Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter
A technology for fixing vaporization and hoisting methods, applied in the direction of manufacturing converters, etc., can solve the problems of large dismantling work surface, prolong maintenance time, and dismantle many parts, and achieve the effect of reducing construction cost, reducing maintenance time, and improving efficiency and quality.
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2012-12-12
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention belongs to an equipment hoisting method, in particular to a hoisting method for overhauling and dismantling a vaporization flue of a converter. Background technique
[0002] At present, in the metallurgical converter steelmaking, it is often encountered that the first fixed (i.e. the first fixed stage) vaporization flue needs to be replaced due to serious production wear, but the process platform and equipment layout in the converter area are many three-dimensional intersections. The fixed vaporization flue of the first stage is arranged between the movable vaporization flue of the converter and the fixed second stage vaporization flue, and the three-dimensional space is very compact and narrow. Usually, when replacing the first fixed vaporization flue, it is necessary to remove the support of the flue and the upper fixed II Part of the process platform affected by the first section of the vaporization flue and the hoisting channel, as we...
Examples
Example Embodiment
[0035] Example
[0036] In a steelmaking plant’s 60t converter vaporization cooling flue removal and replacement project, the first section of the fixed vaporization flue is 13 meters long and weighs 10t, but the demolition area is very small, so the lifting method is used for construction, and the entire removal and lifting process The operation was smoothly implemented, and the time for the removal and replacement of the first fixed vaporization flue was advanced from 5 days to 3 days. The converter production resumed quickly, the effect was very obvious, the removal efficiency was high, and the product protection was good. The construction steps are:
[0037] 1. Set up lifting equipment:
[0038] 1) Set up a hoisting device:
[0039] Place a hoist 8 for driving the pulley block 13 on the second-layer platform 7 at the rear of the converter, and the power of the hoist 8 is 15kw;
[0040] 2) Set the pulley block:
[0041] The pulley block 13 is fixed on the oxygen lance platform beam ...