Water-stop curtains at the ends of the underwater channel foundation pit along the water banks
By setting up horizontally connected high-pressure rotary spray piles and vertically connected high-pressure rotary spray piles at the ends of the underwater channel foundation pit along the two banks, a three-sided enclosure structure is formed, which solves the problem of leakage of the underwater channel foundation pit and improves the The structural stability and water stopping effect are provided to prevent leakage risks.
Patent Information
- Application Number
- CN201911084931.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-08
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2039-11-08
AI Technical Summary
Water leakage is prone to occur at the ends of the underwater channel foundation pit along the two banks of the water, causing river water or river water to leak into the channel foundation pit, causing safety hazards.
The first high-pressure rotary spray pile and the second high-pressure rotary spray pile are arranged at the ends of the underwater channel foundation pit along the water banks to make horizontal connections, and vertically connect through the third high-pressure rotary spray pile to form a three-sided enclosure structure, using yellow The sand backfilling dense layer is connected to the plain concrete force conveying belt to enhance structural stability and water stop effect.
By increasing the contact area and structural stability of the bottom plate and pile foundation, the bottom plate is prevented from disengaging from the high-pressure rotary spray pile, avoiding the formation of leakage channels, improving the water stop effect, and ensuring the safety of the underwater channel foundation pit.
Smart Images

Figure CN110777832B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a water-stopping curtain at the ends of two banks of a foundation pit of an underwater channel. Background Art
[0002] In the construction of water-stop curtains for underwater channel foundation pits across rivers and other waters, the construction of foundation pit water-stop curtains is more difficult than the construction environment of soil foundation pit water-stop curtains because the foundation pit construction crosses rivers and other waters, and it is very easy to have safety hazards such as leakage. In particular, the leakage problem at the ends of the underwater channel foundation pit along the water is more serious, especially in the southern region where groundwater is abundant and the water level is high, and the leakage of river-side foundation pits is more common. Because the underwater channel foundation pit crosses the river, it is generally constructed by open-cut underground channel foundation pit construction to cross the bottom of the river. During construction, cofferdams are used to avoid water, and then the cross-river underwater channel foundation pit is excavated and constructed. The existing foundation pit water-stop curtain includes high-pressure rotary jet piles located below the bottom plate of the underwater channel foundation pit to stop the underwater channel foundation pit. After the revetment is completed, due to the settlement of the foundation, the bottom plate of the underwater channel foundation pit is separated from the high-pressure rotary jet piles to form a leakage channel, and the river water and river water leak into the underwater channel foundation pit through the leakage channel. Therefore, anti-leakage of the water-stop curtain for underwater channel foundation pit is a technical problem that technical personnel in this field need to solve urgently. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a water-stop curtain at the ends of the underwater channel foundation pit along both sides of the water to solve the problem of leakage of the underwater channel foundation pit.
[0004] In order to solve the above technical problems, the present invention provides a water-stop curtain at the ends of an underwater channel foundation pit along the water, comprising a first high-pressure rotary jet pile and a second high-pressure rotary jet pile horizontally connected to each other below the bottom plate at the ends of the underwater channel foundation pit along the water, and a third high-pressure rotary jet pile located above the bottom plate of the underwater channel foundation pit and vertically connected to the first high-pressure rotary jet pile; the second high-pressure rotary jet pile, the third high-pressure rotary jet pile and the first high-pressure rotary jet pile below them are located on the inner side of the foundation pit retaining piles at the ends of the underwater channel foundation pit along the water.
[0005] Furthermore, the present invention provides a water-stop curtain at the ends of the underwater channel foundation pit along the water, and the first high-pressure rotary jet pile and the third high-pressure rotary jet pile are connected by a yellow sand backfill compaction layer and a plain concrete force transmission belt.
[0006] Furthermore, the present invention provides a water-stop curtain at the ends of the underwater channel foundation pit along the water, and the third high-pressure rotary jet pile includes a lower pile and an upper pile connected by a connecting plate, and the connecting plate is located between the outer bank protection and the lower pile and the upper pile.
[0007] Furthermore, in the water-stop curtain at the ends of the underwater channel foundation pit along the water bank provided by the present invention, the depth of the second high-pressure rotary jet pile is less than the depth of the first high-pressure rotary jet pile.
[0008] Furthermore, the water-stop curtain at the ends of the underwater channel foundation pit along the water bank provided by the present invention, the density of the second high-pressure rotary jet pile is greater than the density of the first high-pressure rotary jet pile, and the second high-pressure rotary jet pile is compaction grouting.
