A novel high-efficiency installation node assembly integral beam column and its production design method
By using new and efficient installation nodes to assemble integral beams and columns in prefabricated buildings, the problems of steel bar collision and steel bar arrangement are solved, the safety and construction efficiency of nodes are improved, and high integration and rapid installation of prefabricated production are achieved.
Patent Information
- Application Number
- CN201911267682.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-11
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2039-12-11
AI Technical Summary
In prefabricated buildings, there are problems with the collision of steel bars and the arrangement and bending methods of steel bars at beam and column nodes, which affects the safety and construction efficiency of the nodes.
Using new efficient installation nodes to assemble integral beams and columns, by prefabricating beams and column components in the factory and cast-in-place connections on site, using technologies such as shelved primary and secondary beam connections, embedded mechanical connection joints and reinforcement bending anchorage, avoiding Rebar collision and optimize the layout of reinforcement.
It effectively avoids collision of steel bars, improves the safety and stability of beam and column connection nodes, improves the installation efficiency of construction sites, and realizes the high degree of integration of prefabricated production and the convenience of construction and installation.
Smart Images

Figure CN110847355B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of reinforced concrete assembled building structure engineering, and in particular to a novel high-efficiency installation node assembled integral beam column and a production design method thereof. Background Art
[0002] Prefabricated and assembled structures are concrete components such as beams, slabs, columns, and walls that are prefabricated in factories and then transported to the construction site for assembly or cast-in-place at key nodes to eventually build a building.
[0003] The design of beam and column nodes of prefabricated concrete structures should generally meet basic requirements such as reasonable force, good integrity, simple construction and beautiful appearance.
[0004] Due to different specifications, the classification of connection methods is diverse, but from the perspective of construction technology, most of them are divided into two types: dry connection and wet connection. Wet connection refers to the prefabrication of the main components of the building in the factory, and the overall connection of the building is achieved by pouring nodes on the construction site. It is the most widely used connection method in prefabricated structures in my country. Today, when dry connection technology is not yet mature, wet connection technology is still an indispensable key magic weapon for the country to vigorously promote overall prefabricated buildings.
[0005] In prefabricated frame structures, the performance of beam and column nodes is related to the overall performance of the building.
[0006] In terms of the characteristics of prefabricated buildings themselves, the quality of prefabricated components is absolutely reliable, and the combination of these components into buildings relies on nodes, so the performance of nodes is related to the overall performance of the building.
[0007] From the perspective of the stress characteristics of beam-column joints, beam-column joints not only have complex stress and force transmission mechanisms, but also are prone to non-ductile failure. Beam-column joints are both the key parts of a building's load-bearing and stress-bearing structure and the weakest link in a building. Once damaged, serious consequences will occur.
[0008] In wet connection, the bending stiffness of the beam can be changed by changing the number of upper and lower steel bars of the beam to form a plastic hinge. At the same time, the diagonal bars can also enhance the shear resistance of the beam. Summary of the invention
[0009] The present invention is to solve one of the above-mentioned technical problems. After technical research, the company has developed an assembled integral beam-column node steel bar avoidance structure and method. The technical solution adopted is: a new type of efficient installation node assembled integral beam-column, comprising a column assembly and a plurality of layers of beam assemblies arranged from top to bottom, the plurality of layers of beam assemblies comprising a beam assembly located at the top layer and a beam assembly located at a standard layer, the beam assembly comprising a cross beam assembly (16) and a longitudinal beam assembly (17), the cross beam assembly (16) comprising a plurality of prefabricated main beams (3) arranged at intervals, the longitudinal beam assembly (17) comprising a plurality of prefabricated secondary beams (4), the prefabricated main beams (3) and the prefabricated secondary beams (4) being connected by a shelving type main and secondary beams, the column assembly (18) comprising a plurality of prefabricated columns, each of the prefabricated columns being vertically connected to the bottom of the beam assembly, and each of the prefabricated beams being overlapped and fixedly connected to the cast-in-place secondary beams (2).
