Condensate tank pipeline structure

By introducing sealing structures, through-hole plates and impurity tanks into the condensate tank pipeline structure, the blockage and corrosion problems caused by impurities entering the pipeline are solved, sealing and filtration effects are achieved, maintenance work is reduced, water quality and equipment life are improved .

CN222363727UActive Publication Date: 2025-01-17FUSHUN XIANGYING NEW ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421152999.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2025-01-17
Estimated Expiration
2034-05-24

AI Technical Summary

Technical Problem

The water in the condensate can contain impurities. If these impurities enter the pipeline, it will cause the pipeline to be blocked and corroded, affecting the water flow and cooling or heating effect. The installation of the condensate canister requires sealing to prevent heat loss, but the prior art is difficult. Effectively solve these problems.

Method used

A condensate tank pipeline structure is designed, including sealing structure, through-hole plate and impurity tank, sealed by double-layer rubber pads, filter impurities through hole plate, impurities tank collect and discharge impurities, base and universal wheel are easy to move, and coating The layer improves the corrosion resistance of the pipeline and facilitates regular cleaning of the observation window.

Benefits of technology

It achieves a tight sealing effect, prevents heat loss, effectively filters and collects impurities, reduces maintenance workload, and improves water quality cleaning and equipment life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222363727U_ABST
    Figure CN222363727U_ABST
Patent Text Reader

Abstract

The utility model discloses a condensate tank pipeline structure which comprises a condensate tank, the side wall of the condensate tank is fixedly connected with a first pipeline, the other side of the first pipeline is provided with a second pipeline, a sealing structure is installed between the first pipeline and the second pipeline, the inner wall of the second pipeline is fixedly connected with a through hole plate, and the through hole plate is obliquely arranged. The lower surface of the second pipeline is fixedly connected with a first flange square pipe, the other end of the first flange square pipe is in flange connection with a second flange square pipe, the other end of the second flange square pipe is fixedly connected with an impurity tank, and a discharging pipe is installed on the side wall of the impurity tank. A double-layer rubber pad is arranged between the sealing structures for sealing, so that a tight sealing effect can be provided, the problem of sealing leakage is prevented, heat loss between the condensate tank and a pipeline caused by the sealing problem is avoided, impurities in the pipeline can be effectively collected and filtered, and the service life of the condensate tank is prolonged. And the maintenance workload of equipment such as a condensate tank can be reduced by regularly collecting and filtering impurities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of condensate tank pipeline installation, and specifically relates to a condensate tank pipeline structure. Background Art

[0002] Condensate tanks are commonly used in air conditioning systems, especially in systems that use steam compressors for cooling or heating. In this process, steam condenses into water and is collected in condensate tanks. The function of condensate tanks is to collect and store this condensate, protect the pipeline system from interference from other impurities, and ensure the stability and efficiency of the steam compression process. If it is not collected and processed in time, it will drip into the pipes of the heating equipment, causing a waste of resources. Therefore, condensate tanks came into being.

[0003] The water in the condensate tank may contain some impurities, such as dust, microbial residues, etc. If these impurities enter the pipeline, it may cause pipeline blockage and affect the normal flow of water. Secondly, the pipeline of the condensate tank needs to be cleaned and maintained regularly to prevent problems such as blockage and corrosion. And pay attention to the sealing during the installation process. Sealing problems will cause heat loss between the condensate tank and the pipeline, affecting the cooling or heating effect of the system. Therefore, we propose a condensate tank pipeline structure to ensure the sealing and stability of the condensate tank. Utility Model Content

[0004] The purpose of the utility model is to provide a condensate tank pipeline structure to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a condensate tank pipeline structure, including a condensate tank, a first pipeline is fixedly connected to the side wall of the condensate tank, a second pipeline is arranged on the other side of the first pipeline, a sealing structure is installed between the first pipeline and the second pipeline, a through-hole plate is fixedly connected to the inner wall of the second pipeline, and the through-hole plate is inclined, a first flange square tube is fixedly connected to the lower surface of the second pipeline, the other end of the first flange square tube is flange-connected to the second flange square tube, the other end of the second flange square tube is fixedly connected to an impurity tank, and a discharge pipe is installed on the side wall of the impurity tank.

