Super-heavy-load petroleum and natural gas drilling machine
By adopting double-roller winch, brake device and waist-hole protective cover design in overheaval-load oil and natural gas drilling rigs, the problem of wire rope interference and wear in ultra-deep well drilling rigs of more than 10,000 meters is solved, and the operating efficiency and safety of the drilling rigs are improved .
Patent Information
- Application Number
- CN202411735467.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-02-11
AI Technical Summary
When the ultra-deep well drilling rig above 10,000 meters is lifted, due to the gravity of the car, the drilling wire rope and the car's shield will interfere and wear, resulting in a shortening of the life of the wire rope, increasing the drilling time, and the risk of explosion and combustion.
An overloaded oil and gas drilling rig was designed, using a double-roller winch and a brake device, combined with a protective cover design of waist-shaped holes, effectively control the lifting action through a double-roller winch, reduce the interference and wear of the wire rope, and passes the reinforcement structure. Increase the strength of the protective cover.
It effectively reduces the interference and wear of the wire rope, improves the operating efficiency and reliability of the drilling rig, extends the service life of the wire rope and protective cover, and reduces the risk of explosion and combustion.
Smart Images

Figure CN119411967A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an ultra-heavy-load oil and gas drilling rig, belonging to the technical field of oil drilling rigs. Background Art
[0002] At present, my country's medium and shallow oil and gas are becoming less and less, and deep and ultra-deep layers are the major strategic replacement areas for my country's oil and gas. As the main battlefield for domestic oil and gas development, the Tarim Basin in Xinjiang currently has newly developed drilling depths of about 9,000 meters, and some blocks have been designed to have a well depth of more than 10,000 meters. Ultra-deep exploration and development technology is extremely difficult and there are many technical problems.
[0003] At present, conventional winches for drilling rigs with a depth of more than 10,000 meters have two reduction gearboxes, four motors, and weigh more than 100 tons. In order to meet the transportation requirements, a split winch is used in the structure. The entire winch is divided into three transportation units: left, middle, and right. The units on the left and right sides are basically the same, that is, the reduction gearbox and two motors. The middle unit consists of a drum shaft assembly, a winch frame, a hydraulic disc brake, etc. When installing, the three parts must be repositioned and installed together.
[0004] The existing oil rig lifting system consists of a crown block, a traveling block, a dead rope holder, a winch, and a wire rope. One end of the wire rope is fixed to the dead rope holder, the middle part of the wire rope is supported by the crown block pulley and the traveling block and the big hook are suspended, and the other end of the wire rope is fixed to the drum of the winch. Only one set of wire ropes is used for lifting in the lifting system.
[0005] For ultra-deep well drilling rigs over 10,000 meters, due to the gravity of the traveling block, the hoisting rope and the drilling wire rope form a certain angle α during lifting, causing interference and wear between the drilling wire rope and the shield of the traveling block. For ultra-deep well drilling rigs over 10,000 meters, the traveling block is very heavy, reaching 19 tons. The heavier the traveling block, the more serious the interference and wear.
[0006] During drilling conditions, the speed of the internal pulley block is different when the traveling block moves up and down, resulting in unbalanced forces, which will cause a certain swing angle and lead to interference and wear between the drilling wire rope and the protective cover.
[0007] The interference and wear between the wire rope and the shield mentioned above will result in shortened service life of the drilling wire rope, shortened rope cutting cycle of the drilling wire rope, and increased drilling time. In severe cases, drilling accidents may occur if the rope is not cut in time. What is more serious is that during drilling conditions, sparks are generated due to friction between the wire rope and the shield. If combustible gas overflows from the wellhead and ignites, it will cause a major explosion and combustion accident. Summary of the invention
[0008] The object of the present invention is to provide an ultra-heavy-load oil and gas drilling rig to address the above-mentioned problems, which can effectively reduce the interference and wear of the wire rope and ensure efficient and reliable lifting and drilling operations of the ultra-deep heavy-load drilling rig.
