A tough steel-concrete composite bridge deck and construction method thereof

By using a tough steel-concrete composite deck in the steel bridge deck structure, combined with a steel box girder, a tough concrete layer and an asphalt wearing layer, the problems of fatigue cracking and pavement damage during the operation cycle of the existing steel bridge deck structure are solved. Higher bridge deck stability and lower maintenance costs are achieved.

CN109778665BActive Publication Date: 2024-10-29SHANDONG TRAFFIC PLANNING DESIGN INST
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN201910194299.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-03-14
Publication Date
2024-10-29
Estimated Expiration
2039-03-14

AI Technical Summary

Technical Problem

The existing steel bridge deck structure is prone to fatigue cracking and pavement damage during the operation cycle, resulting in frequent repairs and high maintenance costs, and the construction process is complex and polluting.

Method used

Adopting a tough steel-concrete composite deck structure, through the combination of steel box girder, tough concrete layer and asphalt wearing layer, the stiffness and fatigue resistance of the bridge deck are improved, the thickness requirement of the steel bridge deck is reduced, and simple plate stiffeners are used to simplify Steel structure processing reduces project cost and construction complexity.

Benefits of technology

It significantly improves the stiffness and fatigue resistance of the bridge deck, reduces the risk of fatigue cracking, simplifies the steel processing process, reduces construction pollution and traffic interruption, and reduces maintenance costs during the life of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109778665B_ABST
    Figure CN109778665B_ABST
Patent Text Reader

Abstract

The present invention discloses a tough steel-concrete composite bridge deck and a construction method thereof. The tough steel-concrete composite bridge deck comprises: a steel box girder for bearing weight, whose top plate constitutes the supporting plane of the bridge deck, and a plurality of diaphragms and a plurality of plate-type stiffening ribs are arranged on the opposite side of the supporting plane, wherein the diaphragms are parallel to each other and perpendicular to the top plate; the plate-type stiffening ribs are plate-like structures, wherein the plate-type stiffening ribs are parallel to each other and perpendicular to the diaphragms and the top plate; a tough concrete layer, comprising a concrete layer and a steel mesh layer buried in the concrete layer, wherein the concrete layer is connected to the top plate of the steel box girder by a bolt assembly pre-welded on the top plate; and an asphalt concrete wear layer, which is laid flat on the tough concrete layer. This composite bridge deck is a composite structure formed by an orthotropic steel bridge deck and tough concrete, which jointly bears external loads, can greatly improve the stiffness of the steel bridge deck, reduce the stress of the steel bridge deck itself, and improve the fatigue resistance of the steel bridge deck.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge steel decks, and in particular relates to a tough steel-concrete composite bridge deck and a construction method thereof. Background Art

[0002] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention, and should not necessarily be regarded as an admission or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art.

[0003] The deck structure is supported on a deck support system consisting of transverse diaphragms and longitudinal stiffeners (see Figure 1 ). The bridge deck, longitudinal stiffeners and transverse diaphragms are perpendicular to each other and are connected together by welds to work together. my country's specifications stipulate that the thickness of steel bridge decks shall not be less than 14mm. In order to improve its rigidity, steel bridge decks generally use U-shaped stiffeners. In recent years, when steel bridges use orthotropic steel bridge decks, in order to improve the fatigue performance of the bridge deck structure, the thickness of the steel bridge deck is often 16-20mm, the thickness of the U-shaped stiffener is 6-10mm, and the height is 260-300mm. However, nearly 70 years of engineering practice has shown that conventional steel bridge decks and pavement structures at home and abroad are prone to fatigue cracking of steel bridge decks after a period of use (domestic bridges are generally 3-8 years due to the large number of overloaded vehicles; foreign vehicles are relatively less overloaded, generally 15-25 years) (existing diseases show that the steel bridge deck at the heavy vehicle lane cracks earlier) and pavement cracking, rutting, congestion, pushing and other diseases, which have to be frequently repaired during the operation cycle. Not only is the maintenance cost extremely high, but the traffic interruption also causes huge social costs. The inventors found that the main reasons why the orthotropic steel bridge deck pavement is easy to damage include insufficient stiffness of the steel bridge deck, poor high temperature performance, fatigue characteristics and bonding strength of the asphalt pavement, overloaded operation of the bridge, etc. The solution may be to increase the thickness of the steel bridge deck (the national standard stipulates that the thickness of the steel bridge deck should not be less than 14mm), improve the structural details and improve the processing technology, but these methods have not been able to completely solve the problem of orthotropic steel bridge deck defects.

