Method and device for measuring and calculating group scheduling and group control small capacity increasing of building energy consumption equipment
By determining the characteristics of flexible load and adjustable equipment for group adjustment and group control of building groups, and carrying out potential calculation and load deviation analysis, the problem of difficulty in quantifying the group adjustment and group control of building energy-using equipment in the existing technology is solved, and accurate calculation of less capacity increase and optimized operation of the power system is achieved.
Patent Information
- Application Number
- CN202411763098.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-03
- Publication Date
- 2025-03-21
AI Technical Summary
The prior art is difficult to effectively quantify the potential of building energy-using equipment group control, resulting in the inability to accurately calculate the reduced capacity (less capacity increase), thus unable to optimize the operation of the power system.
By determining the characteristics of the flexible load and adjustable equipment of the building group, the flexible adjustable potential of the group group control is calculated, combining load prediction and power capacity supply capacity, the load deviation and the actual power involved in the regulation are determined, and the capacity increase is finally calculated.
It realizes effective quantitative calculation of the potential of group control of building energy equipment, and can accurately calculate the reduced capacity part (less capacity increase), thereby optimizing the operation of the power system and reducing the power supply cost.
Smart Images

Figure CN119674944A_ABST
Abstract
Description
Technical Field
[0001] This document relates to the field of energy and power technology, and in particular to a method and device for calculating the capacity increase of group adjustment and control of building energy equipment. Background Art
[0002] With the deepening of the green and low-carbon transformation of energy, new elements of source, grid, load and storage are constantly emerging. New energy sources are gradually becoming the main body of installed capacity and power. Extreme weather, electric vehicles and other factors have brought about extraordinary changes in load characteristics. Multi-energy storage is booming, and the complexity and uncertainty of new power systems are unprecedented. The dual control of energy consumption and the tight supply and demand of electricity are intertwined, and the safe supply of electricity is a great test. With the continuous growth of electricity demand, the volatility of new energy sources is random, volatile and intermittent, and the frequent occurrence of extreme weather, the pressure on the balance of power supply and demand in my country is increasing. It is expected that the balance of power supply and demand in the country will be tight, and the power supply and demand will be tight during local peak hours. In extreme situations, gaps may appear in some local areas, and the carrying capacity of some power grid channels is close to the limit. Power demand side management can not only alleviate the contradiction between supply and demand, but also improve economic efficiency by avoiding or reducing capacity increase. The conventional approach to alleviating power shortages is to increase capacity configuration. By increasing the installed capacity of power generation, building or upgrading the power grid, the capacity of generation, transmission and distribution can be increased, and the current carrying capacity of transmission lines can be increased, thereby improving the power supply capacity and meeting peak power demand. However, the duration of peak electricity consumption is not long-term, and the equipment utilization rate is not high. If we only rely on increasing the available capacity of power generation, a large amount of inefficient investment in power grids will be generated, pushing up the cost of power supply. At the same time, since power planning and construction requires a certain period of time, it is impossible to achieve instant capacity increase. Deepening the construction of new load management systems, establishing a complete demand response resource pool, and applying demand-side management of "one-key response, group adjustment and group control" have become inevitable. Demand-side response can reduce the peak-to-valley difference rate of the system load curve by changing the user's power consumption structure, and can also reduce the overall capacity demand, reduce the cost of transformer expansion construction and later electricity charges. When encountering high temperature weather, demand response can be implemented continuously to enhance the power supply carrying capacity of the power grid, reduce or slow down the construction of installed capacity, and improve the overall efficiency of the power system. The existing group adjustment and group control technologies involve more distributed energy generation. However, the group adjustment and group control of building groups is to package the controllable and adjustable power loads of building groups through refined and information management, and participate in power demand-side response, power market transactions and other behaviors as a whole. At present, there are relatively few group dispatching and group control technologies for energy-consuming equipment in building groups. The energy-consuming equipment and terminals involved are of many types, with different characteristics, and there are many influencing factors, which makes quantitative analysis difficult and subsequent regulation difficult. In summary, the loads of group dispatching and group control are currently dispersed and have different characteristics. The potential of group dispatching and group control regulation is difficult to quantify and calculate, and thus it is impossible to quantify how much capacity is reduced (less capacity increase). Therefore, there is an urgent need for a method for calculating the less capacity increase of group dispatching and group control of building energy-consuming equipment. Summary of the invention
[0003] The purpose of the present invention is to provide a method and device for calculating the capacity increase of group adjustment and control of building energy equipment, aiming to solve the above-mentioned problems in the prior art.
