Road slab, assembled road and construction method thereof

By designing road boards supporting the frame and road layer, combined with the splicing technology of inverted T-shaped pallets and caulking agents, the problems of long construction time and difficulty in demolition of existing prefabricated roads are solved, and rapid construction and reuse are achieved. Temporary road demand on construction sites has improved construction efficiency and road bearing capacity.

CN110453559BActive Publication Date: 2024-12-31SUIZHOU GUOMIN GEOTECHNICAL ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910749137.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-14
Publication Date
2024-12-31
Estimated Expiration
2039-08-14

AI Technical Summary

Technical Problem

The existing prefabricated roads are built for a long time and are difficult to demolish, and a large amount of construction waste is generated after construction, making it difficult to meet the temporary road needs of the construction site.

Method used

A road panel including a supporting frame and road layer was designed, and a prefabricated road was formed by splicing the support frame and road layer, and fixed at the joints using inverted T-shaped pallets and caulkants to simplify the construction and demolition process. At the same time, construction fences and railings are set up to improve the efficiency of road use.

Benefits of technology

It realizes the rapid construction and reuse of road slabs, reduces the generation of construction waste, improves construction efficiency and road bearing capacity, and is suitable for temporary road needs at construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110453559B_ABST
    Figure CN110453559B_ABST
Patent Text Reader

Abstract

The present invention discloses a road plate, an assembled road and a construction method thereof, wherein the road plate comprises a lower support frame, the support frame comprises a support top plate and a support bottom plate, a plurality of support columns are arranged between the support bottom plate and the support top plate; a road layer is paved on the support top plate, a lower steel frame is arranged around the support frame, an upper steel frame is arranged around the road layer, and the lower steel frame and the upper steel frame are fixed together with the support frame. The road plate provided by the present invention can be used to build temporary roads, which is convenient and quick to build, and the road plate can be reused without generating construction waste. The assembled road of the present invention is provided with an assembleable construction fence, which is convenient to install and reduces the workload of building fences during construction on the construction site. In addition, the assembled road of the present invention is provided with an assembleable sidewalk slab and railings, which makes the road layout more reasonable and allows pedestrians to pass safely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building materials, and in particular to a road slab, an assembled road and a construction method thereof. Background Art

[0002] In construction sites such as house construction, subway construction, underground pipeline laying, underground sidewalk construction, etc., it is usually necessary to lay temporary roads on the construction site because of the need to transport earth out of the site and to transport various building materials such as steel bars, concrete, bricks, and formwork into the site.

[0003] If excavated soil is used directly for paving, the temporary road will easily become muddy; if concrete is poured for construction, it will not only damage the roadbed but also generate a large amount of construction waste when it is demolished later.

[0004] At present, the use of prefabricated temporary roads can meet the use needs of most construction sites, and the prefabricated road surface is flat and will not generate construction waste. For example, the Chinese patent document with publication number CN106881366A records an assembled road, which includes a shaped steel frame, the shaped steel frame has four corners, and also includes a lifting lug, which can be movably installed on the four corners of the shaped steel frame, and the four corners of the shaped steel frame are respectively provided with lifting lug holes, and the lifting lug can extend from the lifting lug hole. The assembled road recorded in the patent document has the following shortcomings: First, it is inconvenient to build. The assembled road only assembles the shaped steel frame, and still needs to pour concrete, which is inconvenient and not fast during construction; second, the assembled road is poured with concrete, and if it is dismantled later, it is very difficult and will generate a large amount of construction waste. Therefore, it is not suitable for use as a temporary road. Third, the construction period of the assembled road is long, and the construction site is generally tight. Therefore, the road is not suitable for use in the construction site. Summary of the invention

[0005] The present invention aims to provide a road slab, an assembled road and a construction method thereof, so as to solve the technical problems in the prior art that temporary roads take a long time to build and generate a large amount of construction waste.

[0006] To solve the above technical problems, the first aspect of the present invention is:

[0007] A road plate is designed, comprising a lower support frame, wherein the support frame comprises a support top plate and a support bottom plate, a plurality of support columns are arranged between the support bottom plate and the support top plate; a road layer is laid on the support top plate.

[0008] Preferably, a lower steel frame is provided around the supporting frame, and an upper steel frame is provided around the road layer, and the lower steel frame and the upper steel frame are fixed together with the supporting frame.

[0009] Preferably, the road layer is a permeable road layer.

