A high-speed light bridge-laying vehicle for emergency rescue and a bridge-laying and bridge-closing method thereof
By designing a four-wheel drive high-speed high-load bearing axle and an automated bridge stud mechanism on the bridge stud car, the existing bridge stud car has been solved, and high-speed driving and rapid bridge stud building have been achieved. The effect meets the need for light equipment to pass quickly.
Patent Information
- Application Number
- CN201911399111.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-30
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2039-12-30
AI Technical Summary
The existing bridge stairs are slow and the bridge stairs are insufficient, which cannot meet the needs of rapid erection and bridge collection.
A rescue and rescue high-speed light-duty bridge car including four-wheel drive high-speed high-load-bearing axle and automated bridge studs are designed. The bridge car is equipped with a three-level structure of rotating arms, supporting arms and gripping arms, combining locking pins and gripping. The claws realize the rapid erection and retraction of bridges. The bridge adopts a high-strength folding structure, which can be adjusted and folded left and right.
It realizes high-speed driving and high maneuverability, has multiple freedoms in the bridge formation mechanism, and quickly erects and collects bridges to meet the needs of rapid passage of light equipment and improves the speed and functional capabilities of the bridge formation vehicle.
Smart Images

Figure CN110965455B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an engineering mechanical bridge erecting vehicle. Background Art
[0002] Most of the current bridge-building vehicles are heavy-duty bridge-building vehicles modified from tank-type chassis, or wheeled bridge-building vehicles modified from automobile chassis. Heavy-duty bridge-building vehicles are bulky and slow, and are not suitable for the needs of emergency repair and rescue work; general wheeled bridge-building vehicles have insufficient carrying capacity and low mobility, and cannot achieve the purpose of rapid emergency repair and rescue. Therefore, it is necessary to develop a high-speed, highly maneuverable, and automated engineering machinery bridge-building vehicle. The whole machine is required to be light in weight, fast in travel speed, and the dimensions meet the requirements of air transportation; the bridge is long in length, high in carrying capacity, and can meet the needs of rapid passage of light equipment.
[0003] In addition, the bridge-laying vehicle needs to quickly erect the bridge it carries at a specified position, but the existing bridge-laying mechanisms are relatively simple and can often complete the bridge-laying but cannot fold the bridge. For example, the bridge-laying vehicle disclosed in Chinese patent CN 204023395 U only needs to unload the bridge when laying the bridge, but when folding the bridge, the bridge-laying mechanism and the bridge need to be accurately aligned, and currently the alignment can only be achieved by the driver moving the vehicle position. Summary of the invention
[0004] The technical problem to be solved by the present invention is: to provide a high-speed, highly maneuverable and automated engineering mechanical bridge-building vehicle in view of the problems that the existing bridge-building vehicle has a slow speed and insufficient functions of the bridge-building mechanism.
[0005] The technical solution of the present invention is:
[0006] A high-speed light bridge-laying vehicle for emergency rescue comprises a cab assembly, a chassis assembly and a bridge-laying device. The chassis assembly adopts a four-wheel drive high-speed and high-load-bearing axle and has an air suspension system. The bridge-laying device comprises a bridge-laying mechanism and a bridge. The bridge-laying mechanism is mounted at the rear of the chassis assembly, the bridge is folded and placed on the chassis assembly, and the cab assembly is mounted at the front end of the chassis assembly and is located in the middle in front of the folding bridge.
[0007] The bridge is divided into two halves, each half is connected by a left and right box with a crossbeam, and the two halves are connected front and back with a four-bar mechanism and equipped with a folding cylinder.
[0008] The bridge-building mechanism is a three-section arm structure consisting of a swivel arm, a support arm and a grab arm. The swivel arm is horizontally hinged at the rear of the chassis assembly and installed with a swivel arm cylinder, the support arm is vertically hinged at the end of the swivel arm and installed with a support arm cylinder, and the grab arm is vertically hinged at the end of the support arm and installed with a grab arm cylinder.
[0009] The crossbeam is a three-section hinged structure with the hinge perpendicular to the bridge deck. The lower end of the grab arm can cooperate with the crossbeam at the root of the bridge through a locking pin, and the upper end of the grab arm can cooperate with another crossbeam of the bridge through a claw.
