Gas pipeline docking fixing device and construction method

By designing a gas pipeline fixing device including a fixing sleeve and a connecting plate, the breakage and air leakage problems during gas pipeline docking are solved, and a more stable and sealed connection is achieved, and safety is improved.

CN107940136BActive Publication Date: 2025-01-03TIANJIN XINSHILI ENERGY TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201711313618.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-12-12
Publication Date
2025-01-03
Estimated Expiration
2037-12-12

AI Technical Summary

Technical Problem

When connecting the gas pipelines, due to the unreasonable structure of the fixture, cracks or breaks often occur, resulting in gas leakage, posing safety hazards.

Method used

A fixing device including gas pipes No. 1 and No. 2, fixing sleeves, connecting plates and fastening sleeves is designed to ensure the stability and sealing of the pipe connection through specific connection and insertion steps and bolt and screw fixing methods.

Benefits of technology

Effectively prevent gas pipelines from breaking and leaking, improve the stability of the connection and the rationality of the overall structure, and ensure safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN107940136B_ABST
    Figure CN107940136B_ABST
Patent Text Reader

Abstract

A gas pipeline docking and fixing device and a construction method, the gas pipeline docking and fixing device comprises a No. 1 gas pipeline, a No. 2 gas pipeline, a No. 2 fixing sleeve, a No. 1 fixing sleeve, a No. 2 connecting plate, a No. 1 connecting plate, a No. 1 connecting sleeve, and a No. 2 connecting sleeve. The left side of the No. 1 gas pipeline is connected to the right side of the No. 2 gas pipeline, the No. 1 gas pipeline is meshed with the No. 1 connecting sleeve, the left side of the No. 1 gas pipeline is connected to the No. 1 connecting sleeve, the left side of the No. 1 gas pipeline is inserted into the No. 1 connecting sleeve, the No. 2 gas pipeline is meshed with the No. 2 connecting sleeve, the right side of the No. 2 gas pipeline is connected to the No. 2 connecting sleeve, the No. 2 gas pipeline is inserted into the No. 2 connecting sleeve, the outer side of the No. 1 gas pipeline is connected to the right side of the fastening sleeve, the No. 1 gas pipeline is inserted into the fastening sleeve, the outer side of the No. 2 gas pipeline is connected to the left side of the fastening sleeve, the No. 2 gas pipeline is inserted into the fastening sleeve, and the right side of the fastening sleeve is connected to the No. 1 connecting sleeve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of gas pipelines, and in particular to a gas pipeline docking and fixing device and a construction method. Background Art

[0002] When gas pipelines are connected, fixing devices are often used to fix the gas pipelines together. However, due to the unreasonable structure of the fixing devices, cracks or breaks often appear at the joints of the gas pipelines, causing gas leakage and posing safety hazards to the workers. Summary of the invention

[0003] In view of the above-mentioned deficiencies in the prior art, the present invention provides a gas pipeline docking and fixing device with a reasonable structure and a construction method.

[0004] The purpose of the present invention is to be achieved through the following technical solutions:

[0005] A gas pipeline docking and fixing device comprises a No. 1 gas pipeline, a No. 2 gas pipeline, a No. 2 fixing sleeve, a No. 1 fixing sleeve, a No. 2 connecting plate, a No. 1 connecting plate, a No. 1 connecting sleeve, and a No. 2 connecting sleeve. The left side of the No. 1 gas pipeline is connected to the right side of the No. 2 gas pipeline. The No. 1 gas pipeline is meshed with the No. 1 connecting sleeve. The left side of the No. 1 gas pipeline is connected to the No. 1 connecting sleeve. The left side of the No. 1 gas pipeline is inserted into the No. 1 connecting sleeve. The No. 2 gas pipeline is meshed with the No. 2 connecting sleeve. The right side of the No. 2 gas pipeline is connected to the No. 2 connecting sleeve. The No. 2 gas pipeline is inserted into the No. 2 connecting sleeve. The outer side of the No. 1 gas pipeline is connected to the right side of the fastening sleeve. The No. 1 gas pipeline is inserted into the fastening sleeve. In the sleeve, the outer side of the No. 2 gas pipeline is connected to the left side of the fastening sleeve, the No. 2 gas pipeline is inserted into the fastening sleeve, the right side of the fastening sleeve is connected to the No. 1 connecting sleeve, the left side of the fastening sleeve is connected to the No. 2 connecting sleeve, the left side of the No. 1 connecting sleeve is connected to the right side of the No. 2 connecting sleeve through a fixing bolt, the right side of the No. 1 connecting sleeve is connected to the left side of multiple No. 1 connecting plates through a No. 1 screw, the right side of the No. 1 connecting plate is connected to the outer side of the No. 1 fixing sleeve through the No. 1 screw, the No. 1 fixing sleeve is meshed with the No. 1 gas pipeline, the inner side of the No. 1 fixing sleeve is connected to the outer side of the No. 1 gas pipeline, the No. 1 gas pipeline is inserted into the No. 1 fixing sleeve, and the No. 1 gas pipeline passes through the No. 1 fixing sleeve and the No. 1 connecting sleeve in turn and is inserted into the fastening sleeve.

