Device and method for extracting gas by bridging goaf with large diameter horizontal drilling
By bridging the gas extraction device in the goaf through large-diameter horizontal boreholes, the problem of gas drainage in coal mines is solved, and multi-point continuous controllable drainage and real-time monitoring of gas in the goaf are realized, effectively preventing spontaneous combustion of left coal and The gas concentration exceeded the limit, which improved the safety production conditions of coal mines.
Patent Information
- Application Number
- CN201910054867.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-01-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-01-21
AI Technical Summary
In coal mines, it is difficult to control gas drainage in goafs of Class II spontaneously igniting coal seams, resulting in spontaneous combustion of leftover coal and excessive gas concentration, affecting production safety.
Large-diameter horizontal boreholes are used to bridge the gas drainage devices in the goaf, including casings, butterfly valves and drainage pipes. The coal pillars are penetrated through the boreholes and flow, temperature, gas and carbon monoxide gas concentration measurement devices are installed to achieve the goal of gas extraction. Multi-point continuous controllable extraction and real-time monitoring of gas in empty areas.
It effectively controls the gas gush intensity, reduces the risk of spontaneous combustion of coal left in the goaf, realizes the prevention and control of complex disasters in the mine, avoids gas concentration exceeding limits, and improves the efficiency and safety of gas drainage in the goaf.
Smart Images

Figure CN109519212B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine safety, and relates to a device and a method for extracting gas by bridging goaf with a large diameter horizontal borehole. Background Art
[0002] The adjustable and controllable gas extraction volume in the goaf and the real-time monitoring of the signal gas are important guarantees for effectively controlling the spontaneous combustion of coal in the goaf and preventing the gas concentration in the upper corner of the underground coal mining face from exceeding the limit. At present, the main coal seams of most high-gas mines in the northeastern edge of the Ordos Basin in my country belong to the second-class spontaneous combustion coal seams, and the ignition period is 4 to 6 months. In addition, the air intake of the coal seam fully-mechanized top coal caving mining face is generally 2000m 3 / min, the return air volume is about 1600m 3 / min, so, for the underground coal mining working face of this type of mine, the air leakage in the goaf caused by gas extraction is very likely to cause spontaneous combustion of the coal in the goaf, and the spontaneous combustion of the coal body becomes the ignition source of gas combustion and gas explosion, which not only seriously affects the safe extraction of gas, but also becomes a huge source of danger for mine production; conversely, in the process of preventing and controlling spontaneous combustion, the measures taken, such as sealing the goaf and coal body, reducing air leakage, and pouring loose coal body with fire-fighting yellow mud colloid to form an isolation zone, are not conducive to gas extraction in the goaf. Therefore, in taking measures to prevent and control the spontaneous combustion of coal seams, full consideration should be given to the control of the gas outflow intensity of the working face by gas extraction in the goaf, and in the process of gas extraction, consideration should be given to the control of air leakage in the goaf to prevent and control spontaneous combustion fires, which has become a key problem for achieving safe production in mines with both gas and spontaneous combustion disasters.
[0003] In view of this, the present invention aims at the problem of gas control in goaf under high-intensity mining conditions of Class II spontaneous combustion thick coal seams in the eastern edge of Ordos Basin in my country, and proposes to adopt a large-diameter horizontal drilling construction technology, and apply the large-diameter horizontal drilling bridge goaf gas extraction technology to the control of gas in the upper corner of the working face, so as to realize continuous and controllable extraction from multiple gathering points on the return air side of the comprehensive caving working face. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a device and method for extracting gas from a large-diameter horizontal drill hole bridging goaf, which is used to solve the problem of gas control in the return air corners of high-intensity mining working faces under the condition of a "Y"-shaped ventilation method, and to achieve multiple gas collection points in the goaf and continuous and controllable extraction. While effectively controlling the outburst of corner gas, the spontaneous combustion of coal residues in the goaf can be monitored in real time, thereby achieving effective prevention and control of complex mine disasters.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] A device for extracting gas by bridging a goaf with a large diameter horizontal borehole, comprising a casing, a butterfly valve, a tee and an extraction pipeline;
[0007] The butterfly valve is installed on the casing, and the casing is connected to the extraction pipeline through a tee;
[0008] The casing is placed inside the horizontal borehole; the horizontal borehole is constructed on the coal pillar between the belt conveyor chute of the mining face and the air inlet chute of the adjacent working face, and penetrates the coal pillar;
[0009] The extraction pipeline is equipped with flow, temperature, gas and carbon monoxide gas concentration measuring devices for monitoring the gas extraction situation in the horizontal drilling bridge goaf area.