[0004] At present, conventional steel bridge deck paving generally uses 5cm-8cm thick epoxy asphalt concrete or poured asphalt concrete, with a construction cost of 1,000-1,500 yuan / square meter and a service life of 15 years. It needs to be replaced 6 times during the life of the bridge. In addition, the existing technology has high requirements on the construction process. The temperature of the mixture is required to be above 100°C during construction, which causes great pollution to the environment and requires traffic closure.

[0005] The ultra-high performance composite steel bridge deck structure that has been used in recent years is a new type of steel bridge deck structure. Its structure is to lay high-strength active powder concrete on the steel bridge deck. The strength of this concrete structure can reach more than 120MPa, which is 3-5 times that of conventional concrete materials. Therefore, it is relatively brittle and needs to be mixed with high-quality steel fibers with a volume content of not less than 3% and dense reinforcement to improve the ductility of the structure. The spacing between steel bars is generally about 4cm, and the diameter of the steel bars is generally 10mm. In addition, because the concrete uses fine aggregates with a diameter of less than 1.25mm, the concrete shrinkage strain is large, which is 2-3 times that of conventional concrete. High-temperature steam curing methods are required during construction, and high requirements are placed on construction equipment. It is generally completed by professional manufacturers. At present, the cost of this steel-concrete composite bridge deck structure is relatively high, with a unit price of about 1,600-1,800 yuan / square meter. Summary of the invention

[0006] In view of the technical problems existing in the above-mentioned prior art, the purpose of the present invention is to provide a tough steel-concrete composite bridge deck and its construction method. This composite bridge deck is a composite structure formed by an orthogonal anisotropic steel bridge deck and tough concrete to jointly bear external loads, which can greatly improve the stiffness of the steel bridge deck, reduce the stress of the steel bridge deck itself, and improve the fatigue resistance of the steel bridge deck. After the steel bridge deck and tough concrete form a composite structure, its stiffness will be much greater than that of the steel plate, and the steel bridge deck only needs to use simpler plate-type stiffening ribs, and the processing of the steel structure will be more convenient. In addition, the conventional asphalt wear layer is laid on the upper surface of the cement-based tough concrete, which not only has better stability itself, but also the later maintenance is consistent with the conventional concrete bridge deck paving, and the maintenance during the life of the bridge is more convenient and the cost is lower.

[0007] In order to solve the above problems, the technical solution of the present invention is:

[0008] A tough steel-concrete composite bridge deck, comprising:

[0009] The steel box girder is used for bearing loads. Its top plate constitutes the supporting plane of the bridge deck. A number of diaphragms and a number of plate-type stiffening ribs are arranged on the opposite side of the supporting plane. The diaphragms are parallel to each other and perpendicular to the top plate. The plate-type stiffening ribs are plate-shaped structures. The plate-type stiffening ribs are parallel to each other and perpendicular to the diaphragms and the top plate.

[0010] A tough concrete layer, comprising a concrete layer and a steel mesh layer embedded in the concrete layer, wherein the concrete layer and the top plate of the steel box girder are connected via a bolt assembly pre-welded on the top plate;

[0011] Asphalt concrete wearing course is laid flat on the tough concrete layer.