[0009] The technical solution adopted by the present invention is as follows:
[0010] An ultra-heavy-load oil and gas drilling rig comprises a base and a derrick arranged on the base, a winch is arranged on the base, a crown block and a lifting and lowering traveling system are arranged on the top of the derrick, the crown block and the traveling system are connected by the winch through a drilling wire rope, and the lifting and lowering of the traveling system is controlled by the winch;
[0011] The winch is provided with at least one drum, the drum is wound with a drilling wire rope, and the crown block and the traveling system are connected via the drilling wire rope. The winch is also provided with a brake device.
[0012] Furthermore, the traveling system includes a traveling car and a protective cover matched with the traveling car, the protective cover is provided with a through hole for the drilling wire rope to pass through, the through hole is a waist-shaped hole, the through hole has a wide hole at one end for leading out the drilling wire rope, and a narrow hole at the other end away from leading out the drilling wire rope.
[0013] Furthermore, the cover body at both sides of the through hole is provided with reinforcing ribs, and the reinforcing ribs are fixedly arranged on the inner side of the cover body facing the traveling carriage.
[0014] Furthermore, the winch also includes a box structure matched with the drum, the box structure includes a box body, the box body includes a back plate and at least two parallel wall plates, the back plate is arranged between the two wall plates, the drum is rotatably arranged between the two wall plates, and an installation gap for installing a disc brake device is formed between the back plate and the two wall plates respectively;
[0015] Also included is a cross beam, which is arranged across the wall panel.
[0016] Further, an opening is formed on the wall panel, and the wall panel is provided with an inserting plate and at least two connecting plates, the inserting plate can be inserted into the opening, the inserting plate is arranged between the two connecting plates and connected to the two connecting plates, the inserting plate is detachably connected to the wall panel through the connecting plates, and after the inserting plate is installed, it forms a mounting hole matching the roller with the wall panel;
[0017] Both ends of the plug board abutting against the wall board are formed with first buckling parts along the insertion direction of the plug board, and one end of the connecting plate is formed with a second buckling part, and the first buckling part can be buckled with the second buckling part to connect the plug board to the connecting plate.
[0018] Furthermore, the wall panel has a third snap-fitting portion formed on the edge of the opening along the direction of insertion of the plug plate, and the connecting plate has a fourth snap-fitting portion formed on one end away from the second snap-fitting portion, and the third snap-fitting portion can be snap-fitted with the fourth snap-fitting portion to connect the wall panel to the connecting plate.
[0019] Further, the traveling system includes a steel rope hoisting system, and the steel rope hoisting system is provided with at least two groups, each group of the steel rope hoisting system includes a traveling block and a drilling rig steel rope, the traveling block is located below the crown block, the drum is arranged on one side of the crown block, the drum is connected to a drum driving device, the drilling rig steel rope is wound and one end is fixed on the drum, and the other end of the steel rope passes through the crown block and the traveling block and is used to be fixed to a dead rope fixer on the other side of the crown block;
[0020] Each group of the drilling rig wire rope hoisting systems can operate independently, or each group of the wire rope hoisting systems can be interconnected to operate together.
[0021] Furthermore, the swimming system also includes a suspension member and a first load-bearing connecting member;
[0022] The suspension member is arranged just above the wellhead and mounted on the derrick, each set of the crown block comprises at least one fixed pulley, the fixed pulley is detachably connected to the suspension member, and the fixed pulleys of the two sets of crown blocks are symmetrical about the center line of the wellhead;
[0023] The traveling block comprises at least one movable pulley, the lower end of which is detachably connected to the first load-bearing connector, and the two groups of movable pulleys of the traveling block are symmetrical about the center line of the wellhead;
[0024] Alternatively or alternatively, the travel system further comprises a translation device, a crown block coupling and a second load-bearing connection member;
[0025] The crane is connected to the derrick in a horizontal sliding manner, and two sets of cranes are detachably connected through the crane coupling. The translation device is installed on the derrick and connected to each set of cranes, and can push the cranes to reciprocate in the horizontal direction, so that the center line of each set of cranes or the center lines of the two sets of cranes are aligned with the center line of the wellhead.
