A Quaternary deep well stratified pumping and water stopping device and pumping and water stopping method thereof

By using components such as drill pipe joints, flanges, pump chamber tubes, rubber airbags, and water stoppers in the deep well layered pumping device, combined with submersible pumps and water level monitoring probes, the poor water stop effect and the problem of layered pumping in deep wells are solved. solve the problem of poor safety and achieve more efficient and safe water level monitoring and control.

CN108468528BInactive Publication Date: 2024-10-01LAND & RESOURCES EXPLORATION CENT OF HEBEI PROVINCIAL BUREAU OF GEOLOGY & MINERAL RESOURCES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201810480438.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-05-18
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology has poor water-stopping effect and poor safety when pumping water in layers in deep wells. It cannot accurately judge the water level changes in the upper and lower aquifers, and there is a risk of accidents in the hole.

Method used

A deep well layered water pumping device including a drill pipe joint, a flange sub-section, a pump chamber pipe, a water conduit pipe, a rubber water-stop airbag and a rubber water-stop plug was designed. It was combined with a submersible pump and a water level monitoring probe to pump water through the drill pipe's own weight. Pressure and airbag expansion achieve water stop and monitor water level changes in real time.

Benefits of technology

It achieves a more effective water-stopping effect, improves safety performance, avoids accidents in the hole, can accurately judge the water-stopping effect, and is suitable for deep water pumping experiments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN108468528B_ABST
    Figure CN108468528B_ABST
Patent Text Reader

Abstract

The present invention discloses a Quaternary deep well stratified pumping and water-stopping device and a pumping and water-stopping method thereof. The device comprises a drill pipe joint, a pump chamber pipe arranged at the lower part of the drill pipe joint, a water guide pipe arranged at the lower part of the pump chamber pipe, a rubber water-stopping airbag arranged on the upper outer wall of the water guide pipe, and a rubber water-stopping plug arranged on the lower outer wall of the water guide pipe; the use method thereof comprises the following steps: 1) drilling sampling and analysis; 2) drilling; 3) punching; 4) well pipe installation; 5) gravel filling and water-stopping; 6) well washing; 8) pumping test. The deep well stratified pumping and water-stopping device has a simple structure, and the use method thereof overcomes the defects of the previous water-stopping methods, is easy to operate, and has a reliable water-stopping effect through actual use, effectively isolating the upper and lower aquifers, thereby being able to realize stratified water-stopping in the pipe in the same wellbore, and achieving the purpose of stratified pumping test. The stratified pumping and water-stopping device and method are suitable for separately observing and pumping tests on different aquifers during hydrogeological drilling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a quaternary deep well stratified water pumping and water stopping device and a water pumping and water stopping method thereof, and is suitable for a quaternary deep well stratified water pumping test. Background Art

[0002] Layered water stopping is to conduct observation and pumping test separately for different aquifers (groups) when conducting hydrogeological drilling in areas with different aquifers (groups) in order to obtain hydrogeological parameters such as water volume, water level, water quality and water temperature of each aquifer (group). The work of isolating and water stopping the upper and lower aquifers (groups) of the well at the aquiclude position according to the design requirements to prevent the upper and lower aquifers from being connected is called layered water stopping. It includes two parts: external water stopping and internal water stopping. External water stopping generally uses water stopping materials to perform permanent water stopping in the water stopping section (aquiclude); internal water stopping is to perform temporary water stopping at a reasonable water stopping position designed in the well pipe to conduct pumping tests of different aquifers in the same well and obtain hydrogeological parameters of different aquifers (groups).

[0003] At present, when stopping water in stratified pumping pipes in China, the casing lowering, water stop plug water stopping method and inflatable air bag water stopping method are generally used. The former method requires the preparation of water stop pipes, which is costly. During operation, the processes of lowering pipes, lifting pipes, and lowering water stop plugs are cumbersome, with long intervals, which can easily cause accidents in the hole. The second method, for deep water stopping, requires inflation equipment on the ground, and the air line has high compressive strength requirements, and poor safety and reliability. Both of the above methods cannot observe the water level changes of the upper and lower aquifers at the same time, and cannot accurately judge whether the water stopping effect meets the requirements of the stratified pumping test. Therefore, it is necessary to conduct comprehensive research and design based on actual conditions to develop more practical and reliable stratified water stopping devices and methods. Summary of the invention

[0004] The invention provides a deep well stratified water pumping and water stopping device and a water pumping and water stopping method thereof, which solve the problems of poor safety of deep well stratified water pumping and water stopping and inability to accurately judge the water stopping effect.

