A biogas water washing and purification system that combines internal and external energy sources and has high energy utilization efficiency
By using the thermal heating heating and water-cooling and air-cooling technology to optimize cooling in the biogas water purifying and purification system in the biogas water purifying and purification system, the problems of high energy consumption and low energy utilization are solved, and the efficient use of internal and external energy and energy conservation and emission reduction are achieved.
Patent Information
- Application Number
- CN201811486837.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-12-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2038-12-06
AI Technical Summary
The existing pressurized water washing method biogas purification system has high energy consumption and low energy utilization. The heating and insulation measures require additional equipment investment and energy consumption, which violates the energy conservation and emission reduction policies.
A biogas water purifying and purification system with both internal and external energy was designed. The thermal energy of the biogas compressor is used to heat up the biogas tank through the heat collecting unit, and the cooling water circulation is optimized by combining water cooling and air cooling technology to reduce the energy consumption of the cooling tower, and utilize the outside world in winter. Cool the cold air to prevent the cooling water from freezing.
It effectively reduces the energy consumption of biogas compressors, reduces production costs, improves energy utilization, complies with the requirements of energy conservation and emission reduction policies, and reduces the energy consumption of chillers under low temperature conditions in winter.
Smart Images

Figure CN109401803B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of biogas water washing and purification, and in particular relates to a biogas water washing and purification system which takes both internal and external energy into consideration and has high energy utilization rate. Background Art
[0002] Biogas purification into biogas can provide a clean green energy. The biogas purification technologies involved in the development of biogas, such as pressure water washing, chemical absorption and pressure swing adsorption, have been commercialized. Among them, the pressure water washing method is widely used due to its advantages of high methane purity, high methane recovery rate and mature process technology.
[0003] The process flow of the existing pressurized water washing method for biogas purification circulating water system is as follows: Figure 1 As shown: the conveying direction of the fluid in any pipeline is defined as the front, and the following directional descriptions all follow this definition; the biogas water washing and purification system includes a biogas compressor 10, an absorption tower 20, a primary analysis tower 30 and a secondary analysis tower 40;
[0004] A biogas delivery pipeline is provided between the biogas compressor 10 and the absorption tower 20 and the biogas delivery pipeline is connected to the lower part of the absorption tower 20;
[0005] The absorption tower 20 and the primary analysis tower 30 are connected through a first process water pipeline for conveying process water, and the rear end of the first process water pipeline is connected to the lower part of the absorption tower 20, and the front end is connected to the upper part of the primary analysis tower 30;
[0006] The primary desorption tower 30 and the secondary desorption tower 40 are connected through a second process water pipeline for conveying process water, and the rear end of the second process water pipeline is connected to the lower part of the primary desorption tower 30, and the front end is connected to the upper part of the secondary desorption tower 40;
[0007] A third process water pipeline for conveying process water is provided at the bottom of the secondary decomposition tower 40. The rear end of the third process water pipeline is connected to the bottom of the secondary decomposition tower 40, and the front end is connected to the upper part of the absorption tower 20. After being cooled, the process water in the third process water pipeline is conveyed to the upper part of the absorption tower 20 by a pump 50 for continued circulation.
[0008] Among them, the energy consumption of biogas compressor accounts for more than 50% of the energy consumption of the entire water washing and purification system. After the compression work is converted into heat energy, it is not used and is directly cooled by cooling water. At the same time, in order to maintain the efficient gas production of the biogas pool, heating and insulation measures need to be taken to maintain the temperature of the biogas pool. At present, solar water heater water circulation heating, boiler water circulation heating and electric heating film heating technologies are mostly used. However, these heating and insulation measures require additional equipment investment and / or energy consumption, which increases the production cost of the enterprise, and the direct release of the energy consumption of the biogas compressor does not meet the national policy requirements for energy conservation and emission reduction. Summary of the invention
[0009] In view of the problems of high energy consumption and low energy utilization rate in the existing biogas water washing and purification systems, the present invention provides a biogas water washing and purification system which takes into account both internal and external energy and has a high energy utilization rate. The system not only makes full use of the energy consumption within the system and solves various problems, but also cleverly utilizes external energy, taking into account both internal and external energy and having a high energy utilization rate.