[0004] The present invention provides a method for calculating the capacity increase of group adjustment and group control of building energy-using equipment, comprising:
[0005] Determine the flexible load of group adjustment and group control of the building group, and determine the characteristics of the adjustable equipment and adjustment;
[0006] Based on the determined adjustable equipment and adjustable features, the flexible adjustable potential of group adjustment and group control is calculated to obtain the adjustable potential;
[0007] Determine the load deviation based on load forecast and power supply capacity, and determine the power that actually participates in the regulation based on actual dispatch;
[0008] Based on the electricity that is actually involved in the final regulation, the capacity reduction calculation is carried out according to the adjustable potential.
[0009] The present invention provides a device for calculating the capacity increase of group adjustment and group control of building energy-using equipment, comprising:
[0010] The first determination module is used to determine the group adjustment and group control flexible load of the building group, and determine the adjustable equipment and adjustment characteristics;
[0011] The adjustable potential calculation module is used to calculate the flexible adjustable potential of group adjustment and group control based on the determined adjustable equipment and adjustment characteristics to obtain the adjustable potential;
[0012] The second determination module is used to determine the load deviation according to the load forecast and the power capacity supply capability, and determine the power that actually participates in the regulation according to the actual dispatch;
[0013] The module for calculating the reduced capacity increase is used to calculate the reduced capacity increase according to the adjustable potential based on the power actually involved in the final regulation.
[0014] An embodiment of the present invention also provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the above-mentioned method for calculating the capacity increase of group adjustment and control of building energy equipment.
[0015] An embodiment of the present invention further provides a computer-readable storage medium, on which a program for implementing information transmission is stored. When the program is executed by a processor, the steps of the above-mentioned method for calculating the capacity increase of group adjustment and control of building energy equipment are implemented.
[0016] The use of the embodiments of the present invention can effectively support the work on the demand side, and further support the work on energy and power supply, which is of great significance for reducing construction investment and ensuring the safe, stable and economical operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate one or more embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0018] Figure 1 It is a flow chart of a method for calculating the capacity increase of group adjustment and group control of building energy-consuming equipment according to an embodiment of the present invention;
[0019] Figure 2 It is a schematic diagram of a device for calculating the capacity increase of group adjustment and control of building energy equipment according to an embodiment of the present invention;
[0020] Figure 3 is a schematic diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0021] In order to enable those skilled in the art to better understand the technical solutions in one or more embodiments of this specification, the following will be combined with the drawings in one or more embodiments of this specification to clearly and completely describe the technical solutions in one or more embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on one or more embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this document.
[0022] Method Embodiment
[0023] According to an embodiment of the present invention, a method for calculating the capacity increase of group adjustment and group control of building energy-consuming equipment is provided. Figure 1 Flow chart of the method for calculating the capacity increase of building energy equipment group adjustment and group control according to an embodiment of the present invention. Figure 1 As shown, the method for calculating the capacity increase of group adjustment and group control of building energy-consuming equipment according to an embodiment of the present invention specifically includes:
[0024] Step S101, determining the group-adjustable and group-controlled flexible loads of the building group, determining the adjustable equipment and the characteristics of the adjustment; specifically including:
[0025] A set of building energy equipment loads is established, and screening conditions are determined. Based on the screening conditions, flexible and adjustable loads that can be group-adjusted and group-controlled are screened out. The energy consumption characteristics and regulation characteristics of different equipment in the building are analyzed, the characteristics of the adjustable equipment and regulation are determined, and it is determined whether the equipment is installed with a terminal, power, adjustable proportion of this type of equipment, regulation method, and concurrency. Among them, the flexible and adjustable loads that can be group-adjusted and group-controlled in the building group specifically include: air conditioning load, heating load, lighting load, and energy storage. The screening conditions include: proportion and regulation feasibility.