[0010] Furthermore, the length of the coal pillar between the belt conveyor chute of the mining face and the air inlet chute of the adjacent working face is 150 to 200 meters, the width of the coal pillar is 20 meters, and there are through-going connecting tunnels between the coal pillars.
[0011] Furthermore, the diameter of the horizontal borehole is 113 mm, the spacing between the boreholes is 5 to 10 m, and 14 to 19 large-diameter horizontal boreholes are constructed on each coal pillar.
[0012] Furthermore, cotton yarn is wound on the sleeve, and a certain amount of polyurethane mixed solution is poured on the cotton yarn. After the polyurethane mixed solution reacts and solidifies, the inner wall of the horizontal borehole is adhered to the sleeve to form a sealing body for isolating the intake of air.
[0013] Furthermore, a method for extracting gas from a goaf by bridging a large-diameter horizontal borehole applicable to the device specifically comprises the following steps:
[0014] S1: construct large-diameter horizontal boreholes on the coal pillar between the belt conveyor chute of the mining face and the air intake chute of the adjacent working face;
[0015] S2: The large-diameter horizontal borehole constructed in the above-mentioned construction penetrates the coal pillar, and after the construction is completed, a casing is inserted into the borehole;
[0016] S3: Wrapping cotton yarn on the sleeve, and pouring a certain amount of polyurethane mixed solution on the cotton yarn, and after the polyurethane mixed solution reacts and solidifies, the sleeve is effectively blocked;
[0017] S4: installing a butterfly valve on the casing to control the negative pressure of the horizontal borehole;
[0018] S5: Connect the sleeve with the butterfly valve installed to the tee;
[0019] S6: The tee is connected to the extraction pipeline, and flow, temperature, gas and carbon monoxide gas concentration measuring devices are installed on the extraction pipeline to monitor the gas extraction situation of the large-diameter horizontal drilling bridge goaf area.
[0020] Further, the step S3 specifically includes the following steps:
[0021] S31: Wrap cotton yarn around the casing, then pour the mixed polyurethane solution on the cotton yarn, and quickly put the casing into the drill hole;
[0022] S32: After the mixed polyurethane solution is fully reacted and solidified, it will adhere the inner wall of the borehole to the casing to form a seal, thereby isolating the intake of air and preventing the concentration of the extracted gas from decreasing.
[0023] Further, in step S5, the control method of the butterfly valve is:
[0024] (1) At the beginning of extraction, the butterfly valve is opened to allow the gas in the goaf to flow into the horizontal borehole under the action of the negative pressure in the extraction pipeline; at the same time, the gas extraction situation is monitored by the gas and carbon monoxide concentration sensors installed on the extraction pipeline;
[0025] (2) If carbon monoxide gas is found in the extraction pipeline, close or adjust the opening degree of the butterfly valve to reduce air leakage in the goaf and prevent the spontaneous combustion of the coal.
[0026] The beneficial effects of the present invention are:
[0027] (1) The present invention can be used to implement upper corner gas control during the advancement of coal mining working faces in coal mines. The process is to use a large-diameter horizontal drilling construction process to construct a borehole in the coal pillar to bridge the goaf, and a large-diameter extraction pipeline is laid in the chute on the preparation working face to drain the gas in the goaf, thereby interfering with the flow field in the goaf;
[0028] (2) The present invention can replace the joint tunnel and realize the complete isolation between the goaf and the drift on the preparation working face, thus preventing the high-concentration gas in the goaf from directly flowing into the drift on the preparation working face, and fundamentally solving the problem of excessive return air gas concentration. The negative pressure of the extraction at the point where the bridge pipe is connected to the goaf is much greater than the negative pressure of the ventilation at the cross-section under the condition of the "Y" type ventilation system, and the extraction volume is large, which can more effectively intercept the high-concentration gas in the deep return air side area of the goaf from flowing into the working face than the "Y" type ventilation system.