[0010] By prefabricating various parts and components such as integral beams and columns assembled at new and efficient installation nodes in the factory, they are transported to the construction site for construction and installation of cast-in-place beam and column connection nodes.
[0011] Preferably, a bullfighting plate is installed at the connection point between the prefabricated main beam (3) and the corresponding prefabricated secondary beam (4) at the shelved main-secondary beam connection node, one end of the bullfighting plate is connected to the corresponding prefabricated main beam (3) through an embedded part fixedly connected thereto, and the other end of the bullfighting plate is connected to the corresponding prefabricated secondary beam (4) through a plurality of bolts fixedly connected thereto.
[0012] Preferably, at the connection node between the cast-in-place secondary beam (2) and the prefabricated beam, the cast-in-place secondary beam (2) is connected to the current prefabricated beam through a pre-buried primary mechanical connection joint and connecting steel bars at the end.
[0013] Preferably, the lower layer of prefabricated columns connected to the cast-in-place beams at the cross-section change point of the prefabricated columns are connected to the upper layer of prefabricated columns by bending steel bars. Figure 6 as shown in .
[0014] A novel production design method for efficiently installing node-assembled integral beam-columns comprises the following steps:
[0015] a. Design the steel bar avoidance method at the node connection of the new type of efficient node assembly integral beam-column and the arrangement design of the column variable section steel bars;
[0016] b. Use group molds on automated production lines to produce new, efficient installation nodes to assemble integral beams and columns.
[0017] Preferably, the specific design method of the steel bar avoidance design at the node connection of the novel high-efficiency installation node assembly integral beam-column and the column variable-section steel bar arrangement design in step a is as follows:
[0018] (1) Shelved main and secondary beam connection; the node diagram is as follows Figure 2 As shown in:
[0019] The shelving type main and secondary beam connection nodes are mainly that the shelving type prefabricated secondary beam (4) is overlapped on the shelving type prefabricated main beam (3) through a pre-buried ox-carrying plate, the ox-carrying plate is fixed to the shelving type prefabricated secondary beam (4) through bolts during installation, and the shelving type prefabricated main beam (3) and the shelving type prefabricated secondary beam (4) are filled with grouting material at the overlap of the ox-carrying plate;
[0020] (2) The connection node between cast-in-place secondary beam (2) and precast beam; the node diagram is as follows Figure 3 As shown in:
[0021] The load-bearing steel bars of the cast-in-place secondary beam (2) and the precast beam 1 are connected by pre-embedded primary mechanical connection joints and connecting steel bars in the precast beam 1, and the diameter of the connecting steel bars is consistent with the longitudinal bars of the beam, and the stirrups in the overlap area are denser;
[0022] (3) Anchorage of longitudinal reinforcement in the node area of precast beams and columns at standard floors; the node diagram is as follows: Figure 4 As shown in:
[0023] ① The node in the standard layer when the height of precast beams is consistent;
[0024] The standard layer mid-node precast beam (5) is overlapped on the standard layer mid-node precast column (6). The longitudinal reinforcement anchorage can be achieved by bending the steel bar. The bending length of the steel bar is 15d (d is the diameter of the steel bar). The steel bar extension anchorage length of the standard layer mid-node precast beam (5) should be greater than or equal to 0.4LabE.
