A vertical stainless steel water meter case and its production process

The vertical stainless steel water meter case is produced through stainless steel materials and welding processes, which solves the problems of pollution of lead brass case and the complex and energy-consuming casting process, and realizes environmentally friendly, efficient and automated water meter case production.

CN110017876BActive Publication Date: 2024-11-19NINGBO NINGSHUI INSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910410111.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-16
Publication Date
2024-11-19
Estimated Expiration
2039-05-16

AI Technical Summary

Technical Problem

The existing water meter case material is lead brass, which has problems with rust oxidation and heavy metal pollution. The casting process is complex and energy-consuming, and the quality is defective.

Method used

The vertical stainless steel water meter case is produced through laser cutting and welding processes, which is decomposed into multiple parts and combined welding, simplifying the production process and increasing automation control functions.

Benefits of technology

It realizes an environmentally friendly and pollution-free water meter case, which is corrosion-resistant and wear-resistant, has high production efficiency, is suitable for mass production, and realizes automated water flow control through ball valves and valve stems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110017876B_ABST
    Figure CN110017876B_ABST
Patent Text Reader

Abstract

A vertical stainless steel water meter case and its production process, including: a case body, the surface of which is provided with a water inlet and a water outlet; a movement positioning plate, used to position the water meter movement; a cover connecting sleeve, used to connect with the water meter cover; a case sealing piece, used to seal the case body; an inlet and outlet water conduit, the upper and lower ends of which are respectively connected to an external water pipe; a connecting pipe, used to transport water back and forth between the inlet and outlet water conduit and the case body. Then, the stainless steel plate and the stainless steel round tube are manufactured into various parts by extrusion, stamping and laser cutting, and then laser welded into the whole case. The water meter case is made of stainless steel material, which is environmentally friendly and pollution-free, and the material is corrosion-resistant, wear-resistant, high-strength, and has a long service life. The production process is simple, the production efficiency is high, and it is suitable for mass production. At the same time, a ball valve and a valve stem are also installed in the water meter case, and the ball valve and the valve stem can realize the automatic control of the internal water flow.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a water meter case, in particular to a vertical stainless steel water meter case and a production process thereof. Background Art

[0002] The existing water meter cases are basically formed in one piece by casting, which has the following problems: 1. The basic material of the water meter cases formed by casting is mostly lead brass metal, and copper will rust and oxidize to varying degrees after long-term contact with water. Lead brass contains heavy metal lead, which will directly pollute the water quality. 2. Since the volume of the water meter case is relatively large, if the casting is too heavy, the wall thickness of the case will be uneven, and there will be quality defects such as casting sand holes and pores, which seriously affect the product quality. 3. Since the water meter case has many curved surfaces and complex structures, the casting process is relatively complicated, and the casting process requires a large amount of labor and energy consumption, which is not conducive to energy saving and environmental protection. Summary of the invention

[0003] In order to overcome the above-mentioned deficiencies in the prior art, the present invention provides a vertical stainless steel water meter case and a production process thereof, which can replace the casting process to achieve simplified production of the water meter case.

[0004] The technical solution of the present invention to solve the technical problem is: a vertical stainless steel water meter case, comprising:

[0005] The case body has a water inlet and a water outlet on its surface, and the water outlet is located directly above the water inlet;

[0006] A movement positioning plate, used for positioning the water meter movement, is located in the meter case body and just separates the water outlet and the water inlet;

[0007] A meter cover connecting sleeve, used to connect with the water meter cover, with a first thread connected to the water meter case at its upper end and a lower end connected to the case body;

[0008] A case sealing piece, used to seal the case body, connected to the bottom end of the case body;

[0009] The inlet and outlet water conduit has upper and lower ends connected to the external water pipe respectively, and a connection port is provided on the surface of the inlet and outlet water conduit, and a water dividing spacer is provided in the connection port, and the water dividing spacer divides the connection port into a water inlet cavity and a water outlet cavity;

[0010] A connecting pipe is used to transport water back and forth between the water inlet and outlet conduits and the case body. A water dividing baffle is provided in the connecting pipe, and the water dividing baffle divides the connecting pipe into a water inlet portion and a water outlet portion. The water dividing baffle and the water inlet portion form a water inlet channel, and the water dividing baffle and the water outlet portion form a water outlet channel. One end of the water inlet channel is connected to the water inlet cavity, and the other end of the water inlet channel is connected to the water inlet, one end of the water outlet channel is connected to the water outlet cavity, and the other end of the water outlet channel is connected to the water outlet.