[0010] The second aspect of the present invention is:

[0011] An assembled road is designed, comprising a plurality of road slabs spliced ​​in sequence, wherein the road slabs are the road slabs described in any one of the first aspects of the present invention.

[0012] Preferably, a sidewalk slab is provided on one side of the road slab, and the sidewalk slabs are spliced ​​in sequence to form a sidewalk; the sidewalk slab includes a lower sidewalk support frame, the sidewalk support frame includes a sidewalk support top plate and a sidewalk support bottom plate, a plurality of sidewalk support columns are provided between the sidewalk support top plate and the sidewalk support bottom plate, and a pedestrian road layer is laid on the sidewalk support top plate.

[0013] Preferably, a railing is provided between the sidewalk slab and the road slab, and a socket hole for inserting a railing leg is provided on the side of the sidewalk slab close to the road slab.

[0014] Preferably, an inverted T-shaped support plate is provided at the joints between the road slabs, at the joints of the sidewalk slabs and / or at the joints between the road slabs and the sidewalk slabs.

[0015] Preferably, it also includes a construction fence arranged on one side of the prefabricated road, and a limiting sleeve for installing a pile column is provided on the corresponding side of the road slab, and the supporting column of the construction fence is a hollow supporting column corresponding to the pile column, and the lower part of the hollow supporting column is sleeved on the pile column; a support plate for supporting the sidewalk slab is provided on the other side of the road slab.

[0016] The third aspect of the present invention is:

[0017] A construction method for a prefabricated road is designed, comprising:

[0018] Roadbed preparation: Prepare the roadbed along the route where the road needs to be paved, so that the prepared roadbed is flat and stable;

[0019] Laying road slabs: hoisting and laying the road slabs described in the first aspect of the present invention along the roadbed, arranging inverted T-shaped support plates at the joints of adjacent road slabs, wherein the vertical plate portion of the inverted T-shaped support plates is located in the joints of adjacent road slabs, and injecting a sealant into the joints of adjacent road slabs;

[0020] Laying sidewalk slabs: laying sidewalk slabs on one side of the road paved with the road slabs, providing a support plate for supporting the sidewalk slabs on the side of the road slabs, and fixing the corresponding side of the sidewalk slabs on the support plate; the sidewalk slabs are thinner than the road slabs, and the part of the roadbed corresponding to the sidewalk slabs is provided with steps for supporting the sidewalk slabs or paving debris under the sidewalk slabs, so that the sidewalk slabs are flush with the upper surface of the road slabs.

[0021] Preferably, the construction method further comprises:

[0022] Installing the construction fence: installing the construction fence on the other side of the road paved with the road slab, a limiting sleeve for installing a pile column is provided on the corresponding side of the road slab, the pile column is driven into the roadbed along the limiting sleeve, the support column of the construction fence is a hollow support column corresponding to the pile column, and the lower part of the hollow support column is sleeved on the pile column;

[0023] Installing the handrail: installing the handrail between the sidewalk slab and the road slab, and a socket hole for inserting the handrail legs is provided on the side of the sidewalk slab close to the road slab.

[0024] The beneficial technical effects of the present invention are:

[0025] 1. The road slab provided by the present invention can be used to build temporary roads. The construction is convenient and quick, and the road slab can be reused without generating construction waste.

[0026] 2. The road plate provided by the present invention is provided with a plurality of supporting columns, has a strong bearing capacity, and is suitable for heavy trucks on the construction site.

[0027] 3. The assembled road of the present invention is provided with an assembleable construction fence, which is easy to install and reduces the workload of building fences during construction on the construction site.

[0028] 4. The assembled road of the present invention is provided with assembled sidewalk slabs and railings, so that the road layout is more reasonable and convenient for pedestrians to pass safely. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a partial cross-sectional view of the road plate of Example 1 of the present invention;

[0030] Figure 2 for Figure 1 Enlarged view of part A in the middle;

[0031] Figure 3 This is a schematic diagram of the arrangement of support columns in the road slab according to Embodiment 1 of the present invention;

[0032] Figure 4 This is a top view of the road slab after welding according to Example 1 of the present invention;

[0033] Figure 5 This is a layout diagram of the assembled road according to Example 2 of the present invention;

[0034] Figure 6 for Figure 5 A magnified view of part B;

[0035] Figure 7It is a partial cross-sectional view of a sidewalk slab in a prefabricated road in Example 2 of the present invention;

