A wet quenching device system

Through the wet coke quenching device system, the rotating nozzle and water circulation technology are used to reduce the coke temperature, and the exhaust gas treatment module is used to reduce pollution, solving the energy waste and pollution problems in the coke quenching process in the coking industry, and achieving efficient and environmentally friendly coke production.

CN111040787BActive Publication Date: 2024-10-29张涛
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010016023.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-08
Publication Date
2024-10-29
Estimated Expiration
2040-01-08

AI Technical Summary

Technical Problem

In the existing coking industry, the coke quenching process consumes a lot of energy and causes serious pollution. The wet coke quenching method leads to water shortages. The dry coke quenching method has high equipment investment and high maintenance costs, making it difficult to popularize.

Method used

A wet coke quenching device system is designed, including an exhaust gas treatment module, a spray module, a nozzle cleaning module and a water circulation module. The nozzle rotates to spray water for cooling, water circulation is used to reduce water use, infrared temperature measurement is used to control the temperature, and the horn-shaped guide is used to control the temperature. Flow devices and catalysts treat exhaust gases.

Benefits of technology

It has achieved a 30% water saving, reduced equipment maintenance and operating costs, ensured coke quality, reduced pollutant emissions, and improved coke quenching efficiency and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111040787B_ABST
    Figure CN111040787B_ABST
Patent Text Reader

Abstract

The present invention discloses a wet quenching device system, which includes a waste gas treatment module, a spraying module, a nozzle cleaning module and a water circulation module, etc. The waste gas treatment module, the spraying module, the nozzle cleaning module and the water circulation module are installed at the sewage outlet below the flue, and together with the flue, constitute a quenching system. As the quenching process proceeds, a large amount of condensed wastewater is generated at the bottom of the tower and concentrated in a primary wastewater tank and a primary wastewater tank, where the wastewater is deprecipitated to reduce the solid matter content. Afterwards, it is lifted to the secondary wastewater tank by the wastewater lifting pipe and the wastewater lifting pipe. After being purified by a purification membrane between the secondary wastewater tank and the clean water tank, the clean water finally enters the clean water tank for storage. The present invention introduces an infrared temperature measuring device to monitor the temperature during the quenching process to ensure the quality of coke. The various modules and mechanisms of the present invention cooperate with each other; the overall system can ensure the environmental protection and high efficiency of the quenching process while achieving high-quality quenching.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a wet coke quenching device system, which is mainly used in the coke quenching process of coke smelting and belongs to the technical field of coke smelting. Background Art

[0002] In my country, the steel industry has always been an important industry in the country's industrial development. In the process of steelmaking, a large amount of energy is consumed and a large amount of pollutants are also produced. In the steel industry, the coking process is an important component. In the process of blast furnace ironmaking, coke plays many roles such as providing heat source, reducing agent, and skeleton material. With the continuous development of China's steel industry, the production capacity of China's coke industry has also been continuously improved.

[0003] In the coke refining process, it is mainly necessary to carbonize the well-proportioned coal in a high-temperature carbonization chamber to refine it into coke, and then the carbonized coke. After that, the carbonized high-temperature coke needs to be sent to the coke transport truck. In the coking process, the high-temperature coke produced from the coke oven will burn violently after it comes into contact with the air and obtains abundant oxygen. Therefore, it is necessary to reduce the high-temperature coke from more than 1000°C to less than 200°C in a short period of time. The above-mentioned process of cooling the coke is called coking. After the coke, the coking plant will conduct another screening, and then sell the coke as a commodity based on the screening results, or serve as a raw material for other process flows.

[0004] In the coking plant under the current process, the quenching process is the most polluting and energy-consuming production link in the coking industry. At the same time, there are many problems in the recovery and reuse of energy in the coke production process. The main reason for the above problems is that according to the principle of heat balance, the energy released in the coke cooling process often needs to be reflected in another form. Under the existing technical conditions, the coking industry often absorbs the energy generated by coke in the production process with water and inert gas. These two mainstream methods correspond to the wet quenching technology and dry quenching technology commonly used in coking plants at this stage. Wet quenching technology has the advantages of simple equipment and fast quenching speed, but because water will turn into water vapor under high temperature environment, the water vapor generated by this method will contain a large amount of toxic and harmful substances, such as coke powder particles, H2S, CO, etc. Since the formed steam is reused by condensation, a large amount of heat energy will be lost in such two heat transfers. Moreover, most coking plants are built in water-scarce areas, consuming a large amount of water, which will further aggravate the shortage of water resources. The water content in coke will also increase the energy consumption of coke ironmaking. On the other hand, high-temperature coke contains a large amount of heat energy, and almost half of the heat in coking is consumed in the gasification of quenching water. Quenching evaporates a large amount of water, resulting in a large waste of energy and water resources. In recent years, the dry quenching technology of using nitrogen to cool red coke for power generation has also been widely used in the coking industry, playing a positive role in recovering energy and reducing pollutant emissions. However, the problems of high equipment investment, high operating costs, and high maintenance costs of the dry quenching method have not been solved, which has brought a relatively heavy cost burden to the operation of enterprises and seriously restricted the widespread popularization of dry quenching technology.

