An assembled connection node for lattice beams and columns
Through prefabricated connection nodes, C-shaped steel, steel pipe columns and clamps are used to assemble lattice beams and columns, which solves the problems of long construction period, high cost and deformation caused by welding in the existing technology, and achieves simplified construction and reduced risks. Effect.
Patent Information
- Application Number
- CN201711340217.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-12-14
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2037-12-14
AI Technical Summary
The connection nodes between existing lattice beams and columns need to be welded during construction, resulting in long construction period, high cost, residual deformation and increased fire risk.
Prefabricated connection nodes are used, and C-shaped steel, steel pipe columns, clamps and beam connectors are used for assembly to avoid on-site welding, and the structural connection is completed through the combination of clamps and beam connectors.
The construction process is simplified, the construction cost and cycle are reduced, residual deformation and fire risks caused by welding are avoided, and simple assembly and efficient connection are achieved.
Smart Images

Figure CN107893480B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel structures and relates to an assembled connection node of a lattice beam and a column. Background Art
[0002] During the construction of the connection nodes between existing lattice beams and columns, it is necessary to first prepare the components constituting the connection nodes in a factory and then transport them to the site for welding. However, this construction method has a long construction period and high construction cost, and it will cause residual deformation after welding. At the same time, open flames will be generated during welding construction, thereby increasing the possibility of fire during construction and affecting the construction environment. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide an assembled connection node between a lattice beam and a column. The connection node adopts an assembled structure and can avoid various problems caused by welding at the construction site.
[0004] To achieve the above-mentioned object, the assembled connection node of the lattice beam and column of the present invention comprises a first C-shaped steel, a second C-shaped steel, a steel pipe column, a first end plate fixing clamp, a second end plate fixing clamp, a first upper flange clamp, a second upper flange clamp, a first lower flange clamp and a second lower flange clamp;
[0005] The first end plate fixing clamp comprises a first end plate, a first clamping plate and a second clamping plate, wherein the end of the first C-shaped steel is fixed to the side surface of the first end plate, the end of the first clamping plate is connected to the side surface of the upper end of the first end plate, and the end of the second clamping plate is connected to the side surface of the lower end of the second end plate; the second end plate fixing clamp comprises a second end plate, a third clamping plate and a fourth clamping plate, wherein the end of the second C-shaped steel is fixed to the side surface of the second end plate, the end of the third clamping plate is connected to the second end plate The sides of the upper ends are connected, the end of the fourth clamping plate is connected to the side of the lower end of the second end plate, and the first upper flange clamp, the second upper flange clamp, the first lower flange clamp and the second lower flange clamp are all fixed on the steel pipe column, and the first clamping plate is clamped in the first upper flange clamp, the second clamping plate is clamped in the first lower flange clamp, the third clamping plate is clamped in the second upper flange clamp, the fourth clamping plate is clamped in the second lower flange clamp, and the first C-shaped steel is connected to the second C-shaped steel.
[0006] It also includes a first end plate fixing clamp and a second end plate fixing clamp, which are located between the first end plate and the second end plate, and the first end plate fixing clamp and the second end plate fixing clamp both include a first side plate and a second side plate, wherein an end portion of the first side plate is fixed to a side surface of a steel pipe column, an end portion of the second side plate is connected to a side surface of the first side plate, the first end plate is clamped between the side surface of the steel pipe column and the second side plate in the first end plate fixing clamp, and the second end plate is clamped between the side surface of the steel pipe column and the second side plate in the second end plate fixing clamp.
[0007] The first C-shaped steel and the second C-shaped steel are connected by a first beam connector and a second beam connector, wherein two ends of the first beam connector are respectively connected to an upper flange of the first C-shaped steel and an upper flange of the second C-shaped steel, and two ends of the second beam connector are respectively connected to a lower flange of the first C-shaped steel and a lower flange of the second C-shaped steel.
[0008] The first upper flange clamp and the second upper flange clamp both include a top plate and a plurality of L-shaped clamps, wherein the end of the top plate is fixed to the side wall of the steel pipe column, the upper end of each L-shaped clamp is fixed to the top plate, the first clamping plate is clamped between the top plate and each L-shaped clamp in the first upper flange clamp, and the third clamping plate is clamped between the top plate and each L-shaped clamp in the second upper flange clamp.
