Vertical shaft excavation supporting structure
By adopting oblique drilling pipe shed holes and steel pipe structures in the excavation of the vertical shaft, combined with consolidation grouting and spraying concrete support, the problem of rock mass inability to stabilize with poor geological conditions of the vertical shaft with large diameter is solved, and the rock mass stability is improved and construction safety.
Patent Information
- Application Number
- CN202420586815.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-25
AI Technical Summary
When excavating vertical shafts with large diameters and poor geological conditions, it is difficult for the existing technology to effectively pre-support, resulting in the inability to stabilize the rock mass and poses construction safety risks.
The oblique drilling pipe shed hole and steel pipe structure are adopted, combined with consolidation grouting and spraying concrete support, steel arch frames and anchors are installed, and rock mass detection and grouting effect inspection are carried out through the inspection holes to ensure the stability of the rock mass.
It effectively solved the problem of unstable rock mass support, improved the stability of the lower rock mass, and determined the rock mass conditions through inspection equipment to ensure construction safety.
Smart Images

Figure CN222045761U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of support systems, in particular to a shaft excavation support structure. Background Art
[0002] When excavating a shaft, sprayed anchor support is usually used. For small-diameter shafts, since the excavation has relatively little disturbance on the rock mass, sprayed anchor support can generally meet safety requirements. However, for shafts with larger diameters and poorer geological conditions, pre-support is required. At present, domestic shafts often use grid frames, sprayed concrete hanging nets, and anchor rod support. However, no effective pre-support structure is given for rock masses that cannot stabilize themselves after excavation, resulting in a lack of certain guarantees for the safety of shaft excavation construction in poor rock mass conditions and relatively broken rock masses that are difficult to stabilize themselves. Therefore, it is necessary to design a shaft excavation support structure to solve the above-mentioned practical engineering problems. Utility Model Content
[0003] The utility model aims to provide a supporting structure which can effectively pre-support the lower rock mass of shaft excavation.
[0004] To this end, the utility model adopts the following technical solutions:
[0005] A shaft excavation support structure is provided, in which a pipe-shelf hole obliquely drilled into the lower rock mass is arranged on a target excavation section of the rock mass, the opening angle of the pipe-shelf hole is between 35 degrees and 45 degrees, a first pipe-shelf steel pipe for grouting or a second pipe-shelf steel pipe for consolidation grouting is arranged in the pipe-shelf hole; the next cycle excavation section is immediately arranged below the target excavation section, and the bottom end of the pipe-shelf hole and the pipe-shelf steel pipe therein extends below the bottom of the next cycle excavation section of the rock mass.
[0006] Furthermore: a preliminary shotcrete layer is preset on the shaft wall of the target excavation section to ensure safe drilling of the pipe-roof hole.
[0007] Furthermore: a steel arch frame is installed in the target excavation section, and the steel arch frame is connected to the end of the pipe-roof steel pipe extending out of the rock mass. A re-sprayed concrete layer is provided on the well wall of the target excavation section after the well is excavated, and the re-sprayed concrete layer covers the end of the pipe-roof steel pipe extending out of the rock mass and the steel arch frame.
[0008] Furthermore: An anchor rod is arranged in the well wall of the target excavation section, and one end of the anchor rod protrudes out of the rock mass and plays the role of erecting a steel arch frame.
[0009] Furthermore: a drainage hole is arranged in the rock mass of the excavated area, and the end of the drainage hole passes through the sprayed concrete layer.
[0010] Furthermore: an inspection hole in the same direction as the pipe-roof hole is drilled on the well wall of the target excavation section, and an inspection channel for the inspection camera to pass through is formed inside the inspection hole, and the first pipe-roof steel pipe or the second pipe-roof steel pipe is later installed in the inspection hole.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] The utility model constructs a pipe-roof structure at a large downward angle so that the pipe-roof structure is combined with the consolidation grouting of the lower rock mass as support, thereby effectively solving the support problem of the rock mass that cannot be self-stabilized and has poor conditions when the well wall is excavated. At the same time, the inspection equipment of the utility model detects the conditions of the lower rock mass through the pipe-roof hole, which can further determine and thereby improve the stability of the lower excavated rock mass. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a horizontal section support diagram of the utility model;
[0014] Figure 2 This is a horizontal section support diagram of the utility model before the system anchor rod is driven in;
[0015] Figure 3 It is a schematic diagram of drilling a pipe shed hole at an oblique angle in the construction steps of the utility model;
[0016] Figure 4 It is a schematic diagram of the installation of the pipe shed in the construction steps of the utility model;
[0017] Figure 5 It is a schematic diagram of the pipe shed grouting and consolidation grouting of some pipe shed holes in the construction steps of the utility model;
[0018] Figure 6 It is a schematic diagram of drilling inspection holes in the construction steps of the utility model;
[0019] Figure 7 It is a schematic diagram of the TV inspection in the inspection hole in the construction steps of the utility model;
[0020] Figure 8 It is a schematic diagram of installing a pipe shed in an inspection hole in the construction steps of the utility model;
[0021] Fig. 9 It is a schematic diagram of the construction steps of the utility model when the pipe shed grouting is performed in the inspection hole;
[0022] Fig.10 It is a schematic diagram of the next cycle of excavation and initial spraying of concrete support after completing the anchor rod installation, steel arch installation and re-spraying of concrete in the construction steps of the utility model;
[0023] Fig.11It is a schematic diagram of the pipe-roof steel pipe of the utility model;
[0024] Fig.12 It is a schematic diagram of the pipe roof grouting of the utility model.
