A prefabricated component production line

By introducing a temporary storage unit for table molds into the prefabricated component production line, the production process is divided into a non-fixed production rhythm area and a fixed area, which solves the problem of uneven production rhythm of different types and sizes of prefabricated components and achieves the adaptability and efficiency of the production line. Improvement ensures 24-hour uninterrupted production.

CN110303590BActive Publication Date: 2024-10-22CHENZHOU GRAND RESIDENCE IND CO LTD
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN201910706823.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-01
Publication Date
2024-10-22
Estimated Expiration
2039-08-01

AI Technical Summary

Technical Problem

When the existing prefabricated component production line produces different types or personalized customized parts, it is difficult to coordinate the operation time of installing molds and arranging steel bars/embedded parts stations, resulting in uneven production rhythm, causing congestion in the production line and reduced production capacity.

Method used

A prefabricated component production line is designed, including a first assembly line, a second assembly line, a third assembly line, a fourth assembly line, a fifth assembly line, a table mold ferry mechanism and a table mold temporary storage unit. The production process is divided into table mold temporary storage units. Unfixed areas and fixed areas for production rhythm ensure that prefabricated components of different types and sizes can be produced according to set time intervals and improve the adaptability of the production line.

Benefits of technology

It achieves 24-hour uninterrupted operation of the production line, reduces labor intensity, avoids blockage of the production line and reduced efficiency, ensures the consistency of the production rhythm, and adapts to the production needs of prefabricated components of different types and sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110303590B_ABST
    Figure CN110303590B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated component production line, which includes a first assembly line, a second assembly line, a third assembly line, a fourth assembly line, a fifth assembly line, a curing unit and a table mold temporary storage unit; a demoulding station is arranged on the first assembly line, one end of which is connected with the curing unit, and the other end is connected with one end of the second assembly line through a table mold ferrying mechanism; the other end of the second assembly line is connected with one end of the third assembly line; the other end of the third assembly line is connected with one end of the fourth assembly line through a table mold ferrying mechanism, and a reinforcement station is arranged on the fourth assembly line; the other end of the fourth assembly line is connected with the table mold temporary storage unit, and the two ends of the fifth assembly line are respectively connected with the curing unit and the table mold temporary storage unit, and a material distribution station is arranged on the fifth assembly line. The present invention improves the adaptability of the production line, and even if prefabricated components of different types or sizes are produced at the same time, it is convenient to ensure the production rhythm of the production line, which is conducive to arranging production plans.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a prefabricated component production line, belonging to the technical field of prefabricated component production. Background Art

[0002] The characteristics of the assembly line production method of prefabricated components are that the table mold / steel trolley (that is, the working platform) flows to the corresponding workstation of each process through the conveying system of the production line in the process sequence; the operators and specific work of each workstation are relatively fixed, for example, table mold cleaning, sidewall mold installation, embedded parts embedding, steel bar placement, concrete pouring, vibration and other operations are performed by relatively fixed people and equipment at fixed positions. This production process can reduce labor intensity, improve production efficiency, and save labor. Therefore, domestic prefabricated component manufacturers currently use assembly line production methods for prefabricated exterior wall panels and interior wall panels.

[0003] The existing production process of prefabricated components generally includes: cleaning molds, spraying and marking, installing molds, arranging steel bars / embedded parts, pouring and vibrating concrete, scraping concrete, pre-curing, grinding, curing in curing kilns, demoulding, hoisting, etc.

[0004] Among these processes, the operation (processing) time rhythm of pouring and vibrating concrete, scraping concrete, pre-curing, grinding, curing in curing kilns, demoulding, and hoisting stations is roughly fixed and will not change significantly due to factors such as the form and size of prefabricated components. However, the operation time of installing molds and arranging steel bars / embedded parts stations will vary greatly due to the different forms and sizes of prefabricated components, especially for customized parts that are personalized for specific construction projects. Their unconventional appearance will often prolong the operation time of installing molds and arranging steel bars / embedded parts stations. Figure 1 As shown, the production process of a typical prefabricated component production line in the prior art is as follows: the prefabricated components that have completed the entire production process are demolded (the retaining edge molds are removed) at the demolding station, and then the prefabricated components are hoisted and transferred to the finished product warehouse. The remaining table molds are transferred along the first assembly line, and mold cleaning, mold installation, steel bar arrangement, and embedded parts embedding operations are performed in sequence. During these operations, the table mold can be transferred from the first assembly line to the second assembly line through the table mold ferry mechanism. After completing the above operations, the table mold enters the material distribution station for concrete pouring and vibration, and then enters the curing kiln for curing after some post-pouring treatment. The cured table mold comes to the demolding station to complete a production cycle.