[0012] The diaphragms and plate stiffeners at the bottom of the top plate of the steel box girder are perpendicular to each other and distributed in a grid pattern, which can provide good support for the top plate of the steel box girder and the composite bridge deck to ensure the stability of the composite bridge deck. The plate stiffeners increase the stiffness of the steel bridge deck before it forms a composite structure with the tough concrete layer, and together with the steel bridge deck form an orthotropic steel bridge deck to bear the tough concrete load.

[0013] 1) The tough concrete layer and the top plate of the steel box girder are connected by pre-welded bolts, which can significantly enhance the connection strength between the tough concrete layer and the top plate of the steel box girder. The combined structure formed by the tough concrete layer and the top plate of the steel box girder jointly bears the external load, which can greatly improve the stiffness of the bridge deck and significantly reduce the fatigue stress of the key parts of the steel bridge deck, thereby solving the problem of fatigue cracking of the steel bridge deck before reaching the service life; 2) Because the stiffness of the steel-concrete composite structure is greatly improved, the thickness of the steel bridge deck can be reduced, and the steel bridge deck does not need to use U-shaped stiffening ribs, but plate-type stiffening ribs, which makes the steel structure processing more convenient. 3) The steel mesh reinforces the concrete layer to make it have better toughness, and compared with the high-strength concrete composite structure, it has better ductility, which is conducive to reducing the project cost and simplifying the steel bar processing process. 4) Compared with the epoxy asphalt or cast asphalt concrete bridge deck paving scheme, when the bridge deck pavement is overhauled, the present invention only needs to replace the asphalt concrete wear layer, and there is no need to close the traffic during construction, and the lanes can be replaced, which has a significant social effect for areas with heavy traffic pressure.

[0014] The asphalt concrete wearing layer can transfer and diffuse the wheel load, increase the friction between the wheel and the pavement structure layer, reduce driving noise, improve driving comfort, and protect the tough concrete layer from the direct impact of the wheel.

[0015] A construction method for a ductile steel-concrete composite bridge deck comprises the following steps:

[0016] Processing, welding, anti-corrosion coating of steel structures, and welding of stud assemblies on the surface of the top plate of steel box girders;

[0017] Transport the steel structure to the site, hoist it into place, and complete the connection between the segments;

[0018] Sandblast and remove rust from the bridge deck within a set distance from the outer edge of the tough concrete layer, and apply anti-rust paint;

[0019] Tie up the steel mesh and pour the tough concrete. After pouring, lay the curing film for moisturizing and curing;

[0020] After the maintenance is completed, the surface of the tough concrete layer is roughened by shot blasting, and the asphalt wearing layer is constructed to obtain a composite bridge deck.

[0021] Tough concrete is a cement-based material, mainly composed of cement, cement plus filler or fine aggregate with a particle size of no more than 5mm, and reinforced with non-metallic fiber mesh with a fiber content not exceeding 2.5% of the total volume of the composite material. The hardened composite material has significant strain hardening characteristics, and can produce multiple fine cracks under tensile loads. The ultimate crack width is less than 0.05mm, and the ultimate tensile strain can stably reach more than 3%. The ultimate tensile strain of this material is more than 300 times the tensile strain of concrete (0.01%) and more than 20 times the yield strain of steel bars (0.15%). Superimposing it with orthotropic steel bridge decks to form a tough composite structure can significantly improve the mechanical performance of steel bridge decks, and setting an asphalt wear layer on tough concrete can greatly improve its performance.

[0022] Tough concrete generally has good water seepage performance and can be considered impermeable when in use, that is, the steel plate will not corrode at the joint with the steel bridge deck. However, the edge of the tough concrete will slip slightly due to construction and temperature. Therefore, in order to improve the durability of the steel bridge deck, the bridge deck within a certain distance from the outer edge of the tough concrete layer needs to be sandblasted to remove rust and apply anti-corrosion coating.

[0023] The curing membrane is a waterproof film used to keep concrete moist during the curing process to ensure the curing effect of tough concrete.