[0025] The marks in the attached drawing are: 1-first pipe rack steel pipe, 2-second pipe rack steel pipe, 3-drainage hole, 4-steel arch frame, 5-re-sprayed concrete layer, 6-reserved deformation, 7-anchor rod, 8-initial sprayed concrete layer, 9-inspection hole, 10-inspection camera, 11-geotextile, 12-pipe rack grouting hole, 13-slurry inlet pipe, 14-slurry outlet pipe, 15-sealing body, 16-grouting body, 17-pipe rack hole. DETAILED DESCRIPTION
[0026] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0027] like Figure 1-12 As shown, a vertical shaft excavation support structure is provided, in the target excavation section of the rock mass, a pipe-shelf hole 17 obliquely drilled into the lower rock mass is provided, and the opening angle of the pipe-shelf hole 17 is 40 degrees, so as to expand the effective consolidation grouting influence range of the lower surrounding rock; a first pipe-shelf steel pipe 1 for grouting or a second pipe-shelf steel pipe 2 for consolidation grouting is provided in the pipe-shelf hole 17, and a steel arch frame 4 is installed in the target excavation section, and the end of the pipe-shelf steel pipe extending out of the rock mass is obliquely overlapped on the steel arch frame 4, so that the force of the pipe-shelf structure can be transmitted to the steel arch frame 4, and a re-sprayed concrete layer 5 is provided on the shaft wall of the target excavation section after the pipe-shelf steel pipe support is completed, and the re-sprayed concrete layer 5 covers the end of the pipe-shelf steel pipe extending out of the rock mass and the steel arch frame 4; the next cycle excavation section is immediately provided below the target excavation section, and the length of the pipe-shelf hole 17 and the pipe-shelf steel pipe therein needs to penetrate to a sufficient depth below the bottom surface of the next cycle excavation section to ensure that the force of the pipe-shelf structure can be effectively transmitted to the unexcavated rock mass at the bottom of the next cycle excavation section.
[0028] In this embodiment, a primary shotcrete layer 8 is pre-set on the well wall of the target excavation section after excavation. The thickness of the primary shotcrete layer 8 is set to 5 cm to ensure the safety of drilling construction of the pipe support hole 17 and the inspection hole 9 during the support construction period.
[0029] An anchor rod 7 connected to the rock mass is arranged in the re-sprayed concrete layer 5. At the same time, a drainage hole 3 is arranged in the rock mass of the excavated area, and the end of the drainage hole 3 passes through the re-sprayed concrete layer 5. A steel mesh is hung inside the sprayed concrete layer 5.
[0030] In this embodiment, the support of the excavated section of the previous cycle of the shaft is formed by combining a pipe-roof structure, an annular steel arch frame, and sprayed anchor support. During the design, a reserved deformation amount of 6 needs to be considered to ensure the size of the structural concrete.
[0031] This embodiment also provides a pipe-roof steel pipe, which needs to be provided with a pipe-roof grouting hole 12 on the pipe section 250 cm away from the end (i.e., the end of the pipe-roof steel pipe extending out of the rock mass), and a geotextile 11 is installed inside the pipe at about 50 cm from the end and outside the pipe at 100 cm.
[0032] Based on the above content, a plugging body 15 is arranged inside the pipe-roof steel pipe through the geotextile 11 and between the pipe-roof steel pipe and the pipe-roof hole 17. The plugging body uses Sika 3200 cement slurry as a grout stopper for the pipe-roof steel pipe and the pipe-roof hole 17. A grout inlet pipe 13 and a grout outlet pipe 14 are arranged on the plugging body 15 for grouting and grouting.
[0033] This embodiment also provides a pipe-roof hole inspection structure, which can inspect the lower rock mass of the target excavation section and the grouting effect of the previous step to find out the geologically poor parts / collapsed cavities of the lower rock mass.
