A three-dimensional structure of rapid desalination and improvement of soil profile in saline-alkali land in tidal flat reclamation area
A technology of three-dimensional structure and saline-alkali land, which is applied in the fields of soil preparation, climate change adaptation, agricultural machinery and implements, etc., can solve the difficulty of increasing the desalination and alkali treatment of saline-alkali land in new reclamation areas, the effect of rapid desalination of dark pipes is not obvious, and reduce the drainage and desalination of dark pipes The rate and other issues, to achieve the effect of improving soil infiltration capacity, improving soil porosity, and preventing surface soil compaction
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2015-08-05
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1
Abstract
Description
technical field
[0001] The invention belongs to the technical field of saline-alkali land improvement engineering, and in particular relates to a three-dimensional structure for fast desalination and soil improvement of saline-alkali land in a new sea reclamation area. Background technique
[0002] The tidal flats in the coastal areas are rich in resources, which are rare land reserve resources in our country. The implementation of scientific reclamation and development of tidal flats plays an irreplaceable role in supplementing the shortage of cultivated land resources in my country, ensuring national food security, and expanding coastal development space. However, the newly reclamation area of the tidal flat has the characteristics of high salt content, shallow groundwater depth, high mineralization, poor soil texture and structure, and low natural fertility level of the soil due to the short time of soaking away from seawater and soil formation. These barrier factors h...
Examples
Embodiment 1
[0022] Such as figure 1 As shown, the present invention is applied to the saline-alkali land in the new reclamation area of the tidal flat. First, the hidden pipe is buried in the saline-alkali soil layer 3 section to be desalted at a depth of 90 cm to form a hidden pipe drainage layer 4. The inclination angle of the dark pipe to the water outlet direction is 2°. The embedding distance is 20m; dig out the 45cm soil of the surface layer of the soil layer 3 section, and pile it up in the open space next to it. Add 5cm long crushed straw to the surface soil on the side, the addition amount is 20t / hm 2 , add desulfurization gypsum at the same time, the addition amount is 10t / hm 2 , mixed evenly to form straw + gypsum mixed soil; spread 15cm thick mixed soil on the straw isolation layer, level it, and then lay infiltration capillary at 1.2m intervals (buried as deep as 30cm above the ground), and then spread the remaining mixed soil The soil is leveled to form a straw-gypsum m...
Embodiment 2
[0025] The present invention is applied to the saline-alkali land in the new reclamation area of the tidal flat. First, the hidden pipe is buried in the saline-alkali soil layer 3 section to be desalinated at a depth of 100 cm to form a drainage layer 4 of the hidden pipe. 30m; dig out the 40cm soil of the surface layer of the soil layer 3 section, and pile it up in the open space beside it. Add 8cm long crushed straw to the soil, the addition amount is 30t / hm 2 , while adding desulfurization gypsum, the addition amount is 20t / hm 2 , mixed evenly to form straw + gypsum mixed soil; spread 10cm thick mixed soil on the straw isolation layer, level it, and then lay infiltration capillary at 2m intervals (buried as deep as 30cm above the ground), and then spread the remaining mixed soil And leveled to form straw gypsum mixed tillage layer (seepage irrigation layer).