[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0006] A quaternary deep well stratified pumping and water-stopping device, the technical solution of which is as follows: it comprises a drill pipe joint, a flange short section arranged at the lower part of the drill pipe joint and connected by a flange, a pump chamber pipe arranged at the lower part of the flange short section and connected by a flange, a water guide pipe arranged at the lower part of the pump chamber pipe, a rubber water-stopping airbag arranged on the upper outer wall of the water guide pipe and a rubber water-stopping plug arranged on the lower outer wall of the water guide pipe, wherein a submersible pump is arranged inside the pump chamber pipe.

[0007] As a limitation, the upper and lower surfaces of the rubber water-stop airbag are respectively provided with an airbag upper plate and an airbag lower plate, and the airbag upper plate is provided with an air line connector for inflating the airbag.

[0008] As another limitation, the upper and lower surfaces of the rubber waterstop are respectively provided with an upper pressure plate and a lower pressure plate for fixing the waterstop, and a waterstop guide ring is also provided on the lower outer wall of the water guide pipe, and the waterstop guide ring is located on the upper part of the rubber waterstop.

[0009] As a further limitation, a water level monitoring probe is provided on the water conduit, and the water level monitoring probe is located at the lower part of the rubber water-stop airbag.

[0010] As a further limitation, a water stop seat ring is provided on the inner wall of the water stop section in the well pipe corresponding to the rubber water stop plug.

[0011] A method for pumping and stopping water by a deep well stratified pumping and water stopping device comprises the following steps:

[0012] 1) Borehole sampling and analysis to determine the lithology and aquifer of the Quaternary strata, divide the stratigraphic age, define the salt-fresh water interface, and determine the drilling depth and orifice diameter;

[0013] 2) Drilling: using a three-wing scraper drill bit, mud wall drilling method, and two-hole drilling;

[0014] 3) After punching and drilling, adjust the mud properties. The punching time is 2-3 hours to make the mud density uniform in the upper and lower parts of the hole;

[0015] 4) Well pipe installation: use the hanging welding method to lower the pipe;

[0016] 5) Gravel filling and water stopping

[0017] The gravel is filled with hydrostatic filling method. Quartz river gravel is selected as the gravel material. According to the effective particle size of the aquifer, mixed gravel with a diameter of 2-5mm is used. Clay ball tube with a diameter of 20-30mm is used to seal the water outside.

[0018] 6) Well washing

[0019] After filling with gravel to stop water, the Quaternary deep wells were pumped and cleaned with a small pump, piston, and large pump in sequence;

[0020] 7) Pumping test

[0021] After the well is flushed, three drop-stroke pumping tests are performed. For Quaternary water wells, the pumping test should be conducted from the smallest drop in depth to the largest drop in depth.

[0022] The specific method of step 4) is:

[0023] (1) Before lowering the pipe, the original drilling tool should be used to calibrate the hole diameter and hole depth and conduct drilling. The hole depth should be 4-5m greater than the lowering depth of the pipe;

[0024] (2) Before lowering the pipe, wrap the filter pipe with two layers of 90-100 mesh gauze according to the particle size of the aquifer, cover the gauze with bamboo curtain to protect it, and tie it with wire every 20-30cm to prevent the gauze from loosening and clogging the gap of the filter pipe when pumping water;

[0025] (3) Inspect the well pipes and replace them promptly if any defects such as incompleteness, breakage and bending are found. The well pipes and filter pipes shall be arranged according to the design and measured and numbered one by one;

[0026] (4) When lowering the pipe, check and record each pipe in the order of arrangement. The bottom of the first pipe is sealed. Tighten the clamping screws when lowering the pipe. Before welding the pipe, hang wires in front, behind, left and right of the pipe. After the pipe is aligned and straightened, start welding. The welding is firm, reliable and tightly sealed.

[0027] The specific method of step 5) is:

[0028] (1) Determine the amount of gravel to be used based on the borehole diameter, well pipe diameter and gravel filling height;

[0029] (2) After lowering the pipe and before filling with gravel, check the depth of the well pipe, calculate the position of the layered water stop, and inspect the specifications and quantity of the gravel. When filling with gravel, lower the measuring rope into the layered water stop position in advance, measure while filling, and fill the gravel evenly and slowly from all sides of the wellhead to avoid bridging and blockage;

[0030] (3) Waterstop: After the first section of gravel is filled, wait for 30 minutes and measure the height of the gravel. After filling to the position, start filling with clay balls to stop water. The first section is the layered waterstop section. Calculate the amount of clay balls and evenly drop clay balls from the annular gap outside the pipe around the hole. Measure at any time. After filling, wait for 1 hour and measure the height of the clay balls again to ensure that the gravel is filled to the height area of ​​the water barrier layer. Start filling gravel and follow the above steps to carry out subsequent gravel filling and waterstopping work.