[0026] The second load-bearing connecting member is arranged below the traveling carriage, and two groups of the traveling carriages are detachably connected via the load-bearing connecting member.
[0027] Furthermore, the translation device comprises a bearing platform arranged on the derrick, the bearing platform is provided with a slide rail arranged in a horizontal direction, the overhead travelling vehicle is arranged on the slide rail, and a hydraulic cylinder is further arranged between the overhead travelling vehicle and the bearing platform, and the hydraulic cylinder drives the overhead travelling vehicle to move along the slide rail;
[0028] The second load-bearing connecting member includes a plurality of interfaces, and the traveling carriage is detachably connected to the interfaces via pins.
[0029] Furthermore, the traveling system also includes fixed pulleys arranged on both sides of the derrick base section, and a lifting rope for lifting the derrick. One end of the lifting rope is fixedly connected to the traveling block and is fixed to the middle of the derrick after passing through the fixed pulley.
[0030] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0031] 1. The super-heavy-load oil and gas drilling rig of the present invention can effectively control the entire winch action process through the design of the winch and the brake device, and can further meet the working conditions of the entire lifting and lifting drilling, thereby effectively improving the operating efficiency and reliability of the drilling rig, and significantly improving the installation and transportation efficiency of the winch and reducing the maintenance workload;
[0032] 2. The winch of the super-heavy-load oil and gas drilling rig of the present invention adopts a double-drum structural design, which takes into account the various difficulties of the single-drum structure and the drum drive device in lifting the super-heavy-load derrick, and uses the dual drive mode to achieve joint action, effectively solving the stability and reliability of the lifting capacity under heavy and super-heavy load conditions. In addition, the double structure mode can also adopt a single drum to work when the drilling rig is working with light and medium loads, and the other drum is used as an alternative and better solution, which can save energy consumption and reduce the frequency of downtime maintenance required for normal work, and can lift the working load at a faster hook speed, thereby effectively improving the working efficiency of the entire drilling rig and the service life of related structures;
[0033] 3. The super-heavy-load oil and gas drilling rig of the present invention, in the design of the traveling system, combines the double-drum winch to effectively realize the multi-application effect of the existing single traveling block, and can adjust the actual application of the traveling block according to the demand of the traveling block carrying object, realize effective application in driving energy consumption, further ensure that energy consumption is not wasted, and also have a backup plan for the drilling rig, which can fully ensure the continuity of the traveling block work, further reduce the frequency of maintenance, and also improve the working efficiency of the entire drilling rig and the service life of the traveling block;
[0034] 4. The ultra-heavy-load oil and gas drilling rig of the present invention, based on the traditional traveling block structure design and the practical application of the traveling block, adopts the design of waist-shaped holes, which reserves sufficient swing space for the drilling wire rope, reduces the friction between the drilling wire rope and the protective cover, and effectively improves the service life of the protective cover. At the same time, the structural design of the reinforcing ribs can effectively ensure the strength of the protective cover, and avoid the cover body where the waist-shaped hole is wider, which is easy to break and deform, thereby effectively realizing the protective function of the entire protective cover. This design can also avoid the possibility of major accidents caused by sparks generated by the friction between the drilling wire rope and the traveling block protective cover, which may cause the combustible gas overflowing from the wellhead to explode and burn. Improve the safety of drilling operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The present invention will now be described by way of example with reference to the accompanying drawings, in which:
