A large-scale high-altitude cable-suspended structure aluminum single plate ceiling and its construction method

By using high-altitude suspension structure aluminum veneer ceilings in large public buildings, using lightweight materials and suspension structures to simplify construction, the construction difficulty and safety problems of traditional steel frame conversion layer ceilings are solved, and an efficient, safe and environmentally friendly building is achieved. Ceiling effect.

CN109403533BActive Publication Date: 2024-10-01CHINA STATE DECORATION GRP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN201811487876.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-12-06
Publication Date
2024-10-01
Estimated Expiration
2038-12-06

AI Technical Summary

Technical Problem

Traditional steel frame transfer layer ceilings in large public buildings are difficult to construct, labor intensive, and dangerous, and cannot meet rapid construction and fire protection requirements, resulting in extended project duration and reduced profits.

Method used

A large-scale high-altitude suspension structure aluminum veneer-shaped ceiling is used, and decorative aluminum panels are suspended through civil steel structure trusses and stainless steel suspension structures to simplify the construction process. Lightweight materials and screw-type regulating valves are used for ceiling suspension, reducing the need for welding and anti-rust paint. Use to improve installation efficiency and safety.

Benefits of technology

It achieves lightweight ceiling base construction, reduces labor intensity and safety risks, improves construction efficiency and construction period quality, reduces material transportation and stacking pollution, meets safety requirements for high-altitude operations, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109403533B_ABST
    Figure CN109403533B_ABST
Patent Text Reader

Abstract

The invention discloses a large-scale high-altitude cable suspension structure aluminum veneer shaped ceiling and a construction method thereof, wherein the large-scale high-altitude cable suspension structure aluminum veneer shaped ceiling comprises: a civil steel structure truss; a decorative aluminum plate, the decorative aluminum plate is located below the civil steel structure truss; wherein the decorative aluminum plate is suspended below the civil steel structure truss through multiple sets of cable structures; and wherein each set of cable structures in the multiple sets of cable structures comprises: a fixing nut, the fixing nut is located at the top of the cable structure, the fixing nut is fixedly connected with the civil steel structure truss, and the fixing nut is used to fix the cable structure on the civil steel structure truss; a pulley, one end of the pulley is fixedly connected with the fixing nut, and the other end of the pulley leads to multiple steel cables; an adjusting hanger, one end of the adjusting hanger is fixedly connected with one of the multiple steel cables, and the other end of the adjusting hanger is fixedly connected with the decorative aluminum plate. The invention simplifies the difficulty of ceiling base construction, has high installation efficiency, and has good energy-saving effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and in particular to a large-scale high-altitude cable suspension structure aluminum single plate modeling ceiling and a construction method thereof. Background Art

[0002] Nowadays, architectural decoration construction projects in large public buildings have the problem of high-altitude operations and large-scale construction. Especially with the increasingly fierce market competition, EPC-type large public projects characterized by speed and efficiency are becoming the new market. In addition, such projects must adopt metal plate ceilings in design and adopt open grid ceilings (such as modern large public buildings such as airports and high-speed railway stations) to achieve rapid construction and relevant fire protection regulations. This will inevitably bring the following conflicts: the conflict between the extremely short ceiling base construction period and the fixed construction period of the traditional steel frame transfer layer ceiling structure; the steel frame transfer layer type ceiling base cannot meet the design aesthetic requirements of some open ceilings and the construction period requirements of the project. On the other hand, the traditional steel frame transfer layer ceiling construction has a poor working environment, high labor intensity, high risk factor, and rising labor costs year by year, which will seriously affect the normal profit of the project. Therefore, seeking a safer, more economical and more environmentally friendly new material and method to partially replace the traditional steel frame transfer layer ceiling construction is of great significance for improving the quality of engineering entities and improving the benefits of construction companies.

