Manual hole digging pile retaining wall pouring device
By designing a manual hole-pile wall-protecting casting device including support plate, cutter and chute, the problems of low construction efficiency, difficulty in ensuring quality and high safety risks in the prior art are solved, and efficient and safe wall-protecting casting is achieved process.
Patent Information
- Application Number
- CN202420431046.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-03-06
AI Technical Summary
The construction efficiency of existing artificial hole-punched pile wall-guard concrete is low, the quality is difficult to guarantee, and there is a risk of falling, and the safety is poor.
Design a manual hole-punch wall-protecting casting device, including two parallel support plates, cutter silo, chute A and chute B. The cutter silo is fixed through the support plate. The chute A is used for concrete transportation, and chute B is used for concrete pouring. Achieve continuous pouring of concrete into the wall-guarding formwork.
It improves construction efficiency, ensures the quality of wall protection, reduces workers' labor, and reduces safety risks during construction.
Smart Images

Figure CN222525340U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of municipal engineering, in particular to a manual bored pile wall protection casting device. Background Art
[0002] The retaining wall of bored piles can support the surrounding soil, prevent soil loss and collapse, ensure the stability and safety of the hole wall, and reduce the risk of engineering accidents. Therefore, retaining wall construction is an important link in the construction process of bored piles. At present, the concrete pouring of the retaining wall of bored piles is generally carried out by lifting the concrete downwards by an electric hoist after the retaining wall formwork and steel bars are tied. The lifting is generally carried out by buckets, and workers pour concrete bucket by bucket. The pouring time is long, the quality of the final retaining wall is difficult to guarantee, the construction efficiency is low, and there is a risk of falling when the bucket is lifted up and down, and the safety is poor. Summary of the invention
[0003] The problem to be solved by the present invention is to overcome the shortcomings of the background technology and provide a manual bored pile wall casting device.
[0004] The present invention is achieved through the following technical solutions:
[0005] A device for pouring protective walls of bored piles, comprising two parallel support plates, the length of which is greater than the diameter of the bored piles, the two ends of the support plates being fixed to the ground on both sides of the upper surface of the bored piles, a lower bin being fixed on the two support plates, the lower bin being located at the center of the bored piles, the left and right sides of the upper end surface of the lower bin being provided with extension plates outwardly, the extension plates being perpendicular to the support plates, the extension plates being fixed to the support plates by bolts, a lower discharge port of the lower bin being integrally connected downwardly to a discharge pipe, the discharge pipe being connected downwardly to a plurality of extension pipes; an upwardly inclined chute A is overlapped above the lower bin, the upper part of the chute A is supported by a vertical support rod, the bottom of the support rod being fixed to the ground; a chute B is also included, The chute B is inclined downward, and the upper side of the chute B is closed. An upper cover plate is provided on the upper part of the chute B, and a material receiving hole is provided on the upper cover plate. The diameter of the material receiving hole is larger than the outer diameter of the extension tube, and the extension tube extends into the material receiving hole. The upper bottom surface of the chute B is fixedly connected downward to a vertical rotating column, and the rotating column is inserted into a sleeve. The rotating column can rotate in the sleeve. The sleeve is located at the center of the artificial bored pile, and the inner diameter of the sleeve is equal to the diameter of the rotating column. The bottom of the sleeve is fixed on a base; handles are provided on both sides of the lower part of the chute B, and a vertical supporting column is provided downward on the lower bottom surface of the chute B. Universal wheels are provided at the bottom end of the supporting column. The chute B extends into the casting space surrounded by the retaining wall template, and the chute B rotates to cast concrete into the retaining wall template.
[0006] Preferably, a handle is provided in the middle of the lower bin.
[0007] Preferably, the handle is in an inverted U shape, and the inner width of the handle is smaller than the outer width of the chute A.
[0008] Preferably, a base plate is provided at the bottom of the support rod, and the base plate is fixed to the ground by anchor bolts.
[0009] Preferably, a cable tie, a clamp or a clamp is provided at the connection between the extension tube and the feed tube or at the connection between the extension tubes.
[0010] Preferably, the base is a solid metal body.
[0011] Preferably, the diameter of the material receiving hole is 5-10 cm larger than the outer diameter of the extension tube.
[0012] The artificial bored pile wall casting device of the present invention can continuously cast concrete into the wall template, which not only greatly improves the construction efficiency but also ensures the quality of wall formation; the device of the present invention reduces the workload of workers and avoids unsafe factors in traditional construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the top view of the structure of this embodiment;
[0014] Figure 2 This is a schematic diagram of the side structure of this embodiment;
[0015] Figure 3 It is a schematic diagram of the local structure of this embodiment;
[0016] Figure 4 for Figure 3 Another angle structural diagram;
[0017] Figure 5 This is a schematic diagram of the structure of the chute B part of this embodiment.