[0031] The specific method of step 7) is:

[0032] The working area is divided into four aquifer groups, namely, aquifer group I, aquifer group II, aquifer group III and aquifer group IV. The deep well pumping test is carried out in three parts: first, a mixed pumping test is carried out, then a layered pumping test of aquifer group IV is carried out, and finally a layered pumping test of aquifer group III is carried out; the mixed pumping is observed according to the conventional pumping test method; for the layered pumping test of aquifer groups III and IV, it is necessary to use the in-pipe water-stopping device to carry out layered water-stopping to isolate the upper and lower aquifers and prevent the upper and lower aquifers from communicating with each other; during the layered pumping test, the water levels of aquifer groups III and IV are monitored simultaneously to verify the water-stopping effect.

[0033] Due to the adoption of the above structure and method, the present invention has the following technical advances compared with the prior art:

[0034] The deep well stratified pumping and water-stopping device of the present invention utilizes the drill rod used for construction drilling as the counterweight of the water guide pipe, the water outlet pipe and the water stopper, and has a simple structure;

[0035] The present invention uses a water-stopping plug and a water-stopping air bag in combination, has a good water-stopping effect, and is more suitable for deep water-stopping;

[0036] The present invention installs underground water level probes to monitor the water level changes of the upper and lower aquifers at the same time, and checks the water stopping effect at any time, has good safety performance, and avoids various accidents in the hole. ;

[0037] In summary, the present invention has a simple structure, good water-stopping effect, and good safety performance, and is suitable for deep well stratified pumping experiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0039] In the attached picture:

[0040] Figure 1 A schematic diagram of a drilling structure according to an embodiment of the present invention;

[0041] Figure 2 It is a schematic structural diagram of a layered pumping and water-stopping device according to an embodiment of the present invention;

[0042] Figure 3 This is a schematic diagram of pumping water from the IV aquifer component layer according to an embodiment of the present invention;

[0043] Figure 4 This is a schematic diagram of pumping water from the third aquifer component layer according to an embodiment of the present invention;

[0044] Marked parts: 1-φ325 well pipe, 2-clay waterstop section outside the upper pipe, 3-φ219 well pipe, 4-water filter pipe, 5-clay waterstop section outside the pipe at the isolation layer, 6-waterstop seat ring, 7-drill pipe joint, 8-flange short joint, 9-upper flange, 10-pump chamber pipe, 11-submersible pump, 12-lower flange, 13-water guide pipe, 14-gas line joint, 15-air bag upper plate, 16-rubber waterstop air bag, 17-air bag lower plate, 18-water level monitoring probe, 19-waterstop plug guide ring, 20-waterstop plug upper pressure plate, 21-rubber waterstop plug, 22-waterstop plug lower pressure plate, 23-water outlet pipe, 24-air pump, 25-gas line, 26-drill pipe straightening, 27-waterstop plug counterweight. DETAILED DESCRIPTION

[0045] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0046] Embodiment A Quaternary deep well stratified pumping and water stopping device

[0047] Reference Figure 2 The layered pumping and water-stopping device of this embodiment includes a pump chamber tube 10, a water guide tube 13, a rubber water-stopping airbag 16 and a rubber water-stopping plug 21. In this embodiment, the pump chamber tube 10 is made of Φ219×8mm seamless tube, with a length of 2500mm. A 30×200mm strip window for water passing is opened in the tube body, and a submersible pump 11 is arranged inside. The upper end of the pump chamber tube 10 is connected to the drill pipe joint 7 through an upper flange 9 and a flange short section 8 in sequence, and the lower end of the pump chamber tube 10 is connected to the water guide tube 13 through a lower flange 12. In this embodiment, the water guide tube 13 directly uses a Φ89 drill pipe and is connected by threaded connection.

[0048] In this embodiment, the water-stopping airbag is composed of an air line joint 14, an airbag upper plate 15, an airbag lower plate 17 and a rubber water-stopping airbag 16. After being inflated, the rubber airbag and the inner wall of the well pipe are tightly squeezed to play a water-stopping role.

[0049] In this embodiment, the water-stop rubber plug is composed of a water-stop guide ring 19, an upper water-stop pressure plate 20, a rubber water-stop plug 21 and a lower water-stop pressure plate 22. When pumping water in layers, the rubber water-stop plug 21 expands and deforms under the deadweight pressure of the drill pipe to isolate the upper and lower aquifers.

