Supercritical CO2 turbine installation structure
Through the alternating axial installation structure of multi-stage turbine discs and nozzle rings, combined with the connecting shaft and cam structure, the stability problem of the connection between the turbine disc and the main shaft in the supercritical carbon dioxide turbine is solved, and the precise installation of the nozzle ring is achieved, ensuring The power delivery of the turbine and the machining accuracy of the nozzle ring.
Patent Information
- Application Number
- CN201911132485.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-19
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2039-11-19
AI Technical Summary
In supercritical carbon dioxide turbines, the connection structure between the turbine disk and the main shaft is difficult to ensure the stability of power transmission, and the processing and installation of the nozzle ring are difficult, especially when multiple bolts are arranged on the end face of the small-diameter main shaft, and the nozzle in the multi-stage scheme Radial splitting of the ring results in reduced machining and installation accuracy.
It adopts an alternating axial installation structure of multi-stage turbine discs and nozzle rings. The main shaft and turbine disc are fastened through the connecting shaft and cam structure. Specially designed connecting bolts and seals are used to ensure reliable connection between the turbine disc and the main shaft. And through the positioning and installation of cylindrical pins and pins, radial splitting of the nozzle ring is avoided.
It achieves a stable connection between the turbine disk and the main shaft, improves the reliability of fasteners, ensures the processing and installation accuracy of the nozzle ring, avoids radial splitting of the nozzle ring, and ensures the power transmission stability of the supercritical carbon dioxide turbine. .
Smart Images

Figure CN110700892B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of turbines, and in particular relates to a supercritical carbon dioxide turbine installation structure. Background Art
[0002] The turbine uses the expansion of the working fluid when it flows through the nozzle ring and the turbine disc to convert thermodynamic energy into gas kinetic energy, which drives the turbine disc to rotate. The connection between the turbine disc and the main shaft drives the load at the end of the transmission shaft to do work. Among them, the connection structure between the turbine disc and the main shaft is an important factor affecting power transmission. High-power units mostly adopt the layout form in which the turbine disc is located in the middle of the main shaft. The turbine disc and the main shaft are integrated or heat-shrink-fitted. Small and medium-power units mostly adopt a cantilever layout. The turbine disc is located at one end of the main shaft and is connected to the main shaft by bolts.
[0003] Supercritical carbon dioxide has a higher density than other media, so the diameter of the turbine disc of a supercritical carbon dioxide turbine is small at the same power. In order to improve aerodynamic efficiency, the spindle speed is relatively high, usually reaching 24,000 rpm or above. Due to the limitation of the linear speed of the bearing, the spindle journal is relatively small, usually with a journal diameter of 50 mm or less. In order to ensure reliable power transmission from the turbine disc to the spindle, on the one hand, multiple bolts are usually used to press the turbine disc onto the spindle, but it is very difficult to arrange multiple bolts on the small-diameter spindle end face of a supercritical carbon dioxide turbine. On the other hand, when the turbine adopts a multi-stage solution, the stator ring must be radially split into two halves due to the alternating arrangement of the nozzle ring and the turbine disc, which brings difficulties to the processing and installation of the small-diameter supercritical carbon dioxide nozzle ring. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a supercritical carbon dioxide turbine installation structure that can achieve reliable connection between the turbine disk and the main shaft, ensure stable power transmission, and ensure the processing and installation accuracy of the nozzle ring.