[0006] The left side of the No. 2 connecting sleeve is connected to the right side of multiple No. 2 connecting plates through No. 2 screws, the left side of the No. 2 connecting plate is connected to the outer side of the No. 2 fixing sleeve through No. 2 screws, the No. 2 fixing sleeve is engaged with the No. 2 gas pipeline, the inner side of the No. 2 fixing sleeve is connected to the outer side of the No. 2 gas pipeline, the No. 2 gas pipeline is inserted into the No. 2 fixing sleeve, and the No. 2 gas pipeline passes through the No. 2 fixing sleeve and the No. 2 connecting sleeve in sequence and is inserted into the fastening sleeve.

[0007] A method for constructing a gas pipeline docking and fixing device comprises the following steps: 1. First, a No. 1 gas pipeline sequentially passes through a No. 1 fixing sleeve and a No. 1 connecting sleeve and is inserted into a fastening sleeve; 2. Then, a No. 2 gas pipeline sequentially passes through a No. 2 fixing sleeve and a No. 2 connecting sleeve and is inserted into the fastening sleeve; 3. Then, the No. 1 connecting sleeve is connected to the No. 2 connecting sleeve by a fixing bolt, and finally, the No. 1 connecting sleeve and the No. 1 fixing sleeve are fixed together by a No. 1 connecting plate, and the No. 2 connecting sleeve and the No. 2 fixing sleeve are fixed together by a No. 2 connecting plate.

[0008] Beneficial effects:

[0009] Under the joint action of the No. 1 connecting sleeve, the No. 2 connecting sleeve and the fastening sleeve, the connection between the No. 1 gas pipeline and the No. 2 gas pipeline is made more stable, which effectively prevents the No. 1 gas pipeline and the No. 2 gas pipeline from being broken, making the overall structure more reasonable. At the same time, the fastening sleeve seals the No. 1 gas pipeline and the No. 2 gas pipeline, effectively preventing gas leakage at the connection between the No. 1 gas pipeline and the No. 2 gas pipeline, making the overall structure more reasonable. Under the joint action of the No. 2 fixing sleeve, the No. 1 fixing sleeve, the No. 2 connecting plate and the No. 1 connecting plate, the contact area between the No. 1 gas pipeline and the No. 2 gas pipeline is increased, the stability of the connection between the No. 1 gas pipeline and the No. 2 gas pipeline is improved, and the overall structure is more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 This is a schematic diagram of the structure of the gas pipeline docking and fixing device described in the present invention. DETAILED DESCRIPTION

[0011] The present invention is further described in detail below according to the accompanying drawings and embodiments:

