Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

136results about How to "Simple and fast construction" patented technology

Construction method of anti-typhoon sea wave sea-crossing steel trestle and platform adjacent to residential building

The invention relates to a construction method of an anti-typhoon sea wave sea-crossing steel trestle and platform adjacent to a residential building. The construction method comprises the steps that firstly, deep fusion application of BIM and VR is conducted; step 2, surveying and setting out; step 3, embedding steel bars and pouring strip-shaped concrete; fourthly, the steel pipe piles are transported and lengthened; fifthly, steel pipe piles are driven; sixthly, parallel connection and diagonal bridging construction is conducted; seventhly, bearing beams are installed; eighthly, longitudinal beams are installed; ninthly, the distribution beams are installed; tenthly, bridge deck slabs and guardrails are installed; and 11, an intelligent monitoring and early warning system.
Owner:SHANGHAI BAOYE GRP CORP

Fabricated concrete shear wall structure and construction method thereof

The invention relates to the field of concrete structures, in particular to a fabricated concrete shear wall structure and a construction method thereof.A prefabricated wall body is connected with a base through a UHPC post-pouring connecting section, vertical steel bars are arranged in the prefabricated wall body and the base correspondingly, the vertical steel bars in the prefabricated wall body penetrate into a loading beam, the loading beam and the prefabricated wall body form a whole, and the loading beam and the prefabricated wall body are arranged in the base; reserved hole UHPC prefabricated blocks are symmetrically distributed in the prefabricated wall body, SMA ribs are assembled in the reserved hole UHPC prefabricated blocks, part of vertical steel bars in the prefabricated wall body are divided into two sections by the reserved hole UHPC prefabricated blocks, and the two sections of vertical steel bars are in butt joint with the two ends of the SMA ribs through steel bar connectors respectively. According to the method, through optimal design of all construction parameters, the limit plastic damage area can be transferred to the SMA rib containing area from an original vertical connection joint, the situation that the fabricated shear wall is damaged too early at the joint to exit work is avoided, the fabricated shear wall has the good energy consumption and self-resetting capacity, and therefore the anti-seismic capacity of the fabricated shear wall is improved.
Owner:NANCHANG UNIV

Double-layer bolt prefabricated pipe piece, pipe piece joint and construction method

The invention relates to a double-layer bolt prefabricated duct piece, a duct piece connector and a construction method, the double-layer bolt prefabricated duct piece connector comprises a steel fiber concrete duct piece connector and a double-layer connecting assembly, and a first-layer connecting structure and a second-layer connecting structure are arranged in the steel fiber concrete duct piece connector; the connecting end of the first-layer connecting structure and the connecting end of the second-layer connecting structure are connected through a reinforcing component in a main body zigzag mode, so that stress of the first-layer connecting structure and the second-layer connecting structure is borne, the first-layer connecting structure comprises a first hole channel of an arc-shaped structure, and the second-layer connecting structure comprises a second hole channel of an arc-shaped structure. The second-layer connecting structure comprises a second pore channel of an arc-shaped structure, the first pore channel and the second pore channel are arranged in the mode that the curvature center positions are approximate and are spaced from each other, and the curvature of the first pore channel is smaller than that of the second pore channel. The reinforcing component protects the weak area of the hand hole, replaces the effect of a gasket, and meanwhile, the double-layer connecting assembly is connected together, so that a relatively strong reinforcing effect is achieved.
Owner:SHENZHEN METRO GROUP +1

Light spray coating and construction process thereof

The invention discloses a light spray coating and a construction process thereof. The light spray coating comprises 15-20% of cement, 15-20% of plant particles, 35-40% of building material particles, 15-18% of clay, 5-8% of siliceous superfine powder, 3-5% of cellulose, 3-5% of alumina micropowder and 0.02-0.05% of aluminum powder. The construction process comprises the following steps: S1, mixing and stirring the light spraying material, adding water accounting for about 3% of the total weight of the light spraying material for wetting, forming a semi-dry material, and filling the semi-dry material into a powder tank of a powder spraying machine; s2, a semi-dry method is adopted for spraying, the semi-dry material in the step S1 is fed into a muzzle of a powder spraying gun, atomized water is added into the muzzle, and the semi-dry material is sprayed to a construction part in the sequence of water first and material second; and rubber powder is added into the atomized water. The materials in the spray coating are simple and easy to obtain, the cost is low, the effects of comprehensive reinforcement and no influence on the internal ecology of the soil can be achieved, the construction is simple and rapid, and a construction foundation does not need to be built; the setting time is extremely short, and the construction period is not delayed; the terrain does not need to be considered, the construction surface is smooth, and the original construction part is not changed too much.
Owner:WEN XIAN XI FA TE ZHONG LU LIAO CHANG

Modularized roadbed slope drainage torrent chute framework

The utility model discloses a modular roadbed slope drainage chute framework which comprises a water collecting inlet chute plate, a water collecting outlet chute plate and a water collecting outlet chute plate, the shallow extending groove plate, the top end of the passage and the bottom end of the passage of the water collecting inlet groove plate are communicated and connected in the same direction; the top end part of the channel and the bottom end part of the channel of the shallow extension groove plate are continuously communicated and connected in the same direction, and the corresponding inclination of the bottom end part of the channel of the bent connection steering groove plate is smaller than that of the top end part of the channel of the bent connection steering groove plate; the deep-position speed reduction groove plate, the top end of the channel and the bottom end of the channel of the bent connection steering groove plate are communicated and connected in the same direction, and the overall extending inclination of the deep-position speed reduction groove plate formed based on the bent connection steering groove plate is smaller than that of the shallow-position extending groove plate. The technical problems that in the prior art, when a torrent chute is built through concrete, the construction process is tedious and complex, time and labor are consumed by constructors, the overall construction efficiency is not high, a large number of concrete materials are needed, and the engineering economy is poor are solved.
Owner:ROAD & BRIDGE INT CO LTD +1