[0025] ②Nodes in standard layers when precast beam heights are inconsistent;
[0026] The standard layer mid-node precast beam (5) is overlapped on the standard layer mid-node precast column (6). The longitudinal reinforcement anchorage of the standard layer mid-node precast beam (5) with a small height can be fixed by bending the steel bar, and the bending length is 15d (d is the steel bar diameter); the standard layer mid-node precast beam (5) with a large height can be fixed by anchoring plates, and the steel bar extension anchorage length of the standard layer mid-node precast beam (5) should be greater than or equal to 0.4LabE;
[0027] ③ Standard layer end node;
[0028] The standard layer end node precast beam (7) is overlapped on the standard layer end node precast column (8), and the longitudinal reinforcement anchorage of the standard layer end node precast beam (7) can be fixed by bending the steel bars or adding anchor plates;
[0029] (4) Anchorage of longitudinal reinforcement in the node area of top precast beams and columns; the node diagram is as follows: Figure 5 As shown in:
[0030] ① The middle node of the top floor when the height of the precast beams is consistent;
[0031] The top-layer mid-node precast beam (9) is overlapped on the top-layer mid-node precast column 10. The longitudinal reinforcement anchorage of the top-layer mid-node precast beam (9) can be achieved by bending the reinforcement. The bending length is 15d (d is the reinforcement diameter). The overhanging anchorage length of the reinforcement of the top-layer mid-node precast beam (9) should be greater than or equal to 0.4LabE.
[0032] The reserved anchorage length of the steel bars of the precast column 10 at the top mid-node should be greater than or equal to 0.5LabE, and the reserved steel bars are fixed by means of anchor plates (if the straight anchor requirements are met, no anchor plate is required);
[0033] ② The top mid-node when the precast beam heights are inconsistent;
[0034] The top-layer mid-node precast beam (9) is overlapped on the top-layer mid-node precast column 10. The top-layer mid-node precast beam (9) with a small height can be anchored with a steel bar bending method, with a bending length of 15d (d is the steel bar diameter).
[0035] The top-level mid-node prefabricated beam (9) with a large height can be fixed by means of an anchor plate;
[0036] The extended anchorage length of the reinforcement of the precast beam (9) at the top mid-node should be greater than or equal to 0.4LabE; the reserved anchorage length of the reinforcement of the precast column 10 at the top mid-node should be greater than or equal to 0.5LabE, and the reserved reinforcement is fixed by means of anchor plates (if the straight anchor requirement is met, the anchor plate may not be provided);
[0037] ③Top-level end node;
[0038] In this case, the outwardly extending anchorage steel bars of the top-level end node precast columns (12) and the top-level end node precast beams (11) are anchored in the form of anchor plates;
[0039] (5) Longitudinal reinforcement structure at the section change point of precast column; the node diagram is as follows: Figure 6 As shown in:
[0040] ① When the variable cross-section of the prefabricated column is not eccentric;
[0041] When the longitudinal reinforcement of the lower precast column 15 is bent, the ratio of the transverse bending length to the longitudinal bending length at the bending point of the reinforcement should be less than or equal to 1 / 6, and the longitudinal reinforcement of the upper variable-section precast column (14) and the lower precast column 15 is connected by a grouting sleeve;
[0042] ② When the precast column has a variable cross-section and is eccentric;
[0043] When the longitudinal reinforcement of the lower precast column 15 is bent, the ratio of the transverse bending length to the longitudinal bending length at the bending point of the reinforcement should be less than or equal to 1 / 6, and the longitudinal reinforcement of the upper variable-section precast column (14) and the lower precast column 15 is connected by a grouting sleeve;
[0044] Preferably, when avoiding the steel bars of beams and columns, the maximum bending ratio of the steel bars should be ensured to be 1 / 6, that is, the ratio of the transverse to longitudinal bending length is less than or equal to 1 / 6.
[0045] Preferably, in step b, the steps of using a group mold to produce a novel high-efficiency installation node assembly integral beam column on an automated production line are as follows:
[0046] (1) Mold processing:
[0047] Clean the surface of the group formwork, make it smooth and free of residues and foreign matter, and clean the cement slurry and concrete residues on the surface;
[0048] (2) Positioning and installation of reserved tongue and groove of group mold, reserved hole for keyway, embedded parts for lifting, embedded parts for connection, and anti-slip strips;
[0049] Accurately install the reserved structural waterproof tongue and groove accessories on the side template surface of the mold, and at the same time install the keyway reserved holes, lifting embedded parts, and connecting embedded parts accessories required for on-site construction installation and hoisting on the template surface;
[0050] (3) Install the steel grid for assembling integral beams and columns;
[0051] According to the design drawings, the steel bars are tied into a steel mesh in the steel bar tying area, and hoisted to the assembled integral beam-column group formwork for installation and positioning by hoisting equipment;
[0052] (4) Concrete pouring: The prefabricated integral beam-column shall be subjected to hidden inspection before concrete pouring. After the inspection, the concrete shall be poured by an automatic concrete placing machine. The concrete shall be poured continuously.
