Continuous structure of composite beam structure using UHPC beam-steel end plate with studs and its construction method

By welding vertical studs on the upper surface of the negative bending moment zone of the steel-concrete composite beam and pouring the UHPC bridge deck, combined with the connection of the steel end plate and horizontal studs to the UHPC beam, the problem of easy cracking of the concrete slab of the composite beam bridge and The problem of uneconomic construction is achieved, the high stiffness and seismic performance of the structure are achieved, and the construction cost and cycle are reduced.

CN111074752BActive Publication Date: 2024-10-22FUZHOU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010090354.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-02-13
Publication Date
2024-10-22
Estimated Expiration
2040-02-13

AI Technical Summary

Technical Problem

Steel-concrete composite continuous girder bridges are prone to concrete slab cracking at the supports, resulting in weakened stiffness, and the construction method is uneconomical and requires a lot of welding work.

Method used

The UHPC cross beam-combined beam structure with studded steel end plates is continuously constructed. Vertical studs are welded on the upper surface of the steel beam and the UHPC bridge deck is cast. The steel end plates and horizontal studs are used to connect the adjacent steel beams with the UHPC beams. -Concrete composite beams to avoid concrete slab cracking and simplify the construction process.

Benefits of technology

It effectively avoids the occurrence of cracks in the concrete slab in the negative bending moment zone, improves the stiffness and seismic performance of the structure, reduces the construction cost and period, and reduces the bridge's own weight.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111074752B_ABST
    Figure CN111074752B_ABST
Patent Text Reader

Abstract

The present invention relates to a continuous structure of a steel-concrete composite beam structure and a construction method thereof, wherein the structure comprises a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure. Vertical bolts are arranged on the upper surfaces of the first steel beam and the second steel beam, steel end plates are respectively fixed to the first ends of the first steel beam and the second steel beam, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, and a UHPC crossbeam is cast in the space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support. A section of a UHPC bridge deck layer is cast on the upper part of the UHPC crossbeam extending toward the upper surfaces of the first steel beam and the second steel beam, respectively, and reinforced concrete bridge deck layers are cast on the upper surfaces of the first steel beam and the second steel beam, respectively, and located beside the UHPC bridge deck layer; the present invention solves the problem of easy cracking of concrete slabs in the negative bending moment area of ​​continuous beams and facilitates construction, thereby improving economy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The invention relates to a continuous structure of a composite beam structure using a UHPC cross beam and a steel end plate with bolts and a construction method thereof. Background technology:

[0002] In recent years, steel-concrete composite beams have been widely used in engineering practice. Compared with traditional concrete beams and steel beams, they have many advantages. They make full use of the characteristics of steel and concrete and have great advantages in material structure. However, steel-concrete composite continuous beam bridges have large negative bending moments at the supports. The concrete bridge deck is prone to cracking due to the large tensile stress. The concrete slab in the negative bending moment area quits work due to cracking, which weakens the stiffness of the composite beam. If the cracks are large, harmful substances may penetrate into the concrete through the cracks, seriously corroding and rusting the steel bars, reducing the durability of the composite beam and increasing the difficulty of maintenance. Secondly, the construction method of steel-concrete composite beam bridges is usually to prefabricate steel main beams in the prefabrication yard, then weld and assemble them on site, erect the steel main beams, and finally cast the concrete bridge deck. At the same time, in order to improve the stability and torsional performance of the beam, transverse stiffening ribs are usually set at the supports to maintain the local stability of the beam and transmit the support reaction force. A large amount of welding work causes the uneconomical nature of the composite beam bridge. Summary of the invention:

[0003] The purpose of the present invention is to provide a continuous structure of a composite beam structure using UHPC beams and steel end plates with studs and a construction method thereof. The continuous structure of the composite beam structure using UHPC beams and steel end plates with studs is conducive to solving the problem of easy cracking of concrete slabs in the negative bending moment zone of steel-concrete composite continuous beams, facilitating construction and improving economy.

[0004] The present invention adopts a continuous structure of a composite beam structure of a UHPC crossbeam-steel end plate with bolts, which is characterized in that it includes a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure, the upper surfaces of the first steel beam and the second steel beam are arranged with vertical bolts, the first ends of the first steel beam and the second steel beam are respectively fixed with steel end plates, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, a UHPC crossbeam is cast in a space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support, a section of UHPC bridge deck layer is cast by extending the upper part of the UHPC crossbeam toward the upper surfaces of the first steel beam and the second steel beam, and reinforced concrete bridge deck layers are cast on the upper surfaces of the first steel beam and the second steel beam and on the sides of the UHPC bridge deck layer.