[0024] Shot blasting and roughening the surface of the tough concrete layer can enhance the bonding effect between the tough concrete layer and the surface asphalt wearing layer, so as to improve the construction quality of the surface asphalt wearing layer.

[0025] The beneficial effects of the present invention are:

[0026] The diaphragms and plate stiffeners at the bottom of the top plate of the steel box girder are perpendicular to each other and distributed in a grid pattern, which can provide good support for the top plate of the steel box girder and the composite bridge deck to ensure the stability of the composite bridge deck. The plate stiffeners increase the stiffness of the steel bridge deck before it forms a composite structure with the tough concrete layer, and together with the steel bridge deck form an orthotropic steel bridge deck to bear the tough concrete load.

[0027] 1) The tough concrete layer and the top plate of the steel box girder are connected by pre-welded bolts, which can significantly enhance the connection strength between the tough concrete layer and the top plate of the steel box girder. The combined structure formed by the tough concrete layer and the top plate of the steel box girder jointly bears the external load, which can greatly improve the stiffness of the bridge deck and significantly reduce the fatigue stress of the key parts of the steel bridge deck, thereby solving the problem of fatigue cracking of the steel bridge deck before reaching the service life; 2) Because the stiffness of the steel-concrete composite structure is greatly improved, the thickness of the steel bridge deck can be reduced, and the steel bridge deck does not need to use U-shaped stiffening ribs, but plate stiffening ribs, which makes the steel structure processing more convenient. 3) The steel mesh reinforces the concrete layer to make it have better toughness, and compared with the high-strength concrete composite structure, it has better ductility, which is conducive to reducing the project cost and simplifying the steel bar processing process. 4) Compared with the epoxy asphalt or cast asphalt concrete bridge deck paving scheme, when the bridge deck pavement is overhauled, the present invention only needs to replace the asphalt concrete wear layer, and there is no need to close the traffic during construction, and the lanes can be replaced, which has a significant social effect for areas with heavy traffic pressure.

[0028] The asphalt concrete wearing layer can transfer and diffuse the wheel load, increase the friction between the wheel and the pavement structure layer, reduce driving noise, improve driving comfort, and protect the tough concrete layer from the direct impact of the wheel. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0030] Figure 1 It is a structural schematic diagram of an orthotropic steel bridge deck;

[0031] Figure 2 This is the standard cross-section of the bridge;

[0032] Figure 3 This is the cross-section of the ductile steel-concrete composite structure bridge deck;

[0033] Figure 4 This is the longitudinal section of the ductile steel-concrete composite structure bridge deck;

[0034] Figure 5 Plan of the anti-rust paint painting area for steel bridge deck;

[0035] Figure 6 Schematic diagram of the structure of a cylindrical head bolt.

[0036] In the figure: 1. Bridge deck, 2. Steel box girder, 3. Asphalt concrete wearing layer, 4. Tough concrete layer, 5. Steel box girder top plate, 6. Transverse steel bars, 7. Studs, 8. Longitudinal steel bars, 9. Plate stiffeners, 10. Steel box girder cross diaphragms. DETAILED DESCRIPTION

[0037] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0038] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0039] like Figure 1 and Figure 2 As shown, a ductile steel-concrete composite bridge deck comprises:

[0040] The steel box girder is used for bearing loads. Its top plate constitutes the supporting plane of the bridge deck. A number of diaphragms and a number of plate-type stiffening ribs are arranged on the opposite side of the supporting plane. The diaphragms are parallel to each other and perpendicular to the top plate. The plate-type stiffening ribs are plate-shaped structures. The plate-type stiffening ribs are parallel to each other and perpendicular to the diaphragms and the top plate.

[0041] A tough concrete layer, comprising a concrete layer and a steel mesh layer embedded in the concrete layer, wherein the concrete layer and the top plate of the steel box girder are connected via a bolt assembly pre-welded on the top plate;

[0042] Asphalt concrete wearing course is laid flat on the tough concrete layer.