[0036] Figure 8 A top view of a sidewalk slab in a prefabricated road according to Embodiment 2 of the present invention;

[0037] Fig. 9 This is a schematic diagram of the structure of installing a handrail on a sidewalk slab in an assembled road in Example 2 of the present invention;

[0038] Fig.10 A top view of a road slab and a sidewalk slab after being spliced ​​in Example 2 of the present invention;

[0039] Fig.11 for Fig.10 Enlarged view of part C;

[0040] Fig.12 for Fig.10 A magnified view of the D portion;

[0041] Fig.13 This is a schematic diagram of the assembly of road slabs, sidewalk slabs, railings, and construction enclosures in Example 2 of the present invention;

[0042] Fig.14 for Fig.13 A magnified view of part E;

[0043] Fig.15 for Fig.13 Magnified view of part F;

[0044] Fig.16 This is a schematic diagram of installing a support column for a construction fence on one side of a road slab according to Embodiment 2 of the present invention;

[0045] Fig.17 for Fig.16 Enlarged view of the G section;

[0046] Fig.18 This is a schematic structural diagram of an inverted T-shaped support plate provided between adjacent road slabs in Example 2 of the present invention;

[0047] Fig.19 It is a schematic diagram of the three-dimensional structure of the lifting lug provided in Embodiment 2 of the present invention;

[0048] Fig. 20 The flowchart of the construction method of the prefabricated road in embodiment 3 of the present invention.

[0049] In the figure, the reference numerals are as follows: supporting bottom plate 111, supporting top plate 112, supporting column 113, lower steel frame 131, upper steel frame 132, road layer 12, hoisting hole 121, fence 211, construction pit 212, construction site gate 213, assembled road 22, road plate 23, limiting sleeve 231, rib plate 232, support plate 233, rivet 2331, inverted T-shaped support plate 234, caulking agent 235, sidewalk plate 24. Sidewalk supporting bottom plate 241, sidewalk supporting top plate 242, sidewalk pavement 243, sidewalk supporting column 244, lower frame 245, upper frame 246, socket hole 247, water-permeable hole 2471, lifting hole 248, riveting hole 249, railing 25, high supporting leg 251, low supporting leg 252, construction fence 26, supporting column 261, pile column 262, bottom plate 271, lifting column 272, hook hole 273. DETAILED DESCRIPTION

[0050] The specific implementation modes of the present invention are described below in conjunction with the accompanying drawings and examples. However, the following examples are only used to illustrate the present invention in detail and do not limit the scope of the present invention in any way.

[0051] Embodiment 1:

[0052] A road plate, please refer to Figures 1 to 4 .

[0053] The road slab of the embodiment of the present invention is used for paving a road, and comprises a lower support frame, on which a road layer is laid. Specifically, Figure 2 As shown, the support frame includes a support top plate 112 and a support bottom plate 111 , a plurality of support columns 113 are provided between the support bottom plate 111 and the support top plate 112 , and the road layer 12 is laid on the support top plate 112 .

[0054] The support bottom plate 111 and the support top plate 112 are both 5 mm thick embossed carbon steel plates, and the support column 113 is a hollow steel column, which is fixed between the support bottom plate 111 and the support top plate 112 by riveting. Figure 3 As shown, the axial centers of adjacent support columns 113 are spaced 200 mm apart, the support columns 113 are densely packed, and the support frame has a strong load-bearing capacity, and can be used for passing concrete tank trucks, trucks transporting slag, and the like.

[0055] Furthermore, a lower steel frame 131 is provided around the supporting frame, and an upper steel frame 132 is provided around the road layer 12. The lower steel frame 131 and the upper steel frame 132 are fixed to the supporting frame. The lower steel frame 131 is made of C-shaped steel, and the upper steel frame 132 is made of angle steel. By providing the lower steel frame 131, the surrounding of the supporting frame is closed to prevent water from entering and causing corrosion of the supporting frame. By providing the lower steel frame 131, the surrounding of the road layer 12 is closed to prevent the edge of the road layer 12 from being damaged, and the laying of the road layer 12 is also convenient.

[0056] The road layer 12 is a permeable road layer, which is formed by paving and pressing environmentally friendly rubber particles bonded with polyurethane. The entire road plate is 150 mm thick, of which the road layer 12 is 30 mm thick. The permeable road layer is easy to wash clean, which is beneficial to road environmental protection.

