Ore preliminary crushing device

By adopting a combined structure of guide plate and shield in the ore crushing device, the problem of gravel splash is solved, safety and crushing efficiency are improved, and the equipment is enhanced through the spring mechanism and the design of the feed hopper and maintenance port. practicality.

CN222076721UActive Publication Date: 2024-11-29HUBEI LONGMANG PHOSPHORUS CHEM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420578188.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-29
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

Existing ore crushing devices are prone to splashing gravel during the crushing process, which poses potential safety risks and may cause harm to the operators.

Method used

A preliminary ore crushing device was designed, using a combined structure of a guide plate and a shield plate. The guide plate was introduced into the ore above the crusher. The shield plate prevented the gravel from splashing, and the tilt of the shield plate was controlled through a spring mechanism, so that the hopper was convenient for the Add ore, maintenance port and safety lock to facilitate equipment maintenance, filtering guide plates and lead plates for waste slag filtering and collection.

Benefits of technology

It effectively avoids splashing of crushed stones, improves the safety of ore processing, reduces potential safety risks, and improves the crushing efficiency and practicality of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222076721U_ABST
    Figure CN222076721U_ABST
Patent Text Reader

Abstract

The utility model relates to an ore preliminary crushing device which comprises a preliminary crushing box, a feeding port penetrating through the preliminary crushing box is formed in the top of the preliminary crushing box, a discharging port penetrating through the preliminary crushing box is formed in one side of the preliminary crushing box, and a double-roller crusher is arranged in the preliminary crushing box; one side of the inner wall of the primary crushing box is fixedly connected with a first material guide plate, the other side of the inner wall of the primary crushing box is fixedly connected with a second material guide plate, and the second material guide plate is located below the first material guide plate; according to the scheme, when the ore crushing device is used, ore is placed into the primary crushing box through the feeding port, the first guide plate and the second guide plate are matched, the ore is guided into the roll crusher, the roll crusher is started to perform primary crushing treatment on the ore, and when the roll crusher rolls the ore, the second guide plate and the first guide plate are matched, so that the ore is crushed, and the crushing efficiency is improved. And the space above the roll crusher can be shielded to a certain extent, so that broken stones can be prevented from splashing to the outside of the feeding hole as much as possible.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ore processing, and in particular to a preliminary ore crushing device. Background Art

[0002] Ore is a general term for rocks or minerals on the earth that contain useful minerals. Ores usually contain metal elements or compounds needed by humans, such as iron, copper, aluminum, zinc, lead, etc., as well as non-metallic minerals such as coal, limestone, etc. Ores can be extracted and processed through processes such as mining and smelting, and used to manufacture various products, such as building materials, machinery and equipment, chemical products, etc. There are many types of ores, which can be divided into two categories: metal ores and non-metallic ores according to their composition and use. During the processing of ore, in order to speed up the processing efficiency of ore, it is usually necessary to use an ore preliminary crushing device. The ore preliminary crushing device is a device used to crush the original ore into smaller particles. This is an important step in the mining and smelting process. When used, it can speed up the processing efficiency of the ore.

[0003] The utility model with announcement number CN208679289U discloses an ore crushing device, which relates to the technical field of ore processing. The utility model comprises an external support bracket, a crushing box is connected inside the external support bracket, a feeding port is arranged on the top of the crushing box, and a discharge port is arranged on the bottom. Two crushing rollers that squeeze and mesh with each other are arranged below the feeding port in the crushing box, and a crankshaft is arranged below the crushing roller. One end of the crankshaft is connected to an inner wall of one side of the crushing box through a bearing, and the other end extends out of the crushing box and is connected to a first rotating drive mechanism. Several connecting rods are hinged on the crankshaft, and the ends of the several connecting rods away from the crankshaft are respectively hinged with a connecting shaft, and the ends of the several connecting shafts away from the connecting rods are respectively fixedly connected with a pressing plate, and a first filter plate is arranged between the pressing plate and the discharge port. The utility model performs coarse crushing of the ore, and then repeatedly rolls the ore through several pressing plates that can move up and down until the ore particles become smaller and are discharged from the filter plate, thereby effectively solving the problem of uneven ore crushing particle size and improving the ore crushing efficiency.