[0005] Furthermore, the vertical bolts and horizontal bolts are both cylindrical head bolts.

[0006] Furthermore, the vertical bolts, the steel end plates and the horizontal bolts and the first steel beam or the second steel beam are all prefabricated.

[0007] Furthermore, the distance between the two steel end plates on the first steel beam and the second steel beam is smaller than the width of the upper end of the lower structure.

[0008] The present invention solves the problem of easy cracking of concrete slabs in the negative moment zone of steel-concrete composite continuous beams by welding vertical studs on the upper surface of steel beams located in the negative moment zone of steel-concrete composite continuous beams and pouring UHPC bridge deck layers; and connecting adjacent steel-concrete composite beams through steel end plates, horizontal studs and UHPC cross beams. Under the action of vertical load, the steel end plates of the steel-concrete composite beams transfer the pressure of the flange of the lower steel beam to the UHPC cross beam, and the UHPC cross beam and UHPC bridge deck are used to resist the tension on the upper surface of the negative moment zone of the steel-concrete composite continuous beam. In addition, the horizontal studs welded on the steel end plates transmit shear loads, which can meet the requirements of mechanical properties. Thereby avoiding the generation and development of cracks in the negative moment zone of the steel-concrete composite continuous beam. At the same time, the use of steel end plates, horizontal studs and UHPC cross beams to connect adjacent steel-concrete composite beams is simple and convenient.

[0009] The present invention adopts a construction method of a continuous structure of a composite beam structure of a UHPC cross beam-steel end plate with bolts, wherein the continuous structure of the composite beam structure of a UHPC cross beam-steel end plate with bolts and the construction method thereof include a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure, the upper surfaces of the first steel beam and the second steel beam are provided with vertical bolts, the first ends of the first steel beam and the second steel beam are respectively fixed with steel end plates, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, a UHPC cross beam is cast in a space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support, the upper part of the UHPC cross beam extends to the upper surfaces of the first steel beam and the second steel beam to cast a section of a UHPC bridge deck layer, and reinforced concrete bridge deck layers are respectively cast on the upper surfaces of the first steel beam and the second steel beam and located beside the UHPC bridge deck layer;

[0010] The construction steps are as follows:

[0011] (1) Construction of substructure, establishment and installation of temporary and permanent supports.

[0012] (2) Prefabrication of the first steel beam and the second steel beam, welding of steel end plates at the ends of the first steel beam and the second steel beam, welding of vertical studs on the upper surfaces of the first steel beam and the second steel beam, welding of horizontal studs on the outer surfaces of the steel end plates of the first steel beam and the second steel beam, and installation and commissioning of lifting equipment;

[0013] (3) Lift the first and second steel beams with steel end plates, vertical bolts and horizontal bolts; place the first and second steel beams on temporary supports. At this time, the structure is in a simply supported state.

[0014] (4) Welding the transverse connection of the first steel beam and the second steel beam, using the first steel beam and the second steel beam as supports, setting up formwork, and pouring reinforced concrete bridge deck layers on the upper surfaces of the first steel beam and the second steel beam, respectively, with a gap between the poured reinforced concrete bridge deck layers on both sides;

[0015] (5) The UHPC bridge deck layer is cast in the interval between the reinforced concrete bridge deck layers on both sides, and the UHPC cross beam is cast in the space enclosed by the opposite surfaces of the two steel end plates and the upper end surfaces of the permanent supports.

[0016] (6) Remove temporary supports, complete system transformation, and organize bridge deck system construction.

[0017] The advantages of the structure of the present invention are that vertical studs are welded on the upper surface of the steel beam located in the negative bending moment area of ​​the steel-concrete composite continuous beam and the UHPC bridge deck is cast; adjacent steel-concrete composite beams are connected by steel end plates, horizontal studs and UHPC cross beams. This connection method has a simple structural form and clear force, and not only has suitable rigidity, but also has good seismic performance. The steel-concrete composite beam can achieve structural continuity without welding, which greatly saves construction costs and construction periods; UHPC has good tensile properties, and for steel-concrete continuous beam bridges, it can avoid the generation and development of cracks in the reinforced concrete bridge deck in the negative bending moment area; at the same time, UHPC reduces the thickness of the concrete cross beam and reduces the deadweight of the bridge. Description of the drawings:

[0018] Figure 1 It is a schematic diagram of the structure of the present invention;

[0019] Figure 2-Figure 7 It is a structural schematic diagram of the construction process of the present invention;