[0026] Step S102, based on the determined adjustable equipment and the adjustable features, the flexible adjustable potential of the group adjustment and group control is calculated to obtain the adjustable potential; specifically, it includes:
[0027] Based on the determined adjustable equipment and the characteristics of the adjustment, the flexible adjustable potential of group adjustment and group control is calculated according to Formula 1 to obtain the adjustable potential:
[0028]
[0029] Among them, S is the adjustable potential, n is the equipment type, a is the power of a certain type of equipment, b is whether the control equipment is installed and smooth communication is guaranteed, where 0 means not installed or communication cannot be guaranteed, 1 means installed, c is the theoretically adjustable space ratio, d is the effectiveness of the control method, and e is the simultaneity rate.
[0030] Step S103, determining the load deviation according to the load forecast and the power capacity supply capability, and determining the power actually involved in the final regulation according to the actual dispatch;
[0031] Step S104, based on the power actually involved in the final regulation, the capacity reduction calculation is performed according to the adjustable potential. Specifically, it includes:
[0032] Based on the actual amount of electricity involved in the final mediation, the benefit of reducing capacity increase is calculated according to Formula 2:
[0033] Objective function Obj = min (total cost = Σ current capacity * operation and maintenance coefficient + adjustable potential S * scheduling cost coefficient + increased capacity * construction cost); Formula 2.
[0034] In summary, the method for calculating the minimum capacity increase of group adjustment and group control for building energy equipment in an embodiment of the present invention first determines the flexible load of the group adjustment and group control of the building group. There are many types of flexible loads of group adjustment and group control of the building group, such as air conditioning load, heating load, lighting load, energy storage, etc. Secondly, the potential of group adjustment and group control is calculated. Finally, the ability to reduce capacity increase is calculated. It can assist the power supply company in promoting the "full installation of on-site equipment" according to the sequence of "adjustment capacity from large to small, construction difficulty from simple to complex" to ensure the "group adjustment and group control" of the load.
[0035] The above technical solution of the embodiment of the present invention is described in detail below.
[0036] Step 1: Determine the flexible loads that can be group-controlled and group-adjusted for the building group. First, establish a set of building energy equipment loads, then determine the screening conditions, and finally screen out the flexible and adjustable loads that can be group-controlled and group-adjusted. There are many types of flexible loads that can be group-controlled and group-adjusted within the building group, such as air conditioning loads, lighting loads, energy storage, etc. However, it is necessary to consider the proportion of electricity consumption and the possibility of installing controllable terminals. The constraint and premise of group adjustment and group control is that the building is equipped with intelligent load control equipment. For example, since the power consumption of lighting and other equipment is small and the number is large, there is no need to install intelligent terminals, while the proportion of electricity consumption for cooling and heating is large, and relatively speaking, equipment such as air conditioners are relatively easy to install terminal equipment. Therefore, according to the screening conditions (proportion and feasibility of regulation, etc.), the important flexible and adjustable loads that can be group-controlled and group-adjusted are screened out, generally temperature control equipment (air conditioning or heating equipment).
[0037] Step 2: Calculate the flexible and adjustable potential of group control. Factors affecting the potential include equipment type power, adjustable ratio, control method, communication protocol, etc. Taking air conditioning as an example, the adjustable characteristics of different types of air conditioning equipment vary greatly. At present, the mainstream types of air conditioning equipment in China include split air conditioners, multi-split air conditioners (VRV), water system central air conditioners and cold storage central air conditioners. Split air conditioners are mainly for household and commercial use, mainly multi-split air conditioners and water system central air conditioning units. The control characteristics of these devices are analyzed as follows:
[0038] Table 1 List of air conditioning equipment types and control information
[0039]
[0040]
[0041] Conduct on-site investigations according to relevant regulations or standards to determine the values of formula parameters. For example, according to the rule, "All units in public buildings, including state organs, social groups, enterprises, institutions and individual businesses, except special units such as hospitals and users with specific temperature requirements in production processes and approved by the government, shall not set the indoor air-conditioning temperature lower than 26 degrees Celsius in summer and higher than 20 degrees Celsius in winter." Based on the on-site investigation and analysis, it is preliminarily determined that the VRV air-conditioning control ratio under the flexible adjustment mode is 28%-32% of the operating power; the central air-conditioning control ratio of the water system is 1 / 3-1 / 2 30% of the rated power of the unit.