[0005] Therefore, the development of a coke quenching system that has the advantages of energy saving and consumption reduction, low environmental pollution, convenient operation and management, and low equipment investment and maintenance costs has always been a key research direction in the coking industry. Summary of the invention

[0006] The technical solution adopted by the present invention is a wet quenching device system, which includes a waste gas treatment module, a spraying module, a nozzle cleaning module and a water circulation module, etc. The waste gas treatment module, the spraying module, the nozzle cleaning module and the water circulation module are installed at the sewage outlet below the flue 1, and together with the flue 1 constitute a quenching system.

[0007] In the exhaust gas treatment module, the trumpet-shaped exhaust gas guide device 3 is installed on the exhaust gas purification and dust removal grille device 2.

[0008] In the spray module, a first rack 5 and a second rack 6 are installed side by side on the bracket 11, and the first rack 5 and the second rack 6 are arranged in parallel. A first gear 7 and a second gear 8 are installed on both sides of the nozzle installation rack 9, and the first gear 7 and the first rack 6 are meshed with each other, and the second gear 8 and the second rack 5 are meshed with each other; the telescopic nozzle water delivery pipe 22 and the telescopic nozzle water delivery pipe 23 are connected to the nozzle installation rack 9. Six nozzle fixing devices 14 are installed side by side on the nozzle installation rack 9, and the six nozzles 10 are installed on the six nozzle fixing devices 14 respectively.

[0009] In the cleaning module, four telescopic cleaning device water pipes 22 connect the cleaning device mounting frame 12 with the clean water tank 21. Six cleaning nozzles 15 are installed side by side on the cleaning device mounting frame 12, and three nozzle gripping mechanism claws 13 are installed around the upper part of each cleaning nozzle 15.

[0010] In the water circulation module, the primary wastewater tank 16 and the primary wastewater tank 17 are connected to the secondary wastewater tank 20 through the wastewater lifting pipe 18 and the wastewater lifting pipe 19. The clean water tank 21 is located below the secondary wastewater tank 20. A water purification membrane is provided between the secondary wastewater tank 20 and the clean water tank 21.

[0011] Four infrared temperature measuring probes 24 are symmetrically mounted above the bracket 11 .

[0012] The coke transport vehicle 4 is located in a space surrounded by the brackets 11 .

[0013] Wet coke quenching produces a large amount of gas, so the main coke quenching device is generally installed in the flue 1. When the coke transport vehicle 4 enters the main coke quenching device surrounded by the bracket 11, the coke quenching process begins. The clean water in the clean water tank 21 is transported to the six nozzles 10 installed on the nozzle installation rack 9 and the six nozzle fixing devices 14 through the telescopic nozzle water delivery pipe 23, and the nozzles 10 spray water on the coke transported by the coke transport vehicle 4. The nozzle installation rack 9 is moved forward and backward through the gears 7 and 8, and each nozzle 10 can also rotate in all directions, so as to achieve the purpose of uniform spraying on the coke.

[0014] A certain amount of smoke and dust will be generated during the quenching process, which will clog the nozzle 10 after a period of time, so a cleaning operation is required. The cleaning device mounting frame 12 is extended under the action of the four telescopic cleaning device water pipes 22, and the nozzle mounting rack 9 moves to the innermost end. Then the nozzle grabbing mechanism claws 13 open, and the cleaning nozzle 15 pops out. After wrapping the nozzle 10, the grabbing mechanism claws 13 are tightened. The cleaning nozzle 15 rotates until the nozzle 13 is separated from the nozzle fixing device 14. The cleaning nozzle 15 discharges water, rinses the nozzle 10, and then stops discharging water. The cleaning nozzle 15 rotates in the opposite direction until the nozzle 13 and the nozzle fixing device 14 are installed compactly.

