Building enclosure structure of housing construction project

By using the movable connecting structure of threaded pipes and screws and the cooperation of spring locking parts in the housing construction guardrail, the problem of instability of the guardrail is solved, and flexible adjustment and efficient disassembly and assembly of the guardrail length are achieved.

CN222614977UActive Publication Date: 2025-03-14HUBEI HUAXIN TIANCHENG CONSTRUCTION ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421240283.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2025-03-14
Estimated Expiration
2034-06-03

AI Technical Summary

Technical Problem

Due to the lack of a locking structure, the guardrails of existing house construction are prone to slide between the hollow pole and the solid pole, resulting in the guardrails being instable enough.

Method used

The movable connection structure of threaded pipe and screw is adopted. The adjustment head drives the screw to rotate, and the automatic locking between the connecting ear and the connecting pin is achieved through the coordination of the spring and the locking member.

Benefits of technology

The flexible adjustment of the length of the guardrail is achieved, ensuring the stability of the guardrail, and improving the disassembly and assembly efficiency of the guardrail.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222614977U_ABST
    Figure CN222614977U_ABST
Patent Text Reader

Abstract

The utility model discloses a building envelope structure of a housing construction project, and relates to the technical field of housing construction project protection. The device comprises two connecting seats and a supporting column, the two connecting seats are movably connected through a threaded pipe and a screw rod, one end of the threaded pipe is fixedly connected to the connecting seat on one side, the other end of the threaded pipe is in threaded connection with the screw rod, and the end, away from the threaded pipe, of the screw rod is rotationally connected with the other connecting seat through a bearing. The adjusting head is rotated to drive the screw rod to rotate, the distance between the two connecting bases can be rapidly adjusted, then the length of the protective fence can be flexibly adjusted according to the building requirement, the using effect is better, the connecting lugs are arranged on the connecting bases, and the connecting lugs are arranged on the connecting bases. And the locking pieces are elastically arranged in the connecting seats at the connecting lugs through the springs, meanwhile, the connecting pins are symmetrically arranged on the two sides of the connecting seats, and the clamping grooves are formed in the connecting pins, so that the disassembly and assembly efficiency of the protective fence by personnel can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building engineering protection, in particular to a building enclosure structure of a building engineering. Background Art

[0002] In building construction, in order to ensure construction safety, it is usually necessary to use guardrails to isolate the construction site to prevent unauthorized personnel from entering the construction site. If unauthorized personnel enter the construction site, serious consequences may occur, such as injury at the construction site or damage to related equipment, resulting in property loss and personal injury. After searching, the patent with application number 202123181381.2 discloses a building construction guardrail, including a counterweight seat, a hollow seat, a hollow rod, a solid rod and a stopper. The side of the stopper is fixedly connected to the solid rod, and the stopper is slidably installed in the hollow rod. The bottom of the hollow seat is fixedly connected to the counterweight seat, and accessories are provided at the ends of the hollow rod and the solid rod. Three matching holes are opened on the side of the hollow seat, and the accessories are clamped in the matching holes. A vertical hole is opened on the top of the hollow seat, and a vertical block is slidingly contacted in the vertical hole. A clamping block and a horizontal block are respectively provided on the side and top of the vertical block. A clamping groove is opened on the top of the accessory, and the clamping block is clamped in the clamping groove. A spring is welded between the topmost clamping block and the inner wall of the hollow seat. A stabilizing groove is opened on the side of the hollow seat, and a stabilizing block is clamped in the stabilizing groove.

[0003] However, during actual use, the applicant found that the hollow seats on both sides of the guardrail were connected by three groups of hollow rods and solid rods. Due to the lack of a locking structure between the hollow rods and the solid rods, relative sliding easily occurred between the hollow rods and the solid rods, making the construction guardrail not stable enough after construction. In view of this, we proposed a building envelope structure for building construction projects. Utility Model Content

[0004] In order to solve the above technical problems, the utility model is realized by the following technical solutions:

[0005] The utility model discloses a building enclosure structure for a building construction project, comprising a connecting seat and a support column, wherein the connecting seat is provided with two places, and the two connecting seats are movably connected through a threaded tube and a screw, one end of the threaded tube is fixedly connected to the connecting seat on one side, and the other end of the threaded tube is threadedly connected to the screw, and the end of the screw away from the threaded tube is rotatably connected to the connecting seat at the other place through a bearing, and an adjusting head is sleeved and fixed at a position near the bearing on the screw, and a telescopic rod is horizontally fixedly connected between the two connecting seats above and below the threaded tube, a connecting ear is fixedly provided on the outer side wall of the connecting seat, a locking piece is elastically connected with a spring at a position near the connecting ear inside the connecting seat, and a base is fixedly provided at the bottom of the support column, and connecting pins are symmetrically and vertically fixedly connected to the two sides of the support column through connecting supports, and a card slot is provided on the connecting pin.