[0005] If the existing production line only produces a single prefabricated component product, it can roughly ensure that each production process is in a controllable state, and the production plan can be arranged according to the average number of prefabricated components produced in 24 hours, and the production rhythm is not easily disrupted. However, when it is necessary to produce different types of prefabricated components at the same time, especially personalized customized parts, it is difficult to coordinate the operation time of installing molds and arranging steel bars / embedded parts. For example, personalized customized parts require several times more mold installation time than conventional prefabricated components when installing molds. This will cause the subsequent conventional prefabricated component production rhythm of personalized customized parts to be disrupted, and the too slow rhythm stations will cause congestion in the production line, reducing the production capacity of the production line. Summary of the invention

[0006] In order to overcome the problems existing in the prior art, the present invention provides a prefabricated component production line, and the specific technical solution is as follows.

[0007] A prefabricated component production line, characterized in that it comprises a first assembly line, a second assembly line, a third assembly line, a fourth assembly line, a fifth assembly line, a table mold ferrying mechanism, a curing unit and a table mold temporary storage unit; a demoulding station is arranged on the first assembly line, one end of which is connected with the curing unit, and the other end is connected with one end of the second assembly line through the table mold ferrying mechanism; the other end of the second assembly line is connected with one end of the third assembly line; the third assembly line spans the curing unit and the table mold temporary storage unit, and the first assembly line is connected with ... The other end of the third assembly line is connected with one end of the fourth assembly line through the table mold ferrying mechanism, and a reinforcement distribution station is arranged on the fourth assembly line; the other end of the fourth assembly line is connected with the table mold temporary storage unit, and the two ends of the fifth assembly line are respectively connected with the maintenance unit and the table mold temporary storage unit, and a material distribution station is arranged on the fifth assembly line; the first assembly line and the fifth assembly line are respectively located on both sides of the maintenance unit, and the fifth assembly line and the fourth assembly line are respectively located on both sides of the table mold temporary storage unit.

[0008] Compared with the prior art, the above-mentioned technical solution of the present application adds a table mold temporary storage unit, so that the production cycle process of the prefabricated components can be roughly divided into two areas with the table mold temporary storage unit as the boundary, namely, the production rhythm non-fixed area and the production rhythm fixed area. The specific production process is roughly as follows: after the table mold used to produce prefabricated components is dismantled and demolded on the first assembly line, it is transferred to the second assembly line through the table mold ferrying mechanism for mold loading (sidewall mold installation), and then transported downstream through the third assembly line. The table mold on the third assembly line is transferred to the fourth assembly line through the table mold ferrying mechanism, and steel bars are arranged at the reinforcement station of the fourth assembly line. If necessary, embedded parts can also be placed at the reinforcement station; then the table mold is transferred from the fourth assembly line to the table mold temporary storage unit for temporary storage; due to the different types and sizes of prefabricated components, the above operations have large differences in time for different prefabricated components, especially the processing time of the mold loading station and the reinforcement station is significantly different. Therefore, the time required from the demoulding operation to the completion of the reinforcement arrangement and the embedding of the embedded parts can be considered uncertain, that is, the production rhythm of this part of the production line is uncertain. The pallet in the pallet temporary storage unit can be transferred to the fifth assembly line at a certain time rhythm (for example, 15 minutes). The pallet on the fifth assembly line is poured with concrete and vibrated at the material distribution station, and then enters the curing unit for curing after post-processing such as smoothing, grinding, resting, and roughening. After curing, the pallet and its prefabricated components are transferred to the first assembly line, and the sidewall mold removal and demoulding operations (prefabricated components are lifted off the pallet) are completed on the first assembly line to complete a production cycle. The operation time on the fifth assembly line and the curing unit is almost not limited by the type and size of the prefabricated components. Prefabricated components of various types and sizes can be produced at the fifth assembly line and the curing unit at the set time interval, that is, the area formed by the fifth assembly line and the curing unit can be called a fixed production rhythm area. The temporary storage unit for table molds is used to accumulate and store a certain amount of table molds, which can ensure that table molds are provided to the fifth assembly line uninterruptedly for 24 hours. In this way, the finished prefabricated components can be produced at the demoulding station of the first assembly line according to the set beat (time interval), which is completely unaffected by the changing types and sizes of prefabricated components, so that all the operation processes with unfixed production beats are located upstream of the temporary storage unit for table molds. In this case, it is only necessary to increase the production capacity of the area with unfixed production beats and ensure that there are enough table molds in the temporary storage unit for table molds to continuously produce prefabricated components. The temporary storage unit for table molds plays the role of "caching and storing water", which greatly improves the adaptability of the production line, and the production of different types of customized prefabricated components will not cause the production line to be blocked or the efficiency to be reduced.

