Magnetic suspension jig loading system

Through the magnetic levitation fixture loading system, the assembly process of the fixture is automatically completed using technologies such as magnetic levitation tracks and multi-axis robotic arms, which solves the problems of low manual operation efficiency and unstable quality, and achieves an efficient and stable assembly process.

CN222114185UActive Publication Date: 2024-12-06SHENZHEN FRESHEN TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323514829.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-12-06
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

During the assembly process of laptop keyboards, mobile phone case and other products, manually turning the cover plate to close the fixture is inefficient, requiring multiple people to operate, the labor cost is high and the assembly quality is unstable.

Method used

A magnetic levitation fixture loading system is designed, including a chassis, a magnetic levitation track, a Band loading assembly, a fixture loading assembly, a first assembly, a second assembly assembly and a snap assembly assembly, which is grasped by a robot and multi-axis The mechanical arm suction cup and other technologies automatically complete the Band loading, loading of fixtures and opening and closing of the upper cover, improving assembly efficiency and quality.

Benefits of technology

It significantly improves assembly efficiency and product quality, reduces labor costs, and improves the stability and efficiency of the assembly process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222114185U_ABST
    Figure CN222114185U_ABST
Patent Text Reader

Abstract

The utility model discloses a magnetic suspension jig loading system. The magnetic suspension track is arranged on the bottom frame and used for carrying magnetic suspension trays, and the Band feeding assembly, the jig feeding assembly, the first assembling assembly, the second assembling assembly, the buckle assembling assembly and the upper string rod device are sequentially arranged in the conveying direction of the magnetic suspension track. According to the automatic assembling device, Band feeding, jig feeding and upper cover opening are completed through the Band feeding assembly, the jig feeding assembly, the first assembling assembly, the second assembling assembly and the buckle assembling assembly, then matching of the Band and the jig and covering of the upper cover are completed, finally, buckles are installed through the buckle assembling assembly, assembling is completed, and the assembling efficiency and the product quality are obviously improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a magnetic suspension fixture loading system. Background Art

[0002] At present, in the process of assembling products such as laptop keyboards and mobile phone shells, it is usually necessary to place the product on the base of the jig for positioning, then place assembly parts such as magnets on the cover of the jig, and manually flip the cover to close the jig so that the cover drives the assembly parts to the corresponding position of the product, thereby facilitating assembly operations such as welding, baking and pasting. However, the manual flipping of the cover to close the jig is inefficient, and it requires multiple people to close the jig on the transmission line, which has high labor costs; in addition, the assembly quality yield of manual work is low and unstable. Summary of the invention

[0003] The main purpose of the present invention is to provide a magnetic suspension fixture loading system, aiming to solve the above technical problems.

[0004] To achieve the above-mentioned purpose, the present invention proposes a magnetic levitation jig loading system comprising a base frame, a magnetic levitation track for carrying magnetic levitation pallets, and a Band loading component, a jig loading component, a first assembly component, a second assembly component, and a snap assembly component arranged in sequence along the conveying direction of the magnetic levitation track. The Band loading component is used to grab the Band from the flow conveyor belt to the carrier on the magnetic levitation track, the jig loading component is used to grab the jig into the carrier and remove the upper cover of the jig, the first assembly component is used to assemble the Band into the jig, the second assembly component is used to snap the upper cover onto the jig, and the snap assembly component is used to snap the upper cover and the lower cover of the jig together in different directions through snaps.

[0005] In one embodiment, the Band loading assembly includes a first grabbing robot disposed on a base frame, and the first grabbing robot can switch between the flow conveyor belt and the magnetic levitation track.

[0006] In one embodiment, the magnetic suspension jig loading system further includes an NG recovery line disposed at the Band feeding assembly, and the first grasping robot can grasp the NG Band onto the NG recovery line.

[0007] In one embodiment, the jig loading assembly includes a connected conveying line, a plurality of material frames and a second grasping robot, the material frame can flow in the conveying line, and the second grasping robot is used to grasp the jig in the material frame into the carrier and remove the upper cover of the jig.

[0008] In one embodiment, the conveying line includes a full material frame line, a material frame transport line and an empty frame transport line, several material frames, several jigs are loaded in the material frames, and the material frame transport line is arranged parallel to the magnetic levitation track.

[0009] In one embodiment, the conveying assembly line is U-shaped, and the second grasping robot is arranged between the full frame assembly line and the empty frame assembly line.

[0010] In one embodiment, the first assembly component includes a multi-axis robot arm and a suction cup disposed at an end of the multi-axis robot arm, and the suction cup is used to suck the Band onto the fixture.

[0011] In one embodiment, the snap-on assembly component includes a first snap-on assembly station and a second snap-on assembly station, the first snap-on assembly station is used to absorb the snap-on to be snapped onto the jig in a horizontal direction, and the second snap-on assembly station is equipped with a rotating module to snap the snap-on onto the jig in a direction inclined to the horizontal direction after rotation.

[0012] In one embodiment, the buckle assembly component further includes a buckle plate and a vibration module disposed on the buckle plate.

[0013] In one embodiment, the carrier includes an assembly station and a cover-laying station arranged in parallel.

