Earth dam paving device for fill roadbed
Through the filling roadbed earth dam paving device integrating the earth dam construction module and the mortar surface smear module, the problems of low efficiency and poor quality of the temporary earth dam construction and mortar surface smear in the existing technology are solved, and the rapid and efficient Earth dam construction and mortar smearing reduce costs and accident risks.
Patent Information
- Application Number
- CN202422878732.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-11-26
AI Technical Summary
There are problems of low efficiency, poor quality, high cost and construction accident risk during the construction of temporary earth dams in the existing filling roadbed and mortar smearing process.
A filling roadbed earth dam paving device integrating earth dam construction module and mortar surface smear module was designed. The inverted groove-type housing structure was adopted, combined with the vibration-filling mechanism to achieve rapid forming of earth dam and continuous mortar surface smear, and improve the Construction efficiency and quality.
The rapid construction of the earth dam and mortar smearing of the fill roadbed earth dam are achieved, the construction efficiency is improved, the quality of the earth dam is ensured, the cost is reduced, and the risk of construction accidents is reduced.
Smart Images

Figure CN222275191U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a fill roadbed construction facility, in particular to a fill roadbed earth dam paving device, belonging to the technical field of fill roadbed construction equipment. Background Art
[0002] In recent years, the requirements for slope drainage and temporary projects in road and building construction have become increasingly stringent, and the use of more portable and accurate equipment for on-site construction has played an increasingly important role. Convenient prefabricated equipment has the characteristics of energy saving and high efficiency, green environmental protection, excellent quality, and high construction precision.
[0003] The existing temporary earth dams for fill roadbeds are mostly constructed by on-site workers and mortared. There are shortcomings in on-site construction, such as long construction time, low efficiency, and high labor costs. In addition, it is easy to cause human-caused accidents during on-site construction, which can easily lead to low construction quality and construction accidents. In addition, when temporary earth dams are constructed by on-site workers or machinery such as excavators, they are generally unable to be effectively vibrated and compacted, and the construction quality is low, which does not meet the quality requirements, and the construction gap is large and unsightly. Mortaring is also a manual process, and manual mortaring is inefficient and of poor quality. Utility Model Content
[0004] In view of the problems of low efficiency, poor quality and high cost in the prior art of constructing temporary earth dams and mortar finishing for fill roadbeds by manual labor and excavators, the utility model provides a fill roadbed earth dam paving device, which integrates an earth dam construction module and an earth dam surface mortar finishing module into one. While the earth dam construction module with a synchronous compaction mechanism is used to realize rapid construction of the earth dam, the earth dam surface mortar finishing module can be used to perform mortar finishing on the newly constructed earth dam. Continuous operation is possible, and while the construction efficiency is high, the stability of the earth dam quality can be effectively guaranteed, and the construction cost is greatly reduced.
[0005] In order to achieve the above technical objectives, the technical solutions adopted by the present utility model are as follows:
[0006] A paving device for earth dam of fill roadbed, the device comprising: a casing, a soil feeding mechanism, a dam-building mold, a vibration mechanism, a mortar feeding mechanism and a plastering mold. The casing is a groove-type structure with an inverted arrangement. The soil feeding mechanism is arranged at the top of one end of the casing. The dam-building mold is arranged inside the casing and below the soil feeding mechanism. The vibration mechanism is located inside the casing and arranged on the dam-building mold. The mortar feeding mechanism is arranged at the top of the other end of the casing. The plastering mold is arranged inside the casing and below the mortar feeding mechanism. The inner diameter of the plastering mold is larger than the inner diameter of the dam-building mold.
[0007] Preferably, the soil feeding mechanism comprises a soil adding funnel and a material leakage channel. The soil adding funnel is arranged on the top of the casing, the upper end of the material leakage channel passes through the casing and is connected to the material discharge end of the soil adding funnel, and the lower end of the material leakage channel is connected to the inside of the dam-building mold.
[0008] Preferably, the material leakage channel is a foldable elastic channel. A first booster pump is also arranged between the soil adding funnel and the material leakage channel.