[0050] The present invention is provided with a water level monitoring probe 18 on the drill pipe. In this embodiment, the water level monitoring probe 18 adopts a groundwater level and temperature automatic recorder of model 3001-M200, with a measuring depth range of 200m, a monitoring accuracy of 0.05% / 0.05°C, and a storage capacity of 2×40,000 readings. It is installed at the corresponding position during pumping to automatically monitor the water level and water temperature and check the water stopping effect.

[0051] In the present invention, a water stop seat ring 6 is arranged on the inner wall of the well pipe at a position corresponding to the water stop section of the rubber water stop plug 21. In this embodiment, the water stop seat ring is made of 20 mm thick steel plate, with an inner diameter of 130 mm and an outer diameter of 219 mm.

[0052] When this embodiment is used, the rubber water-stopping airbag 16 and the rubber water-stopping plug 21 seal and isolate the third aquifer group from top to bottom, and water pumping experiments can be carried out on the third aquifer group and the fourth aquifer group respectively.

[0053] Embodiment A Quaternary Deep Well Layered Pumping and Water Stopping Device and Its Pumping and Water Stopping Method

[0054] In this embodiment, the hydrogeological drilling work is mainly arranged for the Quaternary freshwater aquifer. A total of 10 320-500m deep hydrogeological exploration and production holes are designed, of which 6 holes are subjected to stratified pumping tests. The main purpose is to expose the Quaternary system, find out the stratigraphic age and genesis, the occurrence conditions of groundwater (including the lithology, thickness, structure, etc. of the aquifer) and the burial depth, conduct stratified pumping tests, obtain the hydrogeological parameters and water-richness of the III and IV aquifer groups respectively, circle out the groundwater distribution areas with agricultural water supply significance and the water-rich areas with centralized water supply prospects, and select emergency backup groundwater sources.

[0055] According to the well structure and the exposed strata conditions, a deep well stratified pumping and water-stopping method was studied and designed. The method has been used to achieve good results and meets the requirements of water-stopping and observation in stratified pumping tests.

[0056] This embodiment takes SK deep 2 drilling or well drilling as an example to introduce the specific use method of the layered pumping and water-stopping device of the present invention.

[0057] SK deep 2 borehole (well) is located in Dacun, Sunshi Town, Wen'an County. It is a Quaternary hydrogeological exploration and mining combined hole. The main purpose is to understand the lithology and aquifers of the Quaternary system, divide the stratigraphic age, and define the salt-fresh water interface through full-hole coring, geophysical well logging and sampling (optical luminescence, C14, paleomagnetic) analysis; after the hole is expanded into a well, a stratified pumping test is carried out to find out the water quality and water quantity of the third and fourth aquifer groups. According to the previous hydrogeological data and investigation, the coring depth of the borehole is 482.11m. After the coring is completed, according to the actual stratigraphic conditions and geophysical well logging results, the well depth is 445.00m. The location of the third aquifer group in this area is 145.90-319.00m, and the location of the fourth aquifer group is 343.70-439.00m, which is the water extraction target layer of this well.

[0058] 1.1 Stratigraphic conditions

[0059] The Quaternary strata in the work area of ​​SK Deep 2 borehole are complete, with complex sediment types and genesis, mainly alluvial, flood and their transitional types, with marine deposits in between. The regional layer thickness is 280-550m, mostly continental accumulation, with large thickness and complex phase change. The genetic types include inter-river belt accumulation, river channel accumulation, flood-flood swamp deposition, and marine-continental alternating accumulation in the east. The strata are divided into the Holocene (Qh) and Pleistocene (QP). The Holocene is mainly composed of gray, gray-yellow silty clay, silt and gray, gray-yellow silt sand and fine sand of alluvial, alluvial marine and marine phases. There are generally 1-2 layers of silty silty clay or peat layers, among which the marine sedimentary layer is composed of silty silty clay and silt, and the regional layer thickness is generally 20-40m. The west is river flood alluvial, the middle is marine-continental alternating deposition, and the east is marine deposition; the bottom boundary of the Pleistocene is buried at a depth of 380-550m. The lithology is mainly clay, silty clay, silty sand, silty sand and medium sand. The sand layer has a mixed grain structure and there is cemented sand in some parts.

[0060] Through core drilling, the strata revealed in SK Deep 2 are briefly divided into:

[0061] (1) 0.00-37.60 m, Quaternary Holocene (Qh), the strata are cultivated soil, silt, silty clay silt sand, and fine sand;

[0062] (2) 37.60-318.70m, Quaternary Pleistocene (QP), the lithology is silty clay, silt sand, fine sand, medium sand and coarse sand.