[0010] The present invention adopts the following technical solution:
[0011] A biogas water washing and purification system that takes both internal and external energy into consideration and has high energy utilization rate, wherein the conveying direction of the fluid in any pipeline is defined as the front, and the following directional descriptions all follow this definition; the biogas water washing and purification system comprises a biogas compressor, an absorption tower, a primary analysis tower and a secondary analysis tower;
[0012] A biogas delivery pipeline is provided between the biogas compressor and the absorption tower, and the biogas delivery pipeline is connected to the lower part of the absorption tower;
[0013] The absorption tower and the primary analysis tower are connected through a first process water pipeline for conveying process water, and the rear end of the first process water pipeline is connected to the lower part of the absorption tower, and the front end is connected to the upper part of the primary analysis tower;
[0014] The primary desorption tower and the secondary desorption tower are connected through a second process water pipeline for conveying process water, and the rear end of the second process water pipeline is connected to the lower part of the primary desorption tower, and the front end is connected to the upper part of the secondary desorption tower;
[0015] A third process water pipeline for conveying process water is provided at the bottom of the secondary analysis tower, the rear end of the third process water pipeline is connected to the bottom of the secondary analysis tower, and the front end is connected to the upper part of the absorption tower, and the process water in the third process water pipeline is conveyed to the upper part of the absorption tower after being cooled for continuous recycling;
[0016] The biogas washing and purification system further comprises a heat collecting unit, the heat collecting unit comprises a heat collecting pipe, the front end and the rear end of the heat collecting pipe are both connected to the biogas compressor, and the heat collecting pipe is sequentially connected in series with a hot water tank and a heat exchanger, the heat exchanger is also connected with a biogas liquid circulation pipe, and the biogas liquid circulation pipe and the heat collecting pipe perform heat exchange in the heat exchanger;
[0017] The biogas washing and purification system also includes a water collection tank for containing cooling water, the water collection tank is provided with a first cooling water pipe for outputting cooling water and a waste hot water pipe for inputting waste hot water, the rear end of the first cooling water pipe is connected to the water collection tank, and the front end is connected to the hot water tank, the rear end of the waste hot water pipe is connected to the hot water tank, and the front end is connected to the water collection tank, and the first cooling water pipe and the waste hot water pipe are respectively provided with stop valves V12 and V11.
[0018] Preferably, the third process water pipeline is provided with a water cooling unit, the water cooling unit includes a cooling tower and a chiller, the cooling tower is located above the water collecting tank and is connected to the water collecting tank, the water collecting tank is also provided with a second cooling water pipeline for circulating cooling water, the rear end of the second cooling water pipeline is connected to the water collecting tank, and the front end is connected to the top of the cooling tower;
[0019] The secondary analysis tower is also provided with a fourth process water pipeline for circulating cooling process water, the rear end and the front end of the fourth process water pipeline are both connected to the lower part of the secondary analysis tower, and the connection position of the rear end of the fourth process water pipeline is lower than the connection position of the front end;
[0020] The second cooling water pipeline and the fourth process water pipeline pass through the chiller respectively, and the fourth process water pipeline and the second cooling water pipeline perform heat exchange in the chiller.
[0021] Preferably, the third process water pipeline is also provided with an air cooling unit, and the air cooling unit includes a fifth process water pipeline and a sixth process water pipeline, the fifth process water pipeline and the sixth process water pipeline are respectively used as branch pipelines and are connected to the third process water pipeline from back to front, the rear end of the fifth process water pipeline is connected to the third process water pipeline, and the front end is connected to the top of the cooling tower, the rear end of the sixth process water pipeline is connected to the collecting tank, and the front end is connected to the third process water pipeline, and the part of the third process water pipeline between the fifth process water pipeline and the sixth process water pipeline is provided with a stop valve V1, and the fifth process water pipeline and the sixth process water pipeline are respectively provided with stop valves V6 and V10.