[0009] Preferably, the foldable and retractable elastic channel is a bellows.
[0010] Preferably, a vibrating screening plate is also provided inside the soil adding funnel.
[0011] Preferably, the damming mold comprises a damming top plate and a damming side plate. A pair of damming side plates are symmetrically arranged on both sides of the damming top plate in the width direction to form an inverted groove-shaped mold cavity. The outer plate surfaces of the damming top plate and the damming side plates are connected to the inner wall of the casing through independent front connecting rods.
[0012] Preferably, a front annular slide rail extending along the circumference of the housing is also provided on the inner wall of the housing. Each front connecting rod is connected to the front annular slide rail through an independent slide seat. Each front connecting rod is provided with a vibration mechanism.
[0013] Preferably, a horizontal slide rail extending along the width direction of the dam-building top plate is provided on the lower plate surface, and the upper ends of the two dam-building side plates are connected to the horizontal slide rail through independent slide seats. The front connecting rod is a telescopic connecting rod, and the upper ends of the two dam-building side plates are hinged to the slide seats. The front end opening of the groove-shaped mold cavity is an outward expansion opening.
[0014] Preferably, the articulation is a hinge connection, that is, the upper ends of the two dam-building side plates are connected to the sliding seat by hinges.
[0015] Preferably, the mortar feeding mechanism comprises a grouting funnel and a grouting channel. The grouting funnel is arranged on the top of the casing, the upper end of the grouting channel passes through the casing and is connected to the discharge end of the grouting funnel, and the lower end of the grouting channel is connected to the inside of the plastering mold. The grouting channel is a foldable and retractable elastic channel.
[0016] Preferably, the foldable and retractable elastic channel is a bellows.
[0017] Preferably, a second booster pump is provided between the grouting funnel and the grouting channel.
[0018] Preferably, the plastering mold includes a plastering top plate and a plastering side plate. A pair of plastering side plates are symmetrically arranged on both sides of the plastering top plate in the width direction to form an inverted groove-shaped plastering cavity. A rear annular slide rail extending along its circumference is also arranged on the inner wall of the casing. A plurality of rear connecting rods are arranged on the rear annular slide rail through a plurality of independent slide seats. The outer plate surfaces of the plastering top plate and the plastering side plates are connected to the rear annular slide rail through independent rear connecting rods. A vibration mechanism is arranged on each rear connecting rod.
[0019] Preferably, a horizontal slide rail extending along the width direction is arranged on the lower plate surface of the plastering top plate, and the upper ends of the two plastering side plates are connected to the horizontal slide rail through independent slide seats. The rear connecting rod is a telescopic connecting rod. The upper ends of the two plastering side plates are hinged to the slide seats. The front end opening of the groove-shaped plastering cavity is an outward expansion opening.
[0020] Preferably, the articulation is achieved by hinge connection, that is, the upper ends of the two plastered side panels are connected to the sliding seat by hinges.
[0021] Preferably, a group of traction mechanical arms are also arranged at the front end of the casing.
[0022] Preferably, the compaction mechanism is a vibration motor.
[0023] In the utility model, the earth dam paving device for the fill roadbed of the utility model adopts an assembled design, which is mainly divided into two modules, one is an earth dam construction module with an automatic vibration mechanism, and the other is an earth dam surface mortar finishing module (which may also be equipped with an automatic vibration mechanism). The earth dam construction module and the earth dam surface mortar finishing module are integrated into one by an inverted groove-type casing, thereby realizing the continuous operation of earth dam construction and mortar finishing. The casing is mainly made of steel structure material, which has the characteristics of high strength and good durability. While playing a supporting role, it can also play a good protective role for the other components. In addition, a group of traction mechanical arms are also arranged at the front end of the casing. The traction mechanical arms are also composed of steel structures. The main function is to be mechanically connected to the assembled vehicle to provide traction support for the earth dam paving device for the fill roadbed. The connection method is reliable and convenient.