[0063] (3) 318.70-358.80 m, Quaternary Pleistocene (QP), the main stratigraphic lithology is silty clay, which is the aquiclude of the III and IV aquifer groups.

[0064] (4) 358.80-482.11m, Quaternary Pleistocene (QP), the lithology is silty clay, silt sand, fine sand and medium sand.

[0065] 1.2 Hydrogeological conditions

[0066] The working area where the SK Deep 2 borehole is located spans the Daqing River groundwater system area and the Ziya River groundwater system area. The groundwater in this area is mainly stored in the porous water-bearing rock group of the Quaternary loose rock. The aquifer has a multi-layer structure and a belt-like distribution. The rock types are mainly fine sand and silt sand, and some are medium sand and coarse sand.

[0067] The work area is divided into four aquifer groups: the I and II aquifer groups, with bottom depths of 10-30m and 140-200m respectively. Most of them are shallow surface water and saline water, with little value for exploitation and utilization. The III aquifer group (medium-deep confined aquifer group) has a bottom depth of 280-380m, which is equivalent to the Middle Pleistocene strata. The hydrogeological conditions of this group deteriorate from west to east, the grain size gradually changes from coarse to fine, and the groundwater level is between 61-72m deep. The bottom of the IV aquifer group (deep confined aquifer group) is buried at a depth of 380-550m, which is equivalent to the lower Pleistocene strata. It is mainly composed of thick clay layers and sand layers deposited alternately. Except for the coarse sand layers in the west, which are medium-fine sand, the central and eastern parts are mostly lake deposits. The sand layers are fine sands with a thickness of more than 30m. The hydrogeological conditions of this group change from good to bad from west to east, the grain size changes from coarse to fine, and the thickness of the sand layer changes from thick to thin. The III and IV aquifer groups are the main aquifer utilization sections in this area.

[0068] The deep groundwater runoff in the working area is slow, and the main source of recharge is lateral recharge, followed by overflow recharge. The hydraulic connection between water-bearing rock groups is weak, and the discharge in this area is mainly artificial mining and lateral outflow.

[0069] According to the drilling geological core logging and logging results, the location of the SK Deep 2 borehole's third aquifer group was determined to be 145.90-318.70m, and the location of the fourth aquifer group was determined to be 358.80-439.00m, which are the well-drilling and water-taking sections.

[0070] 1.3 Drilling structure

[0071] See attached Figure 2 The drilling rig structure of the water pumping and water stopping method of the present invention is based on the core drilling stratum cataloging and logging data. The depth of the salt-fresh water interface is 124.45m. The designed well depth of SK deep 2 drilling is 445.00m, and the actual well depth is 445.00m. In order to facilitate the placement and measurement of clay balls, the borehole diameter is 100-150mm larger than the conventional diameter.

[0072] The drilling structure is as follows:

[0073] (1) 0-150.00m: The borehole diameter is Φ650, of which Φ325×7mm spiral steel plate well pipe is inserted in the borehole diameter of 0-135.00m.

[0074] (2) 150.00-445.00m: The borehole diameter is Φ600, and a Φ219×7mm well pipe is inserted into the aquifer at 135-445.00m, and a bridge-type water filter pipe is inserted into the aquifer.

[0075] (3) 0-140.00m, 322-352.00m: Clay balls are used to seal the upper saltwater layer and the stratified water stops respectively.

[0076] 2 Well completion and external water stopping technology

[0077] 2.1 Drilling Equipment

[0078] The main drilling equipment is Shanghai SP-600 rotary drilling rig, BWB850 / 20 mud pump, the drilling tower is a 15m high "A" type tower, and the construction power is an electric motor with a total power of 45KW.

[0079] 2.2 Drilling method

[0080] The drilling method adopts three-wing scraper drill bit for full drilling, two-time hole formation, and mud wall protection. In order to improve efficiency and ensure the verticality of the drilling hole, the opening diameter is φ400mm, with two sets of centralizers, and the design diameter is reached after drilling to the bottom and secondary hole expansion.

[0081] 2.3 Mud

[0082] During the drilling process, natural slurry is formed to protect the wall to reduce the blockage of the aquifer by mud and facilitate rapid well washing. The mud density is 1.08-1.2g / cm3. The mud density is adjusted according to the formation and the conditions in the hole to achieve the purpose of balanced drilling, collapse prevention and wall protection.