[0053] Ensure that the concrete is vibrated densely and evenly; when the molds, embedded parts, steel grids, etc. are deformed or displaced, reinforcement and corrective measures should be taken in time;
[0054] (5) Maintenance and demoulding;
[0055] After the concrete is poured, let it rest for a period of time, then steam-cure the assembled integral beams and columns. Before removing the formwork and lifting, check the strength of the concrete test blocks cured under the same conditions. Remove the formwork and lift them after reaching the designed strength for removing the formwork and lifting.
[0056] The beneficial effects of the present invention are embodied in:
[0057] The main purpose of this structure and construction method is to solve the problems of steel bar collision at the connection nodes of beams and columns in on-site construction of prefabricated building structures; it not only effectively avoids the steel bar collision phenomenon during the on-site installation of components, but also solves the steel bar arrangement and bending methods in variable-section columns and beams, and ensures the safety and stability of the beam-column connection nodes, thereby improving the installation efficiency at the construction site.
[0058] During the construction and installation of the present invention, cast-in-place concrete is used at the beam-column connection nodes, and the novel high-efficiency installation node assembly integral beam-column solves the problem of steel bar collision, and has the advantages of high prefabrication production integration, convenient construction and installation, short construction period and high quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or components are generally identified by similar reference numerals. In the drawings, the elements or components are not necessarily drawn according to the actual scale.
[0060] Figure 1 The present invention provides a plan layout of the reinforcement design of the assembled integral beam-column.
[0061] Figure 2 It is a schematic diagram of the shelved primary and secondary beam connection node of the present invention.
[0062] Figure 3 It is a schematic diagram of the connection node between the cast-in-place secondary beam and the precast beam of the present invention.
[0063] Figure 4 It is a schematic diagram of the longitudinal reinforcement anchorage in the node area of the standard layer prefabricated beams and columns of the present invention.
[0064] (Note: The figure does not show the stirrups of the node area column, the stirrups are the same as the column densification area.)
[0065] Figure 5 It is a schematic diagram of the longitudinal reinforcement anchorage in the node area of the top prefabricated beams and columns of the present invention.
[0066] (Note: The figure does not show the stirrups of the node area column, the stirrups are the same as the column densification area.)
[0067] Figure 6 This is a schematic diagram of the longitudinal reinforcement structure at the variable cross-section of the prefabricated column of the present invention.
[0068] (Note: The figure does not show the stirrups of the node area column, the stirrups are the same as the column densification area.)
[0069] In the figure, 1. precast beam; 2. cast-in-place secondary beam; 3. precast main beam; 4. precast secondary beam; 5. precast beam at the middle node of standard layer; 6. precast column at the middle node of standard layer; 7. precast beam at the end node of standard layer; 8. precast column at the end node of standard layer; 9. precast beam at the middle node of the top layer; 10. precast column at the middle node of the top layer; 11. precast beam at the end node of the top layer; 12. precast column at the end node of the top layer; 13. cast-in-place beam at the variable section column; 14. precast column of variable section on the upper layer; 15. longitudinal reinforcement of precast column on the lower layer; 16. cross beam assembly; 17. longitudinal beam assembly; 18. column assembly; 19. embedded first-level mechanical connection joint; 20. connecting reinforcement; 21. ox-carrying plate; 22. embedded parts; 23. bolts; 24. grouting sleeve. DETAILED DESCRIPTION
[0070] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.