[0042] In the embodiment of the present invention, firstly, the adjustable equipment is determined according to step 1. The energy consumption characteristics and regulation characteristics of different equipment in the building are analyzed to preliminarily determine whether the equipment of this type is adjustable and determine the characteristics of the regulation.
[0043] Then determine whether the device is installed with a terminal, power, adjustable proportion of this type of equipment, control method, simultaneous rate and other information.
[0044] Different control methods have different reliability. If it is multi-level aggregate load control, the reliability is lower than direct control. The concurrency rate can be determined by comparing the current time period with the adjustable response time stage of the equipment.
[0045] Finally, the adjustable potential is calculated according to formula (1).
[0046] Adjustable potential calculation formula:
[0047]
[0048] Among them, S is the adjustable potential, n is the device type, a is the power of a certain type of equipment, b is whether the control device is installed and smooth communication is guaranteed (there are two options, 0 is not installed or communication cannot be guaranteed, 1 is installed), c is the theoretically adjustable space ratio, d is the effectiveness of the control method, and e is the simultaneity rate.
[0049] The above data sources can be determined based on the actual measured data of the samples.
[0050] Step 3: The actual power involved in regulation
[0051] The load deviation is determined based on load forecast and power capacity supply capability, and the power that actually participates in the regulation is determined based on actual scheduling.
[0052] Step 4: Calculate the benefits of less capacity increase
[0053] The original power consumption capacity can no longer meet the current power demand. In order to ensure the smooth progress of production and operation, the power user must increase the power capacity. Power capacity increase can improve the stability and supply capacity of power supply and meet the growing power demand. Under non-group dispatching and group control, in the face of load uncertainty, the peak period of power consumption is inefficient, the energy supply pressure is high, and the duration is short. Taking the five southern provinces (regions) as an example, the duration of 3% peak load generally does not exceed 30 hours, and the duration of 5% peak load generally does not exceed 100 hours. Under the traditional idea of power supply and supply guarantee, power capacity increase for a short time will generate high construction costs and operation and maintenance costs, and the surplus adjustable capacity cannot be used effectively and timely, wasting power supply capacity. Under the condition of tight power supply, the thermal inertia of the building is usually used to start and stop the adjustable equipment to improve the flexibility of power system operation. Especially in the context of group dispatching and group control, although the dispatching cost is increased, it can significantly reduce the time and financial costs caused by power capacity increase while meeting the power supply guarantee and supply guarantee, and achieve less or no capacity increase. There may be many times of participating in demand response in a year, among which the largest actual adjustment of electricity is the part with less capacity increase. Whether the less capacity increase can bring about economic improvement depends on the comparison of the dispatching cost and the capacity increase cost. The capacity increase cost minus the dispatching cost is the benefit of group regulation with less capacity increase.
[0054] Generally speaking, although the group dispatching and group control mode increases the dispatching cost, it can significantly reduce the time and financial costs caused by power capacity expansion while ensuring power supply.
[0055] The operating cost of the regional power grid in the non-group dispatching and group control mode = conventional operating cost + capacity expansion cost + other conventional operation and maintenance
[0056] Regional power grid expenditure under group dispatching and group control mode = conventional operation cost + dispatching cost + capacity expansion cost + other conventional costs
[0057] Objective function: Obj = min (total cost = Σ current capacity * operation and maintenance coefficient + potential S * scheduling cost coefficient + increased capacity * construction cost)
[0058] In summary, the potential of group dispatching and group control of building energy-consuming equipment and the calculation of reducing capacity increase are important foundations for power companies to carry out planning, dispatching, and marketing services. Based on actual work needs, the embodiment of the present invention provides a method for calculating the benefits of reducing capacity increase of group dispatching and group control of building energy-consuming equipment, which can support the safe, stable and economic operation of the power grid. The technical solution of the embodiment of the present invention can be promoted to power companies in various provinces and cities, and can help staff to carry out the construction of new power systems and do a good job in demand-side management.