[0014] In the technical solution of the present invention, the magnetic levitation jig loading system includes a base frame, a magnetic levitation track for carrying magnetic levitation pallets, and a Band loading component, a jig loading component, a first assembly component, a second assembly component, and a snap assembly component arranged in sequence along the conveying direction of the magnetic levitation track. The Band loading component is used to grab the Band from the flow conveyor belt to the carrier on the magnetic levitation track, the jig loading component is used to grab the jig into the carrier and remove the upper cover of the jig, the first assembly component is used to assemble the Band into the jig, the second assembly component is used to snap the upper cover onto the jig, and the snap assembly component is used to snap the upper cover and the lower cover of the jig together in different directions through snaps. The present application completes the loading of the Band, the loading of the jig and the opening of the upper cover through the Band loading component, the jig loading component, the first assembly component, the second assembly component and the buckle assembly component, then completes the coordination of the Band and the jig and the closing of the upper cover, and finally installs the buckle through the buckle assembly component to complete the assembly, which significantly improves the assembly efficiency and product quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0016] Figure 1 It is a structural schematic diagram of a magnetic suspension fixture loading system according to an embodiment of the present invention;

[0017] Figure 2 It is a schematic structural diagram of a jig feeding assembly according to an embodiment of the present invention.

[0018] Explanation of the accompanying drawings: 10, chassis; 20, magnetic levitation track; 30, flow conveyor belt; 40, Band loading assembly; 50, fixture loading assembly; 51, full frame assembly line; 52, frame transport assembly line; 53, empty frame transport assembly line; 60, first assembly assembly; 70, second assembly assembly; 80, first buckle assembly station; 90, second buckle assembly station; 100, upper string rod equipment; 110, NG recovery assembly line; 120, buckle tray.

[0019] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0022] In addition, in the present invention, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0023] Furthermore, the technical solutions between the various embodiments of the present invention may be combined with each other, but this must be based on the fact that they can be implemented by ordinary technicians in the field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0024] The invention provides a magnetic suspension fixture loading system.

[0025] like Figure 1-2 As shown, the magnetic levitation jig loading system provided by the embodiment of the present invention includes a base frame 10, and a magnetic levitation track 20 for carrying magnetic levitation pallets, all of which are arranged on the base frame 10, and a Band loading component 40, a jig loading component 50, a first assembly component 60, a second assembly component 70, and a buckle assembly component arranged in sequence along the conveying direction of the magnetic levitation track 20. The Band loading component 40 is used to grab the Band from the flow conveyor belt 30 to the carrier on the magnetic levitation track 20, the jig loading component 50 is used to grab the jig into the carrier and remove the upper cover of the jig, the first assembly component 60 is used to assemble the Band into the jig, the second assembly component 70 is used to buckle the upper cover to the jig, and the buckle assembly component is used to buckle the upper cover and the lower cover of the jig in different directions through buckles.

[0026] In this embodiment, the Band loading component 40, the jig loading component 50, the first assembly component 60, the second assembly component 70, and the buckle assembly component are used to complete the loading of the Band, the loading of the jig, and the opening of the upper cover. Subsequently, the Band and the jig are matched and the upper cover is closed. Finally, the buckle is installed through the buckle assembly component to complete the assembly, which significantly improves the assembly efficiency and product quality.

[0027] Specifically, the Band loading assembly 40 includes a first grabbing robot disposed on the base frame 10, and the first grabbing robot can switch between the flow conveyor belt 30 and the magnetic suspension track 20. At the same time, the magnetic suspension fixture loading system also includes an NG recovery line 110 disposed at the Band loading assembly 40, and the first grabbing robot can grab the NG Band to the NG recovery line 110.

[0028] In the above embodiment, the jig loading assembly 50 includes a connected conveying line, a plurality of material frames and a second grasping robot, the material frame can flow in the conveying line, and the second grasping robot is used to grasp the jig in the material frame into the carrier and remove the upper cover of the jig. In this embodiment, the conveying line includes a full material frame line 51, a material frame transport line 52 and an empty frame transport line 53, a plurality of jigs are loaded in the material frame, the material frame transport line 52 is arranged in parallel with the magnetic levitation track 20, the conveying line is U-shaped, and the second grasping robot is arranged between the full material frame line 51 and the empty frame line. The starting end of the full material frame assembly line 51 can lift the material frame onto the full material frame assembly line 51 by jacking. When passing through the material frame transport assembly line 52, the second grasping robot transfers the fixture to the assembly of the carrier, and at the same time moves the upper cover of the fixture and places it on the upper cover station of the carrier.

[0029] Furthermore, the first assembly component 60 includes a multi-axis robot arm and a suction cup disposed at the end of the multi-axis robot arm, and the suction cup is used to suck the Band onto the fixture. In this embodiment, the multi-axis robot arm can move in the height direction and in the front-back and left-right directions of the plane, thereby driving the suction cup to suck the Band and move it to the fixture. The second assembly component 70 can also move the upper cover to the fixture loaded with the Band by setting a multi-axis robot arm and a suction cup.