[0015] As the quenching process proceeds, a large amount of condensed wastewater is generated at the bottom of the tower and concentrated in the primary wastewater tank 16 and the primary wastewater tank 17, where the wastewater is deprecipitated to reduce the solid matter content. It is then lifted to the secondary wastewater tank 20 by the wastewater lifting pipe 18 and the wastewater lifting pipe 19. After being purified by the purification membrane between the secondary wastewater tank 20 and the clean water tank 21, the clean water is finally stored in the clean water tank 21.

[0016] Exhaust gas treatment module as attached Figure 5 , Attachment Figure 6 As shown. The waste gas generated during the quenching process is collected by the trumpet-shaped waste gas guide device 3 and then enters the waste gas purification and dust removal grid device 2 containing multiple catalytic substances for desulfurization and deacidification. Finally, the qualified waste gas is discharged into the atmosphere through the flue 1.

[0017] The infrared temperature measuring probe 24 measures the temperature of the coke during the quenching process, controls the temperature of the quenching process, and ensures the quality of the coke after quenching.

[0018] Compared with the prior art, the present invention has the following technical advantages:

[0019] 1. In the present invention, since water vapor and coke are directly contacted for cooling, the fan wear problem in the dry coke quenching process can be avoided. For example, in the dry coke quenching nitrogen cooling process, nitrogen will carry a large amount of coke powder particles, which will collide, rub and corrode with the circulation fan, dust removal fan, etc.; while in the wet coke quenching technology designed by the present invention, since water vapor will react with both coke and coke powder, the content of coke powder in water gas is reduced, the damage to the fan and other components can be reduced, and the maintenance cost of the equipment can be reduced.

[0020] 2. In the process of quenching coke, a large amount of water resources are consumed. The present invention can save about 30% of water consumption by recycling the heat released by the cooling of coke and the wastewater after condensation according to theoretical calculation. In the process of recycling wastewater, the large particles of waste in the wastewater are firstly precipitated, and then the precipitated wastewater is purified for secondary treatment by using a percolation membrane to achieve the purpose of reuse. The above process can play a role in environmental protection while reducing enterprise costs to a large extent.

[0021] 3. Use water maintained at a temperature of approximately 60°C to cool the coke, reduce the temperature difference between the coke and water, and avoid an increase in the number of microcracks in the coke due to excessive temperature difference, so that the quality of the coke is fully guaranteed and good economic benefits can be achieved.

[0022] 4. In the conventional wet quenching process, the nozzle is usually in a fixed position and direction. The present invention realizes uniform cooling of the coke by freely rotating the nozzle direction and moving the nozzle fixing device back and forth, thereby ensuring the quality of the coke.

[0023] 5. In the traditional wet quenching system, the nozzle is often blocked due to the large amount of smoke and dust generated during the quenching process, which reduces the quenching efficiency and seriously affects the coking effect. The present invention introduces a cleaning module, which can use the clamp device to automatically disassemble and automatically clean the nozzle, which can greatly reduce the operating costs of the enterprise and reduce the losses during the maintenance of the quenching system.

[0024] 6. During the wet quenching process, a large amount of smoke and many harmful gases will be generated, which is also a key environmental protection issue facing the current coking industry. In the present invention, in order to fully treat the waste gas generated during the quenching process, a trumpet-shaped drainage device is used to fully collect the waste gas, and then catalytic treatment is carried out through a grid device equipped with multiple catalysts so that the waste gas meets the national emission standards.

[0025] 7. To ensure the quality of coke, the quenching process has very high requirements for temperature control, and the prior art often makes judgments based on experience. In the present invention, an infrared temperature measuring device is introduced to monitor the temperature during the quenching process to ensure the quality of coke.

[0026] 8. Compared with the rigid and clumsy existing quenching systems, the quenching system designed by the present invention has ingenious connections, and the various modules and mechanisms are coordinated; the overall system can achieve high-quality quenching while ensuring the environmental protection and efficiency of the quenching process. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is the overall structure diagram of the coke quenching tower.

[0028] Figure 2 This is a cross-sectional view of the coke quenching tower.

[0029] Figure 3 For internal axonometric Figure 1 .

[0030] Figure 4 For internal axonometric Figure 2 .

[0031] Figure 5 This is a top view of the exhaust gas purification module.

[0032] Figure 6 This is a bottom view of the exhaust gas purification module.

[0033] Figure 7 This is a diagram of the nozzle's free rotation.