[0009] Furthermore, the present invention provides a water-stop curtain at the ends of the underwater channel foundation pit along the water bank, the second high-pressure rotary jet pile is located on the inner side of the first high-pressure rotary jet pile, and the first high-pressure rotary jet pile and the third high-pressure rotary jet pile are located between the side wall of the underwater channel foundation pit and the foundation pit retaining piles.
[0010] Furthermore, in the water-stop curtains at the ends of the underwater channel foundation pit along both sides of the water provided by the present invention, the third high-pressure jet grouting piles are at the same height as the ground level.
[0011] Furthermore, the present invention provides a water-stop curtain at the ends of the underwater channel foundation pit along the water bank, and the foundation pit retaining piles include fourth high-pressure jet grouting piles and bored cast-in-place piles arranged in the underwater channel foundation pit.
[0012] Furthermore, the water-stop curtain at the ends of the underwater channel foundation pit along the water bank provided by the present invention, the contour line of the fourth high-pressure rotary jet pile is smaller than the contour line of the third high-pressure rotary jet pile, and the contour line of the fourth high-pressure rotary jet pile is at the same height as the outer bank protection set at the ends of the underwater channel foundation pit along the water bank.
[0013] Furthermore, the present invention provides a water-stop curtain at the ends of the underwater channel foundation pit along the water's banks, and the second high-pressure rotary jet piles, the third high-pressure rotary jet piles and the first high-pressure rotary jet piles beneath them are distributed in the length and width directions at the ends of the underwater channel foundation pit along the water's banks, forming a three-sided enclosed structure.
[0014] Compared with the prior art, the underwater channel foundation pit water-stop curtain provided by the present invention has a second high-pressure rotary jet pile horizontally connected to the first high-pressure rotary jet pile, and the pile foundation formed by the second high-pressure rotary jet pile and the first high-pressure rotary jet pile increases the contact area below the bottom plate of the underwater channel foundation pit, thereby improving the structural stability of the bottom plate and the pile foundation thereunder, and preventing the bottom plate of the underwater channel foundation pit from separating from the first high-pressure rotary jet pile and forming a leakage channel. When the first high-pressure rotary jet pile settles, the third high-pressure rotary jet pile vertically connected to the first high-pressure rotary jet pile keeps settling synchronously with the first high-pressure rotary jet pile, so that the third high-pressure rotary jet pile drops to the displacement of the first high-pressure rotary jet pile settlement, and the settlement gap between the first high-pressure rotary jet pile and the bottom plate of the underwater channel foundation pit is filled by the settlement of the third high-pressure rotary jet pile, avoiding the safety hazard of the leakage channel at the bottom plate of the underwater channel foundation pit, thereby preventing the underwater channel foundation pit from leakage. The second high-pressure rotary jet pile, the third high-pressure rotary jet pile and the first high-pressure rotary jet pile below them of the present invention are located on the inner side of the foundation pit retaining piles at the ends along both sides of the water of the underwater channel foundation pit. The second high-pressure rotary jet pile, the third high-pressure rotary jet pile and the first high-pressure rotary jet pile below them can reinforce the water-stopping effect of the foundation pit retaining piles. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 1 is a schematic diagram of a top view of the water-stop curtain according to an embodiment of the present invention;
[0016] Figure 2 It is a schematic diagram of the top view of the water-stop curtain at the ends of the underwater channel foundation pit along the water bank according to an embodiment of the present invention;
[0017] Figure 3 It is a schematic cross-sectional structure diagram of a water-stop curtain at the ends of both sides of the underwater channel foundation pit according to an embodiment of the present invention;
[0018] Figure 4 It is a partial cross-sectional structural schematic diagram of a water-stop curtain at the ends of both sides of the underwater channel foundation pit according to an embodiment of the present invention;
[0019] Figure 5 It is a partial cross-sectional structural schematic diagram of the other side of the water-stop curtain at the ends of both banks of the underwater channel foundation pit according to an embodiment of the present invention.
