A shallow circular silo assembled silo roof cover and its construction process

By designing a prefabricated silo roof, an overall support frame is formed by an upper ring beam, a lower ring beam, a prestressed support beam, and a prestressed plate, which solves the problems of safety risks and poor stability in the construction of shallow circular silos and achieves an efficient and safe construction process.

CN110805346BActive Publication Date: 2024-11-12HENAN UNIVERSITY OF TECHNOLOGY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911090342.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-08
Publication Date
2024-11-12
Estimated Expiration
2039-11-08

AI Technical Summary

Technical Problem

Existing construction methods for shallow circular silo roofs have issues with construction safety risks and poor stability, especially during the construction of high formwork and truss platforms.

Method used

The shallow circular silo prefabricated silo top cover is adopted, including an upper ring beam, a lower ring beam, a prestressed support beam and a prestressed plate. It forms an integral support frame through a connecting mechanism and shear bolts, avoiding the use of high formwork and truss platforms. Factory prefabricated components are used for hoisting.

Benefits of technology

It effectively shortened the construction period, avoided safety risks, ensured the stability and uniformity of stress during construction, and improved the waterproofing effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110805346B_ABST
    Figure CN110805346B_ABST
Patent Text Reader

Abstract

The present invention discloses a shallow circular silo assembled silo roof cover and its construction process, including: an upper ring beam, a lower ring beam, a prestressed support beam and a prestressed plate, one end of the prestressed support beam and the prestressed plate are connected to the upper ring beam, and the other end is connected to the lower ring beam; the prestressed plate is laid on the prestressed support beam, and the upper ring beam and four symmetrically arranged prestressed support beams and prestressed plates are cast into a whole to form an integral support skeleton. The present invention does not need to be assembled on a high formwork or installed supporting tower, and the time for disassembling the formwork or tower is eliminated, which effectively shortens the construction period; there is no need to set up a scaffolding or truss platform, which completely avoids the safety risk problems in setting up the scaffolding and the safety problems in the process of lowering the silo roof truss platform.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of granaries, and more specifically relates to an assembled silo roof cover for a shallow circular silo and a construction process thereof. Background Art

[0002] Shallow silos, also known as short silos, are common circular grain storage silos located above the ground with a radius of more than 10 meters. Shallow silos play a certain supporting role in improving grain storage facilities, changing the current situation of grain circulation, solving the problem of insufficient storage capacity, ensuring grain safety, and maximizing the economic and social benefits of grain enterprises.

[0003] At present, there are usually two methods for the construction of the roof of the shallow round silo: one is to follow the traditional high-support formwork construction process, and the other method is to use the silo roof truss platform. The traditional high-support formwork construction process method has a high scaffolding height, low overall rigidity, large deformation, and poor stability, which poses a construction safety risk; the silo roof truss platform construction process method has poor synchronization due to manual control, such as the start time, control time, hand sprocket force and speed, and poor balance and stability during the descent of the truss platform. The force on each hanging point will also change during the descent of the truss platform. Once the descent is not synchronized, the entire truss platform will tilt and deviate; since the gap between the truss platform and the inner wall of the silo is limited, the tilted and deviated truss platform may collide with the inner wall of the silo and scratch it. In severe cases, accidents such as truss tipping may even occur.

[0004] Therefore, how to provide a shallow cylindrical silo assembled silo roof cover and its construction process is a problem that technical personnel in this field urgently need to solve. Summary of the invention

[0005] In view of this, the present invention provides a shallow circular silo assembled silo roof cover and a construction process thereof, which does not require assembly on a high formwork or installation of a supporting tower, thereby eliminating the time for disassembling the formwork or tower, and effectively shortening the construction period; there is no need to set up a scaffolding or truss platform, which completely avoids the safety risks in setting up the scaffolding and the safety issues in the process of lowering the silo roof truss platform.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] A shallow circular silo assembled silo roof cover comprises: an upper ring beam, a lower ring beam, a prestressed support beam and a prestressed plate, wherein one end of the prestressed support beam and the prestressed plate are connected to the upper ring beam, and the other end is connected to the lower ring beam; the prestressed plate is laid on the prestressed support beam, and the upper ring beam and four symmetrically arranged prestressed support beams and the prestressed plate are cast into a whole to form an integral support skeleton.