[0018] In the figure, 1 is a bored pile, 2 is a support plate, 3 is a retaining wall, 4 is a feed bin, 5 is an extension plate, 6 is a feed pipe, 7 is an extension pipe, 8 is a chute A, 9 is a support rod, 10 is a chute B, 11 is an upper cover plate, 12 is a material receiving hole, 13 is a rotating column, 14 is a sleeve, 15 is a base, 16 is a handle, 17 is a support column, 18 is a universal wheel, 19 is a handle, 20 is a bottom plate, and 21 is a cable tie. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.
[0020] This embodiment includes two parallel support plates 2, which are long strips. The length of the support plates 2 is greater than the pile diameter of the bored pile 1, that is, the support plates 2 can span the entire bored pile 1. The two ends of the support plates 2 are fixed to the ground on both sides of the upper surface of the bored pile 1. The support plates 2 are used to support the lower bin 4 and the chute A8. The lower bin 4 is fixed on the two support plates 2. The lower bin 4 is located at the center of the bored pile 1. Extension plates 5 are provided outward on both sides of the upper end surface of the lower bin 4. The extension plates 5 are perpendicular to the support plates 2. The extension plates 5 are placed on the support plates 2 and fixed to the support plates 2 by bolts, thereby fixing the lower bin 4 and the support plates 2 together. The chute A8 is placed at the feed inlet position above the lower bin 4. The chute A8 is tilted upward. The upper part of the chute A8 is supported by a vertical support rod 9. The bottom of the support rod 9 is fixed to the ground near the bored pile 1. In order to make the support rod 9 support the chute A8 more stably, preferably, a bottom plate 20 is provided at the bottom of the support rod 9, and the bottom plate 20 is fixed to the ground by anchor bolts. Preferably, a handle 19 is provided in the middle of the lower bin 4, and the handle 19 is an inverted U-shape. More preferably, the inner width of the handle 19 is smaller than the outer width of the chute A8. The purpose of such a design is that the handle 19 can block the lower end of the chute A8, and when the chute A8 is fixed, the chute A8 can be supported by the handle 19. Concrete is transported to the upper part of the chute A8 by concrete conveying equipment, and the concrete slides down the chute A8 into the lower bin 4. The concrete conveying equipment can be a concrete mixer truck commonly used on the construction site, and the discharge port of the concrete mixer truck can be aligned with the chute A8.
[0021] The lower discharge port of the above-mentioned discharge bin 4 is integrally connected downwardly to the discharge pipe 6, and the discharge pipe 6 is connected downwardly to several sections of extension pipes 7. The discharge pipe 6 is gradually extended by the extension pipes 7 according to the depth of the manual bored pile 1. The connection between the discharge pipe 6 and the extension pipe 7 and the connection between the extension pipes 7 and the extension pipes 7 can be in various forms, such as threaded connection, sleeve connection, bolt connection, etc., and there is no special restriction here. In order to make the connection between the upper and lower pipes stable, preferably, the connection between the discharge pipe 6 and the extension pipe 7 and the connection between the extension pipe 7 and the extension pipe 7 is further strengthened by a cable tie 21 or a clamp or a clamp. In the attached figure of this embodiment, a cable tie 21 is used to further strengthen the connection.
[0022] The device of the present invention also includes a chute B10, which is used to pour concrete into the wall protection template of the artificial bored pile 1. The chute B10 is inclined downward, and the upper end side of the chute B10 is closed to prevent concrete from falling from the upper end. An upper cover plate 11 is provided on the upper part of the chute B10, and the upper cover plate 11 is formed integrally with the chute B10. A material receiving hole 12 is provided on the upper cover plate 11. The diameter of the material receiving hole 12 is slightly larger than the outer diameter of the extension tube 7. The extension tube 7 extends into the material receiving hole 12. Preferably, the diameter of the material receiving hole 12 is 5-10 cm larger than the outer diameter of the extension tube 7. A vertical rotating column 13 is fixedly connected downwardly to the bottom surface of the chute B10 directly below the material receiving hole 12. The rotating column 13 is inserted into a sleeve 14. The inner diameter of the sleeve 14 is equal to the diameter of the rotating column 13. The rotating column 13 can rotate in the sleeve 14. The vertical central axis of the rotating column 13 and the sleeve 14 are both located at the center of the pile of the artificial bored pile 1. The bottom end of the sleeve 14 is fixed on a base 15. The base 15 has a large weight and is used to support the rotating column 13 and the chute B10. To ensure the stability of the base 15, the base 15 is preferably a solid metal body, such as a solid cast iron cylindrical disk. The diameter of the base 15 can be preferably 40-60cm. A vertical support column 17 is fixed downwardly to the bottom surface of the lower part of the chute B10. The support column 17 is used to support the lower part of the chute B10. A universal wheel 18 is provided at the bottom end of the support column 17. The lower end of the chute B10 can extend into the casting space surrounded by the wall template. Handles 16 are provided on both sides of the lower part of the chute B10. The handles 16 are used by workers to pull the chute B10 to rotate. The workers grab the handles 16 to pull the chute B10 to rotate. When rotating, the rotating column 13 on the upper part of the chute B10 rotates in the sleeve 14, so that the chute B10 rotates to pour concrete into the template supported at the guard wall 3.