[0020] As shown in the figure: 100, underwater passage, 110, foundation pit, 111, bottom plate, 120, bored cast-in-place piles, 130, high-pressure rotary jet piles, 140, side walls, 150, outer revetment, 160, end, 170, box-type revetment, 171, temporary blocking wall, 180, ground plane, 200, water-stop curtain, 210, first high-pressure rotary jet pile, 220, second high-pressure rotary jet pile, 230, third high-pressure rotary jet pile, 231, lower section pile, 232, upper section pile, 233, connecting plate, 240, yellow sand backfill compaction layer, 250, plain concrete force transmission belt, 300, waterfront, 400, basement outer wall. DETAILED DESCRIPTION
[0021] The present invention is described in detail below in conjunction with the accompanying drawings:
[0022] Please refer to Figures 1 to 5 The embodiment of the present invention provides a water-stop curtain 200 for an underwater channel foundation pit, including a first high-pressure rotary jet pile 210 and a second high-pressure rotary jet pile 220 which are horizontally connected to each other below the bottom plate 111 at the end 160 on both sides of the underwater channel foundation pit 110, and a third high-pressure rotary jet pile 230 which is located above the bottom plate 111 of the underwater channel foundation pit 110 and vertically connected to the first high-pressure rotary jet pile 210; the second high-pressure rotary jet pile 220, the third high-pressure rotary jet pile 230 and the first high-pressure rotary jet pile 210 below are located on the inner side of the foundation pit retaining piles at the end 160 on both sides of the underwater channel foundation pit 110. The foundation pit retaining piles include but are not limited to the fourth high-pressure rotary jet pile 130 and the bored cast-in-place pile 120 which are arranged in the underwater channel foundation pit 110. The end 160 refers to the position corresponding to the underwater channel foundation pit 110 outside the water shoreline 300.
[0023] The first high-pressure jet grouting pile 210, the third high-pressure jet grouting pile 230 and the fourth high-pressure jet grouting pile 130 of the embodiment of the present invention include but are not limited to using The double row of high pressure jet grouting piles can be used to improve the strength of the high pressure jet grouting piles, thereby improving their stability as water stop piles. The second high pressure jet grouting pile 220 includes but is not limited to using Double-row high-pressure jet grouting piles with a cement content of 25% are used to reinforce the foundation pit. The bored piles 120 located between the third high-pressure jet grouting pile 230 and the fourth high-pressure jet grouting pile 130 include but are not limited to The bored piles at the bottom plate 111 can be
[0024] Please refer to Figures 3 to 5In order to achieve the vertical connection between the third high-pressure rotary jet pile 230 and the first high-pressure rotary jet pile 210, the embodiment of the present invention provides a water-stop curtain 200 at the end 160 of the underwater channel foundation pit 110 along both sides of the water, and the first high-pressure rotary jet pile 210 and the third high-pressure rotary jet pile 230 are connected by a yellow sand backfill compaction layer 240 and a plain concrete force transmission belt 250.
[0025] Please refer to Figure 3 and Figure 4 , the water-stop curtain 200 at the end 160 of the underwater channel foundation pit 110 along the water bank provided by the embodiment of the present invention, the third high-pressure rotary jet pile 230 includes a lower pile 231 and an upper pile 232 connected by a connecting plate 233, and the connecting plate 233 is located between the outer revetment 150 and the lower pile 231 and the upper pile 232. The upper pile 232 of the outer revetment 150 is connected to the ground level 180 with the lower pile 231 after backfilling. That is, the third high-pressure rotary jet pile 230 is at the same height as the ground level 180.
[0026] Please refer to Figures 3 to 5 In the embodiment of the present invention, the water-stop curtain 200 at the end 160 of the underwater channel foundation pit 110 along the water bank is provided, and the depth of the second high-pressure rotary jet pile 220 is less than the depth of the first high-pressure rotary jet pile.
[0027] Please refer to Figures 3 to 5 , the water-stop curtain 200 at the end 160 of the underwater channel foundation pit 110 along the water bank provided by the embodiment of the present invention, the density of the second high-pressure rotary jet pile 220 is greater than the density of the first high-pressure rotary jet column 210, and the second high-pressure rotary jet pile 220 is compaction grouting. The density of the second high-pressure rotary jet pile 220 is greater than the density of the first high-pressure rotary jet column 210, which can improve the connection reliability and structural stability of the second high-pressure rotary jet pile 220 to the first high-pressure rotary jet column 210. The compaction grouting further increases the density below the bottom plate 111, thereby preventing the first high-pressure rotary jet column 210 and the second high-pressure rotary jet pile 220 from settling synchronously.