[0071] like Figure 1-6 As shown in the figure, a novel high-efficiency installation node assembled integral beam-column comprises a column assembly 18 and several layers of beam assemblies arranged from top to bottom, wherein the several layers of beam assemblies comprise beam assemblies located at the top layer and beam assemblies located at the standard layer, wherein the beam assemblies comprise cross beam assemblies 16, longitudinal beam assemblies 17 and cast-in-place beams, wherein the cross beam assemblies are composed of several prefabricated main beams 3 arranged at intervals, wherein the longitudinal beam assemblies are composed of several prefabricated secondary beams, wherein the prefabricated main beams 3 and the prefabricated secondary beams are connected by shelved main and secondary beams, wherein the column assembly comprises several prefabricated columns, wherein the prefabricated secondary beams 4 and the prefabricated main beams 3 are both referred to as prefabricated beams 1, wherein each of the prefabricated columns is vertically connected to the bottom of the beam assembly, and each of the prefabricated beams is overlapped and fixedly connected to the cast-in-place secondary beams.
[0072] By prefabricating various parts and components such as integral beams and columns assembled at new and efficient installation nodes in the factory, they are transported to the construction site for construction and installation of cast-in-place beam and column connection nodes.
[0073] Preferably, a bullfighting plate 21 is installed at the connection position between the prefabricated main beam 3 and the corresponding prefabricated secondary beam at the shelved main-secondary beam connection node, one end of the bullfighting plate 21 is connected to the corresponding prefabricated main beam 3 through an embedded part 22 fixedly connected thereto, and the other end of the bullfighting plate 21 is connected to the corresponding prefabricated secondary beam through a plurality of bolts 23 fixedly connected thereto.
[0074] Preferably, at the connection node between the cast-in-place secondary beam and the precast beam 1 , the cast-in-place secondary beam is connected to the current precast beam 1 through a pre-buried primary mechanical connection joint and a connecting steel bar 20 at the end.
[0075] Preferably, the lower layer of prefabricated columns connected to the cast-in-place beams at the cross-section change point of the prefabricated columns are connected to the upper layer of prefabricated columns by bending steel bars. Figure 6 as shown in .
[0076] A novel production design method for efficiently installing node-assembled integral beam-columns comprises the following steps:
[0077] a. Design the steel bar avoidance method at the node connection of the new type of efficient node assembly integral beam-column and the arrangement design of the column variable section steel bars;
[0078] b. Use group molds on automated production lines to produce new, efficient installation nodes to assemble integral beams and columns.
[0079] Preferably, the specific design method of the steel bar avoidance design at the node connection of the novel high-efficiency installation node assembly integral beam-column and the column variable-section steel bar arrangement design in step a is as follows:
[0080] (1) Shelved main and secondary beam connection; the node diagram is as follows Figure 2 As shown in:
[0081] The connection node of the shelving type primary and secondary beams is mainly that the shelving type prefabricated secondary beam 4 is overlapped on the shelving type prefabricated primary beam 3 through the pre-buried bulldozer plate 21. The bulldozer plate 21 is fixed to the shelving type prefabricated secondary beam 4 by bolts during installation. The shelving type prefabricated primary beam 3 and the shelving type prefabricated secondary beam 4 are filled with grouting material at the overlap of the bulldozer plate 21.
[0082] (2) Connection node between cast-in-place secondary beam and precast beam 1; the node diagram is as follows Figure 3 Shown in: The left picture is an elevation view.
[0083] The stress-bearing steel bars of the cast-in-place secondary beam and the precast beam 1 are connected by pre-embedded primary mechanical connection joints 19 and connecting steel bars 20 in the precast beam 1, and the diameter of the connecting steel bars 20 is consistent with the longitudinal bars of the beam, and the stirrups in the overlap area are denser;
[0084] (3) Anchorage of longitudinal reinforcement in the node areas of precast beams and columns at standard floors; Node diagram Figure 4 As shown in:
[0085] ① When the height of precast beams is consistent, the nodes in the standard layer; the node diagram is as follows Figure 4 As shown in the leftmost figure:
[0086] The standard layer mid-node precast beam 5 is overlapped on the standard layer mid-node precast column 6. The longitudinal reinforcement anchorage can be achieved by bending the steel bar. The bending length of the steel bar is 15d (d is the diameter of the steel bar). The steel bar extension anchorage length of the standard layer mid-node precast beam 5 should be greater than or equal to 0.4LabE.