[0023] When the present invention is used, the lower material bin 4 is fixed in the middle of two parallel support plates 2, and then the two support plates 2 are fixed on the ground, so that the chute A8 is tilted downward, and the lower end of the chute A8 is placed on the feeding port above the lower material bin 4. The upper end of the chute A8 is fixed to the ground through the support rod 9, and then the base 15 is placed at the center of the bottom of the current excavation layer of the artificial bored pile 1, and the rotating column 13 is inserted into the sleeve 14 of the base 15, and then the extension pipe 7 is connected downward from the lower material pipe 6. The number of sections and the length of the extension pipe 7 are determined according to the depth of excavation, so that the bottom end of the extension pipe 7 can extend into the receiving hole 12, but does not touch the bottom surface of the chute B10, and the lower material pipe 6 and the extension pipe 7 are connected. The outer periphery of the connection position of the pipe 7 and the outer periphery of the connection position between the extension pipe 7 and the extension pipe 7 are further fastened and connected with the tie 21. After the connection is completed, the concrete is transported to the chute A8, and the concrete transporting equipment on the construction site is used to directly transport the concrete into the chute A8. For example, the discharge port of the concrete mixer truck is directly aimed at the upper part of the chute A8, and the concrete on the chute A8 slides down the chute A8 into the lower material bin 4, and then slides down to the chute B10 through the lower material bin 4, and then slides down into the retaining wall template through the chute B10. In this process, the worker pulls the chute B10 to rotate, and the chute B10 moves in a circle, realizing the concrete pouring of the retaining wall 3 of the manual bored pile 1. When the retaining wall 3 of the next layer needs to be poured, after the retaining wall template is supported, the extension pipe 7 is extended, and the retaining wall 3 is poured in the same way.
[0024] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A device for pouring artificial bored pile wall protection, characterized in that: The invention comprises two parallel support plates (2), the length of the support plates (2) being greater than the pile diameter of the artificially dug pile (1), the two ends of the support plates (2) being fixed on the ground on both sides of the upper surface of the artificially dug pile (1), a lower material bin (4) being fixed on the two support plates (2), the lower material bin (4) being located at the center of the artificially dug pile (1), and extension plates (5) being provided outwardly on both sides of the upper end surface of the lower material bin (4), the extension plates (5) being perpendicular to the support plates (2), and the extension plates (5) being fixed by bolts. The lower material bin (4) is fixed on the support plate (2), the lower material outlet of the lower material bin (4) is integrally connected to the lower material pipe (6) downwardly, and the lower material pipe (6) is downwardly connected to a plurality of extension pipes (7); an upwardly inclined chute A (8) is overlapped above the lower material bin (4), the upper part of the chute A (8) is supported by a vertical support rod (9), and the bottom of the support rod (9) is fixed on the ground; and a chute B (10) is also included, the chute B (10) is inclined downward, the upper end side of the chute B (10) is closed, and the chute B (10) is (10) is provided with an upper cover plate (11), and a material receiving hole (12) is provided on the upper cover plate (11). The diameter of the material receiving hole (12) is larger than the outer diameter of the extension tube (7). The extension tube (7) extends into the material receiving hole (12). The bottom surface of the upper part of the chute B (10) is fixedly connected downward to a vertical rotating column (13). The rotating column (13) is inserted into a sleeve (14). The rotating column (13) can rotate in the sleeve (14). The sleeve (14) is located at the center of the artificial bored pile (1). The inner diameter of the sleeve (14) is equal to the diameter of the rotating column (13), and the bottom of the sleeve (14) is fixed on a base (15); handles (16) are provided on both sides of the lower part of the chute B (10); a vertical support column (17) is provided downwardly on the bottom surface of the lower part of the chute B (10); a universal wheel (18) is provided at the bottom end of the support column (17); the chute B (10) extends into the pouring space surrounded by the retaining wall (3) template, and the chute B (10) rotates to pour concrete into the retaining wall (3) template.
2. The artificial bored pile wall casting device according to claim 1 is characterized in that: A handle (19) is provided in the middle of the lower material bin (4).
3. The artificial bored pile wall casting device according to claim 2 is characterized in that: The handle (19) is in an inverted U shape, and the inner width of the handle (19) is smaller than the outer width of the chute A (8).
4. The artificial bored pile wall casting device according to claim 1 is characterized in that: A bottom plate (20) is provided at the bottom of the support rod (9), and the bottom plate (20) is fixed to the ground via anchor bolts.
5. The artificial bored pile wall casting device according to claim 1 is characterized in that: A cable tie (21) or a clamp or a clamp is provided at the connection between the extension tube (7) and the feed tube (6) or between the extension tube (7) and the extension tube (7).
6. The artificial bored pile wall casting device according to claim 1 is characterized in that: The base (15) is a solid metal body.
7. The artificial bored pile wall casting device according to claim 1 is characterized in that: The diameter of the material receiving hole (12) is 5-10 cm larger than the outer diameter of the extension tube (7).