[0024] In the utility model, the soil feeding mechanism includes a soil adding funnel and a material leakage channel. The soil adding funnel is connected to the mold cavity of the dam-building mold through the material leakage channel. The external soil enters the material leakage channel through the soil adding funnel, and finally enters the mold cavity of the dam-building mold to form a target-shaped earth dam through the molding action of the dam-building mold. In a preferred embodiment, a first booster pump is also arranged between the soil adding funnel and the material leakage channel. The first booster pump mainly pressurizes the soil entering the material leakage channel, so that it quickly passes through the material leakage channel and enters the mold cavity of the dam-building mold and fills the mold cavity of the dam-building mold with soil. Further, a vibration screening plate is also arranged inside the soil adding funnel. The vibration screening plate is mainly composed of a rigid screen plate, a rigid spring and a micro vibration motor (by directly purchasing a mature product with a vibration screening function on the market). It mainly screens the soil entering the soil adding funnel and screens out larger objects or longer objects to avoid damage to the first booster pump.
[0025] In the utility model, the dam-building mold includes a dam-building top plate and a dam-building side plate. The dam-building top plate is horizontally arranged and a pair of dam-building side plates are symmetrically arranged on both sides of the dam-building top plate in the width direction (the width direction of the earth dam) to form an inverted groove-shaped mold cavity (similar to the inner cavity structure of the casing), and the outer side (referring to the outer side of the mold cavity) of the dam-building top plate and the dam-building side plate are connected to the inner wall of the casing through an independent front connecting rod. In a preferred embodiment, the leakage channel is a folding and retracting elastic channel (similar to the structure of a foldable and retractable straw), and the front connecting rod is a telescopic connecting rod (mainly including a power cylinder and a sleeve-type telescopic rod, such as a hydraulic telescopic rod, an electric telescopic rod, which is a mature product that can be directly purchased on the market), and a front annular slide rail extending along its circumference is also arranged on the inner wall of the casing. Each front connecting rod is connected to the front annular slide rail through an independent slide seat (the front connecting rod and the slide seat can be hinged through a universal joint). That is to say, the front connecting rod can be adjusted by telescopic adjustment and can also move semicircularly along the front annular slide rail. A horizontal slide rail extending along the width direction is arranged on the lower plate surface of the damming top plate, and the upper ends of the two damming side plates are respectively connected to the horizontal slide rail through independent slide seats, and the upper ends of the two damming side plates are hinged to the slide seats (for example, hinges are used for hinge connection). The relative position relationship between the damming top plate and the damming side plates can be adjusted by the telescopic and circular movement of the front connecting rod, thereby achieving the purpose of adjusting the shape and size of the mold cavity inside the damming mold, thereby improving the application range of the device and improving its applicability and practicality. It should be noted that the front end opening of the groove-shaped cavity of the dam-building mold is an outward-expanding opening, and the soil from the leakage channel mainly enters the range of the outward-expanding opening for accumulation, and then when it moves forward with the random shell, the soil inside can enter the rear earth dam compaction template. Because the unit volume of the earth dam compaction template is small, the soil will be compacted once, and the vibration mechanism (such as a vibration motor) will work at the same time, using a certain frequency for vibration compaction. Make the interior of the soil further filled and more dense. It should be noted that in the present utility model, the vibration mechanism can be directly set on the dam top plate and dam side plate of the dam-building mold, or it can be set on the front connecting rod (the vibration mechanism on the plastering mold can also be set in this way).
[0026] In the present invention, the overall structure of the plastering mold is similar to that of the dam-building mold (but without the outward-expanding opening), but during use, it is necessary to adjust its size so that the internal groove-shaped plastering cavity is one size larger than the groove-shaped mold cavity, mainly to leave space for grouting plastering. For example, if the thickness of the mortar plastering is 3 cm, the overall diameter of the plastering cavity (diameter in the radial plane) needs to be adjusted to be 3 cm larger than the diameter of the mold cavity.