[0012] A gas pipeline docking and fixing device, comprising a No. 1 gas pipeline 01, a No. 2 gas pipeline 02, a No. 2 fixing sleeve 03, a No. 1 fixing sleeve 04, a No. 2 connecting plate 05, a No. 1 connecting plate 06, a No. 1 connecting sleeve 07, and a No. 2 connecting sleeve 08. The left side of the No. 1 gas pipeline 01 is connected to the right side of the No. 2 gas pipeline 02, the No. 1 gas pipeline 01 is meshed with the No. 1 connecting sleeve 07, the left side of the No. 1 gas pipeline 01 is connected to the No. 1 connecting sleeve 07, the left side of the No. 1 gas pipeline 01 is inserted into the No. 1 connecting sleeve 07, the No. 2 gas pipeline 02 is meshed with the No. 2 connecting sleeve 08, the right side of the No. 2 gas pipeline 02 is connected to the No. 2 connecting sleeve 08, the No. 2 gas pipeline 02 is inserted into the No. 2 connecting sleeve 08, the outer side of the No. 1 gas pipeline 01 is connected to the right side of the fastening sleeve 09, and the No. 1 gas pipeline 01 is inserted into the fastening sleeve 09 In the figure, the outer side of No. 2 gas pipeline 02 is connected to the left side of fastening sleeve 09, and No. 2 gas pipeline 02 is inserted into fastening sleeve 09. The right side of fastening sleeve 09 is connected to No. 1 connecting sleeve 07, and the left side of fastening sleeve 09 is connected to No. 2 connecting sleeve 08. The left side of No. 1 connecting sleeve 07 is connected to the right side of No. 2 connecting sleeve 08 through fixing bolt 10, and the right side of No. 1 connecting sleeve 07 is connected to the left side of multiple No. 1 connecting plates 06 through No. 1 screw 12. The right side of No. 1 connecting plate 06 is connected to the outer side of No. 1 fixing sleeve 04 through No. 1 screw 12, and No. 1 fixing sleeve 04 is meshed with No. 1 gas pipeline 01. The inner side of No. 1 fixing sleeve 04 is connected to the outer side of No. 1 gas pipeline 01, and No. 1 gas pipeline 01 is inserted into No. 1 fixing sleeve 04. No. 1 gas pipeline 01 passes through No. 1 fixing sleeve 04 and No. 1 connecting sleeve 07 in sequence and is inserted into fastening sleeve 09.

[0013] The left side of the No. 2 connecting sleeve 08 is connected to the right side of multiple No. 2 connecting plates 05 through the No. 2 screws 11, and the left side of the No. 2 connecting plate 05 is connected to the outer side of the No. 2 fixing sleeve 03 through the No. 2 screws 11. The No. 2 fixing sleeve 03 is meshed with the No. 2 gas pipeline 02, and the inner side of the No. 2 fixing sleeve 03 is connected to the outer side of the No. 2 gas pipeline 02. The No. 2 gas pipeline 02 is inserted into the No. 2 fixing sleeve 03, and the No. 2 gas pipeline 02 passes through the No. 2 fixing sleeve 03 and the No. 2 connecting sleeve 08 in sequence and is inserted into the fastening sleeve 09.

[0014] Under the joint action of No. 1 connecting sleeve 07, No. 2 connecting sleeve 08 and fastening sleeve 09, the connection between No. 1 gas pipeline 01 and No. 2 gas pipeline 02 is made more stable, which effectively prevents the No. 1 gas pipeline 01 and No. 2 gas pipeline 02 from being broken, making the overall structure more reasonable. At the same time, the fastening sleeve 09 seals the No. 1 gas pipeline 01 and No. 2 gas pipeline 02, effectively preventing gas leakage at the connection between No. 1 gas pipeline 01 and No. 2 gas pipeline 02, making the overall structure more reasonable. Under the joint action of No. 2 fixing sleeve 03, No. 1 fixing sleeve 04, No. 2 connecting plate 05 and No. 1 connecting plate 06, the contact area between No. 1 gas pipeline 01 and No. 2 gas pipeline 02 is increased, the stability of the connection between No. 1 gas pipeline 01 and No. 2 gas pipeline 02 is improved, and the overall structure is more reasonable.

[0015] A method for constructing a gas pipeline docking and fixing device comprises the following steps: 1. First, a No. 1 gas pipeline 01 passes through a No. 1 fixing sleeve 04 and a No. 1 connecting sleeve 07 in sequence and is inserted into a fastening sleeve 09; 2. Then, a No. 2 gas pipeline 02 passes through a No. 2 fixing sleeve 03 and a No. 2 connecting sleeve 08 in sequence and is inserted into the fastening sleeve 09; 3. Next, the No. 1 connecting sleeve 07 is connected to the No. 2 connecting sleeve 08 through a fixing bolt 10, and finally, the No. 1 connecting sleeve 07 and the No. 1 fixing sleeve 04 are fixed together by a No. 1 connecting plate 06, and the No. 2 connecting sleeve 08 and the No. 2 fixing sleeve 03 are fixed together by a No. 2 connecting plate 05.