[0036] Figure 1 It is a structural schematic diagram of the derrick of the present invention in a state ready for lifting;
[0037] Figure 2 It is a schematic diagram of the enlarged structure of the traveling block of the present invention;
[0038] Figure 3 It is a structural schematic diagram of the winch drum unit of the present invention;
[0039] Figure 4 It is a schematic diagram of the structure of the outer cover of the winch drum unit of the present invention;
[0040] Figure 5 It is a schematic diagram of the assembly structure of the plug board and the connecting board of the present invention;
[0041] Figure 6 This is a schematic diagram of the structure of the assembly hole formed after the plug board of the present invention is assembled
[0042] Figure 7 It is a structural schematic diagram of the swimming system of the present invention;
[0043] Figure 8 is a top view of the swimming system of the present invention;
[0044] Fig. 9 It is one of the working states of the swimming system of the present invention;
[0045] Fig.10 This is the second working state of the swimming system of the present invention;
[0046] Fig.11 This is the third working state of the swimming system of the present invention;
[0047] Fig.12 It is a structural schematic diagram of the overhead traveling system of the present invention;
[0048] Fig.13 It is a structural schematic diagram of the connection between the crown block and the traveling block of the present invention;
[0049] Fig.14 It is a schematic structural diagram of the translation device of the present invention;
[0050] Fig.15 It is a schematic diagram of the structure of the protective cover of the present invention;
[0051] Fig.16 It is a schematic diagram of the cross section at A-A.
[0052] Markings in the figure: 1-base, 2-derrick, 3-winch, 31-drum, 32-wall panel, 33-drum drive device, 34-brake disc, 35-disc brake device, 36-disc brake drive device, 37-crossbeam, 38-back plate, 39-mounting hole, 310-first buckling part, 311-second buckling part, 312-third buckling part, 313-connecting plate, 314-fourth buckling part, 315-plug plate, 4-overhead crane, 5-traveling block, 6-drilling rig wire rope, 7-lifting rope, 8-dead rope fixer, 9-protective cover, 10-waist-shaped hole, 11-reinforcement rib, 12-suspension part, 13-first load-bearing connecting part, 14-translation device, 141-load-bearing platform, 142-slide rail, 143-hydraulic cylinder, 15-overhead crane coupling, 16-second load-bearing connecting part. DETAILED DESCRIPTION
[0053] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.
[0054] Any feature disclosed in this specification, unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
[0055] Example 1
[0056] An ultra-heavy-load oil and gas drilling rig, such as Figures 1 to 16 As shown, it comprises a base 1 and a derrick 2 arranged on the base 1, a winch 3 is arranged on the base 1, a crown block 4 and a travel system that can be raised and lowered are arranged on the top of the derrick 2, the winch 33 connects the crown block 4 and the travel system through a drilling wire rope, and controls the raising and lowering of the travel system through the winch 3;
[0057] The winch 3 is provided with at least one drum 31 , on which a drilling wire rope is wound, and the crown block 4 and the traveling system are connected via the drilling wire rope. The winch 3 is also provided with a brake device.
[0058] In this embodiment, the design of the winch 3 and the brake device can effectively control the entire movement process of the winch 3, which can further solve the working conditions of the entire lifting operation and drilling operation, thereby effectively improving the lifting efficiency of the derrick 2 and the working efficiency of the drilling rig.
[0059] In this embodiment, the winch 3 is provided with a drum 31. As one specific implementation method, the winch 3 also includes a box structure matched with the drum 31. The box structure includes a box body. The box body includes a back plate 38 and at least two parallel wall plates 32. The back plate 38 is arranged between the two wall plates 32. The drum 31 is rotatably arranged between the two wall plates 32. An installation gap for installing a disc brake device 35 is formed between the back plate 38 and the two wall plates 32 respectively.
[0060] The wall panel 32 further includes a cross beam 37 , which is arranged across the wall panel 32 .