[0059] Device Example 1
[0060] According to an embodiment of the present invention, a device for calculating the capacity increase of group adjustment and group control of building energy-using equipment is provided. Figure 2 Schematic diagram of a device for calculating the capacity increase of group adjustment and group control of building energy equipment according to an embodiment of the present invention. Figure 2 As shown, the device for calculating the capacity increase of group adjustment and group control of building energy-consuming equipment according to an embodiment of the present invention specifically includes:
[0061] The first determination module 20 is used to determine the group adjustment and group control flexible load of the building group, determine the adjustable equipment and the characteristics of the adjustment; specifically, it is used to:
[0062] A set of building energy equipment loads is established, and screening conditions are determined. Based on the screening conditions, flexible and adjustable loads that can be group-adjusted and group-controlled are screened out. The energy consumption characteristics and regulation characteristics of different equipment in the building are analyzed, the characteristics of the adjustable equipment and regulation are determined, and it is determined whether the equipment is installed with a terminal, power, adjustable proportion of this type of equipment, regulation method, and concurrency. Among them, the flexible and adjustable loads that can be group-adjusted and group-controlled in the building group specifically include: air conditioning load, heating load, lighting load, and energy storage. The screening conditions include: proportion and regulation feasibility.
[0063] The adjustable potential calculation module 22 is used to calculate the flexible adjustable potential of group adjustment and group control based on the determined adjustable equipment and the characteristics of the adjustment to obtain the adjustable potential; specifically used for:
[0064] Based on the determined adjustable equipment and the characteristics of the adjustment, the flexible adjustable potential of group adjustment and group control is calculated according to Formula 1 to obtain the adjustable potential:
[0065]
[0066] Among them, S is the adjustable potential, n is the equipment type, a is the power of a certain type of equipment, b is whether the control equipment is installed and smooth communication is guaranteed, where 0 means not installed or communication cannot be guaranteed, 1 means installed, c is the theoretically adjustable space ratio, d is the effectiveness of the control method, and e is the simultaneity rate.
[0067] The second determination module 24 is used to determine the load deviation according to the load forecast and the power capacity supply capability, and determine the power actually involved in the final regulation according to the actual dispatch;
[0068] The less-increase capacity calculation module 26 is used to calculate the less-increase capacity based on the power actually involved in the final regulation and the adjustable potential. Specifically used for:
[0069] Based on the actual amount of electricity involved in the final mediation, the benefit of reducing capacity increase is calculated according to Formula 2:
[0070] Objective function Obj = min (total cost = Σ current capacity * operation and maintenance coefficient + adjustable potential S * scheduling cost coefficient + increased capacity * construction cost); Formula 2.
[0071] The embodiment of the present invention is a device embodiment corresponding to the above method embodiment. The specific operations of each module can be understood by referring to the description of the method embodiment, which will not be repeated here.
[0072] Device Example 2
[0073] An embodiment of the present invention provides an electronic device, such as Figure 3 As shown, it includes: a memory 30, a processor 32, and a computer program stored in the memory 30 and executable on the processor 32. When the computer program is executed by the processor 32, the steps described in the method embodiment are implemented.
[0074] Device Example 3
[0075] An embodiment of the present invention provides a computer-readable storage medium, on which a program for implementing information transmission is stored. When the program is executed by the processor 32, the steps described in the method embodiment are implemented.
[0076] The computer-readable storage medium in this embodiment includes, but is not limited to, ROM, RAM, magnetic disk or optical disk, etc.
[0077] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for calculating the capacity increase of group adjustment and group control of building energy equipment, characterized in that: include: Determine the flexible load of group adjustment and group control of the building group, and determine the characteristics of the adjustable equipment and adjustment; Based on the determined adjustable equipment and adjustable features, the flexible adjustable potential of group adjustment and group control is calculated to obtain the adjustable potential; Determine the load deviation based on load forecast and power supply capacity, and determine the power that actually participates in the regulation based on actual dispatch; Based on the electricity that is actually involved in the final regulation, the capacity reduction calculation is carried out according to the adjustable potential.