[0043] The diaphragms and plate stiffeners at the bottom of the top plate of the steel box girder are perpendicular to each other and distributed in a grid pattern, which can provide good support for the top plate of the steel box girder and the composite bridge deck to ensure the stability of the composite bridge deck. The plate stiffeners increase the stiffness of the steel bridge deck before it forms a composite structure with the tough concrete layer, and together with the steel bridge deck form an orthotropic steel bridge deck to bear the tough concrete load.

[0044] The connection between the tough concrete layer and the steel box girder top plate is connected by pre-welded bolts, which can significantly enhance the connection strength between the tough concrete layer and the steel box girder top plate. The combined structure of the tough concrete layer and the steel box girder top plate jointly bears the external load, which can greatly improve the stiffness of the bridge deck and significantly reduce the fatigue stress of the key parts of the steel bridge deck, thereby solving the problem of fatigue cracking of the steel bridge deck before reaching its service life; 2) Because the stiffness of the steel-concrete composite structure is greatly improved, the thickness of the steel bridge deck can be reduced, and the steel bridge deck does not need to use U-shaped stiffening ribs, but plate stiffening ribs, which makes the steel structure processing more convenient. 3) The steel mesh reinforces the concrete layer, making it have better toughness, and compared with the high-strength concrete composite structure, it has better ductility, which is conducive to reducing the project cost and simplifying the steel bar processing technology.

[0045] The asphalt concrete wearing layer can transfer and diffuse the wheel load, increase the friction between the wheel and the pavement structure layer, reduce driving noise, and protect the tough concrete layer from the direct impact of the wheel.

[0046] In some embodiments, the thickness of the top plate of the steel box girder is 10-12 mm. The top plate of the steel box girder is a component of the top surface of the bridge section. After forming a combined structure with the tough concrete, it participates in the force together. It is also a template for cast-in-place tough concrete. When the top plate has sufficient thickness, it can provide sufficient support. Compared with the national standard that the thickness of the steel bridge deck should be no less than 14 mm, the thickness of the top plate of the steel box girder in the present invention is required to be 10-12 mm, which can save costs.

[0047] In some embodiments, the thickness of the tough concrete layer is 5-8 cm. The tough concrete layer increases the rigidity of the steel bridge deck, forms a combined structure with the steel bridge deck, and participates in the force transmission to transfer the secondary dead load, wheel load, etc.

[0048] In some embodiments, the steel mesh is composed of a plurality of transverse steel bars arranged side by side and a plurality of longitudinal steel bars arranged side by side, the diameters of the transverse steel bars and the longitudinal steel bars are 8-12 mm, and the distance between two adjacent transverse steel bars or two adjacent longitudinal steel bars is 120-130 mm. The steel mesh composed of the transverse steel bars and the longitudinal steel bars can further increase the toughness and tensile strength of the concrete structure.

[0049] The transverse steel bars are steel bars parallel to the width direction of the bridge deck, and the longitudinal steel bars are steel bars parallel to the length direction of the bridge deck.

[0050] Furthermore, the transverse steel bars and longitudinal steel bars are both HRB400 grade steel bars.

[0051] Furthermore, the transverse reinforcement is located above the longitudinal reinforcement. The formed composite bridge deck structure is subjected to transverse force, and it is more advantageous to arrange the transverse reinforcement above the reinforcement.

[0052] Furthermore, the net protective layer thickness of all transverse reinforcement and all longitudinal reinforcement is 10-20mm. The net protective layer is the distance from the outer edge of the reinforcement to the concrete surface, which is used to protect the reinforcement from corrosion by air and water, or the corrosion rate is acceptable during the service life.

[0053] In some embodiments, the peg assembly includes a plurality of pegs, and the plurality of pegs are evenly distributed on the top plate.

[0054] Furthermore, the distance between adjacent studs is 100-200 mm.