[0022] Preferably, the cooling tower is located below the secondary desorption tower, so that the process water in the fifth process water pipeline flows to the cooling tower by gravity.
[0023] Preferably, a fan for blowing cold air is provided at the upper part of the cooling tower, and a first remote thermometer is provided at the position where the second cooling water pipe enters the cooling tower. The first remote thermometer is interlocked with the motor of the fan to control the opening or closing of the fan according to the temperature of the cooling water entering the cooling tower through the second cooling water pipe.
[0024] Preferably, a fan for blowing cold air is provided at the upper part of the cooling tower, and a second remote thermometer is provided at the position where the fifth process water pipeline enters the cooling tower. The second remote thermometer is interlocked with the motor of the fan to control the opening or closing of the fan according to the temperature of the process water entering the cooling tower through the fifth process water pipeline.
[0025] Preferably, the third process water pipeline is provided with a first pump, and the front end of the sixth process water pipeline is connected to the position of the third process water pipeline after the first pump.
[0026] Preferably, a second pump is provided on the second cooling water pipeline.
[0027] Preferably, the water collection tank is located below the hot water tank, and a third pump is provided on the first cooling water pipeline.
[0028] The beneficial effects of the present invention are as follows:
[0029] First, the energy consumption of the biogas compressor accounts for more than 50% of the energy consumption of the entire water washing and purification system. After the compression work is converted into heat energy, the present invention takes away the heat energy through the biogas slurry circulated out of the biogas tank, while in the prior art, the cooling water supplied by the cooling tower takes away this part of the heat energy, and the heated cooling water must be cooled again by the fan operation in the cooling tower, which can neither utilize the heat energy of the biogas compressor nor increase the energy consumption of the cooling tower. However, through the improvement of the present invention, on the one hand, the purpose of cooling the biogas compressor can be achieved without cooling water, and of course, there is no need for additional consumption of the cooling tower. On the other hand, this part of the heat energy is brought into the biogas tank by the biogas slurry, thereby heating and preserving the biogas tank. It has been verified that this part of the heat energy is completely sufficient to supply the heat demand of the biogas tank, eliminating the heating equipment such as solar water heater water circulation heating, boiler water circulation heating and electric heating film heating. On the basis of low energy consumption, it ensures the efficient gas production of the biogas tank, which can be said to kill two birds with one stone! From this point of view, the present invention greatly reduces the production cost of the enterprise and meets the national policy requirements of energy conservation and emission reduction.
[0030] Secondly, cooling towers and water collection tanks are usually not provided with insulation measures. Therefore, in the low temperature weather in winter, the water collection tank is directly in contact with cold air, resulting in too low a temperature of the cooling water in the water collection tank. Some manufacturers' chillers have difficulty starting when the cooling water temperature is lower than 18°C. The present invention also makes improvements to this problem. Specifically, before the chiller is started, the waste hot water pipeline is drawn from the hot water tank and transported to the water collection tank for holding cooling water. At the same time, the first cooling water pipeline outputs cooling water, thereby increasing the water temperature of the cooling water to a certain extent, so that the chiller can be started smoothly. After starting, the stop valves V12 and V11 can be cut off. In addition, during temporary shutdown for maintenance, the low temperature weather in winter can easily freeze the cooling water in the cooling tower and the water collection tank, and the freezing will seriously affect the subsequent operation. The waste hot water pipeline provided by the present invention can also solve this problem at one stroke, so that the heat energy generated by the biogas compressor is completely turned into treasure and realize multiple uses.