[0005] The object of the present invention is achieved in that:
[0006] A supercritical carbon dioxide turbine installation structure comprises a main shaft arranged in an outer casing of the turbine and a multi-stage turbine disk and a multi-stage nozzle ring arranged in an inner casing of the turbine, the inner casing and the outer casing are fastened and connected by bolts, a connecting shaft is further arranged between the main shaft and the turbine disk, the connecting shaft a end is fixedly connected to the main shaft by connecting bolts and axially limited by the main shaft shoulder, the connecting shaft b end is fastened and connected to the multi-stage turbine disk by fasteners, the multi-stage turbine disk is axially limited by the end face of the connecting shaft b, the multi-stage nozzle ring and the multi-stage turbine disk are alternately arranged along the axial direction, the adjacent two-stage nozzle rings are circumferentially positioned and installed by cylindrical pins, the multi-stage nozzle rings are tightly fitted and connected by pins, and are axially limited by the second step surface of the inner casing, the last-stage nozzle ring of the multi-stage nozzle ring is circumferentially positioned and installed with the inner casing by internally threaded cylindrical pins, and is fastened to the inner casing by screws.
[0007] The main shaft has an extended end, and the extended end is a cam-type shaft. A first threaded hole is axially arranged at the center of the main shaft extended end. A cam-type hole is axially arranged at the end of the connecting shaft a to cooperate with the cam-type shaft at the extended end of the main shaft. A second threaded through hole is axially arranged at the center of the connecting shaft. A third threaded hole is evenly distributed along the circumference at the end of the connecting shaft b for threaded connection with a fastener to press the multi-stage turbine disk onto the connecting shaft. The first threaded hole and the second threaded through hole are threadedly connected with the connecting bolt. The major diameter of the first threaded hole is smaller than the minor diameter of the second threaded through hole. The thread pitch P of the first threaded hole is 1 >Thread pitch P of the second threaded through hole 2 The torque is transmitted through the cam surface connection, which is simple, stable and efficient, so that the connecting shaft can only move but not rotate relative to the main shaft when tightened, saving radial space for the arrangement of the third threaded hole on the connecting shaft, and ensuring that the fasteners between the turbine disk and the connecting shaft are tightened reliably.
[0008] The connecting bolt is provided with a small diameter section thread and a large diameter section thread, the small diameter section thread cooperates with the first threaded hole of the main shaft, and the large diameter section thread cooperates with the second threaded through hole of the connecting shaft. The connecting shaft is pressed onto the main shaft by tightening the connecting bolt, and the pitch of the small diameter section thread and the large diameter section thread are respectively the same as the pitch of the corresponding first threaded hole and the second threaded through hole. The specially designed connecting bolt saves radial space of the connecting shaft while providing the required preload, provides sufficient space for the arrangement of the fasteners of the turbine disk and the connecting shaft on the connecting shaft, and is conducive to improving the reliability of the fastening of the fasteners.
[0009] Furthermore, when the main shaft is matched with the connecting shaft and connected by connecting bolts, a space L is reserved between the end face of the connecting shaft a and the main shaft shoulder. Δ Distance, L Δ Obtained by the following calculation formula:
[0010] L Δ =n×(p 1-p 2 )
[0011] Where: n is the number of threads of the connecting bolt screwed into the main shaft or screwed into the connecting shaft
[0012] P 1 P is the pitch of the thread in the minor diameter section. 2 The pitch of the thread in the large diameter section
[0013] The multi-stage turbine disk includes four stages. The first-stage turbine disk and the connecting shaft, the second-stage turbine disk and the third-stage turbine disk, and the third-stage turbine disk and the fourth-stage turbine disk are all matched through the clearance of the cylindrical hole shaft and the axial positioning of the turbine disk end face. The multi-stage nozzle ring also includes four stages. The first-stage nozzle ring is arranged at the front end of the first-stage turbine disk and is axially limited by the second step surface of the inner shell. The adjacent two-stage nozzle rings and the adjacent two-stage turbine disks are arranged alternately along the axial direction. The coaxiality and verticality with the high-speed rotor axis are ensured. The alternating axial installation of the four-stage turbine disk and the four-stage nozzle ring avoids the radial splitting of the nozzle ring, which is conducive to ensuring the processing and installation accuracy of the nozzle ring.