[0009] Furthermore, more than two second assembly lines are arranged in parallel, and both ends of all the second assembly lines are connected by a table mold ferry mechanism. Different second assembly lines can be used to perform mold loading operations on different prefabricated components, and after the mold loading operations are completed, they are uniformly transferred to one of the second assembly lines, and the second assembly line is connected to the third assembly line. In this way, the production line will not be blocked due to the installation of a more complicated retaining edge mold on a single table mold.

[0010] Furthermore, the fourth assembly line is arranged in parallel with more than two, and its function is similar to that of the second assembly line. By setting more than two second assembly lines and the fourth assembly line, the number of mold installation stations and reinforcement layout stations can be increased, the production capacity of the area with unfixed production rhythm can be improved, and it is ensured that there are always enough table molds in the table mold temporary storage unit. Such an arrangement can reduce the number of personnel working in three shifts on the production line. The large number of staff required for the mold installation station and reinforcement layout station can only work during the day, that is, when they get off work during the day, it can be ensured that there are enough table molds in the table mold temporary storage unit for the production line at night. At night, the table molds in the table mold temporary storage unit are continuously transferred to the first assembly line according to a fixed rhythm. In this way, only a small number of staff need to be arranged on the fifth assembly line at night to realize 24-hour uninterrupted production of the production line, and it is not necessary for staff in all positions to work in three shifts.

[0011] Furthermore, the first assembly line and the second assembly line are arranged in parallel, and a mold library is arranged between the two. The molds removed from the first assembly line can be put into the mold library nearby, and the molds in the mold library can also be used nearby for mold loading on the second assembly line, which is conducive to improving the efficiency of mold circulation.

[0012] Furthermore, a material warehouse is provided between the third assembly line and the fourth assembly line. The material warehouse is used to temporarily store processed steel bars, embedded parts and other materials. The mold warehouse and the material warehouse are located at both ends of the entire production line, respectively, to achieve partitioned storage of materials and molds, which can significantly improve logistics efficiency and facilitate the management of materials and molds.

[0013] Furthermore, the curing unit adopts a curing kiln or a stacking curing unit. The curing kiln is a curing structure commonly used in the field of prefabricated component production technology; the stacking curing unit is usually a prefabricated component used for natural curing, and the poured concrete prefabricated components are stacked together with the table formwork to form a three-dimensional stack. The stacking process is usually completed by a crane, and the demoulding operation is performed after the natural curing time has passed.

[0014] Furthermore, the temporary storage unit for table molds includes a lifting and moving device and a plurality of accommodating spaces for accommodating table molds; or the temporary storage unit for table molds adopts a stacking storage unit. The stacking storage unit is used to stack the table molds with completed steel bar arrangement to form a three-dimensional stack, and the stacking process is usually completed by an overhead crane.