[0027] Compared with the prior art, the beneficial technical effects of the utility model are as follows:
[0028] 1: The earth dam paving device for fill roadbed of the utility model can quickly build and plaster the temporary earth dam for fill roadbed, can operate continuously, has high construction efficiency, uniform mortar plastering, and stable and reliable structural strength of the earth dam (even a temporary structure can be realized to replace a permanent structure). In addition, the device adopts an assembled structure, and can change the construction and size according to the on-site conditions, and can adapt to various working conditions.
[0029] 2: The earth dam paving device for fill roadbed of the utility model has the advantages of simple overall structure, easy operation, low investment cost, low labor intensity, high production efficiency and strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a three-dimensional structural schematic diagram of the device described in the utility model.
[0031] Figure 2 It is a schematic diagram of the front structure of the device of the utility model.
[0032] Figure 3 It is a schematic diagram of the rear structure of the device of the utility model.
[0033] Figure 4 It is a lateral structural schematic diagram of the device described in the utility model.
[0034] Figure 5 It is a partial enlarged view of the vibrating mechanism in the dam-building mold of the utility model, which is arranged on the front connecting rod.
[0035] Figure markings: 1: housing; 2: soil feeding mechanism; 201: soil adding funnel; 202: leakage channel; 203: first booster pump; 204: vibration screening plate; 3: damming mold; 301: damming top plate; 302: damming side plate; 303: front connecting rod; 304: front annular slide rail; 4: vibration compaction mechanism; 5: mortar feeding mechanism; 501: mortar adding funnel; 502: grouting channel; 503: second booster pump; 6: plastering mold; 601: plastering top plate; 602: plastering side plate; 603: rear connecting rod; 604: rear annular slide rail; 7: traction mechanical arm. DETAILED DESCRIPTION
[0036] The technical solution of the utility model is illustrated below, and the scope of protection requested for the utility model includes but is not limited to the following embodiments. Example 1
[0037] like Figure 1-5As shown, a paving device for earth dam of fill roadbed includes: a casing 1, a soil feeding mechanism 2, a dam-building mold 3, a vibration mechanism 4, a mortar feeding mechanism 5 and a plastering mold 6. The casing 1 is a groove-type structure with an inverted arrangement. The soil feeding mechanism 2 is arranged at the top of one end of the casing 1. The dam-building mold 3 is arranged inside the casing 1 and below the soil feeding mechanism 2. The vibration mechanism 4 is located inside the casing 1 and arranged on the dam-building mold 3. The mortar feeding mechanism 5 is arranged at the top of the other end of the casing 1. The plastering mold 6 is arranged inside the casing 1 and below the mortar feeding mechanism 5. The inner diameter of the plastering mold 6 is larger than the inner diameter of the dam-building mold 3. Example 2
[0038] The embodiment 1 is repeated, except that the soil feeding mechanism 2 includes a soil adding funnel 201 and a material leakage channel 202. The soil adding funnel 201 is arranged on the top of the casing 1, the upper end of the material leakage channel 202 passes through the casing 1 and is connected to the material discharge end of the soil adding funnel 201, and the lower end of the material leakage channel 202 is connected to the inside of the dam building mold 3. Example 3
[0039] The second embodiment is repeated, except that the material leakage channel 202 is a folding elastic channel. A first booster pump 203 is also arranged between the soil adding funnel 201 and the material leakage channel 202. Example 4
[0040] Example 3 is repeated, except that a vibrating screening plate 204 is further provided inside the soil adding funnel 201 . Example 5
[0041] The embodiment 4 is repeated, except that the damming mold 3 includes a damming top plate 301 and a damming side plate 302. A pair of damming side plates 302 are symmetrically arranged on both sides of the damming top plate 301 in the width direction to form an inverted groove-shaped mold cavity. The outer plate surfaces of the damming top plate 301 and the damming side plates 302 are connected to the inner wall of the housing 1 through independent front connecting rods 303. Each front connecting rod 303 is provided with a vibration mechanism 4. Example 6
[0042] The embodiment 5 is repeated, except that a front annular slide rail 304 extending along the circumference of the housing 1 is further provided on the inner wall of the housing 1. Each front connecting rod 303 is connected to the front annular slide rail 304 through an independent slide seat. Example 7