[0014] Furthermore, a seal is provided between the connecting shaft and the outer shell, and the seal is fixedly connected to the outer shell by bolts, a first interstage seal is provided between the first-stage nozzle ring and the connecting shaft, and a first-stage moving blade seal is provided between the first-stage nozzle ring and the first-stage turbine disk, a second interstage seal and a second-stage moving blade seal are provided between the second-stage nozzle ring and the second-stage turbine disk, a third interstage seal and a third moving blade seal are provided between the third-stage nozzle ring and the third-stage turbine disk, and a fourth interstage seal and a fourth moving blade seal are provided between the fourth-stage nozzle ring and the fourth-stage turbine disk.
[0015] Due to the adoption of the above technical solution, the present invention has the following beneficial effects:
[0016] 1. By adding a connecting shaft between the turbine main shaft and the turbine disc, the matching part of the main shaft and the connecting shaft is set as a cam-type structure. The torque transmission is connected through the cam-type structure, which is simple, stable and efficient. When the main shaft and the connecting shaft are tightly connected, the cam-type structure can only move axially without rotation;
[0017] 2. Use specially designed connecting bolts, design small diameter thread segments and large diameter thread segments, and limit the pitch P of the small diameter thread segment. 1 >Pitch P of large diameter thread segment 2 A first threaded hole matching the small-diameter threaded section is designed on the main shaft, and a second threaded through hole matching the large-diameter threaded section is designed on the connecting shaft. Under the condition of providing the required preload, the connecting shaft and the main shaft can be fastened together by only tightening one connecting bolt at the center of the end face of the connecting shaft, which saves radial space of the connecting shaft, provides sufficient space for the arrangement of the turbine disk and the connecting shaft fasteners on the connecting shaft, and is conducive to improving the reliability of the fasteners.
[0018] 3. The four-stage turbine disk and the four-stage nozzle ring are installed axially alternately. The adjacent two-stage turbine disks are matched by the cylindrical hole shaft clearance and the axial positioning of the turbine disk end face to ensure the coaxiality and verticality with the high-speed rotor axis. The adjacent two-stage nozzle rings are installed by circumferential positioning of cylindrical pins. The four-stage nozzle ring is fixed and connected with pins. The four-stage turbine disk and the four-stage nozzle ring are installed alternately axially to avoid radial splitting of the nozzle ring, which is conducive to ensuring the processing and installation accuracy of the nozzle ring. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the installation structure of the present invention;
[0020] Figure 2 yes Figure 1 Middle AA section view;
[0021] Figure 3 is a schematic diagram of a seal arranged on a nozzle ring in the present invention;
[0022] Figure 4 It is a schematic diagram of the geometric tolerances of the turbine disk, the main shaft, and the connecting shaft in the present invention;
[0023] Figure 5 This is a diagram showing the installation state of the connecting bolts, the main shaft and the connecting shaft in the present invention;
[0024] Reference numerals
[0025] In the accompanying drawings, 1 is a connecting bolt, 2 is a main shaft, 3 is a connecting shaft, 4 is a sealing member, 5 is an outer shell, 6 is a first-stage nozzle ring, 7 is a first-stage turbine disk, 8 is a second-stage nozzle ring, 9 is a second-stage turbine disk, 10 is a third-stage nozzle ring, 11 is a third-stage turbine disk, 12 is a screw, 13 is a washer a, 14 is a fourth-stage nozzle ring, 15 is a pin, 16 is a fourth-stage turbine disk, 17 is a screw, 18 is a washer b, 19 is a nut, 20 is an internal threaded cylindrical pin, 21 is an inner shell, 22 is a cylindrical pin, 23 is the axis of the high-speed rotor shaft,
[0026] 1-1 small diameter thread, 1-2 large diameter thread, 2-1 cam shaft, 2-2 first threaded hole, 2-3 shaft shoulder, 3-1 cam hole, 3-2 second threaded through hole, 3-3 connecting shaft end a, 3-4 connecting shaft end b, 3-5 third threaded hole,
[0027] 6-1 first stage seal, 6-2 first stage moving blade seal, 8-1 second stage seal, 8-2 second stage moving blade seal, 10-1 third stage seal, 10-2 third stage moving blade seal, 14-1 fourth stage seal, 14-2 fourth stage moving blade seal, 21-1 first step surface of inner casing, 21-2 second step surface of inner casing, L ΔIt is the reserved distance between the end face of connecting shaft a and the spindle shoulder.