[0029] (3) The present invention uses multiple bridge pipes to access the goaf, realizing extraction at multiple points in the return air side of the goaf, and simultaneous and continuous extraction in the vicinity of the working face and the deep part of the goaf, thereby reducing the intensity of gas outburst in the goaf; the bridge pipes connected to the goaf are connected in parallel with multiple pipes, which effectively reduces the local resistance of the extraction pipes, increases the gas extraction volume, and strengthens the control of the gas flow field in the goaf;
[0030] (4) Compared with the traditional high-position drilling, the present invention has a small drilling construction workload and a large amount of gas extracted from the goaf, which can effectively control the gas flow field in the goaf and prevent the gas from exceeding the limit in the upper corner of the working face; each large-diameter horizontal borehole is connected to the extraction pipeline, and can monitor the concentration of the spontaneous combustion indicator gas of the residual coal in the goaf in real time online, so as to effectively pre-control the spontaneous combustion of coal in the goaf of the coal production working face of the mine; a regulating butterfly valve is installed at the connection between the large-diameter horizontal borehole and the extraction pipeline to control the negative pressure of the gas extracted by the borehole, so that the amount of gas extracted by the borehole can be accurately and effectively controlled, and the spontaneous combustion of the residual coal caused by air intake due to excessive gas extraction in the goaf can be prevented. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:
[0032] Figure 1 It is a schematic diagram of the overall construction position of the device of the present invention;
[0033] Figure 2 It is a horizontal schematic diagram of the device of the present invention;
[0034] Figure 3 for Figure 2 AA cross-sectional diagram of ;
[0035] Figure 4 This is a schematic diagram of the connection between the pipeline and the extraction pipe. DETAILED DESCRIPTION
[0036] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0037] like Figures 1 to 4 As shown, a device for extracting gas by bridging the goaf with a large diameter horizontal borehole comprises a casing, a butterfly valve, a tee and an extraction pipe; the butterfly valve is installed on the casing, and the casing is connected to the extraction pipe through the tee; the casing is inserted into the horizontal borehole; the horizontal borehole is constructed on the coal pillar between the belt conveyor chute of the mining face and the air inlet chute of the adjacent working face, and penetrates the coal pillar; the extraction pipe is equipped with flow, temperature, gas and carbon monoxide gas concentration measuring devices for monitoring the gas extraction situation of the horizontal borehole bridging the goaf.
[0038] The length of the coal pillar between the belt conveyor chute of the mining face and the air inlet chute of the adjacent working face is 150-200m, the width of the coal pillar is 20m, and there is a through communication tunnel between the coal pillars. The diameter of the horizontal borehole is 113mm, the spacing of the boreholes is 5-10m, and 14-19 large-diameter horizontal boreholes are constructed on each coal pillar. Cotton yarn is wrapped around the casing, and a certain amount of polyurethane mixed solution is poured on the cotton yarn. After the polyurethane mixed solution reacts and solidifies, the inner wall of the horizontal borehole is bonded to the casing to form a seal to isolate the intake of air.
[0039] The method for extracting gas by bridging the goaf with a large diameter horizontal drilling comprises the following steps:
[0040] S1: construct large-diameter horizontal boreholes on the coal pillar between the belt conveyor chute of the mining face and the air intake chute of the adjacent working face;
[0041] S2: The large-diameter horizontal borehole constructed in the above-mentioned construction penetrates the coal pillar, and after the construction is completed, a casing is inserted into the borehole;
[0042] S3: Wrapping cotton yarn on the sleeve, and pouring a certain amount of polyurethane mixed solution on the cotton yarn, and after the polyurethane mixed solution reacts and solidifies, the sleeve is effectively blocked; specifically:
[0043] S31: Wrap cotton yarn around the casing, then pour the mixed polyurethane solution on the cotton yarn, and quickly put the casing into the drill hole;
[0044] S32: After the mixed polyurethane solution is fully reacted and solidified, it will adhere the inner wall of the borehole to the casing to form a seal, thereby isolating the intake of air and preventing the concentration of the extracted gas from decreasing.
[0045] S4: installing a butterfly valve on the casing to control the negative pressure of the horizontal borehole;
[0046] S5: Connect the casing with the butterfly valve to the tee; the control method of the butterfly valve is:
[0047] (1) At the beginning of extraction, the butterfly valve is opened to allow the gas in the goaf to flow into the horizontal borehole under the action of the negative pressure in the extraction pipeline; at the same time, the gas extraction situation is monitored by the gas and carbon monoxide concentration sensors installed on the extraction pipeline;
[0048] (2) If carbon monoxide gas is found in the extraction pipeline, close or adjust the opening degree of the butterfly valve to reduce air leakage in the goaf and prevent the spontaneous combustion of the coal.