[0031] Thirdly, the present invention can not only reduce the energy consumption inside the system to a minimum, but also cleverly utilize the energy from the outside. For example, in low-temperature weather in winter, the cold air from the outside sucked in by the fan of the cooling tower is enough to reduce the cooling water to the required temperature and meet the use requirements of process water without starting the chiller. Therefore, the present invention sets up the fifth process water pipeline and the sixth process water pipeline. In low-temperature weather in winter, the process water output by the secondary analysis tower is directly transported to the cooling tower through the fifth process water pipeline for cooling. After cooling, it is returned to the absorption tower through the sixth process water pipeline and the third process water pipeline for recycling. This design cleverly turns the disadvantage of low-temperature weather in winter into an advantage and effectively reduces the energy consumption of the chiller.
[0032] In summary, the present invention not only fully utilizes the energy consumption within the system and solves various problems, but also cleverly utilizes external energy, using both internal and external energy, and has a high energy utilization rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a structural schematic diagram of a biogas water washing and purification system in the prior art;
[0034] Figure 2 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION
[0035] In order to make the technical purpose, technical solution and beneficial effects of the present invention more clear, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0036] like Figure 2 As shown, a biogas water washing and purification system that takes both internal and external energy into consideration and has high energy utilization rate, the conveying direction of the fluid in any pipeline is defined as the front, and the following directional descriptions all follow this definition; the biogas water washing and purification system includes a biogas compressor 10, an absorption tower 20, a primary analysis tower 30 and a secondary analysis tower 40;
[0037] A biogas delivery pipeline is provided between the biogas compressor 10 and the absorption tower 20, and the biogas delivery pipeline is connected to the lower part of the absorption tower 20; the biogas is first compressed by the biogas compressor 10 and then enters the absorption tower 20 to countercurrently contact with the process water delivered by the third process water pipeline (described later) to absorb carbon dioxide in the biogas, and the biogas is delivered from the top of the absorption tower 20;
[0038] A first process water pipeline is provided between the absorption tower 20 and the primary desorption tower 30, and the rear end of the first process water pipeline is connected to the lower part of the absorption tower 20, and the front end is connected to the upper part of the primary desorption tower 30. The first process water pipeline is used to transport the process water after carbon dioxide absorption in the absorption tower 20 to the primary desorption tower 30, and the process water after carbon dioxide absorption is flashed in the primary desorption tower 30 to recover methane;
[0039] A second process water pipeline is provided between the primary desorption tower 30 and the secondary desorption tower 40, and the rear end of the second process water pipeline is connected to the lower part of the primary desorption tower 30, and the front end is connected to the upper part of the secondary desorption tower 40; the process water after absorbing carbon dioxide is transported to the secondary desorption tower 40 through the second process water pipeline after flash evaporation to recover methane, and after decomposing carbon dioxide, it is returned to the absorption tower 20 through the third process water pipeline (described in detail later) for recycling;
[0040] A third process water pipeline for conveying process water is provided at the bottom of the secondary decomposition tower 40. The rear end of the third process water pipeline is connected to the bottom of the secondary decomposition tower 40, and the front end is connected to the upper part of the absorption tower 20. The process water in the third process water pipeline is conveyed to the upper part of the absorption tower 20 after being cooled for continuous recycling. A pump 50 is provided on the third process water pipeline to provide power for conveying process water.
[0041] The process water temperature in the secondary analysis tower 40 is relatively high and cannot meet the use requirements of the absorption tower 20. Therefore, it needs to be cooled before returning to the absorption tower 20. The cooling method can be water cooling or air cooling according to the actual situation. Under the use conditions of higher temperatures, water cooling is preferably used, while under the use conditions of lower temperatures, air cooling can be selected. The details are as follows:
[0042] The third process water pipeline is provided with a water cooling unit, and the water cooling unit includes a cooling tower 60 and a chiller 80. A water collecting tank is integrated at the bottom of the cooling tower 60 and the cooling tower 60 is connected to the water collecting tank. The water collecting tank is also provided with a second cooling water pipeline for circulating cooling water. The rear end of the second cooling water pipeline is connected to the water collecting tank, and the front end is connected to the top of the cooling tower 60. A pump 70 is provided on the second cooling water pipeline, and the pump 70 is used to provide a conveying power for cooling water.