[0015] Furthermore, a first post-processing assembly line and a second post-processing assembly line are arranged in parallel between the maintenance unit and the table mold temporary storage unit. The first post-processing assembly line and the second post-processing assembly line are located between the third assembly line and the fifth assembly line. One end of the first post-processing assembly line is connected with the fifth assembly line through the table mold ferrying mechanism, and the other end of the first post-processing assembly line, one end of the second post-processing assembly line and the third assembly line are connected through the table mold ferrying mechanism, and the other end of the second post-processing assembly line is connected with the maintenance unit. The first post-processing line and the second post-processing line are used for post-processing such as scraping, grinding, resting, and roughening; different prefabricated components require different post-processing. For prefabricated components with fewer post-processing procedures, they can be directly post-processed on the fifth line and transferred to the maintenance unit for maintenance; for prefabricated components that require more post-processing procedures, they can be transferred from the fifth line to the first post-processing line and the second post-processing line for processing, preferably on the second post-processing line, and then transferred to the maintenance unit; for prefabricated components that require secondary material distribution, they can be transferred from the first post-processing line to the third line, and then carry out secondary reinforcement and secondary pre-embedding in turn, and then return to the fifth line for secondary pouring (material distribution). Therefore, setting up the first post-processing line and the second post-processing line can, on the one hand, shorten the length of the fifth line, thereby shortening the overall length of the production line, and facilitate coping with a variety of different post-processing requirements, and improve the efficiency of post-processing; on the other hand, it realizes the circulation process of secondary material distribution and enhances the adaptability of the production line.

[0016] Furthermore, the mold clearing station of the prefabricated component production line is arranged on the first assembly line and / or the second assembly line. The mold clearing station is located after the demoulding station and before the mold loading station.

[0017] Furthermore, the fourth production line passes through the maintenance unit and the table mold temporary storage unit, which is beneficial to reducing the floor space of the production line.

[0018] Compared with the prior art, the present invention has the following beneficial effects.

[0019] 1. The adaptability of the production line has been improved. Even if prefabricated components of different types or sizes are produced at the same time, the production line can be guaranteed not to be blocked, production efficiency is ensured, and the limitation of the single production type of the existing production line is overcome.

[0020] 2. Ensure the consistency of the production rhythm of finished products on the production line, which is convenient for arranging production plans.

[0021] 3. When the production line operates 24 hours a day, some laborers at some workstations can be released at night, reducing the number of workers working in three shifts and lowering labor intensity.

[0022] 4. Through the operation and storage of the table mold temporary storage unit, the processes with different production rhythms can achieve the same standard production rhythm, avoiding the congestion of longer production process stations with shorter production process stations, and solving the problem of unbalanced production rhythm of customized products.

[0023] 5. Divide the production area into areas with variable production rhythm and areas with fixed production rhythm, and realize the regional logistics operation of the mold warehouse, concrete pouring production (material distribution station) and material warehouse, which is conducive to improving the management efficiency of logistics. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the existing prefabricated component production line;

[0025] Figure 2 is a schematic diagram of a prefabricated component production line according to Embodiment 1 of the present invention;

[0026] Figure 3 It is a schematic diagram of a prefabricated component production line according to Embodiment 2 of the present invention.

[0027] In the figure: the first assembly line 1, the second assembly line 2, the third assembly line 3, the fourth assembly line 4, the fifth assembly line 5, the table mold ferry mechanism 6, the maintenance unit 7, the table mold temporary storage unit 8, the demoulding station 9, the reinforcement station 10, the material distribution station 11, the mold warehouse 12, the material warehouse 13, the first post-processing assembly line 14, and the second post-processing assembly line 15. DETAILED DESCRIPTION

[0028] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0029] Example 1

[0030] See also Figure 1A prefabricated component production line, comprising a first assembly line 1, a second assembly line 2, a third assembly line 3, a fourth assembly line 4, a fifth assembly line 5, a table mold ferrying mechanism 6, a curing unit 7 and a table mold temporary storage unit 8; a demoulding station 9 is provided on the first assembly line 1, one end of which is connected to the curing unit 7, and the other end is connected to one end of the second assembly line 2 through the table mold ferrying mechanism 6; the other end of the second assembly line 2 is connected to one end of the third assembly line 3; the third assembly line 3 spans the curing unit 7 and the table mold temporary storage unit 8, and the third assembly line The other end of the line 3 is connected with one end of the fourth assembly line 4 through the table mold ferrying mechanism 6, and the fourth assembly line 4 is provided with a reinforcement distribution station 10; the other end of the fourth assembly line 4 is connected with the table mold temporary storage unit 8, and the two ends of the fifth assembly line 5 are respectively connected with the maintenance unit 7 and the table mold temporary storage unit 8, and the fifth assembly line 5 is provided with a material distribution station 11; the first assembly line 1 and the fifth assembly line 5 are respectively located on both sides of the maintenance unit 7, and the fifth assembly line 5 and the fourth assembly line 4 are respectively located on both sides of the table mold temporary storage unit 8.