Claims

1. A construction method for a gas pipeline docking fixing device, characterized in that : Includes the following steps:

1. First, the No. 1 gas pipeline passes through the No. 1 fixing sleeve and the No. 1 connecting sleeve in sequence and is inserted into the fastening sleeve; 2. Then, the No. 2 gas pipeline passes through the No. 2 fixing sleeve and the No. 2 connecting sleeve in sequence and is inserted into the fastening sleeve; 3. Then, the No. 1 connecting sleeve is connected to the No. 2 connecting sleeve by fixing bolts, and finally, the No. 1 connecting sleeve is fixed to the No. 1 fixing sleeve with the No. 1 connecting plate, and the No. 2 connecting sleeve is fixed to the No. 2 fixing sleeve with the No. 2 connecting plate; the gas pipeline docking fixing device includes the No. 1 gas pipeline, the No. 2 gas pipeline, the No. 2 fixing sleeve, the No. 1 fixing sleeve, the No. 2 connecting plate, the No. 1 connecting plate, the No. 1 connecting sleeve, No. 2 connecting sleeve, the left side of the No. 1 gas pipeline is connected to the right side of the No. 2 gas pipeline, the No. 1 gas pipeline is meshed with the No. 1 connecting sleeve, the left side of the No. 1 gas pipeline is connected to the No. 1 connecting sleeve, the left side of the No. 1 gas pipeline is inserted into the No. 1 connecting sleeve, the No. 2 gas pipeline is meshed with the No. 2 connecting sleeve, the right side of the No. 2 gas pipeline is connected to the No. 2 connecting sleeve, the No. 2 gas pipeline is inserted into the No. 2 connecting sleeve, the outer side of the No. 1 gas pipeline is connected to the right side of the fastening sleeve, the No. 1 gas pipeline is inserted into the fastening sleeve, the outer side of the No. 2 gas pipeline is connected to the left side of the fastening sleeve, the No. 2 gas pipeline is inserted into the fastening sleeve, and the right side of the fastening sleeve is connected to the No. 1 connecting sleeve The left side of the fastening sleeve is connected to the No. 2 connecting sleeve, the left side of the No. 1 connecting sleeve is connected to the right side of the No. 2 connecting sleeve through a fixing bolt, the right side of the No. 1 connecting sleeve is connected to the left side of multiple No. 1 connecting plates through a No. 1 screw, the right side of the No. 1 connecting plate is connected to the outer side of the No. 1 fixing sleeve through a No. 1 screw, the No. 1 fixing sleeve is meshed with the No. 1 gas pipeline, the inner side of the No. 1 fixing sleeve is connected to the outer side of the No. 1 gas pipeline, the No. 1 gas pipeline is inserted into the No. 1 fixing sleeve, and the No. 1 gas pipeline passes through the No. 1 fixing sleeve and the No. 1 connecting sleeve in turn and is inserted into the fastening sleeve; the left side of the No. 2 connecting sleeve is connected to the right side of multiple No. 2 connecting plates through a No. 2 screw, and the No. 2 connecting The left side of the plate is connected to the outer side of the No. 2 fixing sleeve by a No. 2 screw, the No. 2 fixing sleeve is meshed with the No. 2 gas pipeline, the inner side of the No. 2 fixing sleeve is connected to the outer side of the No. 2 gas pipeline, the No. 2 gas pipeline is inserted into the No. 2 fixing sleeve, and the No. 2 gas pipeline passes through the No. 2 fixing sleeve and the No. 2 connecting sleeve in turn and is inserted into the fastening sleeve; under the joint action of the No. 1 connecting sleeve, the No. 2 connecting sleeve and the fastening sleeve, the connection between the No. 1 gas pipeline and the No. 2 gas pipeline is made more stable, and at the same time, the fastening sleeve seals the No. 1 gas pipeline and the No. 2 gas pipeline, effectively preventing gas leakage at the connection between the No. 1 gas pipeline and the No. 2 gas pipeline.