[0061] The installation gap between the back plate 38 and the wall plate 32 is reasonably designed, which not only ensures the effective clamping of the disc brake device 35, but also avoids the contamination of the brake system by the wire rope lubricating oil, ensuring the stability and reliability of the braking performance. In addition, the disc brake device 35 is installed on the back of the back plate 38, and there is no need to increase the distance between the two wall plates 32, thereby ensuring the strength of the winch 3 box.
[0062] In order to better achieve the braking effect of the winch 3, in the specific structural design, the brake device includes a brake disc 34 arranged at one end or both ends of the drum 31, the brake disc 34 is arranged on the inner side or outer side of the wallboard 32, and the brake device also includes a disc brake device 35 arranged on the base 1, the brake disc 34 matches the disc brake device 35, and the disc brake device 35 is driven to open / close by a disc brake driving device 3636. In this structure, in order to better achieve the braking effect, the brake device includes a brake disc 34 arranged at both ends of the drum 31. In this structure, the structural design of the brake disc 34 and the disc brake device 35 can effectively provide a braking effect for the winch 3, and the automatic effect of the winch 3 working and braking at any time is effectively achieved through the design of this method. In the design of this embodiment, the disc brake device 35 is mainly driven by a hydraulic drive method and connected to a hydraulic station, so as to be integrated with the entire drilling rig system.
[0063] As a more specific design, an opening is formed on the wall panel 32, and the wall panel 32 is provided with an inserting plate 315 and at least two connecting plates 313, the inserting plate 315 can be inserted into the opening, the inserting plate 315 is arranged between the two connecting plates 313 and connected to the two connecting plates 313, the inserting plate 315 is detachably connected to the wall panel 32 through the connecting plates 313, and after the inserting plate 315 is installed, it forms a mounting hole 39 matching the drum 31 with the wall panel 32;
[0064] Both ends of the plug plate 315 abutting against the wall panel 32 are formed with a first snap-fitting portion 310 along the insertion direction of the plug plate 315, and one end of the connecting plate 313 is formed with a second snap-fitting portion 311, and the first snap-fitting portion 310 can be snapped with the second snap-fitting portion 311 to connect the plug plate 315 to the connecting plate 313.
[0065] In the design of the above-mentioned specific structure, the design of the structure can facilitate the assembly of the drum 31 structure, further improving the assembly efficiency of the winch 3. The structure is simple and easy to maintain and operate.
[0066] In the design of the specific assembly structure, the wall panel 32 is provided with a third snap-fitting portion 312 at the edge of the opening along the direction of insertion of the plug plate 315, and a fourth snap-fitting portion 314 is formed at the end of the connecting plate 313 away from the second snap-fitting portion 311, and the third snap-fitting portion 312 can be snap-fitted with the fourth snap-fitting portion 314 to connect the wall panel 32 to the connecting plate 313.
[0067] In the design of this structure, as a usage instruction, the brake disc 34 protrudes partly along the wall panel 32 after the drum 31 is assembled, so as to facilitate the cooperation and braking of the disc brake device 35. This is mainly due to the protection and setting of the entire shell structure. Therefore, there is a gap between the back panel 38 and the wall panel 32 for the extension of the brake disc 34, thereby ensuring the operation and braking of the winch 3 and further optimizing the component position layout on the entire base 1.
[0068] Example 2
[0069] On the basis of Example 1, in this example, the swimming system is further optimized, specifically, Figures 7 to 14 As shown, the traveling system includes a steel rope hoisting system, and the steel rope hoisting system is provided with at least two groups, each group of the steel rope hoisting system includes a traveling block 5 and a drilling rig steel rope 6, the traveling block 5 is located below the crown block 4, the drum 31 is arranged on one side of the crown block 4, the drum 31 is connected to a drum driving device 33, the drilling rig steel rope 6 is wound and one end is fixed on the drum 31, and the other end of the steel rope passes through the crown block 4 and the traveling block 5 and is used to be fixed to the dead rope fixer 8 on the other side of the crown block 4;
[0070] Each group of the drilling rig wire rope hoisting systems can operate independently, or each group of the wire rope hoisting systems can be interconnected to operate together.