[0049] S6: The tee is connected to the extraction pipeline, and flow, temperature, gas and carbon monoxide gas concentration measuring devices are installed on the extraction pipeline to monitor the gas extraction situation of the large-diameter horizontal drilling bridge goaf area.
[0050] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A device for extracting gas by bridging goaf with large diameter horizontal drilling, characterized in that: Includes casing, butterfly valve, tee and extraction pipeline; The butterfly valve is installed on the casing, and the casing is connected to the extraction pipeline through a tee; The casing is placed inside the horizontal borehole; the horizontal borehole is constructed on the coal pillar between the belt conveyor chute of the mining face and the air inlet chute of the adjacent working face, and penetrates the coal pillar; 14 to 19 large-diameter horizontal boreholes are constructed on each coal pillar; cotton yarn is wrapped around the casing, and a certain amount of polyurethane mixed solution is poured on the cotton yarn. After the polyurethane mixed solution reacts and solidifies, the inner wall of the horizontal borehole is adhered to the casing to form a sealing body for isolating the intake of air; The extraction pipeline is equipped with flow, temperature, gas and carbon monoxide concentration measuring devices for monitoring the gas extraction situation of the horizontal drilling bridge goaf area; The method steps of extracting gas by the device are as follows: S1: construct large-diameter horizontal boreholes on the coal pillar between the belt conveyor chute of the mining face and the air intake chute of the adjacent working face; S2: The large-diameter horizontal borehole constructed in the above-mentioned construction penetrates the coal pillar, and after the construction is completed, a casing is inserted into the borehole; S3: Wrapping cotton yarn on the sleeve, and pouring a certain amount of polyurethane mixed solution on the cotton yarn, and after the polyurethane mixed solution reacts and solidifies, the sleeve is effectively blocked; S4: installing a butterfly valve on the casing to control the negative pressure of the horizontal borehole; S5: Connect the sleeve with the butterfly valve installed to the tee; S6: The tee is connected to the extraction pipeline, and flow, temperature, gas and carbon monoxide gas concentration measuring devices are installed on the extraction pipeline to monitor the gas extraction situation of the large-diameter horizontal drilling bridge goaf area.
2. The device for extracting gas by bridging goaf with large diameter horizontal drilling according to claim 1 is characterized in that: The length of the coal pillar between the belt conveyor drift of the mining face and the air inlet chute of the adjacent working face is 150-200m, the width of the coal pillar is 20m, and there are through-going connecting tunnels between the coal pillars.
3. The device for extracting gas by bridging goaf with large diameter horizontal drilling according to claim 1 is characterized in that: The diameter of the horizontal drilling hole is 113 mm, and the spacing between the drilling holes is 5 to 10 m.
4. The device for extracting gas by bridging goaf with large diameter horizontal drilling according to claim 1 is characterized in that: The step S3 specifically comprises the following steps: S31: Wrap cotton yarn around the casing, then pour the mixed polyurethane solution on the cotton yarn, and quickly put the casing into the drill hole; S32: After the mixed polyurethane solution is fully reacted and solidified, it will adhere the inner wall of the borehole to the casing to form a seal, thereby isolating the intake of air and preventing the concentration of the extracted gas from decreasing.
5. The device for extracting gas by bridging goaf with large diameter horizontal drilling according to claim 1 is characterized in that: In step S5, the control method of the butterfly valve is: (1) At the beginning of extraction, the butterfly valve is opened to allow the gas in the goaf to flow into the horizontal borehole under the action of negative pressure in the extraction pipeline; at the same time, the gas extraction situation is monitored by the gas and carbon monoxide concentration sensors installed on the extraction pipeline; (2) If carbon monoxide gas is found in the extraction pipeline, close or adjust the opening degree of the butterfly valve to reduce air leakage in the goaf and prevent the spontaneous combustion of the coal.
Citation Information
Patent Citations
Super-large-diameter coal seam drilling pipe insertion goaf gas extraction technology
CN106223996A
Intelligent judging, adjusting and control system for coal mine high-level borehole pressure relief gas extraction
CN108625893A
Ventilating structure for pumping and exhausting gas at coal face
CN201723246U
Large-diameter horizontal drilling bridging goaf gas extraction device
CN209586428U