[0011] Preferably, the water inlet and outlet conduits include a first conduit and a second conduit, and the connecting port is arranged on the first conduit.

[0012] Preferably, the first conduit and the second conduit are connected via a valve mounting seat, the valve mounting seat is provided with a valve stem mounting platform, the valve stem mounting platform is provided with a valve stem, a ball valve is provided in the valve mounting seat, one end of the valve stem passes through the valve stem mounting platform and extends into the valve mounting seat to be connected with the ball valve.

[0013] Preferably, a first sealing ring is provided between the first conduit and the valve mounting seat, a second sealing ring is provided between the second conduit and the valve mounting seat, and a third sealing ring is provided between the valve stem and the valve stem mounting platform.

[0014] Preferably, the first conduit is provided with a second thread connected to an external water inlet pipe, and the second conduit is provided with a third thread connected to an external water outlet pipe.

[0015] Preferably, a lead sealing welding piece is provided at the joint between the connecting pipe and the case body.

[0016] Preferably, the movement positioning plate is provided with a positioning groove for positioning the movement.

[0017] A production process for the above-mentioned vertical stainless steel water meter case:

[0018] 1) Cut the stainless steel round tube into the required length of the round tube section by laser to form the main body blank of the watch case, and then cut the water inlet and outlet on the main body blank of the watch case by laser, and extrude the arc at the bottom of the main body blank of the watch case by hydraulic press to form the sealing hole;

[0019] 2) Punch out the watch case seal from the stainless steel plate through a punching machine, place the watch case seal in the position that coincides with the seal hole, and then weld it with a laser;

[0020] 3) The stainless steel plate is punched by a punching machine to form a movement positioning plate, the movement positioning plate is placed in the case body and separates the water outlet and the water inlet, and then laser welded;

[0021] 4) Cut the stainless steel pipe into pipe sections of required length, turn the first thread on the upper end of the pipe section, turn the lower end to match the inner wall of the case body to form a case connecting sleeve, insert the case connecting sleeve into the upper end of the case body, and weld the connection between the two by laser;

[0022] 5) The stainless steel pipe is cut by laser to form the water inlet and outlet conduits, and then the connection port is cut on the surface of the water inlet and outlet conduits by laser, and the stainless steel plate is punched out with a water dividing spacer by a punching machine, and then the water dividing spacer is placed in the connection port, and laser welding is performed to form a water outlet cavity at the upper end and a water inlet cavity at the lower end;

[0023] 6) Punch the stainless steel plate through a punching machine to form a water dividing baffle, punch the stainless steel plate through a punching machine and extrude it through a hydraulic press to form a water inlet and a water outlet, first weld the water inlet with the water dividing baffle by laser, then match the water inlet with one end of the water dividing baffle and the water inlet and then weld them by laser, then match the water inlet with the other end of the water dividing baffle and the water inlet cavity and then weld them by laser, at the same time, weld the water dividing baffle with the water dividing spacer by laser, and finally weld the water outlet with the water dividing baffle, the water outlet and the water outlet cavity by laser respectively;

[0024] 7) Grind each soldering point and interface, and finally polish them.

[0025] As a preferred embodiment, the water inlet and outlet conduits are divided into three parts, namely, a first conduit, a second conduit and a valve mounting seat, and then the three parts are processed separately and then welded;

[0026] 1) First, the stainless steel tube is cut by laser to form the first conduit, the second conduit and the valve mounting seat;

[0027] 2) The valve mounting seat is punched by a punching machine to form a ball valve cavity for installing the ball valve, and then the valve stem through hole is cut on the valve mounting seat by laser;

[0028] 3) Cut the stainless steel cylinder into a valve stem mounting platform blank by laser, drill the valve stem through hole on the valve stem mounting platform blank by a rocker drill, and then form the valve stem mounting platform by turning. The valve stem mounting platform and the valve mounting seat are laser welded, and the ball valve is placed in the ball valve cavity. The valve stem passes through the valve stem through hole and is connected to the ball valve;

[0029] 4) Place the first conduit at the position where it coincides with the valve mounting seat and weld it by laser, and place the second conduit at the position where it coincides with the valve mounting seat and weld it by laser.