[0010] The locking pin is controlled by the locking pin cylinder, and the gripper is controlled by the gripper cylinder.
[0011] There are two grab arms, each equipped with a grab arm cylinder.
[0012] A bridge erection method comprises the above-mentioned emergency rescue high-speed light bridge erection vehicle, wherein the arm cylinder first props up the arm, and then the folding cylinder unfolds the folded bridge by about 10 degrees, and then the grabbing arm cylinder and the folding cylinder work together to unfold the grabbing arm and the bridge to a horizontal position, and finally the locking pin cylinder and the grabbing claw cylinder loosen the locking pin and the grabbing claw to separate the bridge erection mechanism and the bridge.
[0013] After the bridge erection mechanism is separated from the bridge, the grab arm oil cylinder is operated to retract the grab arm, and then the support arm oil cylinder is operated to retract the support arm.
[0014] A bridge folding method is used for the above-mentioned emergency rescue high-speed light bridge-building vehicle. The bridge is laid flat on the ground. After the vehicle is in place, the support arm cylinder and the grab arm cylinder are operated to aim the grab claw at the bridge, the grab claw cylinder is operated to extend the grab claw, and then the support arm cylinder is operated to extend until the support arm falls to the ground, and the grab arm cylinder is operated to unfold the grab arm to the bridge limit. Then the locking pin cylinder controls the locking pin to lock the bridge, the grab claw cylinder retracts the grab claw to grab the bridge, and finally the grab arm cylinder retracts the grab arm, and the folding cylinder folds the bridge at the same time.
[0015] The grab arm is adjusted to be parallel to the bridge through the swing arm cylinder. After the bridge is folded, the swing arm cylinder adjustment mechanism is operated to be in a left-right symmetrical position and locked. The support arm cylinder is operated to be fully retracted to put the bridge on the roof.
[0016] Beneficial effects of the present invention: Special high-speed driving chassis assembly; adopts engineering machinery chassis, strong load-bearing capacity and fast driving speed. The rotating arm can be adjusted left and right around the frame; when erecting a bridge, the position of the bridge can be adjusted left and right. Structural features of the multi-degree-of-freedom bridge erection mechanism; adopts a three-level structure of rotating arm, support arm and grab arm to realize the erection and withdrawal of the bridge. Quick grab device structure; adopts claws and locking pins to achieve the effect of quick replacement. The structural form of a high-strength folding bridge, and the left and right boxes of the bridge are hinged, and the height of the left and right boxes can be adjusted according to the terrain. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0018] Figure 2 It is a structural diagram of the bridging device.
[0019] Figure 3 This is a diagram of the bridge device in the erection state.
[0020] Figure 4 This is a schematic diagram of the bridge deployment process.
[0021] Figure 5 This is a schematic diagram of the bridge after it is fully deployed.
[0022] Figure 6 It is a schematic diagram of the bridge-building mechanism and the uncoupling state of the bridge.
[0023] Figure 7 This is a schematic diagram of the parking position for closing the bridge.
[0024] Figure 8 It is a structural diagram of the beam. DETAILED DESCRIPTION
[0025] Embodiment: A high-speed light bridge-building vehicle for emergency rescue comprises a cab assembly 100, a chassis assembly 200 and a bridge-building device 300, characterized in that: the chassis assembly 200 adopts a four-wheel drive high-speed and high-load-bearing axle and has an air suspension system, the bridge-building device 300 comprises a bridge-building mechanism and a bridge, the bridge-building mechanism is installed at the rear of the chassis assembly 200, the bridge is folded and placed on the chassis assembly 200, and the cab assembly 100 is installed at the front end of the chassis assembly 200 and is located in the middle in front of the foldable bridge.
[0026] Cab assembly 100: The protective cab is arranged in the middle of the front bridge of the equipment. It is welded with bulletproof steel plates. The doors and windows are made of bulletproof glass. An escape window is arranged on the top of the cab. It can carry 2 people.
[0027] Chassis assembly 200: It is composed of high-speed and high-load-bearing axle, four-wheel drive, torque converter gearbox, air suspension system, high-load-bearing frame, high-power power system, mechanical and hydraulic dual steering system, pneumatic brake system, etc.