[0087] ② When the height of precast beams is inconsistent, the nodes in the standard layer; the node diagram is as follows Figure 4 As shown in the middle figure:
[0088] The standard layer mid-node precast beam 5 is overlapped on the standard layer mid-node precast column 6. The longitudinal reinforcement anchorage of the standard layer mid-node precast beam 5 with a small height can be fixed by bending the steel bar, and the bending length is 15d (d is the steel bar diameter); the standard layer mid-node precast beam 5 with a large height can be fixed by anchoring plates, and the steel bar extension anchorage length of the standard layer mid-node precast beam 5 should be greater than or equal to 0.4LabE;
[0089] ③ Standard layer end node; the node diagram is as follows Figure 4 As shown in the rightmost figure:
[0090] The standard layer end node precast beam 7 is overlapped on the standard layer end node precast column 8, and the longitudinal reinforcement anchorage of the standard layer end node precast beam 7 can be fixed by bending the steel bars or adding anchor plates;
[0091] (4) Anchorage of longitudinal reinforcement in the node area of top precast beams and columns; the node diagram is as follows: Figure 5 As shown in:
[0092] ① When the height of precast beams is consistent, the top middle node; the node diagram is as follows Figure 5 As shown on the far left:
[0093] The top-level mid-node precast beam 9 is overlapped on the top-level mid-node precast column 10. The longitudinal reinforcement anchorage of the top-level mid-node precast beam 9 can be achieved by bending the steel bars. The bending length is 15d (d is the steel bar diameter). The steel bar extension anchorage length of the top-level mid-node precast beam 9 should be greater than or equal to 0.4LabE.
[0094] The reserved anchorage length of the steel bars of the precast column 10 at the top mid-node should be greater than or equal to 0.5LabE, and the reserved steel bars are fixed by means of anchor plates (if the straight anchor requirements are met, no anchor plate is required);
[0095] ② When the height of precast beams is inconsistent, the top middle node; the node diagram is as follows Figure 5 As shown in the middle figure:
[0096] The top-level mid-node precast beam 9 is overlapped on the top-level mid-node precast column 10. The top-level mid-node precast beam 9 with a small height can be anchored with a steel bar bending method, with a bending length of 15d (d is the steel bar diameter);
[0097] The top-level mid-node precast beam 9 with a large height can be fixed by means of anchor plates;
[0098] The extended anchorage length of the reinforcement of the precast beam 9 at the top mid-node should be greater than or equal to 0.4LabE; the reserved anchorage length of the reinforcement of the precast column 10 at the top mid-node should be greater than or equal to 0.5LabE, and the reserved reinforcement is fixed by means of anchor plates (no anchor plate is required when the straight anchor requirements are met);
[0099] ③Top-level end node; the node diagram is as follows Figure 5 As shown in the rightmost figure:
[0100] In this case, the outwardly extending anchorage steel bars of the top-level end node precast columns 12 and the top-level end node precast beams 11 are anchored in the form of anchor plates;
[0101] (5) Longitudinal reinforcement structure at the section change point of precast column; the node diagram is as follows: Figure 6 As shown in:
[0102] ① When the variable cross-section of the prefabricated column is not eccentric;
[0103] When the longitudinal steel bars of the lower prefabricated column 15 are bent, the ratio of the transverse bending length to the longitudinal bending length at the bending point of the steel bars should be less than or equal to 1 / 6, and the longitudinal steel bars of the upper variable-section prefabricated column 14 and the lower prefabricated column 15 are connected by a grouting sleeve 24;
[0104] ② When the precast column has a variable cross-section and is eccentric;
[0105] When the longitudinal steel bars of the lower prefabricated column 15 are bent, the ratio of the transverse bending length to the longitudinal bending length at the bending point of the steel bars should be less than or equal to 1 / 6, and the longitudinal steel bars of the upper variable-section prefabricated column 14 and the lower prefabricated column 15 are connected by a grouting sleeve 24;
[0106] Preferably, when avoiding the steel bars of beams and columns, the maximum bending ratio of the steel bars should be ensured to be 1 / 6, that is, the ratio of the transverse to longitudinal bending length is less than or equal to 1 / 6.