[0020] Figure 8a It is the main view of the first steel beam or the second steel beam;

[0021] Figure 8b is a top view of the first steel beam or the second steel beam;

[0022] Figure 8c yes Figure 8a Left view of

[0023] Figure 8d yes Figure 8a Right view of;

[0024] Explanation of numbers in the figure: 1-steel beam, 101-first steel beam, 102-second steel beam, 2-vertical studs, 3-reinforced concrete bridge deck layer, 4-UHPC bridge deck layer, 5-steel end plate, 6-horizontal studs, 7-UHPC cross beam, 8-permanent support, 9-temporary support, 10-substructure. Specific implementation method:

[0025] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0026] The present invention adopts a continuous structure of a composite beam structure of a UHPC crossbeam-steel end plate with bolts, including a first steel beam 101 and a second steel beam 102 whose first ends A are close to each other, a temporary support 9 arranged below the first end, a permanent support 8 and a lower structure 10, vertical bolts 2 are arranged on the upper surfaces of the first steel beam 101 and the second steel beam 102, steel end plates 5 are respectively fixed on the first end A of the first steel beam 101 and the second steel beam 102, horizontal bolts 6 are respectively arranged on the opposite surfaces of the two steel end plates, and a UHPC crossbeam 7 is cast in the space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support, and a section of UHPC bridge deck layer 4 is cast on the upper part of the UHPC crossbeam 7 extending toward the upper surfaces of the first steel beam and the second steel beam, respectively, and reinforced concrete bridge deck layers 3 are cast on the upper surfaces of the first steel beam 101 and the second steel beam 102, respectively, and located beside the UHPC bridge deck layer 4.

[0027] Furthermore, in order to firmly connect the reinforced concrete bridge deck layer 3, the UHPC bridge deck layer 4 and the UHPC cross beam 7 with the first steel beam 101 and the second steel beam 102, the above-mentioned vertical bolts and horizontal bolts are all cylindrical head bolts, and the small ends of the cylindrical head bolts are welded and fixed on the first steel beam 101 or the second steel beam 102. The spacing between the two cylindrical head bolts is 10-15 cm, and the height of the cylindrical head bolts is 10-15 cm.

[0028] Furthermore, for the sake of reasonable design, a lower structure 10, a permanent support 8 and a temporary support 9 on the upper surface of the lower structure are provided. The lower structure 10 is an existing conventional reinforced concrete structure, the permanent support 8 can be a steel support or a rubber support, and the temporary support 9 can be a concrete pad.

[0029] Furthermore, in order to realize on-site construction conveniently and quickly, the vertical bolts, steel end plates and horizontal bolts are prefabricated and welded with the first steel beam or the second steel beam in the factory, and only need to be lifted, installed and cast on site, which can greatly save construction time.

[0030] Furthermore, in order to provide good support, the distance between the two steel end plates on the first steel beam and the second steel beam is smaller than the width of the upper end of the lower structure.

[0031] The present invention adopts a construction method of a continuous structure of a composite beam structure of a UHPC cross beam-steel end plate with bolts, wherein the continuous structure of the composite beam structure of a UHPC cross beam-steel end plate with bolts comprises a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure, the upper surfaces of the first steel beam and the second steel beam are provided with vertical bolts, the first ends of the first steel beam and the second steel beam are respectively fixed with steel end plates, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, a UHPC cross beam is cast in a space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support, a section of a UHPC bridge deck layer is respectively extended from the upper part of the UHPC cross beam to the upper surfaces of the first steel beam and the second steel beam, and reinforced concrete bridge deck layers are respectively cast on the upper surfaces of the first steel beam and the second steel beam and located beside the UHPC bridge deck layer;

[0032] The construction steps are as follows:

[0033] (1) Construction of substructure 10, establishment and installation of temporary supports 9 and permanent supports 8 (e.g. Figure 2 shown);

[0034] (2) Prefabrication of the first steel beam 101 and the second steel beam 102, welding of steel end plates 5 at the ends of the first steel beam and the second steel beam, welding of vertical studs 2 on the upper surfaces of the first steel beam and the second steel beam, welding of horizontal studs 6 on the outer surfaces of the steel end plates of the first steel beam and the second steel beam (as shown in FIG8 ), installation and commissioning of hoisting equipment (such as Figure 3 shown);

[0035] (3) Lift the first steel beam 101 and the second steel beam 102 with the steel end plate 5, the vertical bolts 2 and the horizontal bolts 6; place the first steel beam 101 and the second steel beam 102 on the temporary support 9. At this time, the structure is in a simply supported state (such as Figure 4 shown);