[0030] The beneficial effects of the present invention are as follows: 1. The water meter case is made of stainless steel material, which is environmentally friendly and pollution-free, and the material is corrosion-resistant, wear-resistant, high-strength and has a long service life. 2. The water meter case is welded together by various components, and the overall production process is simple, the labor intensity is low, the production efficiency is high, and it is suitable for mass production. 3. A ball valve and a valve stem are also installed in the water meter case, and the ball valve and the valve stem can realize the automatic control of the internal water flow. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is an exploded view of the first embodiment of the present invention.

[0032] Figure 2 It is a structural diagram of the watch case main body of the present invention.

[0033] Figure 3 It is an overall structural diagram of the first embodiment of the present invention.

[0034] Figure 4 It is a half-section view of the first embodiment of the present invention.

[0035] Figure 5 It is an exploded view of the second embodiment of the present invention.

[0036] Figure 6 It is an overall structural diagram of the second embodiment of the present invention. DETAILED DESCRIPTION

[0037] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0038] Embodiment 1:

[0039] Reference Figure 1 to Figure 4 , a vertical stainless steel water meter case, comprising:

[0040] The case body 1 has a water inlet 2 and a water outlet 3 on its surface, and the water outlet 2 is located directly above the water inlet 3;

[0041] The movement positioning plate 4 is used to position the water meter movement. It is located in the case body 1 and just separates the water outlet 2 and the water inlet 3. After the water meter movement is fixed on the movement positioning plate 4, external water can enter through the water inlet 3 and then pass through the water meter movement and then be discharged from the water outlet 2, so as to realize the water quantity statistical display function of the water meter movement;

[0042] The meter cover connecting sleeve 5 is used to connect with the water meter cover, and the upper end thereof is provided with a first thread 6 connected with the water meter case. The first thread 6 is connected with the water meter cover, and the water meter movement in the case body 1 can be completely shielded and sealed, thereby ensuring the working stability of the water meter movement, and the lower end thereof is connected with the case body 1;

[0043] The case sealing piece 7 is used to seal the case body, and is connected to the bottom end of the case body 1. The case sealing piece 7 can completely seal the bottom of the case body 1, thereby achieving the overall sealing of the inside of the case body 1 and ensuring the stability of the water meter movement;

[0044] The upper and lower ends of the water inlet and outlet conduit 8 are connected to external water pipes respectively, so as to realize the discharge of external water. The surface of the water inlet and outlet conduit 8 is provided with a connection port 9, and a water dividing spacer 10 is provided on the connection port 9. The water dividing spacer 10 divides the connection port 9 into a water inlet cavity 11 and a water outlet cavity 12, so that external water can enter the watch case body 1 through the water inlet cavity 11 and then be discharged through the water outlet cavity 12;

[0045] The connecting pipe 13 is used to transport water back and forth between the water inlet and outlet conduits 8 and the case body 1. A water dividing baffle 16 is provided inside the connecting pipe 13. The water dividing baffle 16 divides the connecting pipe 13 into a water inlet portion 14 and a water outlet portion 15. The water dividing baffle 16 and the water inlet portion 15 form a water inlet channel 17. The water dividing baffle 16 and the water outlet portion 15 form a water outlet channel 18. One end of the water inlet channel 17 is connected to the water inlet cavity 11, and the other end of the water inlet channel 17 is connected to the water inlet port 2. One end of the water outlet channel 18 is connected to the water outlet cavity 12, and the other end of the water outlet channel is connected to the water outlet port 2. Thus, external water enters the water inlet channel 17 from the water inlet cavity 11, then enters the case body 1 through the water inlet port 3, flows through the water meter movement, then enters the water outlet channel 18 from the water outlet port 2, and finally is discharged to the external water outlet pipe through the water outlet cavity 12.