[0009] The first lower flange clamp and the second lower flange clamp both include a base plate, a plurality of support plates and a plurality of ┏-shaped clamps, wherein the end of each support plate is connected to the bottom of the base plate and the side wall of the steel pipe column, the end of the base plate is connected to the side wall of the steel pipe column, the lower end of each ┏-shaped clamp is fixed to the base plate, the second clamping plate is clamped between the base plate and the ┏-shaped clamp in the first lower flange clamp, and the fourth clamping plate is clamped between the base plate and the ┏-shaped clamp in the second lower flange clamp.
[0010] A first limiting plate for limiting the position of the first end plate is provided at the end of the top plate in the first upper flange clamp;
[0011] A second limiting plate for limiting the position of the second end plate is provided at the end of the top plate in the second upper flange clamp;
[0012] A third limiting plate for limiting the first end plate is provided at the end of the bottom plate in the first lower flange clamp;
[0013] A fourth limiting plate for limiting the second end plate is arranged at the end of the bottom plate in the second lower flange clamp.
[0014] The number of the first beam connecting members and the number of the second beam connecting members are both two.
[0015] The present invention has the following beneficial effects:
[0016] During the specific operation of the assembled connection node between the lattice beam and the column described in the present invention, the steel pipe column is first fixed to the first upper flange clamp, the second upper flange clamp, the first lower flange clamp and the second lower flange clamp in the factory, and the construction of the connection between the first C-shaped steel and the first end plate fixing clamp and the construction of the connection between the second C-shaped steel and the second end plate fixing clamp are completed at the same time. Then the steel pipe column is transported to the construction site. At the construction site, it is only necessary to clamp the first clamping plate and the second clamping plate in the first upper flange clamp and the first lower flange clamp respectively; and clamp the third clamping plate and the fourth clamping plate in the second upper flange clamp and the second lower flange clamp to complete the construction of the assembled connection node between the lattice beam and the column, thereby avoiding various problems caused by on-site welding, avoiding residual deformation caused by welding, reducing the difficulty of construction, and truly achieving the purpose of simple assembly, reducing construction costs and construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the present invention;
[0018] Figure 2 It is a schematic diagram of the structure of the steel pipe column 1 in the present invention;
[0019] Figure 3 Schematic diagram of the structure of the second upper flange clamp 33 in the present invention;
[0020] Figure 4 It is a schematic structural diagram of the second end plate fixing clamp 42 in the present invention;
[0021] Figure 5 It is a schematic structural diagram of the second lower flange clamp 34 in the present invention.
[0022] Among them, 1 is a steel pipe column, 21 is a first C-shaped steel, 22 is a second C-shaped steel, 31 is a first upper flange clip, 32 is a first lower flange clip, 33 is a second upper flange clip, 34 is a second lower flange clip, 41 is a first end plate fixing clip, 42 is a second end plate fixing clip, 5 is a first beam connecting piece, 6 is a top plate, 7 is an L-shaped clip, 8 is a second limit plate, 9 is a first side plate, 10 is a second side plate, 11 is a bottom plate, 12 is a support plate, 13 is a ┏-shaped clip, and 14 is a fourth limit plate. DETAILED DESCRIPTION
[0023] The present invention is further described in detail below in conjunction with the accompanying drawings:
[0024] refer to Figures 1 to 5The assembled connection node of the lattice beam and column described in the present invention includes a first C-shaped steel 21, a second C-shaped steel 22, a steel pipe column 1, a first end plate fixing clamp 41, a second end plate fixing clamp 41, a first upper flange clamp 31, a second upper flange clamp 33, a first lower flange clamp 32 and a second lower flange clamp 34; the first end plate fixing clamp 41 includes a first end plate, a first clamping plate and a second clamping plate, wherein the end of the first C-shaped steel 21 is fixed to the side surface of the first end plate, the end of the first clamping plate is connected to the side surface of the upper end of the first end plate, and the end of the second clamping plate is connected to the side surface of the lower end of the second end plate; the second end plate fixing clamp 41 includes a second end plate, a third clamping plate and a fourth clamping plate. A clamping plate and a fourth clamping plate, wherein the end of the second C-shaped steel 22 is fixed to the side of the second end plate, the end of the third clamping plate is connected to the side of the upper end of the second end plate, the end of the fourth clamping plate is connected to the side of the lower end of the second end plate, and the first upper flange clamp 31, the second upper flange clamp 33, the first lower flange clamp 32 and the second lower flange clamp 34 are all fixed on the steel pipe column 1, and the first clamping plate is clamped in the first upper flange clamp 31, the second clamping plate is clamped in the first lower flange clamp 32, the third clamping plate is clamped in the second upper flange clamp 33, the fourth clamping plate is clamped in the second lower flange clamp 34, and the first C-shaped steel 21 is connected to the second C-shaped steel 22.