[0043] The secondary analysis tower 40 is also provided with a fourth process water pipeline for circulating cooling process water, the rear end and the front end of the fourth process water pipeline are connected to the lower part of the secondary analysis tower 40, the second cooling water pipeline and the fourth process water pipeline pass through the chiller 80 respectively, and the fourth process water pipeline and the second cooling water pipeline are heat exchanged in the chiller 80, thereby cooling the process water used in the secondary analysis tower 40 by the cooling water to reach the temperature requirement for returning to the absorption tower 20 for recycling. Among them, the connection position of the rear end of the fourth process water pipeline is lower than the connection position of the front end. The purpose of this design is that the rear end of the fourth process water pipeline outputs process water with a higher temperature, and the front end of the fourth process water pipeline flows into process water with a lower temperature. When the cold water is above the warm water, it will automatically flow downward, so that the cold water and the warm water are automatically mixed, thereby ensuring that the process water returned to the absorption tower 20 for recycling maintains a relatively stable temperature, which is conducive to maintaining the stability of the absorption process; in addition, the fourth process water pipeline is provided with a stop valve V3 and a pump 90 at the part entering the chiller, and a stop valve V2 is provided at the part entering the secondary analysis tower 40. When the water cooling unit is stopped, the fourth process water pipeline can be cut off by the stop valves V2 and V3. Similarly, the second cooling water pipeline is provided with a stop valve V4 at the part entering the chiller 80, and a stop valve V5 at the part entering the cooling tower 60. When the water cooling unit is stopped, the second cooling water pipeline can be cut off by the stop valves V4 and V5.
[0044] As a preferred embodiment, the third process water pipeline is also provided with an air cooling unit, which includes a fifth process water pipeline and a sixth process water pipeline, the fifth process water pipeline and the sixth process water pipeline are respectively used as branch pipelines and are connected to the third process water pipeline from back to front, the rear end of the fifth process water pipeline is connected to the third process water pipeline, and the front end is connected to the top of the cooling tower 60, preferably, the cooling tower 60 is located below the secondary analytical tower 40, so that the process water in the fifth process water pipeline flows to the cooling tower 60 by gravity. The rear end of the sixth process water pipeline is connected to the water collection tank, and the front end is connected to the third process water pipeline, and the third process water pipeline portion located between the fifth process water pipeline and the sixth process water pipeline is provided with a stop valve V1, when the fifth process water pipeline and the sixth process water pipeline need to be used, the stop valve V1 is used to cut off the third process water pipeline. The fifth process water pipeline and the sixth process water pipeline are respectively provided with stop valves V6 and V10, and the stop valves V6 and V10 are in a normally closed state and are only opened when the fifth process water pipeline and the sixth process water pipeline are used. The front end of the sixth process water pipeline is connected to the position of the third process water pipeline after the pump 50, so that the pump 50 can provide the conveying power for the process water in the sixth process water pipeline and the third process water pipeline at the same time. Because the sixth process water pipeline is not used all year round, such an arrangement can reduce the cost of equipment addition and maintenance.
[0045] A fan M for blowing cold air is provided at the upper part of the cooling tower 60. The fan M is used to cool the cooling water. The second cooling water pipeline and the fifth process water pipeline are merged into a first cooling water main pipeline at a position close to the cooling tower 60. A remote thermometer T is provided on the first cooling water main pipeline. The remote thermometer T is interlocked with the motor of the fan M (which can be achieved through PLC control) to control the opening or closing of the fan according to the temperature of the cooling water entering the cooling tower through the first cooling water main pipeline. For example, the fan is automatically started when the detected temperature is higher than 32°C, and the fan is automatically turned off when the detected temperature is lower than 20°C.
