splicing blocks.

[0011] Preferably, the end of the support rod passes through the through hole and extends to one side of the vibration structure, the vibration structure includes a vibration motor, a cam is installed at the end of the vibration motor, and the cam is configured to periodically squeeze the support rod when rotating.

[0012] Preferably, the cam is offset from the end of the support rod in an initial state, and overlaps with the end of the support rod after the top split.

[0013] Preferably, a square frame is sleeved on the two support rods, and the square frame is used to limit the two support rods from sliding in a direction away from each other.

[0014] Beneficial effects: In the present invention, a closed space is set inside the nickel plating table, and the entire nickel plating work is completed in the closed space, realizing fully automatic closed production. Through the cooperation of the set guide channel, air flow recovery channel and exhaust gas treatment equipment, the exhaust gas in the working pool and overflowing to the outside of the working pool is guided and treated in all directions, achieving zero pollution emission and improving the safety of the working environment.

[0015] In addition, in the present invention, by arranging a limiting mechanism on the clamping structure, locking and unlocking operations can be automatically performed according to the moving distance on the hanger, so as to realize the connection and separation of the hanger and the clamping structure. When used in conjunction with the transfer mechanism, the transfer mechanism is utilized to fix the hanger to the clamping structure, or transfer it to the working pool for corresponding process treatment, and there is no need to add a power structure to the clamping structure, thereby saving costs and reducing the coordination operations between power structures, and improving work efficiency. Among them, through the effect of the top dividing block, when the transfer mechanism moves down to the working pool, the two support rods are automatically separated. On the one hand, the support rod is fixed to the hanger to improve its stability. On the other hand, in conjunction with the vibration structure, it can drive the support plate deep in the working pool to vibrate in the horizontal direction, thereby improving the nickel plating effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0017] In the attached picture: Figure 1 It is a structural schematic diagram of the nickel plating device of the present invention; Figure 2 It is a schematic diagram of the structure inside the nickel plating device of the present invention; Figure 3 It is a structural schematic diagram of the working pool diversion channel of the present invention; Figure 4 It is a schematic diagram of the structure of the inner circulation slideway of the nickel plating device of the present invention; Figure 5 It is a schematic diagram of the structure of a single working pool of the present invention; Figure 6 It is a plan view of a single working pool of the present invention; Figure 7 It is a structural schematic diagram of the transfer mechanism of the present invention; Figure 8 is a plan view of the transfer mechanism of the present invention; Fig. 9 It is a structural schematic diagram of the frame of the present invention; Fig.10 It is a structural schematic diagram of the clamping structure of the present invention; Numbers in the figure: 1. Nickel-plating table; 2. Working pool; 3. Enclosed space; 4. Door panel; 5. Air inlet; 6. Diverter chamber; 7. Slope; 8. Fracture; 9. Connecting channel; 10. Exhaust gas treatment equipment; 11. Reflux hole; 12. Air flow recovery channel; 13. Circulating slideway; 14. Slider; 15. Support rod; 16. Screw rod; 17. Sliding block; 18. Through hole; 19. Groove; 20. Top block; 21. Hanger; 22. Notch; 23. Frame; 24. Elastic structure; 25. Splicing block; 26. Splicing hole; 27. Vibration motor; 28. Cam; 29. ​​U-shaped block; 30. Cross bar; 31. Spring; 32. Triangular block; 33. Connecting rod; 34. First truncated cone block; 35. Second truncated cone block. DETAILED DESCRIPTION

[0018] The embodiments of the present invention are described below in conjunction with the drawings in the embodiments of the present invention. The terms used in the implementation mode of the present invention are only used to explain the specific embodiments of the present invention, and are not intended to limit the present invention. The embodiments of the present application are described below in conjunction with the drawings.