[0028] The bridge erection device 300 includes a bridge erection mechanism and a bridge 10. The bridge erection mechanism is composed of a slewing arm 1, a slewing arm cylinder 2, a support arm 4, a support arm cylinder 3, a grab arm 7, a grab arm cylinder 6, a claw cylinder 8, a claw 9, a locking pin cylinder 5, etc. as shown in FIG2. The bridge erection mechanism is a three-section arm structure composed of a slewing arm 1, a support arm 4 and a grab arm 7. The slewing arm 1 is horizontally hinged at the rear of the chassis assembly 200 and is installed with a slewing arm cylinder 2. The support arm 4 is vertically hinged at the end of the slewing arm 1 and is installed with a support arm cylinder 3. The grab arm 7 is vertically hinged at the end of the support arm 4 and is installed with a grab arm cylinder 6. There are two grab arms 7, each equipped with a grab arm cylinder 6. The locking pin is controlled by the locking pin cylinder 5, and the claw 9 is controlled by the claw cylinder 8. Horizontal hinge means that the hinge is horizontal, and the two can rotate relative to each other on the horizontal plane. The same is true for vertical hinge.
[0029] The bridge 10 is divided into two halves, each half is connected by a left and right box body with a crossbeam, and the two halves are connected front and back with a four-bar linkage and installed with a folding cylinder 11. The crossbeam is a three-segment hinged structure, and the hinge is perpendicular to the bridge deck. The lower end of the grab arm 7 can be matched with the crossbeam at the root of the bridge 10 through a locking pin, and the upper end of the grab arm 7 can be matched with another crossbeam of the bridge 10 through a claw 9. The bridge 10 can be twisted 10° left and right and folded 180° front and back. The bridge is made of high-strength alloy steel, and the I-beam frame is welded into a U-shaped structure. Anti-skid holes are punched on the surface of the bridge.
[0030] Hydraulic system 400: It consists of main pump, main valve, hydraulic oil tank, oil cylinder, pipeline, etc. It meets the working requirements of bridge erection mechanism and bridge.
[0031] Electrical system 500: It consists of a control system, a lighting system, a signal system, etc. and can be remotely controlled.
[0032] Bridging process:
[0033] The first step: reverse the equipment to a suitable bridge erection position, operate the support arm cylinder 3 to extend, prop up the bridge erection device, and transform the state shown in Figure 1 to the state shown in Figure 3.
[0034] Step 2: Operate the folding cylinder 11 to extend, unfold the bridge about 10 degrees, and then operate the grab arm cylinder 6 to extend, and in this way, extend and unfold at the same time, as shown in Figure 4, until it is changed to the state shown in Figure 5.
[0035] Step 3: Operate the locking pin cylinder 5 to retract, and at the same time operate the claw cylinder 8 to retract, and open the claw.
[0036] Step 4: Operate the grab arm cylinder 6 to retract, and then operate the support arm cylinder 3 to retract, as shown in Figure 6. At this point, the bridge erection process is completed.
[0037] Step 5: Drive away with empty equipment and wait away from the road, or turn around and drive along the bridge to the other side of the ditch and wait away from the road.
[0038] Bridge closing process:
[0039] Step 1: Reverse the equipment to the position shown in Figure 7, where L is about 2.7m. Pull out the arm locking pin and operate the arm cylinder 2 to adjust the grab arm parallel to the bridge.
[0040] Step 2: Operate the support arm cylinder 3 and the grab arm cylinder 6 to align the grab claw with the crossbeam of the bridge, and operate the grab claw cylinder 8 to extend and grab.
[0041] Step 3: Operate the support arm cylinder 3 to extend until the support arm 4 falls to the ground, operate the grab arm cylinder 6 to retract until the bridge limit position, and operate the locking pin cylinder 5 to extend to lock the bridge.
[0042] Step 4: operate the grab arm cylinder 6 to retract, lift the grab arm 7, and at the same time operate the folding cylinder 11 to retract, fold the bridge, and lift and fold at the same time as shown in Figure 4, until the cylinder is fully retracted as shown in Figure 3.