[0003] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0004] The purpose of the present invention is to provide a large-scale high-altitude cable suspension structure aluminum single plate modeling ceiling and a construction method thereof, which can overcome the shortcomings of the prior art.

[0005] To achieve the above-mentioned purpose, the present invention provides a large-scale high-altitude cable-suspended aluminum veneer ceiling, comprising: a civil steel structure truss; a decorative aluminum plate, the decorative aluminum plate is located below the civil steel structure truss; wherein the decorative aluminum plate is suspended below the civil steel structure truss through multiple sets of cable structures; and wherein each set of the multiple cable structures comprises: a fixing nut, the fixing nut is located at the top of the cable structure, the fixing nut is fixedly connected to the civil steel structure truss, and the fixing nut is used to fix the cable structure on the civil steel structure truss; a pulley, one end of the pulley is fixedly connected to the fixing nut, and the other end of the pulley leads to multiple steel cables; an adjusting hanger, one end of the adjusting hanger is fixedly connected to one of the multiple steel cables, and the other end of the adjusting hanger is fixedly connected to the decorative aluminum plate.

[0006] In a preferred embodiment, a fixing ring is provided on the pulley, the pulley is a stainless steel pulley, and the fixing ring is fixedly connected to the fixing nut via an annular suspension cable.

[0007] In a preferred embodiment, the annular suspension cable is a stainless steel cable, and the diameter of the annular suspension cable is 3 mm.

[0008] In a preferred embodiment, each of the plurality of steel cables is a stainless steel cable, and the diameter of each of the plurality of steel cables is 3 mm.

[0009] In a preferred embodiment, the adjustment hanger includes: an adjustment hanger body, a first threaded hole and a second threaded hole are respectively opened at both ends of the adjustment hanger body; a connecting ring, the connecting ring is threaded through the first threaded hole, and the connecting ring is fixedly connected to one of the multiple steel cables; a connecting hook, the connecting hook is threaded through the second threaded hole, and the connecting hook is fixedly connected to the decorative aluminum plate.

[0010] The present invention also provides a construction method for the large-scale high-altitude cable-suspended aluminum veneer ceiling as described above, and the construction method comprises the following steps: laying out and positioning the hanging points according to the size requirements of the construction drawings; using an infrared instrument to draw horizontal and vertical lines at the diagonal positions to control the accuracy of the positioning points; before welding the fixing nuts, checking whether the positions of the points to be welded are correct, and whether the fire retardant paint or rust on the surface of the welded steel beams is cleaned; welding the fixing nuts, and at the same time ensuring that the holes of the fixing nuts after welding are at 90 degrees to the installation direction of the decorative aluminum plate; according to the Install the annular suspension cable, pulley, multiple suspension cables and adjustment hangers according to the installation requirements of the drawings; install the decorative aluminum panels. When installing the decorative aluminum panels, draw a reference line in the middle of the assembly area and install them on both sides aligned with the reference line; when installing the decorative aluminum panels, first install the beam-type aluminum panel ceiling on both sides, and ensure that each pair of beam-type ceiling panels are installed symmetrically; after the beam-type aluminum panel ceiling on both sides is installed, install the aluminum panel grille, and the two ends of the aluminum panel grille are directly inserted into the slots reserved for the beam-type aluminum panel ceiling; and use the suspension cables to fine-tune the installed decorative aluminum panels.

[0011] In a preferred embodiment, the welding between the fixing nut and the steel structure truss is full welding, and anti-rust paint is applied after the welding slag is knocked off.

[0012] In a preferred embodiment, the intervals between each fixing nut are the same, and the fixing nuts are on the same straight line.

[0013] In a preferred embodiment, the length of the suspension cable is 600 mm greater than twice the distance from the pulley to the adjustment hanger.

[0014] In a preferred embodiment, a transverse folding groove is designed on the edge of each decorative aluminum plate to ensure stable hanging of the adjustment pendant.