[0006] Preferably, the sealing structure includes two square groove flanges, which are laterally symmetrically arranged, a side wall of the square groove flange on one side is fixedly connected to the first pipe, and a side wall of the square groove flange on the other side is fixedly connected to the second pipe, a rubber pad is symmetrically sleeved between the inner side walls of the two square groove flanges, and the side walls of the two square groove flanges are fixedly connected by bolts.

[0007] Preferably, a base is fixedly connected to the lower surface of the impurity tank, and a universal wheel is installed on the lower surface of the base.

[0008] Preferably, the inner wall of the first flange square tube is provided with a coating layer.

[0009] Preferably, an observation window is installed on the front side wall of the impurity tank, and the observation window is in the shape of a vertical strip.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: when the pipeline is connected to the condensate tank, a sealing structure is arranged at the joint of the pipelines on both sides, and a double-layer rubber pad is arranged between the sealing structures for sealing, which can provide a tight sealing effect, prevent the problem of sealing leakage, and avoid the sealing problem causing heat loss between the condensate tank and the pipeline, affecting the overall cooling or heating effect. At the same time, a through-hole plate is arranged on one side of the pipeline for filtering, and the impurity tank at the bottom is used for collection, which can effectively collect and filter out impurities in the pipeline, improve the water quality cleanliness in the condensate tank, and regularly collect and filter impurities can reduce the maintenance workload of equipment such as the condensate tank. If cleaning and replacement work is required, the pipelines in various parts can be disassembled, which can be operated very conveniently, reducing the difficulty of maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the structure of the utility model;

[0012] Figure 2 for Figure 1 A three-dimensional cross-sectional view of the second pipeline;

[0013] Figure 3 for Figure 1 A partial enlarged view of the middle sealing structure;

[0014] Figure 4 for Figure 3 A three-dimensional cross-sectional view of a middle-groove flange;

[0015] In the figure: 1. condensate tank; 2. first pipeline; 3. second pipeline; 4. sealing structure; 41. square groove flange; 42. rubber pad; 43. bolt; 5. through-hole plate; 6. first flange square tube; 7. second flange square tube; 8. impurity tank; 9. discharge pipe; 10. base; 11. universal wheel; 12. observation window; 13. coating layer. DETAILED DESCRIPTION

[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0017] See also Figure 1-4 The utility model provides a condensate tank pipeline structure, including a condensate tank 1, a first pipeline 2 is fixedly connected to the side wall of the condensate tank 1, a second pipeline 3 is arranged on the other side of the first pipeline 2, a sealing structure 4 is installed between the first pipeline 2 and the second pipeline 3, a through-hole plate 5 is fixedly connected to the inner wall of the second pipeline 3, and the through-hole plate 5 is inclined, a first flange square tube 6 is fixedly connected to the lower surface of the second pipeline 3, the other end of the first flange square tube 6 is flange-connected to the second flange square tube 7, the other end of the second flange square tube 7 is fixedly connected to the impurity tank 8, and a discharge pipe 9 is installed on the side wall of the impurity tank 8.