[0034] Figure 8Prepare a cleaning diagram for the cleaning module.

[0035] Fig. 9 Schematic diagram of the cleaning module extending and opening the clamp.

[0036] Fig.10 Schematic diagram of clamp tightening.

[0037] Fig.11 Schematic diagram of the fixture rotating and lowering to remove the nozzle.

[0038] Fig.12 This is a schematic diagram of the cleaning device retracting.

[0039] Fig.13 Schematic diagram of a cleaning device using high-speed water flow to clear the nozzle.

[0040] Fig.14 Schematic diagram of the water cycle module. DETAILED DESCRIPTION

[0041] Since wet coke quenching will produce a large amount of harmful gases and water vapor, the harmful gases need to be treated by environmental protection equipment before being discharged. Therefore, the main coke quenching system is installed inside the flue 1 to complete the coke quenching process.

[0042] In actual production, after the fully loaded high-temperature coke transport vehicle 4 enters the coke quenching main device surrounded by the bracket 11, the coke quenching process officially begins. Wet coke quenching requires a large amount of water to cool the coke. A large amount of clean water is stored in the clean water tank 21. The clean water is transported to the 6 nozzles 10 installed on the nozzle installation rack 9 and the 6 nozzle fixing devices 14 through the telescopic nozzle water delivery pipe 23, and the nozzles 10 spray water on the coke transported by the coke transport vehicle 4. The nozzle installation rack 9 is moved forward and backward through gears 7 and 8, and each nozzle can also rotate in various directions as needed, and circulate back and forth, which can not only ensure that the cooling water can be evenly sprayed on the coke, but also quickly cool the high-temperature coke to the required temperature.

[0043] With the continuous use of the coke quenching system, due to the generation of a certain amount of smoke and dust during the coke quenching process, the nozzles 10 will be blocked after a period of time, and at this time, they need to be cleaned. When it is detected that the nozzle is blocked by dust, the nozzle cleaning module can automatically disassemble, replace, and dredge a blocked nozzle, thereby solving the problem of easy blockage of the nozzle in wet coke quenching. When the cleaning module is in operation, the cleaning device mounting frame 12 extends outward under the action of the four telescopic cleaning device water pipes 22, and the nozzle mounting rack 9 moves to the innermost end. Then the nozzle gripping mechanism claw 13 opens, the cleaning nozzle 15 pops out, wraps the nozzle 10, and tightens the gripping mechanism claw 13. The cleaning nozzle 15 rotates until the nozzle 13 is separated from the nozzle fixing device 14. The cleaning nozzle 15 discharges water, rinses the nozzle 10, and then stops discharging water. The cleaning nozzle 15 rotates in the opposite direction until the nozzle 13 and the nozzle fixing device 14 are compactly installed. After the above process, the nozzle 10 is cleaned and can continue to work normally.

[0044] Wet quenching requires a large amount of water as a cooling medium. Therefore, it is of great significance to fully recycle the generated wastewater as much as possible, which can not only meet environmental protection requirements, but also reduce costs. At the same time, the temperature of the quenching water can be kept around 60°C as much as possible, improving the safety and quality of quenching. The wastewater is collected and enters the purification device, and then used for quenching, cleaning fixtures, etc. As the quenching process proceeds, a large amount of condensed wastewater is generated at the bottom of the tower and concentrated in the primary wastewater tank 16 and the primary wastewater tank 17, where the wastewater is deprecipitated to reduce the solid matter content. After that, it is lifted to the secondary wastewater tank 20 by the wastewater lifting pipe 18 and the wastewater lifting pipe 19. After purification by the purification membrane between the secondary wastewater tank 20 and the clean water tank 21, the clean water finally enters the clean water tank 21 for storage. According to theoretical calculations, the above process can save about 30% of water consumption for the quenching process.

[0045] A large amount of waste gas is generated during the wet quenching process. The waste gas is sucked into the treatment equipment through the guide device and then discharged. The waste gas generated during the quenching process is guided by the trumpet-shaped waste gas guide device 3 and then enters the waste gas purification and dust removal grid device 2 containing multiple catalytic substances for desulfurization and deacidification. The waste gas that has been treated and qualified is finally discharged into the atmosphere through the flue 1.

[0046] The quenching process requires strict temperature control to ensure the quality of the coke after quenching. The infrared temperature probe 24 measures the coke temperature during the quenching process, controls the temperature of the quenching process, and ensures the quality of the coke after quenching. During the operation of the system, the quenching degree is obtained in real time through the infrared sensor, and the rotatable nozzle on the mobile nozzle holder can spray from any position at different angles to improve the quenching effect and reduce the red coke rate.