[0006] Preferably, the connecting ear cooperates with the slot, and the upper end of the connecting pin is provided with a rounded corner.

[0007] Preferably, an inclined surface is provided at the bottom of the front end of the locking member, and the front end of the locking member extends into the connecting ear, the locking member moves along a slide groove provided inside the connecting seat, and the front end of the locking member cooperates with the slot.

[0008] Preferably, the spring is located in a slide groove inside the connecting seat, one end of the spring is fixedly connected to the inner side wall of the connecting seat, and the other end of the spring is fixedly connected to the tail end of the locking member.

[0009] Preferably, a toggle handle is fixedly provided on the side wall of the locking member, the toggle handle extends out of the connecting seat, and the toggle handle moves along an avoidance groove provided on the side wall of the connecting seat.

[0010] Preferably, one end of the telescopic rod is fixedly connected to the connecting seat on one side, and the other end of the telescopic rod is fixedly connected to the connecting seat on the other side.

[0011] The utility model has the following beneficial effects:

[0012] The utility model discloses a building enclosure structure for a building construction project. By rotating an adjusting head to drive a screw rod to rotate, the spacing between two connecting seats can be quickly adjusted, and then the length of the guardrail can be flexibly adjusted according to the construction requirements, and the use effect is better. Moreover, due to the matching structure of the screw rod and the threaded tube, relative sliding between the screw rod and the threaded tube can be prevented, and then the stability of the construction guardrail after construction can be ensured. By arranging a connecting ear on the connecting seat, and elastically arranging a locking piece in the connecting seat at the connecting ear through a spring, and at the same time, by symmetrically arranging connecting pins on both sides of the connecting seat, and opening a card slot on the connecting pin, by sleeves of the connecting ear on the connecting pin, the front end of the locking piece can be driven to automatically enter the card slot under the elastic force of the spring, and the connecting ear and the connecting pin are automatically locked. By manually toggling the toggle handle, the front end of the locking piece is moved out of the card slot, and the connecting ear can be quickly removed from the connecting pin. The operation is convenient, and the efficiency of disassembling and assembling the guardrail by personnel can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0014] Figure 1It is a schematic diagram of the overall structure of a building enclosure structure of a building construction project of the utility model;

[0015] Figure 2 This is a schematic diagram of the internal structure of a connecting seat in a building enclosure structure of a building construction project of the utility model;

[0016] Figure 3 The utility model is a building enclosure structure for a building construction project Figure 2 A magnified view of the structure in the middle.

[0017] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0018] 1. Connecting seat; 11. Connecting ear; 12. Avoidance groove; 2. Telescopic rod; 3. Threaded tube; 4. Screw; 5. Adjustment head; 6. Support column; 61. Base; 62. Connecting support; 7. Connecting pin; 71. Slot; 8. Locking piece; 81. Toggle handle; 82. Inclined surface; 9. Spring. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-3 As shown, the utility model provides a technical solution:

[0021] Embodiment 1: A building enclosure structure for a building construction project, comprising a connecting seat 1 and a support column 6, wherein the connecting seat 1 is provided at two locations, and the two connecting seats 1 are movably connected by a threaded tube 3 and a screw rod 4, a connecting ear 11 is fixedly provided on the outer wall of the connecting seat 1, and a locking member 8 is elastically connected to the position of the connecting ear 11 inside the connecting seat 1 through a spring 9, a base 61 is fixedly provided at the bottom of the support column 6, and connecting pins 7 are symmetrically and vertically fixedly connected on both sides of the support column 6 through connecting supports 62, and a card slot 71 is provided on the connecting pin 7, and the connecting ear 11 cooperates with the card slot 71, and when building, the connecting ear 11 can be sleeved on the connecting pin 7, and the upper end of the connecting pin 7 is provided with The rounded corners can facilitate personnel to better put the connecting ear 11 on the connecting pin 7. The top of the front end of the locking piece 8 is provided with an inclined surface 82, and the front end of the locking piece 8 extends into the connecting ear 11. The setting of the inclined surface 82 can make the connecting pin 7 smoothly inserted into the connecting ear 11, which can avoid the need for personnel to toggle the locking piece 8, which is more convenient. The locking piece 8 moves along the slide groove provided inside the connecting seat 1, and the front end of the locking piece 8 cooperates with the card groove 71. The spring 9 is located in the slide groove inside the connecting seat 1, one end of the spring 9 is fixedly connected to the inner inner side wall of the connecting seat 1, and the other end of the spring 9 is fixedly connected to the tail end of the locking piece 8. The setting of the spring 9 is used to drive the locking The locking member 8 is reset by moving, and a toggle handle 81 is fixedly provided on the side wall of the locking member 8. The toggle handle 81 extends outside the connecting seat 1, and the toggle handle 81 moves along the avoidance groove 12 provided on the side wall of the connecting seat 1. When the building enclosure structure of the building construction project is constructed, the connecting ears 11 on the two connecting seats 1 can be respectively aligned with the connecting pins 7 on the two supporting columns 6, and the connecting ears 11 are sleeved on the connecting pins 7. In the process that the upper end of the connecting pin 7 passes through the connecting ears 11, due to the setting of the inclined surface 82, the connecting pin 7 can squeeze the locking member 8 toward the inside of the connecting seat 1, so that the locking member 8 can move along the sliding groove inside the connecting seat 1 to compress the spring 9. When the connecting ear 11 moves to the bottom and contacts the connecting support 62, the elastic force of the spring 9 can drive the locking piece 8 to reset and make the front end of the locking piece 8 automatically snap into the slot 71, thereby realizing automatic locking between the connecting ear 11 and the connecting pin 7, and thus realizing the rapid construction of the guardrail. When the guardrail needs to be disassembled, the toggle handle 81 can be manually pushed inward to drive the locking piece 8 to move, so that the front end of the locking piece 8 is removed from the slot 71, and the connecting seat 1 can be lifted upward to remove the connecting seat 1 from the connecting pin 7, so that the guardrail can be quickly disassembled. The operation is convenient, and the disassembly and assembly efficiency of the building envelope structure of the building construction project can be improved.

[0022] Embodiment 2: The difference between this embodiment and embodiment 1 is that one end of the threaded tube 3 is fixedly connected to the connecting seat 1 on one side, and the other end of the threaded tube 3 is threadedly connected to the screw rod 4. The end of the screw rod 4 away from the threaded tube 3 is rotatably connected to the other connecting seat 1 through a bearing. An adjusting head 5 is sleeved and fixed at a position close to the bearing on the screw rod 4. By turning the adjusting head 5 to drive the screw rod 4 to rotate, the distance between the two connecting seats 1 can be adjusted, and the threaded connection between the threaded tube 3 and the screw rod 4 can achieve self-locking between the threaded tube 3 and the screw rod 4 when the rotation of the screw rod 4 is stopped, and the two connecting seats 1 above and below the threaded tube 3 are both horizontal. A telescopic rod 2 is fixedly connected, one end of the telescopic rod 2 is fixedly connected to the connecting seat 1 on one side, and the other end of the telescopic rod 2 is fixedly connected to the connecting seat 1 on the other side. The telescopic rod 2 can realize telescopic adjustment of the length. In the process of building the guardrail, when the length of the guardrail needs to be adjusted according to actual conditions, the screw 4 can be driven to rotate by rotating the adjusting head 5. At this time, the screw 4 and the threaded tube 3 rotate relative to each other, and the two connecting seats 1 can be driven to approach or move away synchronously under the cooperation of the two telescopic rods 2, so that the distance between the two connecting seats 1 can be adjusted, and then the length of the guardrail can be flexibly adjusted according to the construction requirements.