[0018] When installing, a first pipe 2 is arranged on one side of the condensate tank 1, and the first pipe 2 is firstly connected to the second pipe 3, and the second pipe 3 is connected to the steam delivery pipe. The first pipe 2 and the second pipe 3 are sealed and connected through a sealing structure 4, and the square groove flanges 41 are symmetrically arranged, respectively connected to the first pipe 2 and the second pipe 3, and the square groove flanges 41 on both sides are connected, and a rubber pad 42 is arranged between the flanges, and the rubber pad 42 is buckled with the square groove provided in the square groove flange 41, and the rubber pad 42 is double-layered for sealing, and then the bolts 43 are passed through the square groove flange 41 for fastening, and the square corners of the square groove flange 41 are convenient for docking. , to avoid docking deviation and ensure that the pipes on both sides are firmly connected. A through-hole plate 5 is provided in the inner cavity of the second pipe 3, and impurities in the steam are intercepted by the through-hole plate 5. Since the through-hole plate 5 is inclined, when the steam transportation working interval is at a certain level, the condensed water mixed with impurities flows along the surface of the inclined through-hole plate 5. A first flange square pipe 6 is provided at the bottom of the second pipe 3, and the first flange square pipe 6 is connected to the second flange square pipe 7. The impurity condensed water is transported through the first flange square pipe 6 and finally collected through the support tank 8. A valve is provided inside the discharge pipe 9. When a certain amount of water accumulates, it is discharged through the discharge pipe 9 on one side to drain the accumulated water in the tank and ensure normal operation.

[0019] The sealing structure 4 includes two square groove flanges 41, and the number of the square groove flanges 41 is symmetrical and they are arranged laterally. The side wall of the square groove flange 41 on one side is fixedly connected to the first pipe 2, and the side wall of the square groove flange 41 on the other side is fixedly connected to the second pipe 3. A rubber pad 42 is symmetrically sleeved between the inner side walls of the two square groove flanges 41, and the side walls of the two square groove flanges 41 are fixedly connected by bolts 43.

[0020] The lower surface of the impurity tank 8 is fixedly connected to a base 10, and a universal wheel 11 is installed on the lower surface of the base 10. Through the use of the base 10 and the universal wheel 11, it is convenient to move during the replacement process, thereby improving the overall efficiency during installation.

[0021] The inner wall of the first flange square tube 6 is provided with a coating layer 13, which increases the smoothness of the first flange square tube 6, facilitates the flow of impurity condensed water, and effectively protects the pipeline from corrosion and wear, greatly extending its service life.

[0022] An observation window 12 is installed on the front side wall of the impurity tank 8, and the observation window 12 is in the shape of a vertical strip. Through the setting of the observation window 12, it is convenient to observe the inventory in the impurity tank 8, and discharge work can be carried out in time.

[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A condensate tank pipeline structure, characterized in that: The invention comprises a condensate tank (1), wherein a first pipe (2) is fixedly connected to the side wall of the condensate tank (1), a second pipe (3) is arranged on the other side of the first pipe (2), a sealing structure (4) is installed between the first pipe (2) and the second pipe (3), a through-hole plate (5) is fixedly connected to the inner wall of the second pipe (3), and the through-hole plate (5) is arranged in an inclined manner, a first flange square tube (6) is fixedly connected to the lower surface of the second pipe (3), the other end of the first flange square tube (6) is flange-connected to the second flange square tube (7), the other end of the second flange square tube (7) is fixedly connected to an impurity tank (8), and a discharge pipe (9) is installed on the side wall of the impurity tank (8).

2. A condensate tank pipeline structure according to claim 1, characterized in that: The sealing structure (4) comprises a square groove flange (41), the number of the square groove flange (41) is two and they are arranged symmetrically in the transverse direction, the side wall of the square groove flange (41) on one side is fixedly connected to the first pipe (2), and the side wall of the square groove flange (41) on the other side is fixedly connected to the second pipe (3), a rubber pad (42) is symmetrically sleeved between the inner side walls of the two square groove flanges (41), and the side walls of the two square groove flanges (41) are fixedly connected by bolts (43).

3. The condensate tank pipeline structure according to claim 1, characterized in that: The lower surface of the impurity tank (8) is fixedly connected to a base (10), and the lower surface of the base (10) is equipped with a universal wheel (11).

4. The condensate tank pipeline structure according to claim 1, characterized in that: The inner wall of the first flange square tube (6) is provided with a coating layer (13).

5. The condensate tank pipeline structure according to claim 1, characterized in that: The front side wall of the impurity tank (8) is provided with an observation window (12), and the observation window (12) is in the shape of a vertical long strip.