[0043] Example 6 is repeated, except that a horizontal slide rail extending along the width direction is provided on the lower plate surface of the damming top plate 301, and the upper ends of the two damming side plates 302 are connected to the horizontal slide rail through independent slide seats. The front connecting rod 303 is a telescopic connecting rod, and the upper ends of the two damming side plates 302 are hinged to the slide seats. The front end opening of the groove-shaped mold cavity is an outward expansion opening. Example 8
[0044] Example 7 is repeated, except that the mortar feeding mechanism 5 includes a grouting funnel 501 and a grouting channel 502. The grouting funnel 501 is arranged on the top of the housing 1, the upper end of the grouting channel 502 passes through the housing 1 and is connected to the discharge end of the grouting funnel 501, and the lower end of the grouting channel 502 is connected to the inside of the plastering mold 6. The grouting channel 502 is a foldable and retractable elastic channel. Example 9
[0045] Example 8 is repeated, except that a second booster pump 503 is further provided between the grouting funnel 501 and the grouting channel 502 . Example 10
[0046] Repeat Example 9, except that the plastering mold 6 includes a plastering top plate 601 and a plastering side plate 602. A pair of plastering side plates 602 are symmetrically arranged on both sides of the plastering top plate 601 in the width direction to form an inverted groove-shaped plastering cavity. A rear annular slide rail 604 extending along its circumference is also arranged on the inner wall of the casing 1. A plurality of rear connecting rods 603 are arranged on the rear annular slide rail 604 through a plurality of independent slide seats. The outer plate surfaces of the plastering top plate 601 and the plastering side plates 602 are connected to the rear annular slide rail 604 through independent rear connecting rods 603. A vibration mechanism 4 is arranged on each rear connecting rod 603. Embodiment 11
[0047] The embodiment 10 is repeated, except that a horizontal slide rail extending along the width direction is provided on the lower plate surface of the plastering top plate 601, and the upper ends of the two plastering side plates 602 are connected to the horizontal slide rail through independent slide seats. The rear connecting rod 603 is a telescopic connecting rod. Example 12
[0048] The embodiment 11 is repeated, except that a group of pulling mechanical arms 7 are further provided at the front end of the housing 1 . Embodiment 13
[0049] Example 12 is repeated, except that the vibration mechanism 4 is a vibration motor.
[0050] When the earth dam paving device for filling roadbed of the utility model is used to pave the temporary earth dam for filling roadbed, the size of the dam-building mold 3 and the plastering mold 6 are adjusted in advance by the front connecting rod and the rear connecting rod according to the working condition requirements, and then the traction mechanical arm is installed on the traction vehicle, and soil is added to the soil adding funnel 201. The soil enters the leakage channel 202 after being screened by the vibrating screening plate 204, and under the action of the first booster pump 203, the soil continuously enters the outward expansion opening area of the dam-building mold 3, and then under the traction of the traction vehicle, the dam-building mold 3 moves forward to initially press the soil into shape, and then the vibration mechanism 4 set on the dam-building mold 3 is started to further vibrate the soil. After that, the vibrated and formed earth dam enters the plastering mold 6, and the adjusted mortar enters the plastering mold 6 through the grouting funnel 501 and the grouting channel 502 in turn and is evenly spread on the earth dam, and is further vibrated by the vibration mechanism 4 set on the plastering mold 6. By repeating the above operations, the paving operation of the temporary earth dam can be continuously realized.
Claims
1. A paving device for earth dam of fill roadbed, characterized in that: The device comprises: a casing (1), a soil feeding mechanism (2), a dam-building mold (3), a vibration mechanism (4), a mortar feeding mechanism (5), and a plastering mold (6); the casing (1) is an inverted groove-shaped structure; the soil feeding mechanism (2) is arranged at the top of one end of the casing (1); the dam-building mold (3) is arranged inside the casing (1) and below the soil feeding mechanism (2); the vibration mechanism (4) is located inside the casing (1) and arranged on the dam-building mold (3); the mortar feeding mechanism (5) is arranged at the top of the other end of the casing (1); the plastering mold (6) is arranged inside the casing (1) and below the mortar feeding mechanism (5); the internal diameter of the plastering mold (6) is larger than the internal diameter of the dam-building mold (3).