[0015] Compared with the prior art, the large-scale high-altitude cable-suspended aluminum veneer ceiling and its construction method of the present invention have the following advantages: the present invention simplifies the difficulty of ceiling base construction, and adopts a lightweight base structure for lightweight metal plate ceilings. The weight of the cable-suspended ceiling base is only 1%-2% of the steel frame transition layer ceiling of the same area; only the cable and the main structure hanging point need to be welded; the cross-sectional size of the cable can be matched with the weight of the ceiling, which can fully meet the load-bearing requirements of the ceiling; the cable itself is rotated and woven from multiple strands of stainless steel wire with a grade of 304 or above, and has high strength and corrosion resistance, eliminating the need for a large amount of welding after the steel structure is welded. The disadvantages of re-brushing anti-rust paint; the weight of the cable itself is relatively light, rope-type building materials are easy to transport, and on-site installation and operation are easy; the cable accessories are equipped with screw-type regulating valves, which can fine-tune the height of the hanging point at any time; the energy-saving effect is good, avoiding the dust, noise and other pollution caused by the stacking and transportation of steel on conventional construction sites, and the stacking of raw materials on the construction site occupies a smaller site area; the installation efficiency is relatively high, the daily workload is more than 400 square meters, which can effectively improve the quality of the construction period and avoid the large demand for labor during the construction of conventional steel frame conversion layer ceilings; the demand for scaffolding for high-altitude operations is relatively low, and the scaffolding can be lowered for construction after welding the top fixed point, shortening the service life of the scaffolding. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of a large-scale high-altitude cable-suspended aluminum single-plate ceiling according to one embodiment of the present invention.

[0017] Figure 2 Schematic diagram of the structure of a suspension cable structure according to an embodiment of the present invention.

[0018] Figure 3 The present invention is a flowchart of a construction method of a large-scale high-altitude cable-suspended structure aluminum single plate ceiling according to one embodiment of the present invention. DETAILED DESCRIPTION

[0019] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific implementation modes.

[0020] Unless explicitly stated otherwise, throughout the specification and claims, the term “comprise” or variations such as “include” or “comprising”, etc., will be understood to include the stated elements or components but not to exclude other elements or components.

[0021] Figure 1 It is a structural schematic diagram of a large-scale high-altitude cable-suspended aluminum single-plate ceiling according to one embodiment of the present invention. Figure 2 Schematic diagram of the structure of a suspension cable structure according to an embodiment of the present invention. Figure 1-2 As shown, the large-scale high-altitude cable-suspended aluminum veneer ceiling of the present invention includes: a civil steel structure truss 101; a decorative aluminum plate 102, which is located below the civil steel structure truss; wherein the decorative aluminum plate is suspended below the civil steel structure truss through multiple sets of cable structures 103.

[0022] And wherein, each set of the multiple sets of suspension cable structures 103 includes: a fixing nut 201, which is located at the top of the suspension cable structure, fixedly connected to the civil steel structure truss, and used to fix the suspension cable structure on the civil steel structure truss; a pulley 202, one end of the pulley is fixedly connected to the fixing nut, and the other end of the pulley leads to multiple steel cables 203; and an adjusting hanger, one end of the adjusting hanger is fixedly connected to one of the multiple steel cables, and the other end of the adjusting hanger is fixedly connected to the decorative aluminum plate.

[0023] In a preferred embodiment, a fixing ring 204 is provided on the pulley, the pulley is a stainless steel pulley, and the fixing ring is fixedly connected to the fixing nut through an annular suspension cable 205 .

[0024] In a preferred embodiment, the annular suspension cable is a stainless steel cable, and the diameter of the annular suspension cable is 3 mm.

[0025] In a preferred embodiment, each of the plurality of steel cables is a stainless steel cable, and the diameter of each of the plurality of steel cables is 3 mm.