[0043] Step 5: Operate the arm cylinder 2 to adjust the mechanism to a symmetrical position on the left and right, and lock it with a latch. Operate the support arm cylinder 3 to fully retract the bridge to the roof as shown in Figure 1. The bridge retraction process is now complete.
Claims
1. A method for erecting a bridge using a high-speed light bridge erecting vehicle for emergency rescue, the bridge erecting vehicle comprising a cab assembly (100), a chassis assembly (200) and a bridge erecting device (300), characterized in that: The chassis assembly (200) adopts a four-wheel drive high-speed high-load-carrying axle and has an air suspension system. The bridge erection device (300) includes a bridge erection mechanism and a bridge (10). The bridge erection mechanism is installed at the rear of the chassis assembly (200). The bridge is folded and placed on the chassis assembly (200). The cab assembly (100) is installed at the front end of the chassis assembly (200) and is located in the middle in front of the folding bridge. The bridge (10) is divided into two halves. Each half is connected by a left and right box body with a cross beam. The two halves are connected front and rear with a four-link mechanism and a folding cylinder (11) is installed. The bridge erection mechanism is a three-section arm structure consisting of a rotating arm (1), a supporting arm (4) and a grab arm (7). The arm (1) is hinged horizontally at the rear of the chassis assembly (200) and is installed with a swing arm cylinder (2); the support arm (4) is hinged vertically at the end of the swing arm (1) and is installed with a support arm cylinder (3); the grab arm (7) is hinged vertically at the end of the support arm (4) and is installed with a grab arm cylinder (6); there are two grab arms (7), each of which is equipped with a grab arm cylinder (6); the cross beam is a three-segment hinged structure, the hinge is perpendicular to the bridge deck, the lower end of the grab arm (7) is matched with the cross beam at the root of the bridge (10) through a locking pin, and the upper end of the grab arm (7) is matched with another cross beam of the bridge (10) through a grab claw (9); the locking pin is controlled by the locking pin cylinder (5), and the grab claw (9) is controlled by the grab claw cylinder (8); The bridge erection method comprises: the support arm cylinder (3) first props up the support arm (4), then the folding cylinder (11) unfolds the folded bridge (10) by about 10 degrees, then the grab arm cylinder (6) and the folding cylinder (11) work together to unfold the grab arm (7) and the bridge (10) to a horizontal position, and finally the locking pin cylinder (5) and the claw cylinder (8) release the locking pin and the claw (9) to separate the bridge erection mechanism from the bridge.
2. The method for erecting a bridge using a high-speed light bridge-erecting vehicle for emergency rescue according to claim 1, characterized in that When erecting a bridge: after the erecting mechanism and the bridge (10) are separated, the grab arm oil cylinder (6) is operated to retract the grab arm (7), and then the support arm oil cylinder (3) is operated to retract the support arm (4).
3. The bridge-laying method of the emergency rescue high-speed light bridge-laying vehicle according to claim 1 is characterized in that When the bridge is folded: the bridge is laid flat on the ground, and after the vehicle is in place, the arm support cylinder (3) and the arm grab cylinder (6) are operated to align the claw (9) with the bridge (10), and the claw grab cylinder (8) is operated to extend the claw (9), and then the arm support cylinder (3) is operated to extend until the arm support (4) falls to the ground, and the arm grab cylinder (6) is operated to unfold the grab arm (7) to the limit position of the bridge (10), and then the locking pin cylinder (5) controls the locking pin to lock the bridge (10), and the claw grab cylinder (8) retracts the claw (9) to grasp the bridge (10), and finally the arm grab cylinder (6) retracts the grab arm (7), and at the same time the folding cylinder (11) folds the bridge (10).
4. The bridge-laying method of the emergency rescue high-speed light bridge-laying vehicle according to claim 3 is characterized in that When the bridge is folded, the grab arm (7) is adjusted to be parallel to the bridge (10) by the swing arm cylinder (2). After the bridge is folded, the swing arm cylinder (2) is operated to adjust the mechanism to a left-right symmetrical position and lock it, and the support arm cylinder (3) is operated to fully retract the bridge (10) to be folded on the roof.