[0004] When the above technical solution is in use, personnel can place the ore into the crushing box through the feed port, and the crushing box can perform preliminary crushing on the ore through the crushing roller. However, when the ore is preliminarily crushed by the crushing roller, the crushing roller will produce flying gravel when rolling the ore. The gravel may splash outward from the feed port, which may cause certain harm to the surrounding operators. There is a certain potential safety risk, which is not conducive to actual use. Therefore, the technical personnel in this field provide a preliminary ore crushing device to solve the problems raised in the above background technology. Utility Model Content

[0005] In order to solve the problem raised in the above background technology that crushing rollers will produce flying crushed stones when crushing ore, and the crushed stones may splash outward from the feed port, thereby causing certain harm to the surrounding operators and posing certain potential safety risks, the present application provides a preliminary ore crushing device.

[0006] The present application provides a preliminary ore crushing device adopts the following technical solution:

[0007] A preliminary ore crushing device comprises a preliminary crushing box, a top of the preliminary crushing box is provided with a feed port which passes through the preliminary crushing box, a side of the preliminary crushing box is provided with a discharge port which passes through the preliminary crushing box, a double-roll crusher is arranged inside the preliminary crushing box, a first guide plate is fixedly connected to one side of the inner wall of the preliminary crushing box, a second guide plate is fixedly connected to the other side of the inner wall of the preliminary crushing box, the second guide plate is located below the first guide plate, the second guide plate is located above the double-roll crusher, a filter guide plate is hingedly connected to the other side of the inner wall of the preliminary crushing box, the filter guide plate is located below the double-roll crusher, and the side of the filter guide plate away from the hinged portion passes through the interior of the discharge port.

[0008] By adopting the above technical scheme, the ore is placed into the preliminary crushing box through the feed port, and the ore is guided into the double-roll crusher through the cooperation of the first guide plate and the second guide plate for preliminary crushing. When the double-roll crusher crushes the ore, the second guide plate cooperates with the first guide plate to shield the space above the double-roll crusher to a certain extent, thereby avoiding the splashing of crushed stones to the outside of the feed port as much as possible, and improving the safety of ore processing.

[0009] Preferably, a baffle plate located inside the feed port is hinged on the preliminary crushing box, a support plate is fixedly connected to one side of the inner wall of the preliminary crushing box, a first spring is fixedly connected to the support plate, and one end of the first spring away from the support plate is elastically connected to the lower surface of the baffle plate.

[0010] By adopting the above technical solution, the support plate cooperates with the first spring so that the baffle plate can shield the feed port to prevent some crushed stones from splashing out from the feed port. When ore is added from the feed port, the baffle plate can be controlled to tilt under the action of the gravity of the ore, so that the ore can enter the preliminary crushing box.

[0011] Preferably, a feed hopper is fixedly connected to the upper surface of the preliminary crushing box, and the feed hopper is communicated with the feed port.

[0012] By adopting the above technical solution, the feed hopper can facilitate personnel to add ore into the preliminary crushing box.

[0013] Preferably, an inspection port penetrating the preliminary crushing box is provided on one side of the preliminary crushing box, and an inspection door located inside the inspection port is movably connected to one side of the preliminary crushing box through a hinge, and a safety lock is provided on the inspection door.

[0014] By adopting the above technical solution, the inspection port cooperates with the inspection door, so that personnel can easily inspect the equipment inside the preliminary crushing box, and the position of the safety lock can be limited by the safety lock when the inspection door is closed.

[0015] Preferably, the filter guide plate comprises a rectangular frame hinged on the inner wall of the preliminary crushing box, a filter screen is fixedly connected to the inner wall of the rectangular frame, an end of the rectangular frame away from the hinged portion is fixedly connected to a guide plate, and the guide plate passes through the interior of the discharge port.

[0016] By adopting the above technical solution, the filter net can perform a certain filtering treatment on the waste slag, and the outlet plate can outlet the filtered ore to the outside of the discharge port.

[0017] Preferably, a mounting port penetrating the preliminary crushing box is provided on one side of the preliminary crushing box, the mounting port is located below the inspection port, a waste residue box is placed inside the mounting port, and the waste residue box is located below the filter guide plate.

[0018] By adopting the above technical solution, the filtered waste residue can be collected through the waste residue box, so that personnel can handle it in a centralized manner.

[0019] Preferably, a mounting plate is fixedly connected to one side of the inner wall of the preliminary crushing box close to the discharge port, a second spring is fixedly connected to the upper surface of the mounting plate, and an upper end surface of the second spring is elastically connected to the lower surface of the rectangular frame.