[0107] Preferably, in step b, the steps of using a group mold to produce a novel high-efficiency installation node assembly integral beam column on an automated production line are as follows:
[0108] (1) Mold processing:
[0109] Clean the surface of the group formwork, make it smooth and free of residues and foreign matter, and clean the cement slurry and concrete residues on the surface;
[0110] (2) Positioning and installation of reserved tongue and groove of group mold, reserved hole for keyway, embedded parts for lifting, embedded parts for connection, and anti-slip strips;
[0111] Accurately install the reserved structural waterproof tongue and groove accessories on the side template surface of the mold, and at the same time install the keyway reserved holes, lifting embedded parts, and connecting embedded parts accessories required for on-site construction installation and hoisting on the template surface;
[0112] (3) Install the steel grid for assembling integral beams and columns;
[0113] According to the design drawings, the steel bars are tied into a steel mesh in the steel bar tying area, and hoisted to the assembled integral beam-column group formwork for installation and positioning by hoisting equipment;
[0114] (4) Concrete pouring: The prefabricated integral beam-column shall be subjected to hidden inspection before concrete pouring. After the inspection, the concrete shall be poured by an automatic concrete placing machine. The concrete shall be poured continuously.
[0115] Ensure that the concrete is vibrated densely and evenly; when the molds, embedded parts, steel grids, etc. are deformed or displaced, reinforcement and corrective measures should be taken in time;
[0116] (5) Maintenance and demoulding;
[0117] After the concrete is poured, let it rest for a period of time, then steam-cure the assembled integral beams and columns. Before removing the formwork and lifting, check the strength of the concrete test blocks cured under the same conditions. Remove the formwork and lift them after reaching the designed strength for removing the formwork and lifting.
[0118] The invention solves the problems of steel bar collision in the connection nodes of beams and columns in the on-site construction of prefabricated building structures. The invention can effectively avoid the steel bar collision phenomenon in the process of on-site installation of components, and solves the arrangement and bending methods of steel bars in variable-section columns and beams, and ensures the safety and stability of the connection nodes of beams and columns, thus improving the installation efficiency on the construction site.
[0119] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some or all of the technical features therein can be replaced by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and description of the present invention. For those skilled in the art, any replacement, improvement or change made to the implementation mode of the present invention falls within the protection scope of the present invention.
[0120] The matters not described in detail in the present invention are all known technologies to those skilled in the art.