[0046] In this embodiment, the lower end of the water inlet and outlet conduit 8 is provided with a second thread 19 connected to the external water inlet pipe, and the upper end of the water inlet and outlet conduit 8 is provided with a third thread 20 connected to the external water outlet pipe. After the threaded connection, the disassembly and assembly between the water inlet and outlet conduit 8 and the external water pipe is very simple, which is convenient for subsequent maintenance.

[0047] In this embodiment, a lead seal welding piece 21 is provided at the joint between the connecting pipe 13 and the housing body 1. The lead seal welding piece 21 can ensure the integrity of the overall sealing of the water meter and prevent malicious tampering with the water volume value of the internal movement of the water meter.

[0048] In this embodiment, a positioning groove 22 for positioning the movement is provided on the movement positioning plate 4. The positioning groove 22 can ensure that the movement is more stable and will not shake or shift when water flows through, thereby affecting the water volume counting.

[0049] When installing water pipes, vertically installed water pipes must be used in certain specific environments, so the water meter case must also be able to meet this requirement. The water meter case just meets the above requirements, is more convenient to use and install, and the internal structure makes the water inlet and outlet distribution clearer and simpler, making the water input and output through the water meter case smoother.

[0050] A production process for the above-mentioned vertical stainless steel water meter case:

[0051] 1) Cut the stainless steel round tube into the required length of the round tube section by laser to form the watch case body 1 blank, then cut the water inlet 3 and the water outlet 2 on the watch case body 1 blank by laser, and extrude an arc at the bottom end of the watch case body blank by hydraulic press to form a sealing hole;

[0052] 2) Punch out the watch case seal 7 from the stainless steel plate through a punching machine, place the watch case seal 7 in the position that coincides with the seal hole, and then weld it with a laser;

[0053] 3) The stainless steel plate is punched by a punching machine to form a movement positioning plate 4, the movement positioning plate 4 is placed in the case body 1 and separates the water outlet 2 and the water inlet 3, and then laser welded;

[0054] 4) Cut the stainless steel pipe into pipe sections of required length, turn the first thread 6 on the upper end of the pipe section, turn the lower end to match the inner wall of the case body 1 to form a case connecting sleeve 5, insert the case connecting sleeve 5 into the upper end of the case body 1, and weld the connection between the two by laser;

[0055] 5) The stainless steel pipe is cut by laser to form the water inlet and outlet conduits 8, and then the connection port 9 is cut on the surface of the water inlet and outlet conduits 8 by laser, and the stainless steel plate is punched out with a water dividing spacer 10 by a punching machine, and then the water dividing spacer is placed in the connection port 9, and laser welding is performed to form a water outlet cavity 12 at the upper end and a water inlet cavity 11 at the lower end;

[0056] 6) Punching a stainless steel plate by a punching machine to form a water dividing baffle 16, punching a stainless steel plate by a punching machine and extruding a hydraulic press to form a water inlet 14 and a water outlet 15, firstly welding the water inlet 14 to the water dividing baffle 16 by laser, then matching one end of the water inlet 14 and the water dividing baffle 16 with the water inlet and then welding them by laser, then matching the other end of the water inlet 14 and the water dividing baffle 16 with the water inlet chamber 11 and then welding them by laser, at the same time, welding the water dividing baffle 16 to the water dividing spacer 10 by laser, and finally welding the water outlet 15 to the water dividing baffle 16, the water outlet 2 and the water outlet chamber 12 by laser respectively;

[0057] 7) Grind each soldering point and interface, and finally polish them.

[0058] By dividing the water meter case into multiple parts and then welding them together, the production process is simpler and clearer than the traditional casting process. It does not involve very complex curved surfaces, and each process step can achieve mass production, thereby improving production efficiency.

[0059] At the same time, all components are made of stainless steel, which has high strength, corrosion resistance, and will not pollute the water quality, meeting the current requirements of energy conservation and environmental protection.

[0060] Of course, the shell of the water meter can also be made of materials similar to stainless steel, such as high-quality carbon steel, and its structure and process are exactly the same as those of stainless steel.