[0020] By adopting the above technical solution, the second spring is supported between the mounting plate and the rectangular frame. When a block of ore falls on the filter guide plate, the filter guide plate can be vibrated by the second spring, thereby enhancing the filtering effect of the filter guide plate on waste residue.

[0021] In summary, this application includes the following beneficial technical effects:

[0022] 1. The ore preliminary crushing device can place the ore into the preliminary crushing box through the opening of the feed port. The first guide plate cooperates with the second guide plate to guide the ore to the roller crusher. The roller crusher can be started to perform preliminary crushing on the ore. When the roller crusher crushes the ore, the second guide plate cooperates with the first guide plate to block the space above the roller crusher to a certain extent, thereby avoiding the splashing of broken stones to the outside of the feed port as much as possible, improving the safety of ore processing and reducing the potential safety risks. After the ore is crushed, the ore can be guided out of the discharge port through the filter guide plate;

[0023] 2. The ore preliminary crushing device cooperates with the first spring through the support plate, so that the shielding plate can shield the feed port to prevent some crushed stones from splashing outward from the feed port. When ore is added from the feed port, the shielding plate can be controlled to tilt under the action of the ore gravity, so that the ore can enter the preliminary crushing box, and the feed hopper can facilitate users to add ore into the preliminary crushing box;

[0024] 3. The preliminary ore crushing device can facilitate personnel to inspect the equipment inside the preliminary crushing box by cooperating with the inspection port and the inspection door. When the inspection door is closed, the position of the safety lock can be limited by the safety lock. The filter net can filter the waste slag to a certain extent. The export plate can export the filtered ore to the outside of the discharge port. The filtered waste slag can be collected by the waste slag box. When ore blocks fall on the filter guide plate, the filter guide plate can be vibrated by the second spring, thereby enhancing the filtering effect of the filter guide plate on the waste slag. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;

[0026] Figure 2 is a schematic cross-sectional structural diagram in an embodiment of the present application;

[0027] Figure 3 This is an embodiment of the present application Figure 2 A schematic diagram of the structure enlargement at point A;

[0028] Figure 4 This is an embodiment of the present application Figure 2 Schematic diagram of the enlarged structure at point B in FIG.

[0029] Explanation of the reference numerals in the accompanying drawings: 1. preliminary crushing box; 2. feed port; 3. discharge port; 4. double-roll crusher; 5. first guide plate; 6. second guide plate; 7. filter guide plate; 701. rectangular frame; 702. filter screen; 703. guide plate; 8. shielding plate; 9. support plate; 10. first spring; 11. feed hopper; 12. mounting port; 13. waste slag box; 14. mounting plate; 15. second spring; 16. inspection port; 17. inspection door; 18. safety lock. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1-4 This application is described in further detail.

[0031] The present application embodiment discloses a preliminary ore crushing device. Figure 1 and Figure 2 The ore preliminary crushing device comprises a preliminary crushing box 1, a feeding port 2 which passes through the preliminary crushing box 1 is provided on the top of the preliminary crushing box 1, a discharging port 3 which passes through the preliminary crushing box 1 is provided on one side of the preliminary crushing box 1, a double-roll crusher 4 is arranged inside the preliminary crushing box 1, a first guide plate 5 is fixedly connected to one side of the inner wall of the preliminary crushing box 1, a second guide plate 6 is fixedly connected to the other side of the inner wall of the preliminary crushing box 1, the second guide plate 6 is located below the first guide plate 5, and the second guide plate 6 is located above the double-roll crusher 4, a filter guide plate 7 is hinged on the other side of the inner wall of the preliminary crushing box 1, the filter guide plate 7 is located below the double-roll crusher 4, and the side of the filter guide plate 7 away from the hinged portion passes through the inside of the discharging port 3.