[0034] The inspection structure is provided with an inspection hole 9 drilled on the well wall of the target excavation section in the same direction as the pipe-roof hole 17. An inspection channel for the inspection camera 10 to pass through is formed inside the inspection hole 9. The inspection camera 10 is used to check the lower surrounding rock conditions and the grouting effect of the previous step. After the inspection, the first pipe-roof steel pipe 1 is installed in the inspection hole 9.
[0035] Among them, for the geologically poor area / collapsed cavity area, the number of inspection holes 9 can be opened in this area far exceeding that in other areas to ensure the effectiveness of the inspection.
[0036] See also Figure 1-12 When the excavation support structure is used to support the rock mass where the shaft wall cannot be self-stabilized and the conditions are poor, the specific contents are as follows:
[0037] S1: Make a preliminary judgment on the geology, and consider whether to build a pipe shed structure in the area with poor geological conditions in the lower excavation of the shaft. Use a preliminary sprayed concrete layer 8 on the shaft wall in the target drilling area to ensure the safety of the drilling construction;
[0038] S2: The pipe-roof hole 17 is drilled downward at an angle of 40 degrees into the surrounding rock in the lower area on the primary shotcrete layer 8;
[0039] S3: preparing the steel pipe of the pipe shed, thereby opening the grouting hole 12 of the pipe shed and setting the geotextile 11 inside and outside the steel pipe of the pipe shed;
[0040] S4: Install the pipe-roof steel pipe to the bottom of the pipe-roof hole 17, and set a plugging body 15 on the top of the pipe-roof steel pipe and the pipe-roof hole 17;
[0041] S5: using part of the pipe-roof holes 17 to perform pre-consolidation grouting to improve the parameters of the next cycle rock mass, ensure the safety of the next cycle excavation, and thereby form a grouting body 16 inside and outside the second pipe-roof steel pipe 2;
[0042] S6: Drilling an inspection hole 9, and inspecting the lower rock mass and the grouting effect of the previous step through an inspection camera 10;
[0043] S7: Install the first pipe rack steel pipe 1 in the inspection hole 9, and perform grouting on the first pipe rack steel pipe 1 in the remaining pipe rack holes 17 using a conventional method to complete the pipe rack construction;
[0044] S8: Install the steel arch 4 on the target excavation section and firmly connect it with the steel pipe of the pipe shed, hang the net and construct the sprayed concrete layer 5, and at the same time complete the drilling and installation of the required drainage pipe 3 in the excavated area to effectively relieve pressure;
[0045] S9: Excavate the next excavation cycle section, and repeat the contents of steps S1-S8 to support the next excavation cycle section. Whether the pipe-roof structure of the next excavation cycle section is set depends on the pipe-roof support spacing.
[0046] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.
Claims
1. A shaft excavation support structure, Features: A pipe-shelf hole (17) is provided on the target excavation section of the rock mass and is drilled obliquely into the lower rock mass. The opening angle of the pipe-shelf hole (17) is between 35 and 45 degrees. A first pipe-shelf steel pipe (1) for grouting or a second pipe-shelf steel pipe (2) for consolidation grouting is provided in the pipe-shelf hole (17); The lower layer of the target excavation section is immediately followed by the next cycle excavation section, and the bottom ends of the pipe support holes (17) and the pipe support steel pipes therein extend below the bottom of the next cycle excavation section of the rock mass.
2. A shaft excavation support structure according to claim 1, Features: A primary shotcrete layer (8) is preset on the well wall of the target excavation section to ensure safe drilling of the pipe support hole (17).
3. A shaft excavation support structure according to claim 1, Features: A steel arch frame (4) is installed in the target excavation section, and the steel arch frame (4) is connected to the end of the pipe-roof steel pipe extending out of the rock mass. A re-sprayed concrete layer (5) is provided on the well wall of the target excavation section after the well is excavated, and the re-sprayed concrete layer (5) covers the end of the pipe-roof steel pipe extending out of the rock mass and the steel arch frame (4).
4. A shaft excavation support structure according to claim 3, Features: An anchor rod (7) is arranged in the well wall of the target excavation section, and one end of the anchor rod (7) extends out of the rock mass and plays the role of erecting the steel arch frame (4).
5. A shaft excavation support structure according to claim 3, Features: A drainage hole (3) is arranged in the rock mass of the excavated area, and the end of the drainage hole (3) passes through the sprayed concrete layer (5).
6. A shaft excavation support structure according to claim 1, Features: An inspection hole (9) in the same direction as the pipe-roof hole (17) is also drilled on the well wall of the target excavation section, and an inspection channel for an inspection camera (10) to pass through is formed inside the inspection hole (9), and the first pipe-roof steel pipe (1) or the second pipe-roof steel pipe (2) is subsequently installed in the inspection hole (9).