[0019] Example: Figure 1-Figure 2 As shown, a nickel plating device for electroplating a bottom plate includes a nickel plating table 1, on which a plurality of working pools 2 are arranged, and a conveying mechanism is arranged, wherein the working pools 2 include a cleaning pool, an acid activation pool, an impact nickel pool, a chemical nickel plating pool, etc.; the conveying mechanism is used to drive a rack 21 to move to a designated working pool 2 for corresponding process operations; refer to Figure 1-Figure 2 As shown, a closed space 3 is provided in the nickel plating station 1, and each working pool 2 and the conveying mechanism are located in the closed space 3 for operation; fully enclosed operation is achieved; a door panel 4 is provided at the opening of each working pool 2, and the door panel 4 is configured to seal the working pool 2 when the rack 21 is completely placed in the working pool 2; for the drive of the door panel 4, a corresponding power structure can be provided according to demand, such as a screw rod 16 drive structure, a hydraulic telescopic structure, etc., when the rack 21 goes deep into the corresponding working pool 2 for processing, the door panel 4 is controlled by the above-mentioned power structure to close the opening of the working pool 2, and a sealed space is further formed in the working pool 2, refer to Figure 2 As shown, a double-door structure can be adopted for the door panel 4, and door panels 4 are arranged on both sides of the working pool 2 to reduce the driving stroke of the driving structure.

[0020] Based on the above, reference Figure 1 and 3 As shown, a guide channel is provided near the opening in each working pool 2, and an exhaust gas treatment device 10 is provided in the nickel plating station 1. The exhaust gas treatment device 10 is connected to the guide channel and is used to guide the airflow in the working pool 2 to flow in a specified direction; through the guide channel, the exhaust gas in the working pool 2 is guided to the exhaust gas treatment device 10 for treatment; In a specific embodiment, referring to Figure 3 as shown, the diversion channel includes an air inlet hole 5 located at the opening of the working pool 2 and communicating with the working pool 2, and a diversion chamber 6. The diversion chamber 6 communicates with the air inlet hole 5, and two slopes 7 are arranged in the diversion chamber 6. The two slopes 7 are arranged in an inverted "entry" shape, and a break 8 is arranged near the two slopes 7; the air flow detaches from the diversion chamber 6 through the break 8; and a connection channel 9 for connecting the break 8 and the waste gas treatment device 10; during treatment, the waste gas in the working pool 2 rises to the opening and flows into the diversion chamber 6 through the air inlet hole 5. In the diversion chamber 6, the waste gas first flows along one slope 7, that is, Figure 3 the upper slope 7 in Figure 3 , and the waste gas is guided by this slope 7 to flow to the intersection point of the "entry". The intersection point is the break 8 of the two slopes 7. The waste gas passes through the intersection point and continues to flow along the extension section of the other slope 7, and flows into the connection channel 9. Finally, it flows into the waste gas treatment device 10 through the connection channel 9 for waste gas treatment. The waste gas treatment device 10 uses conventional equipment to treat the polluted gas generated during the treatment process; In the above structure, one end of a slope 7 far from the intersection point extends to near the air inlet hole 5, and the other end of the other slope 7 extends to the side of the working pool 2, and a return hole 11 is opened at the corresponding position of the working pool 2; in addition to guiding the waste gas to flow, through the action of the two slopes 7, the waste gas can be cooled, and the liquid generated after cooling is drained to the return hole 11 through the inclined slopes 7 and then reflows into the working pool 2 through the return hole 11; and referring to Figure 3 as shown in Figure 3 , the extension section of one slope 7 is bent upward, which can prevent the cooled liquid from entering the connection channel 9. Through the diversion chamber 6 arranged above, the waste gas can be guided for treatment, and the temperature of the waste gas can be reduced, and the coolant can be recovered.

[0021] On the basis of the above, in a specific embodiment, an air flow recovery channel 12 is also opened at the top of the nickel plating table 1. The air flow recovery channel 12 covers all the working pools 2, and the air flow recovery channel 12 is connected to the waste gas treatment device 10 through a connecting pipe. Through the air flow recovery channel 12, the waste gas overflowing after the door panel 4 is opened can be recovered, so as to realize the all-round waste gas recovery work.