[0008] Preferably, sixteen prestressed support beams are provided, one end of each of the twelve prestressed support beams is connected to the upper ring beam through a connecting mechanism, and the other end is overlapped on the lower ring beam, thereby realizing the hoisting of the twelve prestressed support beams.

[0009] Preferably, sixteen prestressed plates are provided, and one end of twelve of the prestressed plates are connected to the upper ring beam through a connecting mechanism, and the other end is connected to the lower ring beam through a connecting mechanism, thereby realizing the hoisting of the twelve prestressed plates.

[0010] Preferably, the connecting mechanism includes connecting parts and shear bolts, and the connecting parts are respectively arranged at the nodes between the prestressed support beam and the upper ring beam and at the nodes between the prestressed plate and the upper ring beam and the lower ring beam, and are fixed by shear bolts.

[0011] Preferably, waterproof rubber sealing strips are provided between the prestressed plate and the upper ring beam, between the prestressed plate and the lower ring beam, and between the support beam and the upper ring beam. The provision of the waterproof rubber sealing strips plays a role in waterproofing and water isolation.

[0012] Preferably, the angle between the prestressed plate and the upper ring beam is 67.5 degrees, which ensures that water on the top of the prestressed plate can flow down smoothly, is beneficial to waterproofing, and is beneficial to enhancing external loads.

[0013] Preferably, a waterproof roll is laid on the prestressed plate. The provision of the waterproof roll further enhances the waterproof effect of the warehouse roof.

[0014] A construction process for an assembled silo roof cover of a shallow circular silo comprises the following steps: firstly, an upper ring beam and four symmetrically arranged support beams and prestressed plates are cast into a whole to form an integral support skeleton; then a lower ring beam and twelve prestressed support beams and prestressed plates are cast; after curing for 25 to 30 days, the lower ring beam is hoisted first, and then the support skeleton is hoisted, the support skeleton is anchored on the lower ring beam, and then the remaining twelve prestressed support beams and prestressed plates are anchored and connected to the upper ring beam and the lower ring beam respectively to complete the hoisting.

[0015] Preferably, waterproof rubber sealing strips are fixed on the four sides of the prestressed support beam and the prestressed plate before they are hoisted, thereby greatly improving the waterproof effect at the nodes between the prestressed support beam and the upper ring beam after hoisting, and at the nodes between the prestressed plate and the upper ring beam and the lower ring beam.

[0016] Preferably, a waterproof membrane is laid on top of the silo roof after the hoisting is completed for waterproofing.

[0017] The beneficial effects of the present invention are:

[0018] In the present invention, the upper ring beam is cast together with four symmetrical prestressed support beams and prestressed plates into a whole to form a support skeleton. There is no need to assemble them on a high formwork or install a support tower. This saves time in disassembling the formwork or the tower, and effectively shortens the construction period. The overall support skeleton is hoisted and assembled without the need to set up a scaffold or truss platform, which completely avoids the safety risks in setting up the scaffold and the safety problems in the process of lowering the warehouse roof truss platform. The prestressed support beams and prestressed plates are symmetrically assembled through rigid-strength shear bolts to form an overall force-bearing structure with uniform force, avoiding the problem of stress concentration. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0020] Figure 1 It is a cross-sectional view of the present invention.

[0021] Figure 2 It is a schematic diagram of the connection structure between the prestressed support beam and the upper ring beam of the present invention.

[0022] Figure 3 It is a schematic diagram of the connection structure between the prestressed plate and the upper ring beam of the present invention.

[0023] Figure 4 It is a schematic diagram of the connection structure between the prestressed plate and the lower ring beam of the present invention.

[0024] Figure 5 It is a top view of the present invention.