[0071] The swimming system further comprises a suspension member 12 and a first load-bearing connecting member 13;
[0072] The suspension member 12 is arranged just above the wellhead and mounted on the derrick 2. Each set of the crown block 4 includes at least one fixed pulley, which is detachably connected to the suspension member 12. The fixed pulleys of the two sets of crown blocks 4 are symmetrical about the center line of the wellhead.
[0073] The traveling block 5 includes at least one movable pulley, the lower end of which is detachably connected to the first load-bearing connector 13, and the two sets of movable pulleys of the traveling block 5 are symmetrical about the center line of the wellhead.
[0074] Alternatively or alternatively, the travel system further comprises a translation device 14, a crown block coupling 15 and a second load-bearing connection member 16;
[0075] The crane 4 is slidably connected to the derrick 2 in the horizontal direction, and two groups of the cranes 4 are detachably connected through the crane coupling 15. The translation device 14 is installed on the derrick 2 and connected to each group of the cranes 4, and can push the cranes 4 to reciprocate in the horizontal direction, so that the center line of each group of the cranes 4 or the center lines of the two groups of the cranes 4 are aligned with the center line of the wellhead;
[0076] The second load-bearing connecting member 16 is disposed below the traveling block 5 , and two groups of the traveling blocks 5 are detachably connected via the load-bearing connecting member.
[0077] As a specific design, the translation device 14 includes a bearing platform 141 arranged on the derrick 2, the bearing platform 141 is provided with a slide rail 142 arranged in a horizontal direction, the overhead crane 4 is arranged on the slide rail 142, and a hydraulic cylinder 143 is further provided between the overhead crane 4 and the bearing platform 141, and the hydraulic cylinder 143 drives the overhead crane 4 to move along the slide rail 142;
[0078] The second load-bearing connector 16 includes a plurality of interfaces, and the traveling carriage 5 is detachably connected to the interfaces via a pin.
[0079] In the design of this structure, as a design of double drums 31 , the dead rope fixer 8 is a double dead rope fixer 88 .
[0080] Based on the design of the above-mentioned specific structure, as a more specific design, the traveling system also includes fixed pulleys arranged on both sides of the base section of the derrick 2, and a lifting rope 7 for lifting the derrick 2. One end of the lifting rope 7 is fixedly connected to the traveling block 5, and is fixed to the middle part of the derrick 2 after passing through the fixed pulley.
[0081] As a usage illustration, in a specific operation, when the derrick 2 is lifted, the two rollers 31 work synchronously to lift the derrick 2 through the traveling block 5. After the lifting is completed, the connection between the lifting rope 7 and the traveling block 5 is removed and fixed.
[0082] When the drilling rig is working normally to pull out or drill down, one or two rollers 31 are in operation to drive the traveling block 5 to move up and down; when one roller 31 is in operation, the other roller 3131 and the pulley block of the crown block 4 and the traveling block 5 around which another drilling rope is wound serve as a backup traveling system.
[0083] In the present design, two groups are mainly preferred, and the double-drum 31-type structural design is matched, which takes into account the various difficulties of the single-drum 31-type structure and the driving device in lifting the super-heavy-loaded derrick 2, and uses the dual-drive method to achieve joint action, effectively solving the super-heavy load and heavy load lifting problems, and further ensuring the lifting stability of the super-heavy load derrick 2. In addition, the dual-structure method can also adopt a single drum 31 when the drilling rig is working, and the other drum 31 is used as an alternative and better solution, which can not only save energy consumption, but also effectively ensure the stability of the drilling rig when it is working, and reduce the frequency of downtime and maintenance required for normal work, thereby effectively improving the working efficiency of the entire drilling rig and the service life of related structures.