[0022] For the conveying mechanism, referring to Figure 4 as shown, it is arranged above the working pool 2 and includes a circulating slideway 13 and a plurality of sliders 14 arranged in the circulating slideway 13. The function of the circulating slideway 13 is to provide each slider 14 to slide through all the working pools 2. The circulating slideway 13 is an annular slideway, part of which is arranged inside the nickel plating table 1 and part of which faces the working pool 2. Referring to Figure 4As shown, the slideway and the slider 14 facing the working pool 2 are shown, and the slider 14 can reciprocate on each working pool 2 along the circulating slideway 13, and each slider 14 slides synchronously, and each slider 14 is installed with a clamping structure; the clamping structure can clamp the hanger 21 for transportation between each working pool 2; For the transportation of the rack 21 between the conveying mechanism and the working pool 2, in this embodiment, a transfer mechanism is installed on one side of each working pool 2. Figure 5-Figure 6 As shown, the transfer mechanism includes a pallet and a sliding structure. The pallet is used to support the rack 21, and the pallet is configured to be spliced ​​with the rack 21 in the horizontal direction when it goes deep into the working pool 2; the sliding structure is connected to the pallet, and is used to drive the pallet to go deep into the working pool 2 or move toward the conveying mechanism. In a specific embodiment, reference Figure 3 , Figure 7-Figure 8 As shown, the support plate is mainly composed of two symmetrically arranged support rods 15, the sliding structure includes a screw rod 16 arranged in the vertical direction, and a sliding block 17 with a screw rod 16 nut arranged on the screw rod 16, and through holes 18 are opened on the sliding block 17 corresponding to the two support rods 15, and the ends of the support rods 15 pass through the through holes 18 and are slidably arranged in the through holes 18 along the horizontal direction; grooves 19 are opened on both sides of the working pool 2 in the vertical direction, and a top block 20 is arranged in at least one groove 19, and the top block 20 is configured to squeeze the two support rods 15 to move away from each other when the two support rods 15 enter the groove 19; and a splicing block 25 is installed on each support rod 15, and the top of the hanger 21 is an inverted "mountain" shape structure, and the two support rods 15 are respectively inserted into the two notches 22 of the "mountain" structure, and splicing holes 26 are opened in the notches 22 and at the positions of the splicing blocks 25.

[0023] The screw rod 16 is equipped with a driving motor or other power source to drive the screw rod 16 to rotate, thereby driving the sliding block 17 to move up and down. When moving up, it moves to the clamping structure to support the hanger 21 released from the clamping structure, that is, the two support rods 15 are placed in the two notches 22 of the "mountain"-shaped structure of the hanger 21 to lift the hanger 21. As the screw rod 16 is driven, the support rod 15 and the hanger 21 are driven to move down into the working pool 2. As the support rod 15 moves down, it will contact the top block 20, and the top block 20 is a cone-like structure, which gradually drives the two support rods 15 to move away from each other, thereby driving the splicing block 25 to be inserted into the corresponding splicing hole 26, realizing the splicing between the support rod 15 and the hanger 21, and stably fixing the hanger 21 on the support rod 15 for corresponding processing work; refer to Fig. 9As shown, a square frame 23 may be sleeved on each support rod 15, and the square frame 23 is used to limit the two support rods 15 from sliding in a direction away from each other, so that the two support rods can move stably. Corresponding to the separation between the support rod 15 and the hanger 21, an elastic structure 24 may be provided in the square frame 23, and the elastic structure 24 is used to drive the two support rods 15 to move closer to each other, that is, when the support rod 15 moves upward and gradually separates from the top block 20, the two support rods 15 can be driven to reset closer to each other under the action of the elastic structure 24, and the splicing block 25 is separated from the splicing hole 26, so as to facilitate the subsequent transfer of the hanger 21 to the clamping structure; In a specific embodiment, based on the above, in this embodiment, a vibration structure is further provided, which is configured to drive the support plate deep in the working pool 2 to vibrate in the horizontal direction; Figure 7-Figure 8 As shown, the end of the support rod 15 passes through the through hole 18 and extends to one side of the vibration structure. The vibration structure includes a vibration motor 27. A cam 28 is installed at the end of the vibration motor 27. The cam 28 is configured to periodically squeeze the support rod 15 when rotating; Figure 7-Figure 8 As shown, vibration structures are provided at both ends of the support rod 15, and the cams 28 of the two vibration structures rotate staggered. On the one hand, the cam 28 is driven to rotate by the vibration motor 27 to periodically squeeze the support rod 15, so that the support rod 15 reciprocates in the horizontal direction, and the synchronous bracket 21 realizes vibration. On the other hand, the cam 28 is staggered with the end of the support rod 15 in the initial state, and coincides with the end of the support rod 15 after the top separation. The vibration operation can only be performed when the two support rods 15 are separated, that is, the support rod 15 is stably connected to the bracket 21, so as to avoid vibration when the two support rods 15 are not in place, thereby improving work safety and stability.