[0032] In this embodiment, the ore preliminary crushing device can place the ore that needs to be preliminary crushed into the interior of the preliminary crushing box 1 through the feed port 2 opened. After the preliminary crushing box 1 enters the interior of the preliminary crushing box 1, the ore can be preliminary crushed by starting the set double-roll crusher 4, and the first guide plate 5 and the second guide plate 6 are fixedly connected to the inner wall of the preliminary crushing box 1. The set first guide plate 5 and the second guide plate 6 are both inclined, and the side close to the inner wall of the preliminary crushing box 1 is higher, so that the first guide plate 5 cooperates with the second guide plate 6 to guide the ore to the top of the double-roll crusher 4, and the length of the first guide plate 5 is greater than that of the second guide plate 6. The ore added through the feed port 2 can be guided to the second guide plate 6 through the first guide plate 5, and then through the second guide plate Plate 6 can guide the ore into the middle part above the double-roll crusher 4, so as to facilitate the crushing process by the double-roll crusher 4, and when the double-roll crusher 4 crushes the ore, the second guide plate 6 cooperates with the first guide plate 5 to shield the space above the double-roll crusher 4 to a certain extent, so as to avoid the splashing of broken stones to the outside of the feed port 2 as much as possible, which can improve the safety of ore processing and reduce the potential safety risks, making the present application more conducive to practical use. A filtering guide plate 7 is arranged below the double-roll crusher 4, and the filtering guide plate 7 is inclined. The crushed ore can be guided out of the discharge port 3 through the filtering guide plate 7, and while the filtering guide plate 7 guides the ore, it can also filter some of the waste slag therein to a certain extent, which can improve the practicality of the present application.

[0033] In a further preferred embodiment of the present invention, Figure 1 , Figure 2 and Figure 3 As shown, a baffle plate 8 located inside the feed port 2 is hingedly connected to the preliminary crushing box 1, a support plate 9 is fixedly connected to one side of the inner wall of the preliminary crushing box 1, a first spring 10 is fixedly connected to the support plate 9, and one end of the first spring 10 away from the support plate 9 is elastically connected to the lower surface of the baffle plate 8.

[0034] In this embodiment, by cooperating with the support plate 9 and the first spring 10, the position of the baffle plate 8 can be limited when there is no external force, so that the baffle plate 8 can block the feed port 2 to prevent some gravel from splashing outward from the feed port 2, thereby enhancing the use effect of the present application. When personnel add ore from the feed port 2, the baffle plate 8 can be controlled to tilt from the hinged part with the primary crushing box 1 under the action of the gravity of the ore, so that the ore can enter the primary crushing box 1.

[0035] In a further preferred embodiment of the present invention, Figure 1 , Figure 2 and Figure 3As shown, a feed hopper 11 is fixedly connected to the upper surface of the preliminary crushing box 1 , and the feed hopper 11 is communicated with the feed port 2 .

[0036] In this embodiment, the feed hopper 11 is provided to facilitate personnel to add ore that needs to be initially crushed into the initial crushing box 1 .

[0037] In a further preferred embodiment of the present invention, Figure 1 As shown, an inspection port 16 penetrating the preliminary crushing box 1 is provided on one side of the preliminary crushing box 1, and an inspection door 17 located inside the inspection port 16 is movably connected to one side of the preliminary crushing box 1 through a hinge, and a safety lock 18 is provided on the inspection door 17.

[0038] In this embodiment, the inspection port 16 is provided to facilitate the user to inspect the equipment inside the preliminary crushing box 1, and the inspection door 17 can be opened and closed as needed. When the inspection door 17 is closed, the position of the safety lock 18 can be limited by the safety lock 18.

[0039] In a further preferred embodiment of the present invention, Figure 1 and Figure 2 As shown, a mounting opening 12 is provided on one side of the preliminary crushing box 1 for passing through the preliminary crushing box 1 . The mounting opening 12 is located below the inspection opening 16 . A waste residue box 13 is placed inside the mounting opening 12 . The waste residue box 13 is located below the filter guide plate 7 .

[0040] In this embodiment, the installation position of the waste residue box 13 can be limited by the installation opening 12, and the filtered waste residue can be collected by the waste residue box 13, so that it is convenient for personnel to handle it in a centralized manner.

[0041] In a further preferred embodiment of the present invention, Figure 1 , Figure 2 and Figure 4 As shown, the filter guide plate 7 includes a rectangular frame 701 hinged on the inner wall of the preliminary crushing box 1, the inner wall of the rectangular frame 701 is fixedly connected with a filter screen 702, and one end of the rectangular frame 701 away from the hinged part is fixedly connected with an export plate 703, and the export plate 703 passes through the interior of the discharge port 3.

[0042] In this embodiment, the installation positions of the filter screen 702 and the export plate 703 can be limited by the rectangular frame 701, the waste residue can be filtered to a certain extent by the filter screen 702, and the filtered ore can be exported to the outside of the discharge port 3 by the provided export plate 703.

[0043] In a further preferred embodiment of the present invention, Figure 2 and Figure 4As shown, a mounting plate 14 is fixedly connected to one side of the inner wall of the preliminary crushing box 1 near the discharge port 3 , a second spring 15 is fixedly connected to the upper surface of the mounting plate 14 , and the upper end surface of the second spring 15 is elastically connected to the lower surface of the rectangular frame 701 .