[0084] In the design of the traveling system, the double-drum 31 winch 3 is combined to effectively realize multiple application effects of the existing single traveling block 5. The actual application of the traveling block 5 can be adjusted according to the needs of the load carried by the traveling block 5, and effective application is achieved in driving energy consumption, further ensuring that energy is not wasted. It also has a backup plan for the drilling rig, which can fully guarantee the continuity of the operation of the traveling block 5 and further reduce the frequency of maintenance. In solving the lifting problem, it also improves the working time and efficiency of the entire drilling rig.
[0085] Example 3
[0086] Based on the specific designs of Embodiments 1 and 2, the travel carriage 5 is further designed as follows: Fig.15 and Fig.16 As shown, the traveling system includes a traveling block 5 and a protective cover 9 matched with the traveling block 5. The protective cover 9 is provided with a through hole for the drilling wire rope to pass through. The through hole is a waist-shaped hole 10. The through hole is a wide hole at one end for leading out the drilling wire rope 6, and a narrow hole at the other end away from the leading out of the drilling wire rope 6.
[0087] In the design of this structure, the cover body at both sides of the through hole is provided with reinforcing ribs 11, and the reinforcing ribs 11 are fixedly arranged on the inner side of the cover body facing the right side.
[0088] In the design of this structure, as a specific design, the reinforcing rib 11 is a steel bar, and its cross-section is circular, polygonal, rectangular, etc. The steel bar is welded to the inner side of the protective cover 9 and is opposite to the main body of the traveling carriage 5. The steel bar is used to further strengthen the strength of the cover body, thereby ensuring the strength of the entire protective cover 9 and improving its service life.
[0089] In this embodiment, based on the structural design of the traditional traveling block 5 and based on the actual application of the traveling block 5, the design of the waist-shaped hole 10 is adopted to reserve sufficient swinging space for the drilling wire rope 6, reduce the friction between the drilling wire rope 6 and the protective cover 9, thereby effectively improving the service life of the protective cover 9. At the same time, with the help of the structural design of the reinforcing ribs 11, the strength of the protective cover 9 can be effectively guaranteed, and the cover body at the wider part of the waist-shaped hole 10 can be prevented from having insufficient rigidity and being easy to break or deform, thereby effectively realizing the protective function of the entire protective cover 9.
[0090] The present invention is not limited to the above-mentioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.
Claims
1. An ultra-heavy-load oil and gas drilling rig, characterized in that: It comprises a base and a derrick arranged on the base, a winch is arranged on the base, a crown block and a lifting and lowering traveling system are arranged on the top of the derrick, the crown block and the traveling system are connected by the winch through the drilling wire rope, and the lifting and lowering of the traveling system is controlled by the winch; The winch is provided with at least one drum, the drum is wound with a drilling wire rope, and the crown block and the traveling system are connected via the drilling wire rope. The winch is also provided with a brake device.
2. The super heavy-duty oil and gas drilling rig according to claim 1, characterized in that: The traveling system includes a traveling car and a protective cover matched with the traveling car. The protective cover is provided with a through hole for the drilling wire rope to pass through. The through hole is a waist-shaped hole. The through hole has a wide hole at one end for leading out the drilling wire rope and a narrow hole at the other end away from leading out the drilling wire rope.
3. The super heavy-duty oil and gas drilling rig according to claim 2, characterized in that: The cover body at both sides of the through hole is provided with reinforcing ribs, and the reinforcing ribs are fixedly arranged on the inner side of the cover body facing the traveling carriage.
4. The super heavy-duty oil and gas drilling rig according to claim 1, characterized in that: The winch also includes a box structure matched with the drum, the box structure includes a box body, the box body includes a back plate and at least two parallel wall plates, the back plate is arranged between the two wall plates, the drum can be rotatably arranged between the two wall plates, and an installation gap for installing a disc brake device is formed between the back plate and the two wall plates respectively; Also included is a cross beam, which is arranged across the wall panel.