[0031] The first assembly line 1, the second assembly line 2, the third assembly line 3, the fourth assembly line 4 or the fifth assembly line 5 mainly include two rows of parallel conveying guide mechanisms, such as two rows of rollers. The driving motor can drive the rollers to rotate. When the table mold (steel trolley) used to produce prefabricated components is placed on the assembly line, the table mold can be moved along the assembly line under the drive of the rollers. It should be noted that the drive of the table mold on the assembly line is not limited to roller drive. The driving mechanism can also be driven by hydraulic jacking or sprocket traction. The table mold is moved at a fixed time and distance. The moving rhythm time is calculated according to the production process time. The execution time of each workstation is determined according to the production process of each component, and it can run automatically.

[0032] The table mold ferry mechanism 6 is a mechanism for transferring the table molds on adjacent production lines to each other. The table mold ferry mechanism can adopt a hoisting mechanism or a ferry trolley, and the ferry trolley is arranged on the ferry guide rail.

[0033] Preferably, more than two second assembly lines 2 are arranged in parallel, and both ends of all the second assembly lines 2 are connected by a table mold ferry mechanism 6. Different second assembly lines 2 can be used to perform mold loading operations on different prefabricated components, and after the mold loading operations are completed, they are uniformly transferred to one of the second assembly lines 2, and the second assembly line 2 is connected to the third assembly line 3. In this way, the production line will not be blocked due to the relatively complex installation of the retaining edge mold on a single table mold.

[0034] There are more than two fourth assembly lines 4 arranged in parallel. By setting more than two second assembly lines 2 and fourth assembly lines 4, the number of mold installation stations and reinforcement layout stations can be increased, the production capacity of the area with unfixed production rhythm can be improved, and it is ensured that there are always enough table molds in the table mold temporary storage unit. Such an arrangement can reduce the number of personnel working in three shifts on the production line. The large number of staff required for the mold installation station and reinforcement layout station can only work during the day, that is, when they get off work during the day, it can be ensured that there are enough table molds in the table mold temporary storage unit for the production line at night. At night, the table molds in the table mold temporary storage unit are continuously transferred to the first assembly line according to a fixed rhythm. In this way, only a small number of staff need to be arranged on the fifth assembly line at night to realize 24-hour uninterrupted production of the production line, and it is not necessary for staff in all positions to work in three shifts.

[0035] Preferably, the first assembly line 1 and the second assembly line 2 are arranged in parallel, and a mold library 12 is arranged between the two. The molds removed from the first assembly line 1 can be put into the mold library 12 nearby, and the molds in the mold library 12 can also be used nearby on the second assembly line 2 for mold loading, which is conducive to improving the efficiency of mold circulation.

[0036] Preferably, a material warehouse 13 is provided between the third assembly line 3 and the fourth assembly line 4. The material warehouse 13 is used to temporarily store processed steel bars, embedded parts and other materials. The mold warehouse 12 and the material warehouse 13 are respectively located at both ends of the entire production line, realizing the partitioned storage of materials and molds, which can significantly improve the logistics efficiency and facilitate the management of materials and molds.

[0037] Curing unit 7 uses a curing kiln or a stacking curing unit ( Figure 2 The stacking curing unit is shown in the figure). The curing kiln is a commonly used curing structure in the field of precast component production technology; the stacking curing unit is usually a precast component used for natural curing. The cast concrete precast components are stacked together with the table formwork to form a three-dimensional stack. The stacking process is usually completed by a crane. After the natural curing time is over, the demoulding operation is carried out.

[0038] The table mold temporary storage unit 8 includes a lifting and moving device and a plurality of accommodating spaces (not shown) for accommodating the table mold. For example, the table mold temporary storage unit can adopt the curing device (curing kiln) disclosed in the patent literature (such as the patent literature with publication numbers: CN109264276A, CN109159272A, CN109176855A, CN204136208U, CN203236582U, and CN208697677U). As the table mold temporary storage unit, it is not necessary to set up a heating and moisturizing device. The lifting and moving device can transfer the table mold to the accommodating cavity, and when the next step is required, it can be transferred from the accommodating space to the downstream of the production line. The lifting and moving device is a conventional device in the curing kiln in this field, which can drive the table mold to move in three directions (lateral, longitudinal and vertical directions). Of course, the table mold temporary storage unit can also directly adopt the existing curing kiln.