[0061] Embodiment 2:

[0062] refer to Figure 5-6 In this embodiment, based on the first embodiment, the inlet and outlet water conduits 8 are divided into a first conduit 23 , a second conduit 24 and a valve mounting seat 25 , and a valve assembly is installed in the valve mounting seat 25 .

[0063] In this embodiment, the valve mounting seat 25 is further provided with a valve stem mounting platform 26, the valve stem mounting platform 26 is provided with a valve stem 27, a ball valve 28 is provided in the valve mounting seat 25, and one end of the valve stem 27 passes through the valve stem mounting platform 26 and extends into the valve mounting seat 25 to be connected with the ball valve 28. After the valve stem and the ball valve 28 are installed, the opening and closing of the valve can be controlled by an external intelligent terminal, thereby realizing automatic control of the internal water flow, which is convenient for people to use.

[0064] In this embodiment, a first sealing ring 29 is provided between the first conduit 23 and the valve mounting seat 25, a second sealing ring 30 is provided between the second conduit 24 and the valve mounting seat 25, and a third sealing ring 31 is provided between the valve stem 27 and the valve stem mounting platform 26. The sealing between the parts is ensured by the sealing rings, thereby ensuring the stability and sealing of the internal water flow during transmission.

[0065] Valve assembly assembly and production process

[0066] 1) First, a stainless steel tube is cut by laser to form a first conduit 23, a second conduit 24 and a valve mounting seat 25;

[0067] 2) The valve mounting seat 25 is punched by a punching machine to form a ball valve cavity for mounting the ball valve, and then a valve stem through hole is cut on the valve mounting seat 25 by laser;

[0068] 3) Cut the stainless steel cylinder into a blank of the valve stem mounting platform 26 by laser, drill the valve stem through hole on the blank of the valve stem mounting platform 26 by a radial drill, and then form the valve stem mounting platform 26 by turning, install the third sealing ring 31 in the valve stem mounting platform 26, weld the valve stem mounting platform 26 and the valve mounting seat 25 by laser, put the ball valve 28 into the ball valve cavity, and pass the valve stem 27 through the valve stem through hole and connect it to the ball valve;

[0069] 4) Place the first conduit 24 in the position where it coincides with the valve mounting seat 2, install the first sealing ring 29, and perform laser welding; place the second conduit in the position where it coincides with the valve mounting seat, install the second sealing ring 30, and perform laser welding.

[0070] Through this embodiment, a vertical stainless steel water meter case with a valve can be realized, which, while having the advantages of the first embodiment, can also be controlled by an intelligent terminal, so that people can control the water used anytime and anywhere, thus saving water resources.

[0071] The above embodiment is only one of the more preferred solutions of this patent. Any changes that do not depart from the scope of this technical solution are within the scope of this patent.