[0055] Furthermore, the diameter of the bolt is φ13, and the bolt is vertically welded on the top plate of the steel box beam, and the height of the bolt is 5-10mm less than the thickness of the tough concrete layer. The purpose of the bolt is to connect the steel plate and the tough concrete layer to play a role in shear resistance and anti-lifting, so the height must be lower than the thickness of the concrete layer, but it cannot be too short. Considering that the tough concrete layer is thin, the height of the nail is 5-10mm less than the thickness of the tough concrete layer.

[0056] In some embodiments, the thickness of the asphalt concrete wearing layer is 3-5 cm. It transmits and diffuses wheel loads, increases friction between wheels and pavement structure layers, reduces driving noise, and protects the tough concrete layer from direct action of wheels.

[0057] In some embodiments, the plate-shaped stiffening rib includes a plate body, a first reinforcement body and a second reinforcement body. The first reinforcement body is connected to the intersection of the plate body and the steel box girder top plate, and the second reinforcement body is connected between one end of the plate body away from the steel box girder top plate and the steel box girder top plate.

[0058] The first reinforcement body and the second reinforcement body can respectively reinforce the root of the plate body and the end away from the top plate of the steel box girder to improve the reinforcement effect of the plate-shaped stiffening rib.

[0059] Furthermore, the first reinforcement body is in the shape of a quarter cylinder, and two mutually perpendicular surfaces of the first reinforcement body are respectively welded to the plate body and the top plate of the steel box beam.

[0060] The tough steel-concrete composite bridge deck structure has the following characteristics: 1) The stiffness of the bridge deck is greatly improved, and the fatigue stress of the key parts of the steel bridge deck is greatly reduced, thereby solving the problem of fatigue cracking of the steel bridge deck before reaching its service life; 2) Because the stiffness of the steel-concrete composite structure is greatly improved, the steel bridge deck does not need to use U-shaped stiffening ribs, but plate-type stiffening ribs, which makes the steel structure processing more convenient; 3) High-toughness concrete has a ductility comparable to that of steel. After forming a composite structure with the steel bridge deck, it only needs conventional reinforcement to have good ductility, thereby reducing the project cost and simplifying the steel bar processing technology; 4) High-toughness concrete has the characteristics of harmless dispersion of cracks, and the requirement of controllable concrete cracks can be achieved without high-temperature steam curing, which greatly simplifies the construction process and makes engineering applications more convenient; 5) The construction of the wearing layer is the same as that of conventional asphalt concrete, without the need for high-temperature construction, and has little pollution to the environment; 6) The price of this structural concrete material is significantly lower than that of active powder concrete, including the price of the wearing layer, which is between 800 and 1,000 yuan per square meter. During the life of the bridge, only the asphalt wearing layer needs to be replaced. Compared with epoxy asphalt or poured asphalt concrete solutions, the engineering cost of the bridge during its life can be greatly reduced.

[0061] A construction method for a ductile steel-concrete composite bridge deck comprises the following steps:

[0062] Processing, welding, anti-corrosion coating of steel structures, and welding of stud assemblies on the surface of the top plate of steel box girders;

[0063] Transport the steel structure to the site, hoist it into place, and complete the connection between the segments;

[0064] Sandblast and remove rust from the bridge deck within a set distance from the edge of the tough concrete layer, and apply anti-rust paint;

[0065] Tie up the steel mesh and pour the tough concrete. After pouring, lay the curing film for moisturizing and curing;

[0066] After the maintenance is completed, the surface of the tough concrete layer is roughened by shot blasting, and the asphalt wearing layer is constructed to obtain a composite bridge deck.

[0067] In some embodiments, the tough concrete includes a non-metallic fiber woven mesh and a cement-based matrix, the cement-based matrix is ​​doped with non-metallic short fibers, and the components of the cement-based matrix include, by mass percentage: 9%-31% water, 5%-60% cement, 5%-70% active mineral fine admixture, 20-40% fine sand, and 0-2% water reducer.