[0028] L1 is the length of the small diameter section of the connecting bolt threaded into the first threaded hole.
[0029] L2 is the length of the large diameter section of the connecting bolt threaded into the second threaded hole.
[0030] L is the axial movement distance of the connecting bolt,
[0031] C is the thread insertion position for the small diameter section, and D is the thread insertion position for the large diameter section. DETAILED DESCRIPTION
[0032] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings. Figure 1 The middle arrows indicate the direction of air intake and exhaust.
[0033] See also Figure 1-Figure 5 As shown, a supercritical carbon dioxide turbine installation structure comprises a main shaft 2 arranged in a turbine outer casing 5 and a multi-stage turbine disk and a multi-stage nozzle ring arranged in a turbine inner casing 21, wherein the inner casing 21 and the outer casing 5 are fastened and connected by bolts, and a connecting shaft 3 is further arranged between the main shaft 2 and the turbine disk, wherein the a end of the connecting shaft 3 is fixedly connected to the main shaft 2 by a connecting bolt 1 and axially limited by a main shaft shoulder 2-3, and the b end 3-4 of the connecting shaft 3 is fastened to the multi-stage turbine disk by a fastener The multi-stage turbine disk is fixedly connected, and the multi-stage turbine disk is axially limited by the end face 3-4 of the connecting shaft b. The multi-stage nozzle ring and the multi-stage turbine disk are alternately arranged along the axial direction. The adjacent two-stage nozzle rings are circumferentially positioned and installed by cylindrical pins 22. The multi-stage nozzle rings are tightly connected by pins 15 and axially limited by the second step surface 21-2 of the inner shell. The last-stage nozzle ring of the multi-stage nozzle ring is circumferentially positioned and installed with the inner shell 21 by internal threaded cylindrical pins 20, and is fastened to the inner shell 21 by screws 12 and washers a13.
[0034] To ensure reliable connection between the main shaft 2 and the connecting shaft 3, to simply, smoothly and efficiently transmit torque, and to make the connecting shaft 3 only move but not rotate relative to the main shaft 2 when tightened, as Figure 1 and Figure 2As shown, in this embodiment, the main shaft 2 has an extended end, the extended end is a cam-type shaft 2-1, and a first threaded hole 2-2 is axially arranged at the center of the main shaft extended end, and a cam-type hole 3-1 is axially arranged at the end 3-3 of the connecting shaft a, which cooperates with the cam-type shaft 2-1 of the main shaft extended end, and a second threaded through hole 3-2 is axially arranged at the center of the connecting shaft, and a third threaded hole 3-5 is evenly distributed along the circumferential direction at the end of the connecting shaft b, which is used for threaded connection with a fastener. The fastener in this embodiment adopts a screw 17, a washer b18 and a nut 19 to press the multi-stage turbine disk on the connecting shaft 3, and the first threaded hole 2-2 and the second threaded through hole 3-2 are threadedly connected with the connecting bolt 1, the major diameter of the first threaded hole 2-2 is smaller than the minor diameter of the second threaded through hole 3-2, and the thread pitch P of the first threaded hole 2-2 is 1. 1 >Thread pitch P of the second threaded through hole 3-2 2 .