[0025] Among them, in the figure,

[0026] 1-upper ring beam; 2-prestressed support beam; 3-connecting parts; 4-waterproof rubber sealing strip; 5-shear bolts; 6-shear nuts; 7-prestressed plate; 8-lower ring beam; 9-waterproof membrane. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] Please see attached Figure 1-5 The present invention provides a shallow circular silo assembled silo roof cover, comprising: an upper ring beam 1, a lower ring beam 8, a prestressed support beam 2 and a prestressed plate 7, wherein one end of the prestressed support beam 2 and the prestressed plate 7 are connected to the upper ring beam 1, and the other end is connected to the lower ring beam 8; the prestressed plate 7 is laid on the prestressed support beam 2 in a circumferential arrangement, and the upper ring beam 1 and four symmetrically arranged prestressed support beams 2 and prestressed plates 7 are cast into a whole to form an integral support skeleton. The upper ring beam 1 and the lower ring beam 8 are to enhance the integrity and spatial rigidity of the silo roof cover and resist the influence of seismic forces; the prestressed support beam 2 bears the load transmitted from the upper part; the prestressed plate 7 plays the role of heat preservation, heat insulation, and bearing external loads. Among them, the prestressed support beam 2 adopts a reinforced concrete support beam, and the prestressed plate 7 adopts a reinforced concrete plate.

[0029] In another embodiment, sixteen prestressed support beams 2 are provided, one end of each of the twelve prestressed support beams 2 is connected to the upper ring beam 1 through a connecting mechanism, and the other end is overlapped on the lower ring beam 8, thereby realizing the lifting of the twelve prestressed support beams 2.

[0030] In another embodiment, sixteen prestressed plates 7 are provided, one end of each of the twelve prestressed plates 7 is connected to the upper ring beam 1 through a connecting mechanism, and the other end of each of the twelve prestressed plates 7 is connected to the lower ring beam 8 through a connecting mechanism, thereby realizing the hoisting of the twelve prestressed plates 7.

[0031] The connection mechanism includes a connection piece 3 and a shear bolt 5. The connection piece 3 is arranged at the node between the prestressed support beam 2 and the upper ring beam 1. One end of the connection piece 3 is fixedly connected to the prestressed support beam 2 through the shear bolt 5, and the other end is fixedly connected to the upper ring beam 1 through the shear bolt 5, and is locked by a shear nut 6. The connection piece 3 is arranged at the node between the prestressed plate 7 and the upper ring beam 1. One end of the connection piece 3 is fixedly connected to the prestressed plate 7 through the shear bolt 5, and the other end is fixedly connected to the upper ring beam 1 through the shear bolt 5, and is locked by a shear nut 6. The connection piece 3 is arranged at the node between the prestressed plate 7 and the lower ring beam 8. One end of the connection piece 3 is fixedly connected to the prestressed plate 7 through the shear bolt 5, and the other end is fixedly connected to the lower ring beam 8 through the shear bolt 5, and is locked by a shear nut 6. Thus, the prestressed support beam 2 and the upper ring beam 1 and the lower ring beam 8, and the prestressed plate 7 and the upper ring beam 1 and the lower ring beam 8 are firmly fixed to form a whole.

[0032] In another embodiment, waterproof rubber sealing strips 4 are arranged between the prestressed plate 7 and the upper ring beam 1, between the prestressed plate 7 and the lower ring beam 8, and between the support beam and the upper ring beam 1. The arrangement of the waterproof rubber sealing strips 4 plays a role of waterproofing and water isolation.

[0033] In another embodiment, the angle α between the prestressed plate 7 and the upper ring beam 1 is 67.5 degrees, which ensures that water on the top of the prestressed plate 7 can flow down smoothly, is beneficial to waterproofing, and is beneficial to enhancing external loads.

[0034] In another embodiment, a waterproof roll 9 is laid on the prestressed plate 7. The provision of the waterproof roll 9 further enhances the waterproof effect of the warehouse roof.

[0035] The present invention also provides a construction process for an assembled silo roof cover of a shallow circular silo. When the upper ring beam 1 is cast in the prefabrication factory, the shear bolts 5 are embedded in the embedded design position of the upper ring beam 1, and the upper ring beam 1 is cast together with four symmetrical prestressed support beams 2 and prestressed plates 7 into a whole to form an integral support skeleton; when the remaining twelve prestressed support beams 2 and twelve reinforced concrete plates are cast, the shear bolts 5 are embedded in the embedded design position, and when the lower ring beam 8 is cast, the shear bolts 5 are embedded in the embedded design position; after curing for 28 days, the lower ring beam is transported to the site for hoisting and installation, and the lower ring beam is hoisted first. 8, and then hoist the supporting frame, anchor the prestressed plate 7 of the supporting frame to the shear bolts 5 of the lower ring beam 8, and then symmetrically hoist and assemble four prestressed supporting beams 2 at the designed position for anchoring connection, and so on, after the prestressed supporting beams 2 are hoisted; before the prestressed plate 7 is hoisted, fix the waterproof rubber sealing strip 4 on the four sides of the prestressed plate 7, and then symmetrically hoist and assemble four prestressed plates 7 at the designed position for anchoring connection, and so on, after the prestressed plate 7 is symmetrically hoisted, finally, after the hoisting of the prefabricated components of the warehouse roof cover structure is completed, use self-adhesive waterproof membrane 9 for waterproofing.