[0039] The temporary storage unit 8 can also be a stacking storage unit. The stacking storage unit is used to stack the table forms after the reinforcement arrangement is completed to form a three-dimensional stacking, and the stacking process is usually completed by a crane.

[0040] The mold clearing station (not shown) of the prefabricated component production line is arranged on the first assembly line and / or the second assembly line. The mold clearing station is located after the demoulding station and before the mold loading station.

[0041] The fourth assembly line 4 passes under the curing unit 7 and the table mold temporary storage unit 8, which is beneficial to reducing the floor space of the production line.

[0042] After the table mold for producing prefabricated components is removed from the first assembly line 1, demoulding and cleaning are performed, the table mold is transferred to the second assembly line 2 through the table mold ferrying mechanism 6 for mold loading (sidewall mold installation), and then transported downstream through the third assembly line 3. The table mold on the third assembly line 3 is transferred to the fourth assembly line 4 through the table mold ferrying mechanism 6, and steel bars are arranged at the reinforcement station 10 of the fourth assembly line 4. If necessary, embedded parts can also be placed at the reinforcement station 10; then the table mold is transferred from the fourth assembly line 4 to the table mold temporary storage unit 8 for temporary storage; wherein, there are more than two second assembly lines and fourth assembly lines, and different second assembly lines 2 and fourth assembly lines 4 can be used for mold loading operations for different prefabricated components, and then uniformly transferred to the downstream after the mold loading operations are completed, so that the entire production line will not be blocked due to the more complicated sidewall mold installation or sensor arrangement or embedded parts pre-embedded for a single table mold. By setting up a plurality of second assembly lines 2 and fourth assembly lines 4, the number of mold installation stations and reinforcement layout stations 10 can be increased, thereby improving the production capacity of the area with a non-fixed production rhythm, and ensuring that there are always enough table molds in the table mold temporary storage unit 8.

[0043] The temporary table mold storage unit 8 is used to accumulate and store a certain amount of table molds that have completed reinforcement, which can ensure that the fifth assembly line 5 is provided with table molds uninterruptedly for 24 hours. The prefabricated components are poured with concrete, vibrated and post-processed on the fifth assembly line 5, and then transferred to the maintenance unit 7 for maintenance. In this way, it can be ensured that the finished prefabricated components are produced at the demoulding station 9 of the first assembly line 1 according to the set beat (time interval), which is completely unaffected by the changing types and sizes of prefabricated components, so that all the operating procedures with unfixed production beats are located upstream of the temporary table mold storage unit. In this case, it is only necessary to increase the production capacity of the unfixed production beat area to ensure that there are enough table molds in the temporary table mold storage unit to continuously produce prefabricated components. The temporary table mold storage unit plays the role of "caching water storage", and the adaptability of the production line is greatly improved. The production of different types of customized prefabricated components will not cause the production line to be blocked or the efficiency to be reduced.

[0044] Example 2

[0045] On the basis of Example 1, the prefabricated component production line of the embodiment further includes a first post-processing assembly line 14 and a second post-processing assembly line 15 arranged between the curing unit 7 and the table mold temporary storage unit 8, the first post-processing assembly line 14 and the second post-processing assembly line 15 are located between the third assembly line 3 and the fifth assembly line 5, one end of the first post-processing assembly line 14 is connected with the fifth assembly line 5 through the table mold ferrying mechanism 6, the other end of the first post-processing assembly line 14, one end of the second post-processing assembly line 15 and the third assembly line 3 are connected through the table mold ferrying mechanism 6, and the other end of the second post-processing assembly line 15 is connected with the curing unit 7. The first post-processing assembly line 14 and the second post-processing assembly line 15 are used for post-processing such as scraping, grinding, resting, and roughening; different prefabricated components require different post-processing. For prefabricated components with fewer post-processing steps, they can be directly post-processed on the fifth assembly line 5 and transferred to the maintenance unit 7 for maintenance; for prefabricated components that require more post-processing steps, they can be transferred from the fifth assembly line 5 to the first post-processing assembly line 14 and the second post-processing assembly line 15 for processing, preferably on the second post-processing assembly line 15, and then transferred to the maintenance unit 7; for prefabricated components that require secondary laying, they can be transferred from the first post-processing assembly line 14 to the third assembly line 15, and then carry out secondary reinforcement laying and secondary pre-embedding in turn, and then return to the fifth assembly line 5 for secondary pouring (laying). Therefore, setting up the first post-processing line 14 and the second post-processing line 15 can, on the one hand, shorten the length of the fifth line, thereby shortening the overall length of the production line, and facilitate coping with a variety of different post-processing needs and improving the efficiency of post-processing; on the other hand, it realizes the recycling process of secondary cloth and enhances the adaptability of the production line.