[0083] After drilling, adjust the mud properties and punch for 2-3 hours to make the mud density uniform in the upper and lower parts of the hole to achieve the purpose of slurry replacement. After slurry replacement, the mud density reaches below 1.10g / cm3, the mud viscosity is 18-20s, and the sand content is not more than 4%.

[0084] 2.4 Well pipe installation

[0085] According to the lifting capacity of the drilling rig and the weight of the well pipe, the pipe is lowered by the suspension welding method.

[0086] (1) Before lowering the pipe, the original drilling tool should be used to calibrate the hole diameter and depth and drill the hole. The hole depth should be 4-5m greater than the lowering depth of the pipe.

[0087] (2) Before lowering the pipe, wrap the filter pipe with two layers of 90-100 mesh gauze according to the particle size of the aquifer, cover the gauze with bamboo curtain to protect it, and tie it with 12# iron wire every 20-30cm to prevent the gauze from loosening and clogging the gap of the filter pipe when pumping water.

[0088] (3) Carefully inspect the well pipes and replace them promptly if any defects such as incompleteness, breakage, and bending are found. Well pipes and filter pipes should be arranged according to the design and measured and numbered one by one to prevent the filter pipes from being misplaced.

[0089] (4) When lowering the pipes, check and record them one by one in the order of arrangement. The bottom of the first pipe should be sealed. Tighten the clamping screws when lowering the pipes. Before welding the pipes, hang wires in front, behind, left and right of the pipes. After the pipes are aligned and straightened, welding can begin. The welding should be firm, reliable and tightly sealed.

[0090] 2.5 Gravel filling and water stopping

[0091] The gravel is filled with hydrostatic filling method. Quartz river gravel is selected as the gravel material, which is clean and has few impurities. According to the effective particle size of the aquifer, 2-5mm mixed gravel is used. Clay balls with a diameter of 20-30mm are used to seal the pipe outside. The clay is required to have few impurities, high purity, and high viscosity. The clay balls should be semi-dry.

[0092] (1) Determine the amount of gravel to be used based on the borehole diameter, well diameter and gravel filling height.

[0093] (2) After lowering the pipe and before filling with gravel, the technicians shall check the depth of the well pipe, accurately calculate the position of the layered water stop, and inspect the specifications and quantity of the gravel to see whether they meet the design requirements and whether there is a lack of volume. It is forbidden to fill in unqualified gravel. The volume of each section of gravel shall be calculated, and the measuring rope shall be lowered into the layered water stop position in advance. The measuring rope shall be filled while the gravel is filled. When filling with gravel, it shall be filled evenly and slowly from all sides of the wellhead to avoid "bridging" blockage.

[0094] (3) Gravel filling: For the first section (352-445m), calculate the amount of gravel and place the measuring rope probe at 360m. Probe at any time. Stop filling gravel when the gravel surface is detected to ensure that the gravel height is around 352m. For the second section (140-322m), the gravel should be 6m higher than the filter pipe, and the gravel filling height should not exceed 140m.

[0095] (4) Waterstop: After the first section of gravel is filled, wait for 30 minutes, measure the height of the gravel, and start filling with clay balls to stop water. The first section of 322-352m is the layered waterstop section. Accurately calculate the amount of clay balls, and manually and evenly drop clay balls from the annular gap outside the pipe around the hole, and measure at any time. After filling, wait for 1 hour, measure the height of the clay balls again, and ensure that the filling reaches about 322m, then start filling with gravel, and follow the above steps to carry out subsequent gravel filling and waterstop work.

[0096] 2.6 Well washing

[0097] After filling with gravel to stop water, the SK Deep 2 Well was cleaned by the method of pumping with a small pump volume - pulling the piston - pumping with a large pump volume.

[0098] (1) Pump the well with a small pumping capacity.

[0099] First, a 175QJ40-132 high-lift, small-volume submersible pump is used to pump water and wash the well, with the goal of gradually dredging the upper and lower aquifers, compacting the gravel, and preventing large-volume predatory pumping from damaging the aquifer and filter pipes. The pumping process takes 2-3 shifts and ends when the water is clear and the sand is clean and the water level and volume are stable.

[0100] (2) Piston well washing.

[0101] After pumping water with a small pump volume, pull the piston to wash the well, further remove the mud in the well, destroy the mud skin on the hole wall, dredge the aquifer, increase the permeability, arrange the gravel, and form a stable filter layer around the filter pipe to achieve normal water output of the well.

[0102] (3) Pumping wells with large pumping capacity

[0103] Finally, a submersible pump is lowered to pump water with large volume and great depth to wash the well until all the aquifers are unblocked, the water output and water level are stabilized within the normal range, and then the pumping test is started.