[0035] like Figure 1 , Figure 5 As shown, Figure 5 A in the figure indicates that the connecting bolt 1 begins to be screwed into the main shaft 2 and the connecting shaft 3. Figure 5 B in the figure represents the state after the connecting bolt 1 is screwed in. In order to save radial space of the connecting shaft and provide sufficient space for the arrangement of fasteners of the turbine disk and the connecting shaft on the connecting shaft, a specially designed connecting bolt is adopted in this embodiment to improve the fastening reliability of the connecting bolt while providing the required preload. The connecting bolt is an integral structure, and is provided with a small diameter section thread 1-1 and a large diameter section thread 1-2. The small diameter section thread 1-1 cooperates with the first threaded hole 2-2 of the main shaft, and the large diameter section thread 1-2 cooperates with the second threaded through hole 3-2 of the connecting shaft. By tightening the connecting bolt 1, the connecting shaft 3 is pressed onto the main shaft 2, and the pitch of the small diameter section thread 1-1 and the large diameter section thread 1-2 are respectively the same as the pitch of the corresponding first threaded hole and the second threaded through hole.
[0036] Due to the special design of the connecting bolt 1, certain conditions must be met when connecting the connecting shaft 3 to the main shaft 2. The specific installation process and conditions are as follows:
[0037] The cam hole 3-1 of the connecting shaft 3 is sleeved on the cam shaft 2-1 of the main shaft 2, and ensure that the end face of the connecting shaft a end 3-3 is at a distance L from the main shaft shoulder 2-3. Δ , the two sections of the thread of the connecting bolt 1 are screwed into the first threaded hole 2-2 and the second threaded through hole 3-2 at the same time. The connecting bolt 1 is a whole, and the axial movement distance of each point on it must be the same. When the connecting bolt 1 is screwed in a certain number of turns (i.e., the number of thread teeth), due to the thread pitch P of the small diameter section 1 >Large diameter thread pitch P 2, resulting in an axial distance difference, which is offset by the axial movement of the connecting shaft 3. The connecting shaft 3 is connected to the cam surface of the main shaft 2, so that the connecting shaft 3 does not rotate when it moves axially. When the end face 3-3 of the connecting shaft a comes into contact with the shoulder 2-3 of the main shaft 2, the screwing process is completed. Then tighten the connecting bolt 1 to generate an axial preload force, pressing the connecting shaft 3 against the main shaft 2. At the end of screwing, the small diameter section thread is screwed into the first threaded hole 2-2 by a length of L1, and the number of screwed threads is n 1 , L1 is equal to the axial movement distance L of the connecting bolt 1, the length L2 of the large diameter threaded section screwed into the second threaded hole 3-2, and the number of threads n 2 , the connecting shaft 3 moves axially by a distance LΔ, from which the following relationship can be derived;
[0038] L 1 =n 1 ×P 1
[0039] L 2 =n 2 ×P 2
[0040] L=L 1
[0041] L=L 2 -L Δ
[0042] n 1 =n 2 =n
[0043] That is, n×(P 1 -P 2 )=L Δ
[0044] It can be concluded from the calculation results that when the main shaft 2, the connecting shaft 3, and the connecting bolt 1 are installed, the reserved distance LΔ must satisfy the product of the number of thread teeth n and the pitch difference. If it is too large, the connecting shaft 3 cannot be installed axially in place, and if it is too small, the connecting bolt 1 cannot be installed axially in place, which reduces the number of stressed threads and the stress strength of the threads. When the connecting bolt 1 protrudes too much from the right end of the connecting shaft, it will interfere with the multi-stage turbine disk.
[0045] like Figure 1 , Figure 4 As shown, Figure 4 The important geometric tolerance requirements for the matching of the hole, shaft and end faces between the turbine disk, main shaft and connecting shaft are shown in the figure. Figure 4 Ⅰ indicates the verticality of the main shaft and the connecting shaft shoulder, Ⅱ indicates the coaxiality of the main shaft and the connecting shaft cylindrical hole shaft matching surface, Ⅲ indicates the coaxiality of the turbine disk cylindrical hole shaft matching surface, and Ⅳ indicates the verticality of the turbine disk end face matching surface.