[0028] Please refer to Figure 1 to Figure 2 The embodiment of the present invention provides a water-stop curtain 200 at the end 160 of the underwater channel foundation pit 110 along the water bank, the second high-pressure rotary jet pile 220 is located on the inner side of the first high-pressure rotary jet pile 210, and the first high-pressure rotary jet pile 210 and the third high-pressure rotary jet pile 230 are located between the side wall 140 and the foundation pit retaining pile of the underwater channel foundation pit 110. The embodiment of the present invention reinforces the water-stopping effect at the end 160 of the underwater channel foundation pit by adding the third high-pressure rotary jet pile 230 vertically connected with the first high-pressure rotary jet pile 210 between the original foundation pit retaining pile and the side wall 140, thereby improving the water-stopping ability and overcoming or eliminating the leakage problem at the end 160 of the underwater channel foundation pit.
[0029] Please refer to Figures 3 to 5 In the embodiment of the present invention, the water-stop curtain 200 at the end 160 along the water bank of the underwater channel foundation pit 110 is provided, and the contour line of the fourth high-pressure rotary jet pile 130 is smaller than the contour line of the third high-pressure rotary jet pile 230, and the contour line of the fourth high-pressure rotary jet pile 130 is at the same height as the outer bank protection 160 set at the end 160 along the water bank of the underwater channel foundation pit 110.
[0030] Please refer to Figure 1 to Figure 2 The water-stop curtain 200 provided by the embodiment of the present invention is provided at the end 160 of the underwater channel foundation pit 110 along the water bank, and the second high-pressure rotary jet pile 220, the third high-pressure rotary jet pile 230 and the first high-pressure rotary jet pile 210 below are distributed in the length direction and width direction of the end 160 of the underwater channel foundation pit 110 along the water bank, forming a three-sided enclosed structure. Therefore, the water-stop curtain 200 of the embodiment of the present invention can prevent leakage problems on three sides of the end 160 of the underwater channel foundation pit 110 along the water bank, and improve the water-stopping effect.
[0031] The third high-pressure rotary jet grouting pile 230 and the first high-pressure rotary jet grouting pile 210 under it in the embodiment of the present invention should use ordinary Portland cement with a strength grade of 42.5 or above for projects without special requirements. The smaller the water-cement ratio of the cement slurry, the higher the strength of the foundation treated by high-pressure jet grouting. Generally, 0.8-2.0 is used. The unconfined compressive strength of the cement soil of the pile body shall not be less than 2.5Mpa after 28 days. The compressive modulus of the pile body shall not be less than 80-90Mpa.
[0032] The underwater channel foundation pit 110 water-stop curtain 200 provided in the embodiment of the present invention has a second high-pressure rotary jet pile 220 horizontally connected to the first high-pressure rotary jet pile 210. The pile foundation formed by the second high-pressure rotary jet pile 220 and the first high-pressure rotary jet pile 210 increases the contact area below the bottom plate 111 of the underwater channel foundation pit 110, thereby improving the structural stability of the bottom plate 111 and the pile foundation thereunder, and preventing the bottom plate 111 of the underwater channel foundation pit 110 from detaching from the first high-pressure rotary jet pile 210 to form a leakage channel. When the first high-pressure rotary jet pile 210 sinks, the third high-pressure rotary jet pile 230 vertically connected to the first high-pressure rotary jet pile 210 keeps sinking synchronously with the first high-pressure rotary jet pile 210, so that the third high-pressure rotary jet pile 230 drops to the displacement of the first high-pressure rotary jet pile 210. The settlement gap between the first high-pressure rotary jet pile 210 and the bottom plate 111 of the underwater channel foundation pit 110 is filled through the settlement of the third high-pressure rotary jet pile 230, thereby avoiding the safety hazard of a leakage channel at the bottom plate 111 of the underwater channel foundation pit 110, thereby preventing leakage of the underwater channel foundation pit 110. The second high-pressure rotary jet pile 220, the third high-pressure rotary jet pile 230 and the first high-pressure rotary jet pile 210 below the embodiment of the present invention are located on the inner side of the foundation pit retaining piles at the end 160 along the water bank of the underwater channel foundation pit 110, and the water-stopping effect of the foundation pit retaining piles can be reinforced by the second high-pressure rotary jet pile 220, the third high-pressure rotary jet pile 230 and the first high-pressure rotary jet pile 210 below. That is, the embodiment of the present invention can stop water by high-pressure rotary jet piles. In order to further improve the water-stopping effect, a rubber waterstop is provided in the structural joint.