[0104] 2.7 Pumping test

[0105] After the well is flushed, three drop-stroke pumping tests are performed. For Quaternary water wells, the pumping test should be conducted from the smallest drop in depth to the largest drop in depth.

[0106] The pumping test of SK Deep 2 Well was conducted in three parts: first, the mixed pumping test was conducted, then the layered pumping test of the IV aquifer group was conducted, and finally the layered pumping test of the III aquifer group was conducted. The mixed pumping was observed according to the conventional pumping test method. The layered pumping test of the III and IV aquifer groups required the use of the pipe water-stopping device to perform layered water-stopping, isolate the upper and lower aquifers, and prevent the upper and lower aquifers from communicating; during the layered pumping test, the water levels of the III and IV aquifer groups were monitored at the same time to verify the water-stopping effect.

[0107] 3. How to use the layered water-stopping device in the pipe

[0108] 3.1 Pumping of the IVth aquifer

[0109] See attached Figure 3 , the IV aquifer group is pumped in layers. According to the depth of the water stop ring and the static water level, the length of each part of the water stop device is accurately calculated, and the rubber water stop plug → water guide pipe (Φ89 drill pipe) → rubber water stop air bag → pump chamber pipe → water outlet pipe are lowered in sequence, and the water level monitoring probe, air line and water pump are installed at the same time. After lowering into place, the rubber water stop air bag is inflated through the air line with a ground air pump, and the pressure reaches about 0.4MP. The inflated rubber water stop air bag and the rubber water stop plug after pressure expansion will seal and isolate the III aquifer group from top to bottom. During the pumping test, the pressurized water of the IV aquifer group is led out from the drill pipe and enters the Φ325 well pipe through the pump chamber pipe window. The water level of the IV aquifer group is observed by the measuring line or probe in the pipe. At the same time, the wireless automatic water level monitoring probe detects the water level of the III aquifer group. If the water level of the III aquifer group changes very little or fluctuates within the allowable range, it proves that the isolation and water stopping are successful and the water stopping effect is achieved.

[0110] When installing the water-stop device, pay attention to the threads and flange screws at the joints of each part. The flange should be padded in the middle to prevent leakage. Protective measures should be taken at places prone to bumping and squeezing, such as gas lines and cables. Pull gently and release slowly when going down the well to avoid damaging the airbag, gas lines and cables. After the rubber water-stop plug touches the position of the water-stop seat ring, slowly lower it to apply pressure. The pressure should be 1 / 3-1 / 2 of the total weight of the drilling tool, about 2-3 tons. Do not put all the weight on the seat ring to avoid damaging the seat ring and the well pipe.

[0111] 3.2 Pumping of the third aquifer components

[0112] See attached Figure 4 , the third aquifer group is pumped in layers. After the pumping test of the fourth aquifer group is completed, the water stop device is raised, the water pipe at the bottom of the water stop plug is closed, and the drill is lowered. The upper part of the water stop plug is connected to a drill rod of about 100m as a water stop plug counterweight. The water stop rubber plug and the counterweight are sent to the position of the water stop seat ring with a Φ89 drill rod. After the release, the upper drill rod is raised, and the water stop plug is closed and isolated from the lower aquifer. The test submersible pump is lowered into the Φ325 well pipe for a pumping test. After the pumping test is completed, the water pump is raised, and the Φ89 drill rod is lowered to buckle and the water stop plug and the counterweight drill rod are raised.

[0113] This embodiment solves the problem of water stopping in deep well stratified pumping, and can be used in the stratified pumping test of Quaternary deep wells.

[0114] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of protection of the claims of the present invention.

Claims

1. A Quaternary deep well stratified pumping and water stopping device, characterized in that: It comprises a drill pipe joint (7), a flange short section (8) arranged at the bottom of the drill pipe joint (7) and connected via a flange, a pump chamber pipe (10) arranged at the bottom of the flange short section (8) and connected via a flange, a water guide pipe (13) arranged at the bottom of the pump chamber pipe (10), a rubber water-stopping airbag (16) arranged on the upper outer wall of the water guide pipe (13), and a rubber water-stopping plug (21) arranged on the lower outer wall of the water guide pipe (13), wherein a submersible pump (11) is arranged inside the pump chamber pipe (10); An airbag upper plate (15) and an airbag lower plate (17) for fixing the rubber water-stop airbag (16) are respectively provided at the upper and lower ends of the rubber water-stop airbag (16); an air line connector (14) for inflating the airbag is provided on the airbag upper plate (15); The upper and lower ends of the rubber water stopper (21) are respectively provided with a water stopper upper pressure plate (20) and a water stopper lower pressure plate (22) for fixing the water stopper, and a water stopper guide ring (19) is also provided on the lower outer wall of the water guide pipe (13), and the water stopper guide ring (19) is located on the upper part of the rubber water stopper (21); The water conduit (13) is provided with a water level monitoring probe (18), and the water level monitoring probe (18) is located at the lower part of the rubber water-stopping airbag (16); A water stop seat ring (6) is provided on the inner wall of the water stop section in the well pipe corresponding to the rubber water stop plug (21).