[0057] like Figure 3 As shown, hoisting holes 121 are respectively provided at the four corners near the road slab, and the hoisting holes 121 penetrate the road layer 12 and the supporting frame, so as to facilitate hoisting when the road slab is used to pave the road.

[0058] Figure 3 A road slab in the road is 5 meters long and 3 meters wide. A 3-meter-wide road slab is generally not suitable for trucks such as concrete tankers. Figure 4 As shown, two road plates can be welded together to form a road plate with a width of 6 meters and a length of 5 meters. The 6-meter-wide road plate is then used to pave the road, which is passable by most trucks. Figure 4 The dotted line in the figure is the welding line of the two narrower road plates.

[0059] In other embodiments, the road layer 12 may also be paved with permeable concrete or epoxy asphalt.

[0060] Embodiment 2:

[0061] A prefabricated road, please refer to Figures 5 to 19 .

[0062] The assembled road of the embodiment of the present invention is laid in a construction site, such as Figure 5 As shown, the interior of the fence 211 is a construction site, and the assembled road 22 is laid from the outside of the construction site gate 213 on the left to the inside of the construction site. After entering the construction site, it is laid around the construction pit 212, and then extends out from the construction site gate 213 on the right to facilitate the passage of transport vehicles entering and leaving the construction site.

[0063] like Figure 6As shown, the assembled road 22 includes a plurality of road plates 23 which are spliced ​​in sequence. The road plates 23 are spliced ​​into a driving road for traffic. Each road plate 23 is welded from two road plates in Example 1. The road plate 23 is 6 meters wide and 5 meters long. A sidewalk plate 24 is provided on the left side of the road plate 23. The sidewalk plates 24 are spliced ​​in sequence to form a sidewalk. The sidewalk plates 24 are both 1 meter wide and 1 meter long.

[0064] like Figure 7 and Figure 8 As shown, the structure of the sidewalk slab 24 is similar to that of the road slab 23. The sidewalk slab 24 includes a lower sidewalk support frame, and the sidewalk support frame includes a sidewalk support top plate 242 and a sidewalk support bottom plate 241. A plurality of sidewalk support columns 244 are provided between the sidewalk support top plate 242 and the sidewalk support bottom plate 241. A sidewalk pavement layer 243 is laid on the sidewalk support top plate 242. The sidewalk pavement layer 243 is a permeable pavement layer with a thickness of 30 mm. Since the load-bearing requirements are not high, the total thickness of the sidewalk slab 24 is 100 mm, which is thinner than the thickness of the road slab 23. A lower frame 245 formed by C-shaped steel angle steel is provided around the sidewalk support frame, and an upper frame 246 formed by angle steel is provided around the sidewalk pavement layer 243. As shown Figure 8 As shown, a lifting hole 248 is provided in the middle of the sidewalk slab 24 to facilitate lifting.

[0065] like Figure 6 As shown, a railing 25 is provided between the sidewalk slab 24 and the road slab 23. Figure 7 and Figure 8 As shown, a socket hole 247 for inserting a railing leg is provided on the side of the sidewalk slab 24 near the road slab 23, wherein the sidewalk support bottom plate 241 serves as the bottom surface of the socket hole 247, and a water-permeable hole 2471 is provided on the bottom surface of the socket hole 247 to prevent water from accumulating in the socket hole 247. Fig. 9 As shown, a railing 25 is installed on two sidewalk slabs 24 . The railing 25 includes high support legs 251 on both sides and two low support legs 252 in the middle. The high support legs 251 and the low support legs 252 are inserted into corresponding socket holes 247 .

[0066] The socket hole 247 is provided to facilitate the assembly of the railing 25 .

[0067] like Fig.10 and Fig.13 As shown, one side of the road plate 23 is equipped with five sidewalk plates 24, and the other side is used to install a construction fence 26, which surrounds the construction pit 212 to ensure construction safety. Fig.11 As shown, the side of the road plate 23 is provided with a limiting sleeve 231 for installing the pile column, and the side of the limiting sleeve 231 is provided with a fixing rib 232, as shown in FIG. Fig.17As shown, two ribs 232 are fixedly provided on both sides of the limiting sleeve 231 , and the limiting sleeve 231 and the fixed ribs 232 are both welded and fixed to the side of the road plate 23 .

[0068] like Fig.14 As shown, a pile column 262 is driven into the ground along the limiting sleeve 231. The support column 261 of the construction fence is a hollow support column corresponding to the pile column 262. The lower part of the support column 261 is sleeved on the pile column 262 to install the construction fence. Fig.16 As shown, two support columns 261 are installed on the side of a road slab 23 , and each road slab 23 is installed with a support column 261 .