2. The device according to claim 1, characterized in that: The soil feeding mechanism (2) comprises a soil adding funnel (201) and a material leakage channel (202); the soil adding funnel (201) is arranged on the top of the casing (1); the upper end of the material leakage channel (202) passes through the casing (1) and is connected to the material discharge end of the soil adding funnel (201); and the lower end of the material leakage channel (202) is connected to the interior of the dam building mold (3).
3. The device according to claim 2, characterized in that: The material leakage channel (202) is a foldable and retractable elastic channel; a first booster pump (203) is also provided between the soil adding funnel (201) and the material leakage channel (202); and / or A vibrating screening plate (204) is also provided inside the soil adding funnel (201).
4. The device according to claim 2 or 3, characterized in that: The dam-building mold (3) comprises a dam-building top plate (301) and a dam-building side plate (302); a pair of dam-building side plates (302) are symmetrically arranged on both sides of the dam-building top plate (301) in the width direction to form an inverted groove-shaped mold cavity; the outer plate surfaces of the dam-building top plate (301) and the dam-building side plates (302) are connected to the inner wall of the casing (1) via independent front connecting rods (303).
5. The device according to claim 4, characterized in that: A front annular slide rail (304) extending in the circumferential direction of the housing (1) is also provided on the inner wall of the housing (1); each front connecting rod (303) is connected to the front annular slide rail (304) via an independent slide seat; and each front connecting rod (303) is provided with a vibration mechanism (4).
6. The device according to claim 4, characterized in that: A horizontal slide rail extending along the width direction of the dam-building top plate (301) is arranged on the lower plate surface, and the upper ends of the two dam-building side plates (302) are connected to the horizontal slide rail via independent slide seats respectively; the front connecting rod (303) is a telescopic connecting rod, and the upper ends of the two dam-building side plates (302) are hinged to the slide seats; the front end opening of the groove-shaped mold cavity is an outward-expanding opening.
7. The device according to any one of claims 1 to 3, characterized in that: The mortar feeding mechanism (5) comprises a grouting funnel (501) and a grouting channel (502); the grouting funnel (501) is arranged on the top of the casing (1); the upper end of the grouting channel (502) passes through the casing (1) and is connected to the discharge end of the grouting funnel (501); the lower end of the grouting channel (502) is connected to the inside of the plastering mold (6); the grouting channel (502) is a foldable and retractable elastic channel; and a second booster pump (503) is also arranged between the grouting funnel (501) and the grouting channel (502).
8. The device according to claim 7, characterized in that: The plastering mold (6) comprises a plastering top plate (601) and a plastering side plate (602); a pair of plastering side plates (602) are symmetrically arranged on both sides of the plastering top plate (601) in the width direction to form an inverted groove-shaped plastering cavity; a rear annular slide rail (604) extending along the circumference thereof is also arranged on the inner wall of the casing (1); a plurality of rear connecting rods (603) are arranged on the rear annular slide rail (604) via a plurality of independent slide seats; the outer plate surfaces of the plastering top plate (601) and the plastering side plates (602) are connected to the rear annular slide rail (604) via independent rear connecting rods (603); and a vibration mechanism (4) is arranged on each rear connecting rod (603).
9. The device according to claim 8, characterized in that: A horizontal slide rail extending along the width direction of the plastered top plate (601) is arranged on the lower plate surface, and the upper ends of the two plastered side plates (602) are connected to the horizontal slide rail via independent slide seats respectively; the rear connecting rod (603) is a telescopic connecting rod.
10. The device according to any one of claims 1 to 3, characterized in that: A set of traction mechanical arms (7) is also provided at the front end of the housing (1); and / or The vibration mechanism (4) is a vibration motor.