[0046] The embodiments of the present invention are described above in conjunction with the accompanying drawings. In the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention is not limited to the above-mentioned specific implementations, which are merely illustrative and not restrictive. Under the enlightenment of the present invention, those skilled in the art can also make many forms without departing from the scope of protection of the present invention and the claims, all of which belong to the protection scope of the present invention.

Claims

1. A prefabricated component production line, characterized in that: The invention comprises a first assembly line, a second assembly line, a third assembly line, a fourth assembly line, a fifth assembly line, a table mold ferrying mechanism, a curing unit and a table mold temporary storage unit; a demoulding station is arranged on the first assembly line, one end of which is connected with the curing unit, and the other end is connected with one end of the second assembly line through the table mold ferrying mechanism; a mold loading station is arranged on the second assembly line; the other end of the second assembly line is connected with one end of the third assembly line; the third assembly line spans the curing unit and the table mold temporary storage unit, and the first assembly line is connected with ... The other end of the third assembly line is connected to one end of the fourth assembly line through the table mold ferrying mechanism, and a reinforcement laying station is provided on the fourth assembly line; the other end of the fourth assembly line is connected to the table mold temporary storage unit, and the two ends of the fifth assembly line are respectively connected to the maintenance unit and the table mold temporary storage unit, and a material laying station is provided on the fifth assembly line; the first assembly line and the fifth assembly line are respectively located on both sides of the maintenance unit, and the fifth assembly line and the fourth assembly line are respectively located on both sides of the table mold temporary storage unit; The first assembly line and the second assembly line are arranged in parallel, and a mold library is arranged between the two; A material warehouse is arranged between the third assembly line and the fourth assembly line.

2. A prefabricated component production line according to claim 1, characterized in that: There are more than two fourth assembly lines arranged in parallel.

3. A prefabricated component production line according to claim 1, characterized in that: There are more than two second assembly lines arranged in parallel, and both ends of all the second assembly lines are connected through a table mold ferrying mechanism.

4. A prefabricated component production line according to claim 1, characterized in that: The curing unit adopts a curing kiln or a stacking curing unit.

5. The prefabricated component production line according to claim 1, characterized in that: The table mold temporary storage unit includes a lifting and moving device and a plurality of accommodating spaces for accommodating table molds; or the table mold temporary storage unit adopts a stacking storage unit.

6. A prefabricated component production line according to claim 1, characterized in that: A first post-processing assembly line and a second post-processing assembly line are also arranged in parallel between the maintenance unit and the table mold temporary storage unit. The first post-processing assembly line and the second post-processing assembly line are located between the third assembly line and the fifth assembly line. One end of the first post-processing assembly line is connected with the fifth assembly line through the table mold ferrying mechanism, and the other end of the first post-processing assembly line, one end of the second post-processing assembly line and the third assembly line are connected through the table mold ferrying mechanism, and the other end of the second post-processing assembly line is connected with the maintenance unit.

7. A prefabricated component production line according to claim 1, characterized in that: The mold clearing station of the prefabricated component production line is arranged on the first assembly line and / or the second assembly line.

8. The prefabricated component production line according to claim 1, characterized in that: The fourth assembly line passes through the maintenance unit and the table mold temporary storage unit.

Citation Information

Patent Citations

  • Composite wallboard curing kiln environment control device

    CN109159272A

  • Curing kiln

    CN109176855A

  • Assembly line curing kiln system

    CN109264276A

  • Three-dimensional curing kiln

    CN203236582U

  • Low-energy-consumption concrete member curing kiln with inlet channel arranged above and outlet channel arranged below

    CN204136208U