[0030] Further, the buckle assembly assembly includes a first buckle assembly station 80 and a second buckle assembly station 90, wherein the first buckle assembly station 80 is used to absorb the buckle and buckle it to the jig in the horizontal direction, and the second buckle assembly station 90 is equipped with a rotating module to buckle the buckle to the jig in a direction inclined to the horizontal direction after rotation. When the jig flows through the first buckle assembly station 80 and the second buckle assembly station 90 in sequence, the third grasping robot arranged at the first buckle assembly station 80 and the second buckle assembly station 90 can grasp the buckle on the buckle carrier, and the first buckle assembly station 80 absorbs the buckle on the buckle carrier and buckles it to the jig in the horizontal direction, and the second buckle assembly station 90 absorbs the buckle on the buckle carrier and buckles it to the jig in a direction inclined to the horizontal direction. It can be understood that the buckle positions of the first buckle assembly station 80 and the second buckle assembly station 90 can be adjusted according to different products. The first buckle assembly station 80 and the second buckle assembly station 90 can also be configured as a multi-axis robot arm with different tool heads to work.

[0031] The buckle assembly assembly further includes a buckle plate 120 and a vibration module disposed on the buckle plate 120. By providing the buckle plate 120 and the vibration module, the vibration module vibrates the buckle in the buckle plate 120 to adjust the orientation, so as to facilitate the third grasping robot to grasp.

[0032] In addition, after the buckle is assembled, the assembled products can be transported by the upper string rod device 100, and good products and NG products can be sorted by inspection.

[0033] It can be understood that the main improvements of the present application lie in the installation positions of multiple components and the loading process of the fixture. For the specific structure of each component, such as a multi-axis robotic arm, a multi-axis manipulator, a magnetic levitation track 20, etc. and the corresponding electrical connections, those skilled in the art can adopt the existing technology, and the specific component structure of a certain component will not be elaborated here.

[0034] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A magnetic suspension fixture loading system, characterized in that: The magnetic suspension fixture loading system comprises a base frame (10), a magnetic suspension track (20) for transporting a magnetic suspension tray and arranged on the base frame (10), and a band loading assembly (40), a fixture loading assembly (50), a first assembly assembly (60), a second assembly assembly (70), a buckle assembly assembly, and an upper string rod device (100) arranged in sequence along the conveying direction of the magnetic suspension track (20). The band loading assembly (40) is used to grab the band from the flow conveyor belt (30) to the upper string rod device (100). In the carrier on the magnetic levitation track (20), the jig loading component (50) is used to grab the jig into the carrier and remove the upper cover of the jig, the first assembly component (60) is used to assemble the Band into the jig, and the second assembly component (70) is used to buckle the upper cover to the jig, the buckle assembly component is used to buckle the upper cover and the lower cover of the jig in different directions by buckles, and the upper string rod device (100) is used to transport the assembled products.

2. The magnetic suspension fixture loading system according to claim 1, characterized in that: The Band loading assembly (40) comprises a first grabbing robot arranged on a base frame (10), and the first grabbing robot can switch between a flow conveyor belt (30) and the magnetic suspension track (20).

3. The magnetic suspension fixture loading system according to claim 2, characterized in that: The magnetic suspension jig loading system further comprises an NG recovery line (110) arranged at the Band feeding component (40), and the first grasping robot can grasp the NG Band onto the NG recovery line (110).

4. The magnetic suspension fixture loading system according to claim 1, characterized in that: The jig loading assembly (50) comprises a connected conveying line, a plurality of material frames and a second grasping robot, wherein the material frame can flow in the conveying line, and the second grasping robot is used to grasp the jig in the material frame into the carrier and remove the upper cover of the jig.

5. The magnetic suspension fixture loading system according to claim 4, characterized in that: The conveying assembly line comprises a full material frame assembly line (51), a material frame transport assembly line (52) and an empty frame transport assembly line (53); a plurality of jigs are loaded in the material frame; and the material frame transport assembly line (52) is arranged in parallel with the magnetic suspension track (20).

6. The magnetic suspension fixture loading system according to claim 5, characterized in that: The conveying assembly line is U-shaped, and the second grabbing robot is arranged between the full frame assembly line (51) and the empty frame transport assembly line (53).

7. The magnetic suspension fixture loading system according to claim 1, characterized in that: The first assembly component (60) comprises a multi-axis mechanical arm and a suction cup arranged at the end of the multi-axis mechanical arm, and the suction cup is used to suck the Band onto the fixture.

8. The magnetic suspension fixture loading system according to claim 1, characterized in that: The buckle assembly component includes a first buckle assembly station (80) and a second buckle assembly station (90), wherein the first buckle assembly station (80) is used to absorb the buckle and buckle it onto the jig in a horizontal direction, and the second buckle assembly station (90) is equipped with a rotating module to buckle the buckle onto the jig in a direction inclined to the horizontal direction after rotation.

9. The magnetic suspension fixture loading system according to claim 8, characterized in that: The buckle assembly component also includes a buckle plate (120) and a vibration module arranged on the buckle plate (120).

10. The magnetic suspension fixture loading system according to any one of claims 1 to 9, characterized in that: The carrier comprises an assembly station and a cover station which are arranged in parallel.