Claims

1. A wet quenching system, characterized in that: The device system includes an exhaust gas treatment module, a spraying module, a nozzle cleaning module and a water circulation module. The exhaust gas treatment module, the spraying module, the nozzle cleaning module and the water circulation module are installed at the sewage outlet below the flue and together with the flue form a coke quenching system; In the exhaust gas treatment module, the trumpet-shaped exhaust gas guide device is installed on the exhaust gas purification and dust removal grille device; In the spray module, a first rack and a second rack are installed side by side on the bracket, the first rack and the second rack are arranged in parallel, a first gear and a second gear are installed on both sides of the nozzle installation rack, the first gear and the first rack are meshed with each other, and the second gear and the second rack are meshed with each other; a telescopic nozzle water delivery pipe and a telescopic nozzle water delivery pipe are connected to the nozzle installation rack; six nozzle fixing devices are installed side by side on the nozzle installation rack, and six nozzles are respectively installed on the six nozzle fixing devices; In the cleaning module, four telescopic cleaning device water pipes connect the cleaning device mounting frame with the clean water tank; on the cleaning device mounting frame, six cleaning nozzles are installed side by side, and three nozzle grabbing mechanism claws are installed around the upper part of each cleaning nozzle; In the water circulation module, the primary wastewater tank and the primary wastewater tank are connected to the secondary wastewater tank through the wastewater lifting pipe and the wastewater lifting pipe. The clean water tank is located below the secondary wastewater tank. A water purification membrane is provided between the secondary wastewater tank and the clean water tank. During the quenching process, a certain amount of smoke and dust will be generated, which will clog the nozzle after a period of time, so a cleaning operation is required. The cleaning device mounting frame is extended under the action of four telescopic cleaning device water pipes, and the nozzle mounting rack moves to the innermost end at the same time. Then the nozzle grabbing mechanism claws open, the cleaning nozzle pops out, and after wrapping the nozzle, the grabbing mechanism claws are tightened. The cleaning nozzle rotates until the nozzle is separated from the nozzle fixing device. The cleaning nozzle discharges water, rinses the nozzle clean and then stops discharging water; the cleaning nozzle rotates in the opposite direction until the nozzle and the nozzle fixing device are installed tightly.

2. A coke wet quenching system according to claim 1, characterized in that: Four infrared temperature measuring probes are symmetrically installed above the bracket.

3. A coke wet quenching system according to claim 2, characterized in that: The coke transport vehicle is located in the space enclosed by the bracket.

4. A coke wet quenching system according to claim 1, characterized in that: Wet coke quenching will produce a large amount of gas, so the main coke quenching device is installed in the flue; when the coke transport vehicle enters the main coke quenching device surrounded by the bracket, the coke quenching process begins; the clean water in the clean water tank is transported to the six nozzles installed on the nozzle installation rack and the nozzle fixing devices through the telescopic nozzle water pipe, and the nozzles spray water onto the coke transported by the coke transport vehicle; the nozzle installation rack is moved back and forth by gears and gears, and each nozzle can also rotate in all directions, so as to achieve uniform spraying on the coke.

5. A coke wet quenching system according to claim 1, characterized in that: As the quenching process proceeds, condensed wastewater is generated at the bottom of the tower and concentrated in the primary wastewater tank and the primary wastewater tank, where the wastewater is deprecipitated to reduce the solid matter content; it is then lifted to the secondary wastewater tank by the wastewater lifting pipe and the wastewater lifting pipe; after being purified by the purification membrane between the secondary wastewater tank and the clean water tank, the clean water finally enters the clean water tank for storage.

6. A coke wet quenching system according to claim 1, characterized in that: The waste gas generated during the quenching process is collected by a trumpet-shaped waste gas diversion device and then enters a waste gas purification and dust removal grid device containing a variety of catalytic substances for desulfurization and deacidification treatment; the qualified waste gas is finally discharged into the atmosphere through the flue.

7. A coke wet quenching system according to claim 1, characterized in that: The infrared temperature probe measures the coke temperature during the quenching process and controls the temperature of the quenching process.

Citation Information

Patent Citations

  • Full-automatic spray nozzle washing machine

    CN102941735A

  • Coke quenching system for coke spillage of coke pushing vehicle

    CN204022750U

  • Wet coke quenching device system

    CN213085879U