[0026] In a preferred embodiment, the adjustment hanger includes: an adjustment hanger body 206, wherein a first threaded hole and a second threaded hole are respectively opened at both ends of the adjustment hanger body; a connecting ring 207, wherein the connecting ring is threadedly inserted into the first threaded hole, and the connecting ring is fixedly connected to one of the multiple steel cables; and a connecting hook 208, wherein the connecting hook is threadedly inserted into the second threaded hole, and the connecting hook is fixedly connected to the decorative aluminum plate.

[0027] Figure 3 The following is a flowchart of a method for constructing a large-scale high-altitude cable-suspended aluminum veneer ceiling according to an embodiment of the present invention. Figure 3 As shown, the construction method of the present invention comprises the following steps:

[0028] Step 301: Laying out and positioning the hanging points according to the size requirements of the construction drawings;

[0029] Step 302: Use an infrared instrument to draw horizontal and vertical lines at diagonal positions to control the accuracy of the positioning point;

[0030] Step 303: Before welding the fixing nut, check whether the position of the point to be welded is correct, and whether the fire retardant paint or rust on the surface of the welded steel beam is cleaned;

[0031] Step 304: Weld the fixing nut, and ensure that the hole of the fixing nut is 90 degrees to the installation direction of the decorative aluminum plate after welding;

[0032] Step 305: Install the annular suspension cable, pulley, multiple suspension cables and adjustment pendants according to the installation requirements of the drawings;

[0033] Step 306: Install the decorative aluminum plate. When installing the decorative aluminum plate, draw a reference line in the middle of the assembly area and install it on both sides aligned with the reference line.

[0034] Step 307: When installing the decorative aluminum plate, first install the beam-type aluminum plate ceiling on both sides, and ensure that each pair of beam-type ceiling panels are installed symmetrically;

[0035] Step 308: After the beam-type aluminum plate ceilings on both sides are installed, the aluminum single plate grille is installed, and both ends of the aluminum single plate grille are directly inserted into the slots reserved for the beam-type aluminum plate ceiling; and

[0036] Step 309: Fine-tune the installed decorative aluminum panel using the suspension cable.

[0037] The detailed construction process of the present invention is as follows:

[0038] Process flow:

[0039] Laying out wires, positioning → welding hanging points → installing suspension cables and hanging parts → installing aluminum ceiling → adjusting suspension cables → cleaning

[0040] Operation points:

[0041] Laying out and positioning

[0042] 1) Strictly follow the size requirements of the construction drawings to lay out and position the hanging points (to meet the actual measurement standards);

[0043] 2) Use an infrared instrument to draw horizontal and vertical lines at the diagonal position to control the accuracy of the positioning point (the accuracy must be controlled within 5mm);

[0044] 3) During the layout process, any areas with problems with the construction interface dimensions should be promptly notified to the relevant management personnel for processing.

[0045] Welding hanging point:

[0046] 1) Carry out construction strictly in accordance with the requirements of construction drawings and on-site technical disclosure;

[0047] 2) Before welding, first check whether the position of the welding point is correct and whether the fire retardant paint or rust on the surface of the welded steel beam is clean;

[0048] 3) The direction of the stainless steel nut (fixed nut) used for hanging point welding must be correct. In order to prevent the steel cable from getting knotted due to the wrong direction of the nut hole, it is necessary to ensure that the hole of the nut should be 90 degrees to the installation direction of the ceiling plate (decorative aluminum plate) after welding to ensure that no torque is generated after the steel cable is hung;

[0049] 4) The welding of the hanging nut and the steel structure must be full welding. After knocking off the welding slag according to the specification, the anti-rust paint should be applied twice immediately to ensure that the welding point is sealed and not corroded;

[0050] 5) The spacing between each hanging point must be consistent and on the same straight line to avoid uneven density of steel cables due to different spacing between welding points and uneven straightness in the same column, which will affect the construction effect.