[0033] The high-pressure jet grouting pile slurry strips the soil and fully mixes it with the ejected slurry to form a columnar pile body, forming a continuous overlapping cement reinforcement body. It has the advantages of small construction area, small vibration, and low noise. It is suitable for treating silt, silty soil, fluid plastic, soft plastic or plastic clay, silt, sand, loess, plain fill and gravel soil. The consolidation body produced by the high-pressure jet grouting technology has good strength and toughness, and its anti-seepage performance is good.
[0034] Please refer to Figures 3 to 5 In order to improve the stability of the underwater channel, the embodiment of the present invention is provided with a box-type revetment 170 above the bottom plate 111, and a temporary blocking wall 171 is provided at the joint surface between the box-type revetment 170 and the third high-pressure rotary jet pile 230. Of course, the box-type revetment 170 and the third high-pressure rotary jet pile 230 can also be connected by ribs to improve the reliability of the mutual connection.
[0035] The third high-pressure jet grouting pile 230 of the embodiment of the present invention can be replaced by a Larsen steel sheet pile.
[0036] The embodiment of the present invention is suitable for a water-stop curtain for an underwater passage across a river, and is particularly suitable for a water-stop curtain for an underwater passage across a river. Figure 1The water-stop curtain 200 of the embodiment of the present invention can prevent leakage into the basement outer wall 400 and the basement garage constructed behind it.
[0037] The present invention is not limited to the above specific embodiments, and any deformation and modification made by those skilled in the art based on the above contents shall fall within the protection scope of the claims of the present invention.
Claims
1. A water-stop curtain at the ends of the underwater channel foundation pit along the water bank. It is characterized in that It comprises a first high-pressure rotary jet pile and a second high-pressure rotary jet pile which are horizontally connected to each other below the bottom plate at the ends of the underwater channel foundation pit along the water, a third high-pressure rotary jet pile which is located above the bottom plate of the underwater channel foundation pit and vertically connected to the first high-pressure rotary jet pile, the third high-pressure rotary jet pile is at the same height as the ground plane, the third high-pressure rotary jet pile comprises a lower pile and an upper pile connected by a connecting plate, the connecting plate is located between the outer revetment and the lower pile and the upper pile; the second high-pressure rotary jet pile, the third high-pressure rotary jet pile and the first high-pressure rotary jet pile below them are located on the inner side of the foundation pit retaining piles at the ends of the underwater channel foundation pit along the water, the second high-pressure rotary jet pile, the third high-pressure rotary jet pile and the first high-pressure rotary jet pile below them are distributed in the length direction and the width direction at the ends of the underwater channel foundation pit along the water, forming a three-sided enclosed structure; the foundation pit retaining piles comprise a fourth high-pressure rotary jet pile and a bored cast-in-place pile arranged in the underwater channel foundation pit.
2. The water-stop curtain at the ends of the underwater channel foundation pit along the water bank as claimed in claim 1, It is characterized in that The first high-pressure rotary jet grouting pile and the third high-pressure rotary jet grouting pile are connected by a yellow sand backfill compaction layer and a plain concrete force transmission belt.
3. The water-stop curtain at the ends of the underwater channel foundation pit along the water bank as claimed in claim 1, It is characterized in that The depth of the second high-pressure jet grouting pile is less than the depth of the first high-pressure jet grouting pile.
4. The water-stop curtain at the ends of the underwater channel foundation pit along the water bank as claimed in claim 1, It is characterized in that The density of the second high-pressure rotary jet pile is greater than the density of the first high-pressure rotary jet pile, and the second high-pressure rotary jet pile is compacted grouting.
5. The water-stop curtain at the ends of the underwater channel foundation pit along the water bank as claimed in claim 1, It is characterized in that The second high-pressure jet grouting pile is located inside the first high-pressure jet grouting pile, and the first high-pressure jet grouting pile and the third high-pressure jet grouting pile are located between the side wall of the underwater channel foundation pit and the foundation pit retaining piles.
6. The water-stop curtain at the ends of the underwater channel foundation pit along the water bank as claimed in claim 1, It is characterized in that The contour line of the fourth high-pressure rotary jet pile is smaller than the contour line of the third high-pressure rotary jet pile, and the contour line of the fourth high-pressure rotary jet pile is at the same height as the outer bank protection at the ends of both sides of the underwater channel foundation pit along the water.