[0069] Later, a support crossbar is installed on the support column 261, and the construction fence can be fixed on the support crossbar. The construction fence adopts imitation green grass. A warning light for night use is provided on the top of the construction fence, so that drivers outside the fence can clearly distinguish the wiring and avoid driving against the fence. A water pipe and a dust suppression nozzle connected to the water pipe are also arranged on the top of the construction fence. The dust suppression nozzle is used to control dust on the construction site. In addition, a POE network camera is provided on the top of the construction fence. The POE network camera is connected to a POE separator. The POE separator can be directly connected to the network cable to transmit the video shot by the POE network camera and power the POE network camera. It is easy to use and can be used to monitor the interior of the construction site to prevent the theft of construction materials.

[0070] Further, such as Fig.15 As shown, a support plate 233 for supporting the sidewalk slab 24 is provided on the side of the road slab 23 facing the sidewalk slab 24. Fig.12 As shown, rivet holes 249 are correspondingly provided on the sidewalk slab 24 and the supporting plate 233, and the sidewalk slab 24 is riveted to the supporting plate 233 by rivets 2331. The hollow part below the sidewalk slab 24 can be paved by filling with soil residue or reserving steps when arranging the roadbed.

[0071] Further, such as Fig.18 As shown, an inverted T-shaped support plate 234 is provided at the joint between adjacent road plates 23. The inverted T-shaped support plate 234 is made of carbon steel. The vertical plate portion of the inverted T-shaped support plate 234 is located in the joint between adjacent road plates 23. A sealant 235 is also filled at the top of the joint between adjacent road plates 23. The inverted T-shaped support plate 234 can make a smooth transition between adjacent road plates 23. In addition, an inverted T-shaped support plate can also be provided at the joint of the sidewalk plate and / or the joint between the road plate and the sidewalk plate.

[0072] like Fig.19As shown, the road slab 23 and the sidewalk slab 24 are equipped with lifting ears corresponding to the lifting holes, and the lifting ears include an integrally formed bottom plate 271 and a lifting column 272, and a hook hole 273 is provided on the top of the lifting column 272. When lifting the road slab 23, multiple lifting ears can be used, and then the lifting ears are connected with a hook, and when lifting the sidewalk slab 24, only one lifting ear can be used.

[0073] Embodiment 3:

[0074] A method for constructing an assembled road, see Fig. 20 .

[0075] The construction method of the assembled road according to the embodiment of the present invention includes:

[0076] S100, roadbed preparation: prepare the roadbed along the route where the road needs to be paved, so that the prepared roadbed is flat and stable.

[0077] The raised and sunken areas on the planned route need to be dug or leveled to ensure that most of the bottom surface of the road slab can fit on the roadbed. Since the road slab may be used by heavy trucks, it is also necessary to ensure that the roadbed has the ability to bear heavy trucks. After the roadbed is initially leveled, it can be further flattened by a roller.

[0078] S200, laying road slabs: hoisting and laying road slabs along the roadbed, setting inverted T-shaped support plates at the joints of adjacent road slabs, the vertical plate portion of the inverted T-shaped support plates is located in the joints of adjacent road slabs, and a sealant is injected into the joints of adjacent road slabs.

[0079] The road slab is formed by welding two road slabs in Example 1.

[0080] S300, laying sidewalk slabs: laying sidewalk slabs on one side of the road paved with road slabs, providing a support plate for supporting the sidewalk slabs on the side of the road slabs, and fixing the corresponding side of the sidewalk slabs on the support plate; the sidewalk slabs are thinner than the road slabs, and steps for supporting the sidewalk slabs are provided at a portion of the roadbed corresponding to the sidewalk slabs, so that the sidewalk slabs are flush with the upper surface of the road slabs.

[0081] In step S100, a step portion for supporting the sidewalk slab is reserved on the roadbed. Of course, in other embodiments, the step portion may not be reserved and muck may be directly laid under the sidewalk slab to make the sidewalk slab flush with the upper surface of the road slab.

[0082] S400, installing construction fences: installing construction fences on the other side of the road paved with road slabs, a limiting sleeve for installing piles is provided on the corresponding side of the road slabs, the piles are driven into the roadbed along the limiting sleeves, the supporting columns of the construction fences are hollow supporting columns corresponding to the piles, and the lower part of the hollow supporting columns is sleeved on the piles.