[0036] (4) Weld the first steel beam and the second steel beam to connect transversely, use the first steel beam and the second steel beam as support, set up formwork, and cast reinforced concrete bridge deck layer 3 on the upper surface of the first steel beam and the second span steel beam respectively. There is a gap between the cast reinforced concrete bridge deck layers on both sides, and the gap can be 2-5 times the spacing between the two steel end plates (such as Figure 5 shown);

[0037] (5) Cast the UHPC bridge deck layer 4 in the interval between the reinforced concrete bridge deck layers on both sides and cast the UHPC cross beam 7 (such as Figure 6 shown);

[0038] (6) Remove temporary support 9, complete system conversion, and organize bridge deck system construction (such as Figure 7as shown).

[0039] The advantages of the structure of the present invention are that vertical studs are welded on the upper surface of the steel beam located in the negative bending moment area of ​​the steel-concrete composite continuous beam and the UHPC bridge deck is cast; adjacent steel-concrete composite beams are connected by steel end plates, horizontal studs and UHPC cross beams. This connection method has a simple structural form and clear force, and not only has suitable rigidity, but also has good seismic performance. The steel-concrete composite beam can achieve structural continuity without welding, which greatly saves construction costs and construction periods; UHPC has good tensile properties, and for steel-concrete continuous beam bridges, it can avoid the generation and development of cracks in the reinforced concrete bridge deck in the negative bending moment area; at the same time, UHPC reduces the thickness of the concrete cross beam and reduces the deadweight of the bridge.

[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A continuous structure of a composite beam structure using UHPC beams and studded steel end plates, characterized in that: It comprises a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure, wherein vertical bolts are arranged on the upper surfaces of the first steel beam and the second steel beam, steel end plates are respectively fixed to the first ends of the first steel beam and the second steel beam, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, a UHPC cross beam is cast in the space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support, a section of UHPC bridge deck layer is cast on the upper part of the UHPC cross beam extending toward the upper surfaces of the first steel beam and the second steel beam, respectively, and reinforced concrete bridge deck layers are cast on the upper surfaces of the first steel beam and the second steel beam beside the UHPC bridge deck layer; the vertical bolts and the horizontal bolts are cylindrical head bolts; the distance between the two steel end plates on the first steel beam and the second steel beam is less than the width of the upper end of the lower structure.

2. The continuous structure of the composite beam structure using UHPC beams and studded steel end plates according to claim 1 is characterized in that: The vertical bolts, the steel end plates and the horizontal bolts are all prefabricated with the first steel beam or the second steel beam.

3. A construction method for a continuous structure of a composite beam structure using a UHPC cross beam and a steel end plate with bolts, wherein the continuous structure of the composite beam structure using a UHPC cross beam and a steel end plate with bolts comprises a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure, the upper surfaces of the first steel beam and the second steel beam are provided with vertical bolts, the first ends of the first steel beam and the second steel beam are respectively fixed with steel end plates, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, a UHPC cross beam is cast in a space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the lower structure, a section of a UHPC bridge deck layer is respectively cast on the upper part of the UHPC cross beam to the upper surfaces of the first steel beam and the second steel beam, and reinforced concrete bridge deck layers are respectively cast on the upper surfaces of the first steel beam and the second steel beam and located beside the UHPC bridge deck layer; The construction steps are as follows: (1) Construction of substructure, establishment and installation of temporary and permanent supports; (2) Prefabrication of the first steel beam and the second steel beam, welding of steel end plates at the ends of the first steel beam and the second steel beam, welding of vertical studs on the upper surfaces of the first steel beam and the second steel beam, welding of horizontal studs on the outer surfaces of the steel end plates of the first steel beam and the second steel beam, and installation and commissioning of lifting equipment; (3) Lift the first steel beam and the second steel beam with steel end plates, vertical bolts and horizontal bolts; place the first steel beam and the second steel beam on temporary supports. At this time, the structure is in a simply supported state; (4) Welding the first steel beam and the second steel beam to connect transversely, using the first steel beam and the second steel beam as support, setting up formwork, and pouring reinforced concrete bridge deck layers on the upper surfaces of the first steel beam and the second steel beam, respectively, with a gap between the poured reinforced concrete bridge deck layers on both sides; (5) Cast the UHPC bridge deck layer in the interval between the reinforced concrete bridge deck layers on both sides and cast the UHPC cross beam in the space enclosed by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support; (6) Remove temporary supports, complete system conversion, and organize bridge deck system construction.