[0046] The multi-stage turbine disk used in the turbine in this embodiment includes four stages. The first-stage turbine disk 7 and the connecting shaft 3, the second-stage turbine disk 9 and the third-stage turbine disk 11, and the third-stage turbine disk 11 and the fourth-stage turbine disk 16 are all matched through the cylindrical hole shaft clearance and the axial positioning of the turbine disk end face to ensure the coaxiality and verticality of the cylindrical hole shaft and the turbine disk end face of the adjacent two-stage turbine disk with the high-speed rotor axis 23; the multi-stage nozzle ring also includes four stages, the first-stage nozzle ring 6 is arranged at the front end of the first-stage turbine disk 7, and is axially limited by the second step surface 21-2 of the inner shell. The adjacent two-stage nozzle rings and the adjacent two-stage turbine disks are arranged alternately along the axial direction. When the turbine disk is specifically installed, the corresponding first-stage nozzle ring 6, second-stage nozzle ring 8, third-stage nozzle ring 10, and fourth-stage nozzle ring 14 are arranged alternately with the turbine disk. The adjacent first-stage nozzle ring 6 and the The secondary nozzle ring 8, the second-stage nozzle ring 8 and the third-stage nozzle ring 10, the third-stage nozzle ring 10 and the fourth-stage nozzle ring 14 are all circumferentially positioned by the cylindrical pin 22. The fourth-stage nozzle ring 14 is circumferentially positioned with the inner shell 21 by the internal thread cylindrical pin 20. Since the connection surface between the fourth-stage nozzle ring 14 and the third-stage nozzle ring 10 is slightly higher than the first step surface 21-1 of the inner shell 21, the fourth-stage nozzle ring is pressed as a whole on the second step surface 21-2 of the inner shell 21 by pressing the fourth-stage nozzle ring 14 with the screw 12. The internal thread cylindrical long pin 15 passes through the fourth-stage nozzle rings 6, 8, 10, 14 and has an interference fit with the fourth-stage nozzle ring to prevent the adjacent nozzle rings from rotating. The alternating axial installation of the fourth-stage turbine disk and the fourth-stage nozzle ring avoids radial splitting of the nozzle ring, which is conducive to ensuring the processing and installation accuracy of the nozzle ring.
[0047] like Figure 3 As shown, in this embodiment, a seal 4 is further provided between the connecting shaft 3 and the outer shell 5, and the seal 4 is fixedly connected to the outer shell 5 by bolts, a first interstage seal 6-1 is provided between the first-stage nozzle ring 6 and the connecting shaft 3, and a first-stage moving blade seal 6-2 is provided between the first-stage nozzle ring 6 and the first-stage turbine disk 7, a second interstage seal 8-1 and a second moving blade seal 8-2 are respectively provided between the second-stage nozzle ring 8 and the second-stage turbine disk 9, a third interstage seal 10-1 and a third moving blade seal 10-2 are respectively provided between the third-stage nozzle ring 10 and the third-stage turbine disk 11, and a fourth interstage seal 14-1 and a fourth moving blade seal 14-2 are respectively provided between the fourth-stage nozzle ring 14 and the fourth-stage turbine disk 16, so as to reduce the influence of interstage leakage of the working fluid in the turbine casing on the efficiency.
[0048] The present invention can realize reliable connection between the turbine disk and the main shaft through the installation structure of the turbine disk, the main shaft and the nozzle ring, thereby ensuring stable power transmission of the supercritical carbon dioxide turbine.