[0083] S500, installing the handrail: installing the handrail between the sidewalk slab and the road slab, and providing a socket hole for inserting the handrail support leg on the side of the sidewalk slab close to the road slab.

[0084] The above-mentioned step S400 and step S500 can be performed simultaneously.

[0085] Based on the above embodiments, the road slab provided by the present invention has a strong bearing capacity and is suitable for being laid on a construction site for heavy vehicles to pass through; the prefabricated road of the present invention is also provided with a construction fence, a sidewalk and a railing, which, through prefabricated installation, facilitates construction while achieving the effect of separating motor vehicles, non-motor vehicles and people from passing through.

[0086] The present invention has been described in detail above with reference to the accompanying drawings and embodiments. However, those skilled in the art will appreciate that, without departing from the spirit of the present invention, the specific parameters in the above embodiments may be changed to form a plurality of specific embodiments, which are all within the common variation range of the present invention and will not be described in detail herein.

Claims

1. An assembled road, characterized in that: It comprises a plurality of road plates which are spliced ​​in sequence, and the road plates are spliced ​​into a driving road for traffic, the road plate comprises a lower support frame, the support frame comprises a support top plate and a support bottom plate, a plurality of support columns are arranged between the support bottom plate and the support top plate; a road layer is laid on the support top plate; A sidewalk slab is provided on one side of the road slab, the thickness of the sidewalk slab is smaller than that of the road slab, and the sidewalk slabs are sequentially spliced ​​to form a sidewalk; The sidewalk slab comprises a lower sidewalk support frame, the sidewalk support frame comprises a sidewalk support top plate and a sidewalk support bottom plate, a plurality of sidewalk support columns are arranged between the sidewalk support top plate and the sidewalk support bottom plate, and a sidewalk pavement layer is laid on the sidewalk support top plate; A handrail is provided between the sidewalk slab and the road slab, and a socket hole for inserting a handrail support leg is provided on the side of the sidewalk slab close to the road slab; It also includes a construction fence arranged on one side of the assembled road, a limiting sleeve for installing a pile column is provided on the corresponding side of the road plate, and the support column of the construction fence is a hollow support column corresponding to the pile column, and the lower part of the hollow support column is sleeved on the pile column; A supporting plate for supporting the sidewalk slab is provided on the other side of the road slab, and an inverted T-shaped supporting plate is provided at the joints between the road slabs, the joints of the sidewalk slabs and / or the joints between the road slab and the sidewalk slab. A lower steel frame is provided around the supporting frame of the road slab, and an upper steel frame is provided around the road layer. The lower steel frame and the upper steel frame are fixed together with the supporting frame.

2. The assembled road according to claim 1, characterized in that: The road layer of the road slab is a water-permeable road layer.

3. A method for constructing an assembled road according to claim 1, characterized in that: include: Roadbed preparation: Prepare the roadbed along the route where the road needs to be paved, so that the prepared roadbed is flat and stable; Laying road slabs: using the road slabs of claim 1 to be hoisted and laid along the roadbed, an inverted T-shaped support plate is arranged at the joints of adjacent road slabs, the upright plate portion of the inverted T-shaped support plate is located in the joints of adjacent road slabs, and a sealant is injected into the joints of adjacent road slabs; Laying sidewalk slabs: laying sidewalk slabs on one side of the road paved with the road slabs, providing a support plate for supporting the sidewalk slabs on the side of the road slabs, and fixing the corresponding side of the sidewalk slabs on the support plate; the sidewalk slabs are thinner than the road slabs, and the part of the roadbed corresponding to the sidewalk slabs is provided with steps for supporting the sidewalk slabs or paving debris under the sidewalk slabs, so that the sidewalk slabs are flush with the upper surface of the road slabs.

4. The method for constructing an assembled road according to claim 3, characterized in that: Also includes: Installing the construction fence: installing the construction fence on the other side of the road paved with the road slab, a limiting sleeve for installing a pile column is provided on the corresponding side of the road slab, the pile column is driven into the roadbed along the limiting sleeve, the support column of the construction fence is a hollow support column corresponding to the pile column, and the lower part of the hollow support column is sleeved on the pile column; Installing the handrail: installing the handrail between the sidewalk slab and the road slab, and a socket hole for inserting the handrail legs is provided on the side of the sidewalk slab close to the road slab.