[0046] In order to utilize the heat energy generated by the biogas compressor 10, the biogas water washing and purification system of the present invention also includes a heat collecting unit, which includes a heat collecting pipe. The front end and the rear end of the heat collecting pipe are both connected to the biogas compressor 10, and the heat collecting pipe is connected in series with a hot water tank 110 and a heat exchanger 130. The water in the hot water tank 110 is constantly circulated in the heat collecting pipe. The water in the hot water tank 110 can be transported by a pump 70 or by an external pipe. The water in the hot water tank 110 is cooled by heat exchange in the heat exchanger 130, and then heated by heat exchange in the biogas compressor 10, thereby repeating the cycle. The heat exchanger 130 is also connected to a biogas slurry circulation pipeline, and the biogas slurry circulation pipeline and the heat collecting pipeline exchange heat in the heat exchanger 130. The biogas slurry circulation pipeline is connected to a biogas tank, and its function is to circulate the biogas slurry in the biogas tank to the heat exchanger 130. In this way, the heat energy of the biogas compressor can be turned into treasure, and the heating equipment of the biogas tank and the cooling water used to cool the biogas compressor are eliminated, thereby achieving multiple goals at one stroke.
[0047] The water collection tank is provided with a first cooling water pipeline for outputting cooling water and a waste hot water pipeline for inputting waste hot water, the rear end of the first cooling water pipeline is connected to the water collection tank, and the front end is connected to the hot water tank 110, the rear end of the waste hot water pipeline is connected to the hot water tank 110, and the front end is connected to the water collection tank, and the first cooling water pipeline and the waste hot water pipeline are respectively provided with stop valves V12 and V11. Preferably, the water collection tank is located below the hot water tank 110, and the first cooling water pipeline and the second cooling water pipeline are merged into a second cooling water main pipeline at a position close to the water collection tank, and a pump 70 is provided on the second cooling water main pipeline, so that the pump 70 can simultaneously provide the power for conveying cooling water in the first cooling water pipeline and the second cooling water pipeline, because the first cooling water pipeline is not used all year round, such a setting can reduce the cost of equipment addition and maintenance.
[0048] Finally, it should be noted that the above embodiments are only used to illustrate but not limit the technical solutions of the present invention, and any equivalent substitutions of the present invention and any modifications or partial substitutions that do not depart from the spirit and scope of the present invention should be included in the scope of protection of the claims of the present invention.
Claims
1. A biogas water washing and purification system that takes both internal and external energy into consideration and has high energy utilization rate. The conveying direction of the fluid in any pipeline is defined as the front, and the following directional descriptions all follow this definition; the biogas water washing and purification system includes a biogas compressor, an absorption tower, a primary analysis tower and a secondary analysis tower; A biogas delivery pipeline is provided between the biogas compressor and the absorption tower, and the biogas delivery pipeline is connected to the lower part of the absorption tower; The absorption tower and the primary analysis tower are connected through a first process water pipeline for conveying process water, and the rear end of the first process water pipeline is connected to the lower part of the absorption tower, and the front end is connected to the upper part of the primary analysis tower; The primary desorption tower and the secondary desorption tower are connected through a second process water pipeline for conveying process water, and the rear end of the second process water pipeline is connected to the lower part of the primary desorption tower, and the front end is connected to the upper part of the secondary desorption tower; A third process water pipeline for conveying process water is provided at the bottom of the secondary analysis tower, the rear end of the third process water pipeline is connected to the bottom of the secondary analysis tower, and the front end is connected to the upper part of the absorption tower, and the process water in the third process water pipeline is conveyed to the upper part of the absorption tower after being cooled for continuous recycling; Features: The biogas washing and purification system further comprises a heat collecting unit, the heat collecting unit comprises a heat collecting pipe, the front end and the rear end of the heat collecting pipe are both connected to the biogas compressor, and the heat collecting pipe is sequentially connected in series with a hot water tank and a heat exchanger, the heat