[0068] The active mineral fine admixture is at least one of materials with volcanic ash activity such as fly ash, silica powder, granulated blast furnace slag, etc., and the particle size of the fine sand is less than 0.6 mm.

[0069] The non-metallic fiber woven mesh includes a carbon fiber woven mesh, an aramid fiber woven mesh, an alkali-resistant glass fiber woven mesh, a polyvinyl alcohol fiber woven mesh, a polyethylene fiber woven mesh, or a mixed fiber woven mesh woven from the above fibers.

[0070] The non-metallic short fibers are one or more of polyvinyl alcohol fibers, polyethylene fibers, carbon fibers, and aramid fibers.

[0071] In some embodiments, the pouring temperature of the tough concrete is greater than 10° C., and the discharge temperature is greater than 26° C. This is mainly to ensure the pouring quality of the tough concrete, as too low a temperature is not conducive to the curing of the concrete.

[0072] In some embodiments, the steel box girder motor vehicle road bridge deck is not sandblasted for rust removal. After the steel bridge deck is cleaned, anti-rust paint is applied around the steel bridge deck, and then the steel mesh is constructed, and the bridge deck is thoroughly cleaned before pouring the tough concrete layer.

[0073] In some embodiments, the set distance is 45-55 cm.

[0074] Furthermore, the cleanliness after sandblasting and rust removal is Sa2.5 level, and the roughness reaches Rz50μm ~80μm.

[0075] Furthermore, the anti-rust paint is epoxy zinc-rich anti-rust paint, the thickness of the anti-rust paint applied is 80 μm, and the interface pull-out strength is not less than 5 MPa. The thickness of the anti-rust paint is the specified value of the national standard. If the interface strength is too low, the connection performance is poor.

[0076] In some embodiments, after the pouring of ductile concrete is completed, a curing film should be used for moisturizing maintenance, and the time should not be less than 5 days; during the maintenance process, the vibration of the bridge deck should be strictly controlled, construction should not be carried out near the maintenance construction block, and construction vehicles should pass slowly and at a uniform speed.

[0077] In some embodiments, the temperature during construction of the asphalt wearing course is not less than 5°C.

[0078] Specific examples:

[0079] A construction method for a ductile steel-concrete composite bridge deck comprises the following steps:

[0080] Processing, welding, anti-corrosion coating of steel structures, and welding of stud assemblies on the surface of the top plate of steel box girders;

[0081] Transport the steel structure to the site, hoist it into place, and complete the connection between the segments;

[0082] The bridge deck within the area 50cm inward from the edge of the tough concrete layer is sandblasted to remove rust. The cleanliness after sandblasting is Sa2.5, and the roughness reaches Rz50μm ~80μm. Then, epoxy zinc-rich anti-rust paint is applied. The thickness of the anti-rust paint is 80μm, and the interface tensile strength is 5MPa.

[0083] Tie up the steel mesh and pour the tough concrete. The pouring temperature of the tough concrete is 12℃, the discharge temperature is 28℃, and the thickness of the tough concrete is 7cm. After the pouring is completed, lay the curing film for moisturizing and curing. The curing time is 5 days. During the curing process, the vibration of the bridge deck should be strictly controlled. Construction should not be carried out near the curing construction block. Construction vehicles should pass slowly and at a uniform speed.

[0084] After the maintenance is completed, the surface of the tough concrete layer is roughened by shot blasting, and the asphalt wearing layer is constructed. The thickness of the asphalt wearing layer is 4 cm to obtain a composite bridge deck.