5. The super heavy-duty oil and gas drilling rig according to claim 4, characterized in that: An opening is formed on the wall panel, and the wall panel is provided with an inserting plate and at least two connecting plates, the inserting plate can be inserted into the opening, the inserting plate is arranged between the two connecting plates and connected with the two connecting plates, the inserting plate is detachably connected to the wall panel through the connecting plates, and after the inserting plate is installed, a mounting hole matching the roller is formed with the wall panel; Both ends of the plug board abutting against the wall board are formed with first buckling parts along the insertion direction of the plug board, and one end of the connecting plate is formed with a second buckling part, and the first buckling part can be buckled with the second buckling part to connect the plug board to the connecting plate.
6. The super heavy-duty oil and gas drilling rig according to claim 5, characterized in that: The wall panel is formed with a third snap-fitting portion at the edge of the opening along the direction of insertion of the plug plate, and the connecting plate is formed with a fourth snap-fitting portion at one end away from the second snap-fitting portion, and the third snap-fitting portion can be snap-fitted with the fourth snap-fitting portion to connect the wall panel to the connecting plate.
7. The super heavy-duty oil and gas drilling rig according to claim 1, characterized in that: The traveling system includes a steel rope hoisting system, and the steel rope hoisting system is provided with at least two groups, each group of the steel rope hoisting system includes a traveling block and a drilling rig steel rope, the traveling block is located below the crown block, the drum is arranged on one side of the crown block, the drum is connected to a drum driving device, the drilling rig steel rope is wound and one end is fixed on the drum, and the other end of the steel rope passes through the crown block and the traveling block and is used to be fixed to a dead rope fixer on the other side of the crown block; Each group of the drilling rig wire rope hoisting systems can operate independently, or each group of the wire rope hoisting systems can be interconnected to operate together.
8. The super heavy-duty oil and gas drilling rig according to claim 1, characterized in that: The swimming system also includes a suspension member and a first load-bearing connecting member; The suspension member is arranged just above the wellhead and mounted on the derrick, each set of the crown block comprises at least one fixed pulley, the fixed pulley is detachably connected to the suspension member, and the fixed pulleys of the two sets of crown blocks are symmetrical about the center line of the wellhead; The traveling block comprises at least one movable pulley, the lower end of which is detachably connected to the first load-bearing connector, and the movable pulleys of the two groups of the traveling blocks are symmetrical about the center line of the wellhead; Alternatively or alternatively, the travel system further comprises a translation device, a crane coupling and a second load-bearing connection member; the crane is slidably connected to the derrick in the horizontal direction, and two groups of cranes are detachably connected via the crane coupling; the translation device is mounted on the derrick and connected to each group of cranes, and is capable of pushing the cranes to reciprocate in the horizontal direction, so that the center line of each group of cranes or the center lines of the two groups of cranes are aligned with the center line of the wellhead; The second load-bearing connecting member is arranged below the traveling carriage, and two groups of the traveling carriages are detachably connected via the load-bearing connecting member.
9. The super heavy-duty oil and gas drilling rig according to claim 8, characterized in that: The translation device comprises a bearing platform arranged on the derrick, the bearing platform is provided with a slide rail arranged in the horizontal direction, the overhead travelling vehicle is arranged on the slide rail, and a hydraulic cylinder is further arranged between the overhead travelling vehicle and the bearing platform, and the hydraulic cylinder drives the overhead travelling vehicle to move along the slide rail; The second load-bearing connecting member includes a plurality of interfaces, and the traveling carriage is detachably connected to the interfaces via pins.
10. The super heavy-load oil and gas drilling rig according to claim 7, characterized in that: The traveling system also includes fixed pulleys arranged on both sides of the derrick base section, and a lifting rope for lifting the derrick. One end of the lifting rope is fixedly connected to the traveling block and is fixed to the middle of the derrick after passing through the fixed pulley.