[0024] For the clamping structure, in a specific embodiment, based on the above, refer to Fig.10 As shown, the clamping structure includes a U-shaped block 29, a limiting mechanism is arranged in the U-shaped block 29, a connecting rod 33 is arranged on the hanger 21 at a position corresponding to the U-shaped block 29, and the limiting mechanism is configured to lock the connecting rod 33 inserted into the U-shaped block 29, or unlock the connecting rod 33 inserted into the U-shaped block 29; that is, when the connecting rod 33 of the hanger 21 is transferred and inserted into the U-shaped block 29 by the supporting plate, the limiting mechanism locks the connecting rod 33 to separate the hanger 21 from the supporting rod 15, and then the supporting plate is reset, and the clamping structure drives the hanger 21 to be transferred; For further reference, Fig.10As shown, in this embodiment, the limiting mechanism includes at least one cross bar 30 arranged parallel to the opening of the U-shaped block 29, and in this embodiment, there are two cross bars 30, which are symmetrically arranged. The cross bar 30 is slidably installed in the U-shaped block 29, and one end of the cross bar 30 is deeply inserted into the notch 22 of the U-shaped block 29, and a triangular block 32 is installed at the deep end of the U-shaped block 29; a spring 31 is arranged on the cross bar 30, and the spring 31 area drives the cross bar 30 to move toward the notch 22 of the U-shaped block 29; a first truncated cone block 34 is installed on the connecting rod 33 toward one end of the U-shaped block 29, and a second truncated cone block 35 is coaxially installed on the connecting rod 33 below the first truncated cone block 34, the first truncated cone block 34 and the second truncated cone block 35 are symmetrically arranged, and the second truncated cone block 35 is slidably installed on the connecting rod 33; The hanger 21 is transferred from the support plate to the clamping structure: the support plate moves up, and the connecting rod 33 is inserted into the U-shaped block 29. At this time, the upward movement distance is controlled to be the first distance, and the first truncated cone block 34 contacts the triangular blocks 32 on both sides. The triangular blocks 32 compress the crossbar 30 to move to both sides until the triangular block 32 is located between the first truncated cone block 34 and the second truncated cone block 35, and the triangular block 32 is inserted under the first truncated cone. At this time, the upward movement is completed, and the first truncated cone block 34 can be hung on the two triangular blocks 32; The hanger 21 is transferred from the clamping structure to the support plate: the support plate moves up, and the upward movement distance is controlled to be the second distance. The support rod 15 is inserted into the two notches 22 of the "mountain" shaped structure to lift the hanger 21 and continue to drive the hanger 21 to move upward. At this time, under the action of the second truncated cone block 35, the two triangular blocks 32 will be pushed to compress the cross bar 30 to move to both sides. The two triangular blocks 32 contact the second truncated cone block 35, and the support plate starts to move downward. Since the second truncated cone block 35 is slidably installed on the connecting rod 33, the second truncated cone block 35 will be synchronously moved up to contact with the first truncated cone under the clamping action of the two triangular blocks 32. Through the cooperation of the first truncated cone block 34 and the second truncated cone block 35, the two triangular blocks 32 will automatically disengage from the first truncated cone block 34 and the second truncated cone block 35, so that the connecting rod 33 is separated from the clamping structure; By repeating the above operation, the transfer of the hanger 21 can be completed. There is no need to set a power structure on the clamping structure. Only the upward movement distance of the working pallet is controlled. The operation is simple and the work efficiency is improved.

[0025] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. For ordinary technicians in this technical field, after knowing the contents recorded in the present invention, they can make several equivalent changes and substitutions without departing from the principle of the present invention. These equivalent changes and substitutions should also be regarded as belonging to the protection scope of the present invention.