2. The method according to claim 1, characterized in that: Determine the flexible load of the group adjustment and group control of the building group, and determine the adjustable equipment and adjustment characteristics, including: A set of building energy equipment loads is established, and screening conditions are determined. Based on the screening conditions, flexible and adjustable loads that can be group-adjusted and group-controlled are screened out. The energy consumption characteristics and regulation characteristics of different equipment in the building are analyzed, the characteristics of the adjustable equipment and regulation are determined, and it is determined whether the equipment is installed with a terminal, power, adjustable proportion of this type of equipment, regulation method, and simultaneous rate. Among them, the flexible and adjustable loads that can be group-adjusted and group-controlled in the building group specifically include: air conditioning load, heating load, lighting load, and energy storage. The screening conditions include: proportion and regulation feasibility.
3. The method according to claim 1, characterized in that Based on the determined adjustable equipment and adjustable features, the flexible adjustable potential of group adjustment and group control is calculated, and the adjustable potential includes: Based on the determined adjustable equipment and the characteristics of the adjustment, the flexible adjustable potential of group adjustment and group control is calculated according to Formula 1 to obtain the adjustable potential: Among them, S is the adjustable potential, n is the equipment type, a is the power of a certain type of equipment, b is whether the control equipment is installed and smooth communication is guaranteed, where 0 means not installed or communication cannot be guaranteed, 1 means installed, c is the theoretically adjustable space ratio, d is the effectiveness of the control method, and e is the simultaneity rate.
4. The method according to claim 1, characterized in that Based on the power that is actually involved in the final regulation, the calculation of the reduced capacity increase according to the adjustable potential specifically includes: Based on the electricity that is actually involved in the final mediation, the benefit of reducing capacity increase is calculated according to Formula 2: Objective function Obj = min (total cost = Σ current capacity * operation and maintenance coefficient + adjustable potential S * scheduling cost coefficient + increased capacity * construction cost); Formula 2.
5. A device for calculating the capacity increase of group adjustment and control of building energy equipment, characterized in that: include: The first determination module is used to determine the group adjustment and group control flexible load of the building group, and determine the adjustable equipment and adjustment characteristics; The adjustable potential calculation module is used to calculate the flexible adjustable potential of group adjustment and group control based on the determined adjustable equipment and adjustment characteristics to obtain the adjustable potential; The second determination module is used to determine the load deviation according to the load forecast and the power capacity supply capability, and determine the power that actually participates in the regulation according to the actual dispatch; The module for calculating the reduced capacity increase is used to calculate the reduced capacity increase according to the adjustable potential based on the power actually involved in the final regulation.
6. The device according to claim 5, characterized in that The first determining module is specifically used for: A set of building energy equipment loads is established, and screening conditions are determined. Based on the screening conditions, flexible and adjustable loads that can be group-adjusted and group-controlled are screened out. The energy consumption characteristics and regulation characteristics of different equipment in the building are analyzed, the characteristics of the adjustable equipment and regulation are determined, and it is determined whether the equipment is installed with a terminal, power, adjustable proportion of this type of equipment, regulation method, and simultaneous rate. Among them, the flexible and adjustable loads that can be group-adjusted and group-controlled in the building group specifically include: air conditioning load, heating load, lighting load, and energy storage. The screening conditions include: proportion and regulation feasibility.
7. The device according to claim 5, characterized in that The adjustable potential estimation module is specifically used for: Based on the determined adjustable equipment and the characteristics of the adjustment, the flexible adjustable potential of group adjustment and group control is calculated according to Formula 1 to obtain the adjustable potential: Among them, S is the adjustable potential, n is the equipment type, a is the power of a certain type of equipment, b is whether the control equipment is installed and smooth communication is guaranteed, where 0 means not installed or communication cannot be guaranteed, 1 means installed, c is the theoretically adjustable space ratio, d is the effectiveness of the control method, and e is the simultaneity rate.
8. The device according to claim 5, characterized in that The less capacity increase calculation module is specifically used for: Based on the electricity that is actually involved in the final mediation, the benefit of reducing capacity increase is calculated according to Formula 2: Objective function Obj = min (total cost = Σ current capacity * operation and maintenance coefficient + adjustable potential S * scheduling cost coefficient + increased capacity * construction cost); Formula 2.
9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the method for calculating the capacity increase of group adjustment and control of building energy equipment as described in any one of claims 1 to 4.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores an implementation program for information transmission, and when the program is executed by the processor, the steps of the method for calculating the capacity increase of group adjustment and control of building energy equipment as described in any one of claims 1 to 4 are implemented.