2. A method for pumping and stopping water using the Quaternary deep well stratified pumping and water stopping device according to claim 1, characterized in that: The steps include: 1) Borehole sampling and analysis to determine the lithology and aquifer of the Quaternary strata, divide the stratigraphic age, define the salt-fresh water interface, and determine the borehole depth and orifice diameter; 2) Drilling: using a three-wing scraper drill bit, mud wall drilling method, and two-hole drilling; 3) After punching and drilling, adjust the mud properties. The punching time is 2-3 hours to make the mud density uniform in the upper and lower parts of the hole; 4) Well pipe installation: use the hanging welding method to lower the pipe; 5) Gravel filling and water stopping The gravel is filled with hydrostatic filling material, quartz river gravel is selected as the gravel material, and clay balls are used to seal the water stop; 6) Well washing After filling with gravel to stop water, the Quaternary deep wells were pumped and cleaned with a small pump, piston, and large pump in sequence; 7) Pumping test After the well is flushed, three drop-stroke pumping tests are performed. For Quaternary water wells, the pumping test should be conducted from the smallest drop in depth to the largest drop in depth.

3. The method according to claim 2, characterized in that The specific method of step 4) is: (1) Before lowering the pipe, the original drilling tool should be used to calibrate the hole diameter and hole depth and conduct drilling. The hole depth should be 4-5m greater than the lowering depth of the pipe; (2) Before lowering the pipe, wrap the filter pipe with two layers of 90-100 mesh gauze according to the particle size of the aquifer, cover the gauze with bamboo curtain to protect it, and tie it with wire every 20-30cm to prevent the gauze from loosening and clogging the gap of the filter pipe when pumping water; (3) Inspect the well pipes and replace them promptly if they are damaged, broken or bent. The well pipes and filter pipes shall be arranged according to the design and measured and numbered one by one; (4) When lowering the pipes, check and record them one by one in the order of arrangement. The bottom of the first pipe should be sealed. Tighten the clamping screws when lowering the pipes. Before welding the pipes, hang wires in front, behind, left and right of the pipes. After the pipes are aligned and straightened, welding can begin. The welding should be firm, reliable and tightly sealed.

4. The method according to claim 2, characterized in that: The specific method of step 5) is: (1) Determine the amount of gravel to be used based on the borehole diameter, well pipe diameter and gravel filling height; (2) After lowering the pipe and before filling with gravel, check the depth of the well pipe, calculate the position of the layered water stop, and inspect the specifications and quantity of the gravel. When filling with gravel, lower the measuring rope into the layered water stop position in advance, measure while filling, and fill the gravel evenly and slowly from all sides of the wellhead to avoid bridging and blockage; (3) Waterstop: After the first section of gravel is filled, wait for 30 minutes and measure the height of the gravel. After filling to the position, start filling with clay balls to stop water. The first section is the layered waterstop section. Calculate the amount of clay balls and manually and evenly drop clay balls from the annular gap outside the pipe around the hole. Measure at any time. After filling, wait for 1 hour and measure the height of the clay balls again to ensure that the gravel is filled to the height area of ​​the water barrier layer. Start filling gravel and follow the above steps to carry out subsequent gravel filling and waterstopping work.

5. The method according to claim 2, characterized in that: The specific method of step 7) is: The working area is divided into four aquifer groups, namely, aquifer group I, aquifer group II, aquifer group III and aquifer group IV. The deep well pumping test is carried out in three parts: first, a mixed pumping test is carried out, then a layered pumping test of aquifer group IV is carried out, and finally a layered pumping test of aquifer group III is carried out; the mixed pumping is observed according to the conventional pumping test method; for the layered pumping test of aquifer groups III and IV, it is necessary to use the in-pipe water-stopping device to carry out layered water-stopping to isolate the upper and lower aquifers and prevent the upper and lower aquifers from communicating with each other; during the layered pumping test, the water levels of aquifer groups III and IV are monitored simultaneously to verify the water-stopping effect.