Claims

1. A nickel plating device for electroplating a bottom plate, comprising a nickel plating table, on which a plurality of working pools are arranged, and a conveying mechanism is arranged, wherein the conveying mechanism is used to drive a rack to move to a designated working pool, characterized in that: A closed space is provided inside the nickel plating table, and each working tank and the conveying mechanism are located and operate inside the closed space; and A door panel is provided at the opening of each working tank, and the door panel is configured to seal the working tank when the hanger is completely placed inside the working tank; A diversion channel is opened near the opening inside each working tank. An exhaust gas treatment device is provided inside the nickel plating table. The exhaust gas treatment device is communicated with the diversion channel and is used to guide the airflow inside the working tank to flow in a specified direction; The conveying mechanism is arranged above the working tank and includes a circulating slideway and a plurality of sliders arranged inside the circulating slideway. Each slider can slide along the circulating slideway to traverse all the working tanks, and a clamping structure is installed on each slider; A transfer mechanism is installed on one side of each working tank. The transfer mechanism includes: A pallet for supporting the hanger, and the pallet is configured to be spliced with the hanger in the horizontal direction when it extends into the working tank; A vibration structure configured to drive the pallet extending into the working tank to vibrate in the horizontal direction; A sliding structure connected to the pallet for driving the pallet to extend into the working tank or move towards the conveying mechanism; 2. The nickel plating device for electroplating a bottom plate according to claim 1, characterized in that: The diversion channel includes: An air inlet hole located at the opening of the working tank and communicated with the working tank; A diversion cavity communicated with the air inlet hole. Two slopes are arranged inside the diversion cavity. The two slopes are arranged in an inverted "入" character shape, and a break is arranged at the adjacent position of the two slopes; the airflow breaks away from the diversion cavity through the break; A connecting channel for connecting the break and the exhaust gas treatment device; 3. The nickel plating device for electroplating a bottom plate according to claim 2, characterized in that: One end of one slope extends to be close to the air inlet hole, and the other end of the other slope extends to one side of the working tank, and a return hole is opened at the corresponding position of the working tank; 4. The nickel plating device for electroplating a bottom plate according to claim 1, characterized in that: An air flow recovery channel is opened at the top of the nickel plating table. The air flow recovery channel covers all the working tanks, and the air flow recovery channel is connected to the exhaust gas treatment device through a connecting pipe; 5. The nickel plating device for electroplating a bottom plate according to claim 1, characterized in that: The clamping structure includes a U-shaped block. A limiting mechanism is arranged inside the U-shaped block. A connecting rod is arranged at the position corresponding to the U-shaped block on the hanger. The limiting mechanism is configured to lock or unlock the connecting rod inserted into the U-shaped block; 6. The nickel plating device for electroplating a bottom plate according to claim 5, characterized in that: The limiting mechanism includes at least one cross bar arranged parallel to the opening of the U-shaped block. The cross bar is slidably installed inside the U-shaped block, and one end of the cross bar extends into the notch of the U-shaped block. A triangular block is installed at the extending end of the U-shaped block; a spring is configured on the cross bar, and the spring drives the cross bar to move towards the notch of the U-shaped block; A first frustum block is installed at one end of the connecting rod facing the U-shaped block. A second frustum block is coaxially installed below the first frustum block on the connecting rod. The first frustum block and the second frustum block are symmetrically arranged, and the second frustum block is slidably installed on the connecting rod; 7. The nickel plating device for electroplating a bottom plate according to claim 1, characterized in that: The support plate is mainly composed of two symmetrically arranged support rods, and the sliding structure includes a screw rod arranged in the vertical direction, and a sliding block with a screw rod nut arranged on the screw rod, and through holes are opened on the sliding block at positions corresponding to the two support rods, and the ends of the support rods pass through the through holes and are slidably arranged in the through holes along the horizontal direction; Both sides of the working pool are provided with grooves in the vertical direction, at least one of the grooves is provided with a top block, and the top block is configured to squeeze the two support rods to move away from each other when the two support rods enter the groove; and A splicing block is installed on each of the support rods, and the top of the bracket is an inverted "mountain" shaped structure. The two support rods are respectively inserted into two notches of the "mountain" shaped structure, and splicing holes are opened in the notches and at the positions of the splicing blocks.

8. The nickel plating device for electroplating a bottom plate according to claim 7, characterized in that: The end of the support rod passes through the through hole and extends to one side of the vibration structure. The vibration structure includes a vibration motor. A cam is installed at the end of the vibration motor. The cam is configured to periodically squeeze the support rod when rotating.

9. The nickel plating device for electroplating a bottom plate according to claim 8, characterized in that: The cam is staggered with the end of the support rod in the initial state, and overlaps with the end of the support rod after the top is split.

10. The nickel plating device for electroplating a bottom plate according to claim 7, characterized in that: A square frame is sleeved on the two support rods, and the square frame is used to limit the two support rods from sliding in a direction away from each other.

Citation Information

Patent Citations

  • Exhaust gas treatment device and exhaust gas treatment method

    CN114522526A

  • Plating bath air purification device

    CN208586375U

  • Electrocoppering production line with automatic waste gas collecting device

    CN212357446U

  • Circulating travelling crane exhaust system for rack plating

    CN213061090U

  • Waste gas collecting device for rack plating tank

    CN213951404U