[0051] Installation of suspension cables and pendants:

[0052] 1) Install the pendants strictly according to the installation requirements of the drawings. From the nut hanging point, there are ring suspension cable, stainless steel pulley, stainless steel suspension cable, and adjustment pendant;

[0053] 2) The length of the stainless steel suspension cable should be 600mm longer than the distance from the inclined pulley to the pulley position, so that the stainless steel lock buckle can be used to bend and lock the cable joint;

[0054] 3) After the stainless steel suspension cable passes through the stainless steel pulley block, it should be coiled and stored before the aluminum ceiling is officially installed to avoid damage caused by other professional construction;

[0055] 4) The adjustment pendant uses two cross stainless steel screws to fix the steel cable. During installation, please check whether the locking screws are tightened to prevent the steel cable from slipping due to failure to tighten, which will affect the installation quality of the finished ceiling.

[0056] 5) After the installation of the suspension pendant is completed, it should be inspected and any problems found should be repaired in time to ensure the installation quality;

[0057] 6) After each cable is installed, use tape to number the lower end and number the cables in the order of the cables in the drawing to ensure that the cables are accurately positioned when the ceiling panels are installed and that there is no confusion in the numbering.

[0058] Installing ceiling tiles:

[0059] When installing aluminum veneer, the preparatory work before installation should comply with the following regulations:

[0060] All suspension cables have been adjusted.

[0061] The hoisting rods for heavy lamps, fans and other equipment have been arranged.

[0062] The ventilation, water and electricity pipes in the suspended ceiling, and the pedestrian and safety passages in the suspended ceiling have been installed.

[0063] The light troughs in the ceiling should be arranged appropriately according to the project conditions:

[0064] When installing the metal aluminum veneer, draw a reference line in the middle of the assembly area and align the reference line to install it on both sides. The horizontal folding groove design on the edge of each aluminum plate ensures that the hook of the regulating valve at the end of the suspension cable can be stably hung and is not prone to displacement and wear. When installing, first install the beam-type aluminum plate ceiling on both sides, and ensure that each pair of beam-type ceiling panels are installed symmetrically to avoid the situation where the ceiling panels are installed dislocated. When installing, handle with care, first hang the four suspension cables at both ends of the aluminum plate, and then hang the suspension cables symmetrically one by one. After the installation of the beam-type aluminum plate ceiling on both sides is completed, install the aluminum veneer grille. The two ends of the grille are directly inserted into the slots reserved for the beam-type aluminum plate ceiling, and no suspension cable is required. After all the suspension cables of an aluminum plate ceiling are hung, adjust the tension of the suspension cables through the regulating valve to ensure that each group of suspension cables is subjected to the same force. Cleaning: After the aluminum plate is installed, wipe the entire surface of the plate with a cloth, and no dirt or fingerprints should be left.

[0065] Cable adjustment:

[0066] Measure the installed ceiling panels. If the panel surface is uneven or there are height differences, use the regulating valve at the end of the cable to make fine adjustments. When adjusting, be careful not to adjust only one cable, but all the cables near the uneven position, and gradually fine-tune until it is flat. During the process, pay attention to maintaining uniform tension on each cable.

[0067] Cleanup:

[0068] After the adjustment is completed, the construction work surface should be cleaned up, the excess steel cables at the adjusted suspension cable bend and fixed parts should be cut short, and the remaining materials, construction tools and machine accessories should be cleared out of the work surface and cleaned up.

[0069] The basis of quality control of the present invention is:

[0070] "Uniform Standard for Construction Quality Acceptance of Building Projects" GB50300-2013

[0071] "Code for Construction Quality Acceptance of Building Decoration and Renovation Projects" GB50210-2018

[0072] "Code for Indoor Environmental Pollution Control of Civil Construction Engineering" GB50325-2010

[0073] Code for Fire Protection Design of Building Interior Decoration GB50222-2017

[0074] The specific steps of quality control of the present invention are:

[0075] Quality control during construction operations:

[0076] Guarantee items: The variety and quality of materials used must meet the design requirements.