[0023] Working principle: When in use, when constructing the building envelope structure of the building construction project, the connecting ears 11 on the two connecting seats 1 can be respectively aligned with the connecting pins 7 on the two supporting columns 6, and the connecting ears 11 can be sleeved on the connecting pins 7. In the process of the upper end of the connecting pin 7 passing through the connecting ears 11, due to the setting of the inclined surface 82, the connecting pin 7 can squeeze the locking piece 8 toward the inside of the connecting seat 1, so that the locking piece 8 can move along the slide groove inside the connecting seat 1 to compress the spring 9. When the connecting ear 11 moves to the bottom and contacts the connecting support 62, at this time, under the action of the elastic force of the spring 9, the locking piece 8 can be driven to reset and move, and the front end of the locking piece 8 is automatically snapped into the snap-in groove 71, so as to realize the automatic locking between the connecting ear 11 and the connecting pin 7, thereby realizing the rapid erection of the guardrail. When the guardrail needs to be disassembled, the toggle handle 81 can be manually pushed inward to drive the locking piece 8 to move, so that the front end of the locking piece 8 is moved out of the slot 71, and the connecting seat 1 can be lifted upward to remove the connecting seat 1 from the connecting pin 7, so that the guardrail can be quickly disassembled. The operation is convenient and can improve the disassembly and assembly efficiency of the building envelope structure of the building construction project. In the process of building the guardrail, when it is necessary to adjust the length of the guardrail according to actual conditions, the screw 4 can be driven to rotate by rotating the adjusting head 5. At this time, the screw 4 and the threaded tube 3 rotate relative to each other, and the two connecting seats 1 can be driven to move closer or farther away synchronously under the cooperation of the two telescopic rods 2, so that the distance between the two connecting seats 1 can be adjusted, and then the length of the guardrail can be flexibly adjusted according to the construction requirements.

[0024] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0025] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions described in the aforementioned embodiments and any equivalent replacement of some of the technical features therein are within the protection scope of the present invention.

Claims

1. A building enclosure structure for a building construction project, comprising a connecting seat (1) and a supporting column (6), characterized in that: The connecting seat (1) is provided at two locations, and the two connecting seats (1) are movably connected via a threaded tube (3) and a screw rod (4). One end of the threaded tube (3) is fixedly connected to the connecting seat (1) on one side, and the other end of the threaded tube (3) is threadedly connected to the screw rod (4). The end of the screw rod (4) away from the threaded tube (3) is rotatably connected to the connecting seat (1) at the other location via a bearing. An adjusting head (5) is sleeved and fixed at a position close to the bearing on the screw rod (4). The threaded tube (3) is provided with a plurality of screw rods (5) on the upper and lower sides thereof. A telescopic rod (2) is horizontally fixedly connected between two connecting seats (1) on the side, a connecting ear (11) is fixedly arranged on the outer wall of the connecting seat (1), a locking member (8) is elastically connected to the position of the connecting ear (11) inside the connecting seat (1) through a spring (9), a base (61) is fixedly arranged at the bottom of the support column (6), and connecting pins (7) are symmetrically and vertically fixedly connected to the two sides of the support column (6) through connecting supports (62), and a card slot (71) is provided on the connecting pin (7).

2. The building envelope structure of a building construction project according to claim 1, characterized in that: The connecting ear (11) cooperates with the clamping groove (71), and the upper end of the connecting pin (7) is provided with a rounded corner.

3. The building envelope structure of a building construction project according to claim 2, characterized in that: The bottom of the front end of the locking piece (8) is provided with an inclined surface (82), and the front end of the locking piece (8) extends into the connecting ear (11). The locking piece (8) moves along a sliding groove provided inside the connecting seat (1), and the front end of the locking piece (8) cooperates with the card slot (71).

4. The building envelope structure of a building construction project according to claim 3, characterized in that: The spring (9) is located in a slide groove inside the connecting seat (1), one end of the spring (9) is fixedly connected to the inner side wall of the connecting seat (1), and the other end of the spring (9) is fixedly connected to the rear end of the locking member (8).

5. The building envelope structure of a building construction project according to claim 4, characterized in that: A toggle handle (81) is fixedly provided on the side wall of the locking member (8), the toggle handle (81) extends outside the connecting seat (1), and the toggle handle (81) moves along an avoidance groove (12) provided on the side wall of the connecting seat (1).

6. The building envelope structure of a building construction project according to claim 1, characterized in that: One end of the telescopic rod (2) is fixedly connected to the connecting seat (1) on one side, and the other end of the telescopic rod (2) is fixedly connected to the connecting seat (1) on the other side.

Citation Information