[0044] In this embodiment, the installation position of the second spring 15 can be limited by the mounting plate 14, and the second spring 15 is supported between the mounting plate 14 and the rectangular frame 701, so that when a block of ore falls on the filter guide plate 7, the filter guide plate 7 can vibrate through the second spring 15, thereby enhancing the filtering effect of the filter guide plate 7 on the waste residue.

[0045] The implementation principle of the ore preliminary crushing device in the embodiment of the present application is:

[0046] During use, the ore that needs to be preliminarily crushed is placed into the preliminary crushing box 1 through the opened feed port 2, and the ore is introduced into the double-roll crusher 4 through the cooperation of the first guide plate 5 and the second guide plate 6. The double-roll crusher 4 can be started to perform preliminarily crushing on the ore. When the double-roll crusher 4 crushes the ore, the second guide plate 6 cooperates with the first guide plate 5 to shield the space above the double-roll crusher 4 to a certain extent, so as to avoid the splashing of crushed stones to the outside of the feed port 2 as much as possible, thereby improving the safety of ore processing, reducing the potential safety risks, and making the present application more conducive to practical use. After the ore is crushed, the ore can be guided out of the discharge port 3 through the filtering guide plate 7 to complete the processing of the preliminary crushing of the ore.

[0047] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A preliminary ore crushing device, comprising a preliminary crushing box (1), characterized in that: The top of the preliminary crushing box (1) is provided with a feed port (2) which passes through the preliminary crushing box (1), and one side of the preliminary crushing box (1) is provided with a discharge port (3) which passes through the preliminary crushing box (1). A double-roll crusher (4) is arranged inside the preliminary crushing box (1). A first material guide plate (5) is fixedly connected to one side of the inner wall of the preliminary crushing box (1), and a second material guide plate (6) is fixedly connected to the other side of the inner wall of the preliminary crushing box (1). The second material guide plate (6) is located below the first material guide plate (5), and the second material guide plate (6) is located above the double-roll crusher (4). A filter guide plate (7) is hingedly connected to the other side of the inner wall of the preliminary crushing box (1), and the filter guide plate (7) is located below the double-roll crusher (4). The side of the filter guide plate (7) away from the hinged portion passes through the inside of the discharge port (3).

2. The ore preliminary crushing device according to claim 1 is characterized in that: The preliminary crushing box (1) is hinged with a shielding plate (8) located inside the feed port (2); one side of the inner wall of the preliminary crushing box (1) is fixedly connected with a support plate (9); the support plate (9) is fixedly connected with a first spring (10); one end of the first spring (10) away from the support plate (9) is elastically connected to the lower surface of the shielding plate (8).

3. The ore preliminary crushing device according to claim 1 is characterized in that: A feed hopper (11) is fixedly connected to the upper surface of the preliminary crushing box (1), and the feed hopper (11) is connected to the feed port (2).

4. The ore preliminary crushing device according to claim 1, characterized in that: A maintenance opening (16) penetrating the preliminary crushing box (1) is provided on one side of the preliminary crushing box (1); a maintenance door (17) located inside the maintenance opening (16) is movably connected to one side of the preliminary crushing box (1) via a hinge; and a safety lock (18) is provided on the maintenance door (17).

5. The ore preliminary crushing device according to claim 1 is characterized in that: The filter guide plate (7) comprises a rectangular frame (701) hinged on the inner wall of the preliminary crushing box (1), a filter screen (702) is fixedly connected to the inner wall of the rectangular frame (701), and an outlet plate (703) is fixedly connected to one end of the rectangular frame (701) away from the hinged portion, and the outlet plate (703) passes through the interior of the discharge port (3).

6. The ore preliminary crushing device according to claim 4, characterized in that: A mounting opening (12) is provided on one side of the preliminary crushing box (1) for passing through the preliminary crushing box (1); the mounting opening (12) is located below the inspection opening (16); a waste residue box (13) is placed inside the mounting opening (12); and the waste residue box (13) is located below the filter guide plate (7).

7. The ore preliminary crushing device according to claim 5, characterized in that: A mounting plate (14) is fixedly connected to one side of the inner wall of the preliminary crushing box (1) close to the discharge port (3), a second spring (15) is fixedly connected to the upper surface of the mounting plate (14), and the upper end surface of the second spring (15) is elastically connected to the lower surface of the rectangular frame (701).