[0085] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A construction method for a tough steel-concrete composite bridge deck, characterized in that: The method comprises the following steps: processing, welding, anti-corrosion coating of the steel structure, and welding the stud assembly on the surface of the top plate of the steel box beam; Transport the steel structure to the site, hoist it into place, and complete the connection between the segments; Sandblast and remove rust from the bridge deck within a set distance from the edge of the tough concrete layer, and apply anti-rust paint; Tie up the steel mesh and pour the tough concrete. After pouring, lay the curing film for moisturizing and curing; After the maintenance is completed, the surface of the tough concrete layer is subjected to shot blasting and roughening, and the asphalt wearing layer is constructed to obtain a composite bridge deck; The construction of the wearing layer is the same as that of conventional asphalt concrete, and high temperature construction is not required. After the pouring of the tough concrete is completed, a curing film should be used for moisturizing maintenance, and the time should not be less than 5 days; The pouring temperature of tough concrete is greater than 10°C, and the discharge temperature is greater than 26°C; The steel box girder motorway bridge deck is not sandblasted for rust removal. After the steel bridge deck is cleaned, anti-rust paint is applied around the steel bridge deck, followed by steel mesh construction, and the bridge deck is thoroughly cleaned before pouring the tough concrete layer; The cleanliness after sandblasting and rust removal is Sa2.5, and the roughness reaches Rz50μm ~80μm; The anti-rust paint is epoxy zinc-rich anti-rust paint, the thickness of the anti-rust paint applied is 80 μm, and the interface pull-out strength is not less than 5 MPa; The ductile steel-concrete composite bridge deck includes: The steel box girder is used for bearing loads. Its top plate constitutes the supporting plane of the bridge deck. A number of diaphragms and a number of plate-type stiffening ribs are arranged on the opposite side of the supporting plane. The diaphragms are parallel to each other and perpendicular to the top plate. The plate-type stiffening ribs are plate-shaped structures. The plate-type stiffening ribs are parallel to each other and perpendicular to the diaphragms and the top plate. A tough concrete layer, comprising a concrete layer and a steel mesh layer embedded in the concrete layer, wherein the concrete layer and the top plate of the steel box girder are connected via a bolt assembly pre-welded on the top plate; Asphalt concrete wearing course is laid flat on the tough concrete layer.

2. The construction method of the toughened steel-concrete composite bridge deck according to claim 1 is characterized in that: The thickness of the top plate of the steel box beam is 10-12 mm; the thickness of the tough concrete layer is 5-8 cm; and the thickness of the asphalt concrete wear layer is 3-5 cm.

3. The construction method of the toughened steel-concrete composite bridge deck according to claim 1 is characterized in that: The steel mesh is composed of a number of transverse steel bars and a number of longitudinal steel bars arranged side by side. The diameters of the transverse steel bars and the longitudinal steel bars are 8-12mm, and the distance between two adjacent transverse steel bars or two adjacent longitudinal steel bars is 120-130mm.

4. The construction method of the toughened steel-concrete composite bridge deck according to claim 3 is characterized by: The transverse steel bars are located above the longitudinal steel bars, and the net protective layer thickness of all transverse steel bars and all longitudinal steel bars is 10-20 mm.

5. The construction method of the toughened steel-concrete composite bridge deck according to claim 1 is characterized in that: The diameter of the stud is φ13, and the stud is vertically welded to the top plate of the steel box girder. The height of the stud is 5-10 mm smaller than the thickness of the tough concrete layer.

6. The construction method of the toughened steel-concrete composite bridge deck according to claim 1 is characterized in that: The plate-type stiffening rib comprises a plate body, a first reinforcement body and a second reinforcement body. The first reinforcement body is connected to the intersection of the plate body and the steel box girder top plate, and the second reinforcement body is connected between one end of the plate body away from the steel box girder top plate and the steel box girder top plate.

7. The construction method of the toughened steel-concrete composite bridge deck according to claim 1 is characterized in that: The temperature during the construction of asphalt wearing course shall not be lower than 5°C.

Citation Information

Patent Citations

  • Bridge deck pavement method

    CN104562888A

  • Steel box girder of steel structure bridge

    CN104562917A

  • Reinforcing method of orthotropic steel box girder bridge deck slab

    CN106758878A

  • Light combined bridge floor structure with longitudinal open stiffening ribs

    CN203613459U

  • Tough reinforced concrete combined bridge deck

    CN209854528U