[0077] The elevation, size, arch and shape of the suspended ceiling should meet the design requirements.

[0078] The material, type, specification and color of the finishing materials should meet the design requirements. The installation of finishing materials should be firm and tight.

[0079] The material, specification, installation spacing and connection method of suspension hangers should meet the design requirements.

[0080] The hanging points and suspension hangers of the suspended ceiling project must be installed firmly.

[0081] Dedicated measurement personnel conduct follow-up inspections and measurements on each construction process according to Vanke's measurement inspection and control standards, and deal with any quality issues that arise in a timely manner to meet quality standards.

[0082] After the metal aluminum veneer ceiling is completed, the keel and panels must be firmly fixed, the panels must be flat, without pollution, warping, sagging, missing edges and corners, etc. The panels (strips) must be uniform and straight in both vertical and horizontal directions. The allowable deviation of the ceiling decorative panel should comply with the provisions of Table 1:

[0083] Table 1

[0084]

[0085]

[0086] The promotion prospects of the present invention are as follows: the traditional steel frame transfer layer ceiling construction has a poor working environment, high labor intensity, high risk factor, and rising labor costs year by year, which will seriously affect the normal profit of the project. Therefore, seeking a safer, more economical, and more environmentally friendly new material and method to partially replace the traditional steel frame transfer layer ceiling construction is of great significance for improving the quality of engineering entities and the benefits of construction companies. It is suitable for open metal plate modeling ceilings and grid ceilings, and is particularly suitable for metal plate ceiling base construction in venues with large spaces and high ceiling heights.

[0087] The foregoing description of specific exemplary embodiments of the present invention is for the purpose of illustration and demonstration. These descriptions are not intended to limit the present invention to the precise form disclosed, and it is clear that many changes and variations can be made based on the above teachings. The purpose of selecting and describing the exemplary embodiments is to explain the specific principles of the present invention and its practical application, so that those skilled in the art can realize and utilize various different exemplary embodiments of the present invention and various different selections and changes. The scope of the present invention is intended to be limited by the claims and their equivalents.