Claims
1. A novel high-efficiency installation node assembly integral beam column, comprising a column assembly (18) and a plurality of layers of beam assemblies arranged from top to bottom, wherein the plurality of layers of beam assemblies include a beam assembly located at the top layer and a beam assembly located at a standard layer, and the beam assembly includes a cross beam assembly (16) and a longitudinal beam assembly (17), characterized in that: The cross beam assembly (16) is composed of a plurality of prefabricated main beams (3) arranged at intervals, the longitudinal beam assembly (17) is composed of a plurality of prefabricated secondary beams (4), the prefabricated main beams (3) and the prefabricated secondary beams (4) are connected by a shelving type main-secondary beam connection, the column assembly (18) comprises a plurality of prefabricated columns, each of the prefabricated columns is vertically connected to the bottom of the beam assembly, and each of the prefabricated beams is overlapped and fixedly connected to the cast-in-place secondary beams (2); A bull-carrying plate is installed at the connection point between the prefabricated main beam (3) and the corresponding prefabricated secondary beam (4) at the connection node of the shelved main and secondary beams, one end of the bull-carrying plate is connected to the corresponding prefabricated main beam (3) through an embedded part fixedly connected thereto, and the other end of the bull-carrying plate is connected to the corresponding prefabricated secondary beam (4) through a plurality of bolts fixedly connected thereto; At the connection node between the cast-in-place secondary beam (2) and the prefabricated beam, the cast-in-place secondary beam (2) is connected to the current prefabricated beam through a pre-buried primary mechanical connection joint and connecting steel bars at the end; The prefabricated columns of the lower layer connected to the cast-in-place beams at the locations where the prefabricated columns have variable cross-sections are connected to the prefabricated columns of the upper layer by bending steel bars; The novel production design method of efficiently installing node-assembled integral beam-column comprises the following steps: a. Design the steel bar avoidance method at the node connection of the new type of efficient node assembly integral beam-column and the arrangement design of the column variable section steel bars; b. Use group moulds on automated production lines to produce new and efficient installation nodes for assembly of integral beams and columns; The specific design method for the steel bar avoidance design at the node connection of the novel high-efficiency node assembly integral beam-column and the column variable-section steel bar arrangement design in step a is as follows: (1) Connection of shelved main and secondary beams; the connection nodes of the shelved main and secondary beams are mainly the shelved prefabricated secondary beams (4) overlapped on the shelved prefabricated main beams (3) through pre-buried trolley boards. The trolley boards are fixed to the shelved prefabricated secondary beams (4) by bolts during installation. Grouting material is used to fill the overlapped areas of the trolley boards between the shelved prefabricated main beams (3) and the shelved prefabricated secondary beams (4); (2) A connection node between the cast-in-place secondary beam (2) and the precast beam; the force-bearing steel bars of the cast-in-place secondary beam (2) and the precast beam (1) are connected through a pre-buried primary mechanical connection joint and connecting steel bars of the precast beam (1), and the diameter of the connecting steel bars is consistent with the longitudinal bars of the beam, and the stirrups in the overlap area are denser; (3) Anchorage of longitudinal reinforcement in the node areas of precast beams and columns at standard floors; (4) Anchorage of longitudinal reinforcement in the node areas of top-level precast beams and columns; (5) Longitudinal reinforcement structure at the section change location of the precast column; ① When the section change location of the precast column is not eccentric; when the longitudinal reinforcement of the lower precast column (15) is bent, the ratio of the transverse bending length to the longitudinal bending length at the bending location of the reinforcement should be less than or equal to 1 / 6, and the longitudinal reinforcement of the upper precast column (14) with variable section and the lower precast column (15) should be connected by a grouting sleeve; ② When the precast column has an eccentric variable cross-section, when the longitudinal reinforcement of the lower precast column (15) is bent, the ratio of the transverse bending length to the longitudinal bending length of the reinforcement bending position should be less than or equal to 1 / 6, and the longitudinal reinforcement of the upper precast column (14) with a variable cross-section and the lower precast column (15) should be connected by a grouting sleeve.
2. According to claim 1, a novel high-efficiency installation node assembly integral beam column is characterized in that: When avoiding steel bars in beams and columns, the maximum bending ratio of the steel bars should be ensured to be 1 / 6, that is, the ratio of the transverse to longitudinal bending length is less than or equal to 1 / 6.
3. According to claim 2, a novel high-efficiency installation node assembly integral beam column is characterized in that: In step b, the steps of using a group mold to produce a new type of efficient installation node assembly integral beam column on an automated production line are as follows: (1) Mold processing: (2) Positioning and installation of reserved tongue and groove of group mold, reserved hole for keyway, embedded parts for lifting, embedded parts for connection, and anti-slip strips; (3) Install the steel grid for assembling integral beams and columns; (4) Pouring concrete: (5) Maintenance and demoulding.