Claims

1. A vertical stainless steel water meter case, characterized in that: include: The case body has a water inlet and a water outlet on its surface, and the water outlet is located directly above the water inlet; A movement positioning plate, used for positioning the water meter movement, is located in the meter case body and just separates the water outlet and the water inlet; A meter cover connecting sleeve, used to connect with the water meter cover, with a first thread connected to the water meter case at its upper end, and a lower end connected to the case body; A case sealing piece, used to seal the case body, connected to the bottom end of the case body; The inlet and outlet water conduit has upper and lower ends connected to the external water pipe respectively, and a connection port is provided on the surface of the inlet and outlet water conduit, and a water dividing spacer is provided in the connection port, and the water dividing spacer divides the connection port into a water inlet cavity and a water outlet cavity; A connecting pipe, used for transporting water back and forth between the water inlet and outlet conduits and the case body, wherein a water dividing baffle is provided in the connecting pipe, and the water dividing baffle divides the connecting pipe into a water inlet portion and a water outlet portion, and the water dividing baffle and the water inlet portion form a water inlet channel, and the water dividing baffle and the water outlet portion form a water outlet channel, one end of the water inlet channel is connected to the water inlet cavity, and the other end of the water inlet channel is connected to the water inlet, one end of the water outlet channel is connected to the water outlet cavity, and the other end of the water outlet channel is connected to the water outlet; the water inlet and outlet conduits include a first conduit and a second conduit, and the connecting port is arranged on the first conduit; The first conduit and the second conduit are connected via a valve mounting seat, the valve mounting seat is provided with a valve stem mounting platform, the valve stem mounting platform is provided with a valve stem, a ball valve is provided in the valve mounting seat, one end of the valve stem passes through the valve stem mounting platform and extends into the valve mounting seat to be connected with the ball valve; The production process of the vertical stainless steel water meter case includes the following steps: 1) Cut the stainless steel round tube into the required length of the round tube section by laser to form the main body of the watch case, and then cut the water inlet and outlet on the main body of the watch case by laser. The bottom end of the main body of the watch case is squeezed out by a hydraulic press to form a sealing hole; 2) Punch out the watch case seal from the stainless steel plate through a punching machine, place the watch case seal in the position that coincides with the seal hole, and then weld it with a laser; 3) The stainless steel plate is punched by a punching machine to form a movement positioning plate, the movement positioning plate is placed in the case body and the water outlet and the water inlet are separated, and then laser welding is performed; 4) Cut the stainless steel pipe into pipe sections of required length, turn the first thread on the upper end of the pipe section, turn the lower end to match the inner wall of the case body to form a case connecting sleeve, insert the case connecting sleeve into the upper end of the case body, and weld the connection between the two by laser; 5) The stainless steel pipe is cut by laser to form the water inlet and outlet conduits, and then the connection port is cut on the surface of the water inlet and outlet conduits by laser, and the stainless steel plate is punched out with a water dividing spacer by a punching machine, and then the water dividing spacer is placed in the connection port, and laser welding is performed to form a water outlet cavity at the upper end and a water inlet cavity at the lower end; 6) Punch the stainless steel plate through a punching machine to form a water dividing baffle, punch the stainless steel plate through a punching machine and extrude it through a hydraulic press to form a water inlet and a water outlet, first weld the water inlet with the water dividing baffle by laser, then match the water inlet with one end of the water dividing baffle and the water inlet and then weld them by laser, then match the water inlet with the other end of the water dividing baffle and the water inlet cavity and then weld them by laser, at the same time, weld the water dividing baffle with the water dividing spacer by laser, and finally weld the water outlet with the water dividing baffle, the water outlet and the water outlet cavity by laser respectively; 7) Grind each welding point and interface, and finally polish it; divide the inlet and outlet water conduit into three parts: the first conduit, the second conduit and the valve mounting seat, and then process the three parts separately and then weld them together. The specific steps are as follows: 7.1) First, the stainless steel tube is cut by laser to form the first conduit, the second conduit and the valve mounting seat; 7.2) The valve mounting seat is punched by a punching machine to form a ball valve cavity for mounting the ball valve, and then the valve stem through hole is cut on the valve mounting seat by laser; 7.3) Cut the stainless steel cylinder into a valve stem mounting platform blank by laser, drill the valve stem through hole on the valve stem mounting platform blank by a rocker drill, and then form the valve stem mounting platform by turning. The valve stem mounting platform and the valve mounting seat are laser welded, and the ball valve is placed in the ball valve cavity. The valve stem passes through the valve stem through hole and is connected to the ball valve; 7.4) Place the first conduit in the position where it coincides with the valve mounting seat and weld it by laser. Place the second conduit in the position where it coincides with the valve mounting seat and weld it by laser.

2. The vertical stainless steel water meter case according to claim 1, characterized in that: A first sealing ring is arranged between the first conduit and the valve mounting seat, a second sealing ring is arranged between the second conduit and the valve mounting seat, and a third sealing ring is arranged between the valve stem and the valve stem mounting platform.

3. The vertical stainless steel water meter case according to claim 1, characterized in that: The first conduit is provided with a second thread connected to an external water inlet pipe, and the second conduit is provided with a third thread connected to an external water outlet pipe.

4. The vertical stainless steel water meter case according to claim 1, characterized in that: A lead sealing welding piece is provided at the joint between the connecting pipe and the watch case body.

5. The vertical stainless steel water meter case according to claim 1, characterized in that: The movement positioning plate is provided with a positioning groove for positioning the movement.