exchanger is also connected with a biogas liquid circulation pipe, and the biogas liquid circulation pipe and the heat collecting pipe perform heat exchange in the heat exchanger; The biogas washing and purification system also includes a water collection tank for containing cooling water, the water collection tank is provided with a first cooling water pipeline for outputting cooling water and a waste hot water pipeline for inputting waste hot water, the rear end of the first cooling water pipeline is connected to the water collection tank, and the front end is connected to the hot water tank, the rear end of the waste hot water pipeline is connected to the hot water tank, and the front end is connected to the water collection tank, and the first cooling water pipeline and the waste hot water pipeline are respectively provided with stop valves V12 and V11; The third process water pipeline is provided with a water cooling unit, and the water cooling unit includes a cooling tower and a chiller. The cooling tower is located above the water collecting tank and is connected to the water collecting tank. The water collecting tank is also provided with a second cooling water pipeline for circulating cooling water. The rear end of the second cooling water pipeline is connected to the water collecting tank, and the front end is connected to the top of the cooling tower. The secondary analysis tower is also provided with a fourth process water pipeline for circulating cooling process water, and the rear end and the front end of the fourth process water pipeline are both connected to the lower part of the secondary analysis tower; The second cooling water pipeline and the fourth process water pipeline pass through the chiller respectively, and the fourth process water pipeline and the second cooling water pipeline perform heat exchange in the chiller; The third process water pipeline is also provided with an air cooling unit, which includes a fifth process water pipeline and a sixth process water pipeline, the fifth process water pipeline and the sixth process water pipeline are respectively used as branch pipelines and are connected to the third process water pipeline from back to front, the rear end of the fifth process water pipeline is connected to the third process water pipeline, and the front end is connected to the top of the cooling tower, the rear end of the sixth process water pipeline is connected to the water collecting tank, and the front end is connected to the third process water pipeline, and the third process water pipeline portion located between the fifth process water pipeline and the sixth process water pipeline is provided with a stop valve V1, and the fifth process water pipeline and the sixth process water pipeline are respectively provided with stop valves V6 and V10; The third process water pipeline is provided with a first pump, and the front end of the sixth process water pipeline is connected to the third process water pipeline at a position after the first pump; The cooling tower is located below the secondary desorption tower, so that the process water in the fifth process water pipeline flows to the cooling tower by gravity; The second cooling water pipeline is provided with a second pump; The water collection tank is located below the hot water tank, and a third pump is provided on the first cooling water pipeline.
2. The biogas water washing and purification system according to claim 1, which takes both internal and external energy into consideration and has high energy utilization rate, is characterized in that: A fan for blowing cold air is provided at the upper part of the cooling tower, and a first remote thermometer is provided at the position where the second cooling water pipe enters the cooling tower. The first remote thermometer is interlocked with the motor of the fan to control the opening or closing of the fan according to the temperature of the cooling water entering the cooling tower through the second cooling water pipe.
3. The biogas water washing and purification system according to claim 1, which takes both internal and external energy into consideration and has high energy utilization rate, is characterized in that: A fan for blowing cold air is provided at the upper part of the cooling tower, and a second remote thermometer is provided at the position where the fifth process water pipeline enters the cooling tower. The second remote thermometer is interlocked with the motor of the fan to control the opening or closing of the fan according to the temperature of the process water entering the cooling tower through the fifth process water pipeline.
4. The biogas water washing and purification system according to claim 1, which takes both internal and external energy into consideration and has high energy utilization rate, is characterized in that: The fourth process water pipeline is provided with a stop valve V3 at the part entering the chiller, and a stop valve V2 at the part entering the secondary desorption tower; The second cooling water pipeline is provided with a stop valve V4 at the portion entering the chiller, and a stop valve V5 at the portion entering the cooling tower.