[0036] The present invention fixes the waterproof rubber sealing strip 4 on the four sides of the prestressed support beam 2 and the prestressed plate 7 before hoisting, thereby greatly improving the waterproof effect at the nodes of the prestressed support beam 2 and the upper ring beam 1 after hoisting, and at the nodes of the prestressed plate 7 and the upper ring beam 1 and the lower ring beam 8.

[0037] The present invention mainly uses factory prefabricated components, which are no longer affected by natural environmental conditions, and the scientific construction process effectively shortens the production cycle of prefabricated components. Reasonable prefabricated concrete components can reduce on-site construction breaks or shorten the break time; the upper ring beam 1 is cast together with four symmetrical prestressed support beams 2 and prestressed plates 7 into a whole to form a support skeleton, which no longer needs to be assembled on a high formwork or installed with a support tower, thus eliminating the time for dismantling the formwork or tower and effectively shortening the construction period; the overall support skeleton is hoisted and assembled, and there is no need to set up a scaffolding or truss platform, which completely avoids the safety risk problems in setting up the scaffolding and the safety problems in the process of lowering the warehouse roof truss platform; the symmetrically assembled prestressed support beams 2 and prestressed plates 7 are connected by rigid-strength shear bolts 5 to form an overall force-bearing structure, which is evenly stressed and avoids stress concentration problems.

[0038] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0039] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A shallow round silo assembled silo roof cover, characterized in that: include: An upper ring beam, a lower ring beam, a prestressed support beam and a prestressed plate, wherein one end of the prestressed support beam and the prestressed plate are connected to the upper ring beam, and the other end is connected to the lower ring beam; the prestressed plate is laid on the prestressed support beam, and the upper ring beam and the four symmetrically arranged prestressed support beams and the prestressed plate are cast into a whole to form an integral support skeleton; Sixteen prestressed support beams are provided, one end of each of the twelve prestressed support beams is connected to the upper ring beam through a connecting mechanism, and the other end is overlapped on the lower ring beam; Sixteen prestressed plates are provided, one end of twelve of the prestressed plates are connected to the upper ring beam through a connecting mechanism, and the other end of twelve of the prestressed plates are connected to the lower ring beam through a connecting mechanism; Among them, the prestressed support beam adopts reinforced concrete support beam, and the prestressed slab adopts reinforced concrete slab; The connection mechanism includes a connection piece and a shear bolt, wherein the connection piece is respectively arranged at the node between the prestressed support beam and the upper ring beam and at the node between the prestressed plate and the upper ring beam and the lower ring beam, and is fixed by the shear bolt; Specific construction techniques include: First, cast the upper ring beam and the four symmetrically arranged support beams and the prestressed plates into a whole to form an integral support skeleton; then cast the lower ring beam and the twelve prestressed support beams and prestressed plates; after curing for 25 to 30 days, first hoist the lower ring beam, then hoist the support skeleton, anchor the support skeleton on the lower ring beam, and then respectively anchor the remaining twelve prestressed support beams and prestressed plates to the upper ring beam and the lower ring beam to complete the hoisting; Before the prestressed support beam and the prestressed plate are hoisted, the waterproof rubber sealing strip is fixed on the four sides of the prestressed support beam and the prestressed plate; After the hoisting is completed, waterproof membrane is laid on the top cover of the warehouse for waterproofing.

2. The shallow cylindrical silo assembled silo roof cover according to claim 1, characterized in that: Waterproof rubber sealing strips are arranged between the prestressed plate and the upper ring beam, between the prestressed plate and the lower ring beam, and between the support beam and the upper ring beam.

3. The shallow silo assembled silo roof cover according to claim 1 is characterized in that: The angle between the prestressed plate and the upper ring beam is 67.5 degrees.

4. The shallow cylindrical silo assembled silo roof cover according to claim 1, characterized in that: A waterproof roll is laid on the prestressed plate.