[0025] The present invention also includes a first end plate fixing clamp 41 and a second end plate fixing clamp 42, which are located between the first end plate and the second end plate, and both the first end plate fixing clamp 41 and the second end plate fixing clamp 42 include a first side plate 9 and a second side plate 10, wherein the end of the first side plate 9 is fixed to the side of the steel pipe column 1, the end of the second side plate 10 is connected to the side of the first side plate 9, the first end plate is clamped between the side of the steel pipe column 1 and the second side plate 10 in the first end plate fixing clamp 41, and the second end plate is clamped between the side of the steel pipe column 1 and the second side plate 10 in the second end plate fixing clamp 42.
[0026] The first C-shaped steel 21 and the second C-shaped steel 22 are connected by a first beam connector 5 and a second beam connector, wherein two ends of the first beam connector 5 are respectively connected to the upper flange of the first C-shaped steel 21 and the upper flange of the second C-shaped steel 22, and two ends of the second beam connector are respectively connected to the lower flange of the first C-shaped steel 21 and the lower flange of the second C-shaped steel 22.
[0027] The first upper flange clamp 31 and the second upper flange clamp 33 both include a top plate 6 and a plurality of L-shaped clamps 7, wherein the end of the top plate 6 is fixed to the side wall of the steel pipe column 1, the upper end of each L-shaped clamp 7 is fixed to the top plate 6, the first clamping plate is clamped between the top plate 6 and each L-shaped clamp 7 in the first upper flange clamp 31, and the third clamping plate is clamped between the top plate 6 and each L-shaped clamp 7 in the second upper flange clamp 33.
[0028] The first lower flange clamp 32 and the second lower flange clamp 34 both include a base plate 11, a plurality of support plates 12 and a plurality of ┏-shaped clamps 13, wherein the end of each support plate 12 is connected to the bottom of the base plate 11 and the side wall of the steel pipe column 1, the end of the base plate 11 is connected to the side wall of the steel pipe column 1, the lower end of each ┏-shaped clamp 13 is fixed on the base plate 11, the second clamping plate is clamped between the base plate 11 and the ┏-shaped clamp 13 in the first lower flange clamp 32, and the fourth clamping plate is clamped between the base plate 11 and the ┏-shaped clamp 13 in the second lower flange clamp 34.
[0029] The end of the top plate 6 in the first upper flange clamp 31 is provided with a first limiting plate for limiting the first end plate; the end of the top plate 6 in the second upper flange clamp 33 is provided with a second limiting plate 8 for limiting the second end plate; the end of the bottom plate 11 in the first lower flange clamp 32 is provided with a third limiting plate for limiting the first end plate; the end of the bottom plate 11 in the second lower flange clamp 34 is provided with a fourth limiting plate 14 for limiting the second end plate; the number of the first beam connector 5 and the second beam connector are both two.
[0030] During construction of the present invention, the first beam connector 5, the second beam connector, the first C-shaped steel 21 and the second C-shaped steel 22 are connected by bolts. During disassembly, only the first beam connector 5 and the second beam connector need to be removed. At the same time, the lattice beam is composed of the first C-shaped steel 21 and the second C-shaped steel 22. The moment of inertia of the cross section is large and has good force-bearing performance. The shear force at the beam end is borne by the first upper flange clip 31 and the second upper flange clip 33. The bending moment at the beam end is transmitted by the first end plate and the second end plate to the first upper flange clip 31, the second upper flange clip 33, the first lower flange clip 32 and the second lower flange clip 34, and then to the steel pipe column 1. The force transmission path is clear, which is convenient for designers to perform analysis and calculation.