[0049] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A supercritical carbon dioxide turbine installation structure, comprising a main shaft arranged in an outer casing of the turbine and a multi-stage turbine disk and a multi-stage nozzle ring arranged in an inner casing of the turbine, wherein the inner casing and the outer casing are fastened and connected by bolts, characterized in that: A connecting shaft is also provided between the main shaft and the turbine disk. The end a of the connecting shaft is fixedly connected to the main shaft by a connecting bolt and axially limited by a main shaft shoulder. The end b of the connecting shaft is fastened to the multi-stage turbine disk by a fastener. The multi-stage turbine disk is axially limited by an end face of the connecting shaft b. The multi-stage nozzle ring and the multi-stage turbine disk are alternately arranged along the axial direction. The adjacent two-stage nozzle rings are circumferentially positioned and installed by cylindrical pins. The multi-stage nozzle rings are tightly fitted with pins and axially limited by a second step surface of the inner shell. The last-stage nozzle ring of the multi-stage nozzle ring is circumferentially positioned and installed with the inner shell by an internally threaded cylindrical pin and fastened to the inner shell by screws. The main shaft has an extended end, the extended end is a cam-type shaft, a first threaded hole is axially arranged at the center of the main shaft extended end, a cam-type hole is axially arranged at the end of the connecting shaft a, which cooperates with the cam-type shaft of the main shaft extended end, a second threaded through hole is axially arranged at the center of the connecting shaft, and a third threaded hole is evenly distributed along the circumference at the end of the connecting shaft b, which is used for threaded connection with a fastener to press the multi-stage turbine disk onto the connecting shaft, the first threaded hole and the second threaded through hole are threadedly connected with the connecting bolt, the major diameter of the first threaded hole is smaller than the minor diameter of the second threaded through hole, and the thread pitch P1 of the first threaded hole is greater than the thread pitch P2 of the second threaded through hole; The connecting bolt is provided with a small diameter section thread and a large diameter section thread, the small diameter section thread cooperates with the first threaded hole of the main shaft, and the large diameter section thread cooperates with the second threaded through hole of the connecting shaft, and the connecting shaft is pressed onto the main shaft by tightening the connecting bolt, and the pitch of the small diameter section thread and the large diameter section thread are respectively the same as the pitch of the corresponding first threaded hole and the second threaded through hole; The multi-stage turbine disk comprises four stages, and the first-stage turbine disk and the connecting shaft, the second-stage turbine disk and the third-stage turbine disk, and the third-stage turbine disk and the fourth-stage turbine disk are all fitted through the clearance of the cylindrical hole shaft and axial positioning of the turbine disk end face. The multi-stage nozzle ring also comprises four stages, and the first-stage nozzle ring is arranged at the front end of the first-stage turbine disk and is axially limited by the second step surface of the inner shell, and the adjacent two-stage nozzle rings and the adjacent two-stage turbine disks are alternately arranged along the axial direction.
2. The supercritical carbon dioxide turbine installation structure according to claim 1, characterized in that: When the main shaft is matched with the connecting shaft and connected by connecting bolts, a space L is reserved between the end face of the connecting shaft a and the main shaft shoulder. Δ Distance, L Δ Obtained by the following calculation formula: L Δ =n×(p1-p2) Where: n is the number of threads of the connecting bolt screwed into the main shaft or screwed into the connecting shaft P1 is the thread pitch of the small diameter section, and P2 is the thread pitch of the large diameter section.
3. The supercritical carbon dioxide turbine installation structure according to claim 1, characterized in that: A seal is also provided between the connecting shaft and the outer shell, and the seal is fixedly connected to the outer shell by bolts. A first interstage seal is provided between the first-stage nozzle ring and the connecting shaft, and a first-stage moving blade seal is provided between the first-stage nozzle ring and the first-stage turbine disk. A second interstage seal and a second-stage moving blade seal are provided between the second-stage nozzle ring and the second-stage turbine disk, respectively. A third interstage seal and a third moving blade seal are provided between the third-stage nozzle ring and the third-stage turbine disk, respectively. A fourth interstage seal and a fourth moving blade seal are provided between the fourth-stage nozzle ring and the fourth-stage turbine disk, respectively.