Claims

1. A construction method for a large-scale high-altitude cable-suspended aluminum veneer ceiling, characterized in that: The large-scale high-altitude cable-suspended structure aluminum single plate ceiling includes: Civil engineering steel structure trusses; A decorative aluminum plate, the decorative aluminum plate is located below the civil steel structure truss; Wherein, the decorative aluminum plate is suspended below the civil steel structure truss through multiple sets of suspension cable structures; And wherein each of the plurality of suspension cable structures comprises: A fixing nut, the fixing nut is located at the top of the suspension cable structure, the fixing nut is fixedly connected to the civil steel structure truss, and the fixing nut is used to fix the suspension cable structure on the civil steel structure truss; a pulley, one end of which is fixedly connected to the fixing nut, and the other end of which leads to a plurality of steel cables; an adjusting hanger, one end of which is fixedly connected to one of the plurality of steel cables, and the other end of which is fixedly connected to the decorative aluminum plate. The pulley is provided with a fixing ring, the pulley is a stainless steel pulley, and the fixing ring is fixedly connected to the fixing nut through an annular suspension cable. The annular suspension cable is a stainless steel cable, and the diameter of the annular suspension cable is 3 mm. Each of the plurality of steel cables is a stainless steel cable, and the diameter of each of the plurality of steel cables is 3 mm. The adjustment pendant comprises: An adjusting hanger body, wherein two ends of the adjusting hanger body are respectively provided with a first threaded hole and a second threaded hole; a connecting ring, wherein the connecting ring is threadedly inserted into the first threaded hole, and the connecting ring is fixedly connected to one of the plurality of steel cables; A connecting hook, the connecting hook is threadedly inserted into the second threaded hole, and the connecting hook is fixedly connected to the decorative aluminum plate The construction method comprises the following steps: Lay out and position the hanging points according to the size requirements of the construction drawings; Use infrared instrument to draw horizontal and vertical lines at diagonal positions to control the accuracy of positioning points; Before welding the fixing nut, check whether the position of the point to be welded is correct and whether the fire retardant paint or rust on the surface of the welded steel beam is cleaned; Welding the fixing nut, while ensuring that the hole of the fixing nut is at 90 degrees to the installation direction of the decorative aluminum plate after welding; Install the ring suspension cable, pulley, multiple suspension cables and adjustment pendants according to the installation requirements of the drawings; Install the decorative aluminum plate. When installing the decorative aluminum plate, draw a reference line in the middle of the assembly area and align it with the reference line to install it on both sides. as well as Use the suspension cable to fine-tune the installed decorative aluminum panels. The installation of suspension cables and pendants includes the following steps: 1) Install the pendants strictly according to the installation requirements of the drawings. Below the nut hanging point are the ring suspension cable, stainless steel pulley, stainless steel suspension cable, and adjustment pendant; 2) The length of the stainless steel suspension cable should be 600mm longer than the distance from the inclined pulley to the pulley position, so that the stainless steel lock buckle can be used to bend and lock the cable joint; 3) After the stainless steel suspension cable passes through the stainless steel pulley block, it should be coiled and stored before the aluminum ceiling is officially installed to avoid damage caused by other professional construction; 4) The adjustment pendant uses two cross stainless steel screws to fix the steel cable. During installation, you should check whether the locking screws are tightened to prevent the steel cable from slipping due to failure to tighten, which will affect the installation quality of the finished ceiling. 5) After the installation of the suspension pendant is completed, it should be inspected and any problems found should be repaired in time to ensure the installation quality; 6) After each cable is installed, use tape to number the lower end, and number the cables according to the order of the cables in the drawing to ensure that the cable positions are accurate when the ceiling panels are installed, and no confusion is allowed. When installing the metal aluminum veneer, draw a reference line in the middle of the assembly area, align the reference line and install it on both sides. The horizontal folding groove design on the edge of each aluminum plate ensures that the hook of the regulating valve at the end of the cable can be stably hung and is not prone to displacement and wear. When installing, first install the beam-type aluminum plate ceiling on both sides, and ensure that each pair of beam-type ceiling panels are installed symmetrically to avoid the misalignment of the ceiling panels. When installing, handle it with care. First hang the four cables at both ends of the aluminum plate, and then hang the cables symmetrically one by one. After the installation of the beam-type aluminum plate ceiling on both sides is completed, install the aluminum veneer grille. The two ends of the grille are directly inserted into the slots reserved for the beam-type aluminum plate ceiling. There is no need to hang the cables. After all the cables of an aluminum plate ceiling are hung, adjust the tension of the cables through the regulating valve to ensure that each group of cables is subjected to consistent force.

2. The construction method according to claim 1, characterized in that: in, The welding between the fixing nut and the steel structure truss adopts full welding, and anti-rust paint is applied after knocking off the welding slag.

3. The construction method according to claim 2, characterized in that: The spacing between each fixing nut is the same, and the fixing nuts are on the same straight line.

4. The construction method according to claim 3, characterized in that: The length of the suspension cable is 600 mm greater than twice the distance from the pulley to the adjusting pendant.

5. The construction method according to claim 4, characterized in that: A transverse folding groove is designed on the edge of each decorative aluminum plate to ensure stable hanging of the adjustment pendant.

Citation Information

Patent Citations

  • Universal rotary lifting hook structure of cable crane

    CN104386576A

  • Construction method for assembled building cantilevered element

    CN108104260A

  • Modular and adjustable type hook aluminum sheet

    CN204299091U

  • A large-scale high-altitude cable-stayed aluminum single-panel ceiling design

    CN209163180U

  • Ceiling and ceiling suspension system

    EP3112546A1