Claims
1. An assembled connection node between a lattice beam and a column, characterized in that: It comprises a first C-shaped steel (21), a second C-shaped steel (22), a steel pipe column (1), a first fixing clamp, a second fixing clamp, a first upper flange clamp (31), a second upper flange clamp (33), a first lower flange clamp (32) and a second lower flange clamp (34); The first fixing clamp comprises a first end plate, a first clamping plate and a second clamping plate, wherein the end of the first C-shaped steel (21) is fixed to the side surface of the first end plate, the end of the first clamping plate is connected to the side surface of the upper end of the first end plate, and the end of the second clamping plate is connected to the side surface of the lower end of the first end plate; the second fixing clamp comprises a second end plate, a third clamping plate and a fourth clamping plate, wherein the end of the second C-shaped steel (22) is fixed to the side surface of the second end plate, the end of the third clamping plate is connected to the side surface of the upper end of the second end plate, and the end of the fourth clamping plate is connected to the side surface of the lower end of the first end plate. The side surfaces of the lower ends of the two end plates are connected, and the first upper flange clamp (31), the second upper flange clamp (33), the first lower flange clamp (32) and the second lower flange clamp (34) are all fixed on the steel pipe column (1), and the first clamping plate is clamped in the first upper flange clamp (31), the second clamping plate is clamped in the first lower flange clamp (32), the third clamping plate is clamped in the second upper flange clamp (33), and the fourth clamping plate is clamped in the second lower flange clamp (34), and the first C-shaped steel (21) is connected to the second C-shaped steel (22); It also includes a first end plate fixing clamp (41) and a second end plate fixing clamp (42), the first end plate fixing clamp (41) and the second end plate fixing clamp (42) are located between the first end plate and the second end plate, and the first end plate fixing clamp (41) and the second end plate fixing clamp (42) both include a first side plate (9) and a second side plate (10), wherein an end of the first side plate (9) is fixed to a side surface of the steel pipe column (1), an end of the second side plate (10) is connected to a side surface of the first side plate (9), the first end plate is clamped between the side surface of the steel pipe column (1) and the second side plate (10) in the first end plate fixing clamp (41), and the second end plate is clamped between the side surface of the steel pipe column (1) and the second side plate (10) in the second end plate fixing clamp (42); The first C-shaped steel (21) and the second C-shaped steel (22) are connected via a first beam connector (5) and a second beam connector, wherein two ends of the first beam connector (5) are respectively connected to an upper flange of the first C-shaped steel (21) and an upper flange of the second C-shaped steel (22), and two ends of the second beam connector are respectively connected to a lower flange of the first C-shaped steel (21) and a lower flange of the second C-shaped steel (22); The first upper flange clamp (31) and the second upper flange clamp (33) both comprise a top plate (6) and a plurality of L-shaped clamps (7), wherein the end of the top plate (6) is fixed to the side wall of the steel pipe column (1), the upper end of each L-shaped clamp (7) is fixed to the top plate (6), the first clamping plate is clamped between the top plate (6) and each L-shaped clamp (7) in the first upper flange clamp (31), and the third clamping plate is clamped between the top plate (6) and each L-shaped clamp (7) in the second upper flange clamp (33).
2. The assembled connection node of the lattice beam and column according to claim 1, characterized in that: The first lower flange clamp (32) and the second lower flange clamp (34) both comprise a base plate (11), a plurality of support plates (12) and a plurality of ┏-shaped clamps (13), wherein the end of each support plate (12) is connected to the bottom of the base plate (11) and the side wall of the steel pipe column (1), the end of the base plate (11) is connected to the side wall of the steel pipe column (1), the lower end of each ┏-shaped clamp (13) is fixed on the base plate (11), the second clamping plate is clamped between the base plate (11) and the ┏-shaped clamp (13) in the first lower flange clamp (32), and the fourth clamping plate is clamped between the base plate (11) and the ┏-shaped clamp (13) in the second lower flange clamp (34).
3. The assembled connection node of the lattice beam and column according to claim 2, characterized in that: A first limiting plate for limiting the position of the first end plate is provided at the end of the top plate (6) in the first upper flange clamp (31); A second limiting plate (8) for limiting the position of the second end plate is provided at the end of the top plate (6) in the second upper flange clamp (33); A third limiting plate for limiting the position of the first end plate is provided at the end of the bottom plate (11) in the first lower flange clamp (32); A fourth limiting plate (14) for limiting the position of the second end plate is provided at the end of the bottom plate (11) in the second lower flange clamp (34).
4. The assembled connection node of the lattice beam and column according to claim 1, characterized in that: The number of the first beam connecting members (5) and the number of the second beam connecting members are both two.
Citation Information
Patent Citations
Multi-layer multi-way intersected large-scale super-thick plate node for super-high space and manufacturing method thereof
CN103225347A
Assembled connected node of lattice formula roof beam and post
CN207597591U