Ecological protection slope for water conservancy project

The utility model provides a water conservancy project ecological slope protection which comprises slope protection bricks evenly laid on a slope surface, each slope protection brick is of a regular hexagon structure, a planting chamber is arranged in the center of each slope protection brick, a degradable planting grating is arranged in each planting chamber, inserting grooves and inserting blocks are sequentially and alternately arranged on the outer sides of the six edges of each slope protection brick, and the inserting grooves and the inserting blocks are communicated with the corresponding planting grating. Bolts used for locking the inserting grooves and the inserting blocks of the two adjacent slope protection bricks are perpendicularly arranged on the outer sides of the slope protection bricks. According to the slope protection brick, every two adjacent slope protection bricks are connected together in a matched and inserted mode through the insertion blocks and the insertion grooves, meanwhile, the insertion blocks and the insertion grooves are assembled and locked in cooperation with the bolts, the connection stability between the slope protection bricks is guaranteed, and compared with a concrete cast-in-place mode in the prior art, the construction process is simpler and rapider.
Owner:刘爱林

Cable-clip-like auxiliary cable saddle mounting method based on fabricated temporary cable saddle

The invention belongs to the technical field of suspension bridge upper structure construction, and particularly relates to a cable clamp type auxiliary cable saddle installation method based on an assembly type temporary cable saddle. The invention discloses a cable-clip-like auxiliary cable saddle mounting method based on an assembled temporary cable saddle. The cable-clip-like auxiliary cable saddle mounting method comprises the following steps that mounting construction of a main tower and an auxiliary tower is completed; a main cable saddle and an assembly type temporary cable saddle are installed, then cable strand erection is conducted on the basis of the assembly type temporary cable saddle, and cable strand sag alignment, cable tightening and cable clamp installation are completed; hoisting a stiffening beam in the midspan, pushing the main cable saddle towards the midspan to lift the main cable to a set height, dismounting the fabricated temporary cable saddle, mounting the lower half saddle body of the cable-clip-like auxiliary cable saddle, and then mounting the upper half saddle body to complete the mounting of the cable-clip-like auxiliary cable saddle. By means of the structural characteristics of the suspension bridge, additional internal force generated on the main tower and the auxiliary tower and bidirectional pushing of the main cable saddle are avoided, sag adjustment of the cable strands is facilitated, safety and reliability are achieved, and the safety risk in the whole construction process is reduced.
Owner:CCCC SECOND HIGHWAY ENG CO LTD

Splash-proof concrete discharge pipe

The utility model provides a concrete splash-proof discharge pipe, which belongs to the technical field of discharge pipes for concrete and comprises a discharge pipe, a splash-proof sleeve seat fixedly sleeved at a discharge pipe orifice of the discharge pipe, a discharge pipe head in threaded connection with the other end of the splash-proof sleeve seat, and a splash-proof pipe cover group sleeved on the splash-proof sleeve seat, the other end of the splash-proof pipe cover set extends out of the right end of the discharging pipe head, and through the structural combination design of the splash-proof sleeving base and the splash-proof pipe cover set between the discharging pipe and the discharging pipe head, a splash-proof flow guide cap composed of a splash-proof inward-shrinkage arc-shaped cap, a lower-opening splash-proof arc-shaped inclined plate and a lower discharging triangular through opening is arranged at the extension position of the discharging port end of the discharging pipe head. And the concrete sprayed outwards from the side of the discharge pipe head cannot continue to diffuse outwards, but is blocked by the splash-proof flow guide cap and collected to flow downwards, so that the concrete splashed from the upper end of the discharge pipe head is collected to fall off and is mixed with most of the concrete sprayed out from the middle part again to be sprayed out together.
Owner:QUANZHOU TINGJIU CONCRETE CO LTD

Construction elevator cage anti-collision device

The utility model provides an anti-collision device for a construction elevator cage. The anti-collision device comprises an anti-collision assembly which is connected to the lower portion of an elevator cage door and can move up and down along with the elevator cage door. A limiting assembly matched with the anti-collision assembly in a limiting mode is arranged in the elevator cage. The limiting assembly is provided with a limiting groove allowing the anti-collision rod to be vertically embedded therein. The limiting assembly can descend along with closing of the cage door, and the situation that the cage door of the construction elevator or an opposite protective net is damaged due to sliding impact of a small material carrier carried by the construction elevator is avoided; the limiting assembly can be lifted along with opening of the cage door, and the situation that after the cage door is opened, an anti-collision rod influences passing of the cage is avoided; the anti-collision assembly is arranged on the lower portion of the elevator cage door so that the small material carrier can be conveniently prevented from sliding and colliding with the elevator cage door.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

Expanded-base rotor steel pipe pile and construction technology thereof

PendingCN121781581AIncrease horizontal load resistanceImprove bearing capacityBulkheads/pilesClassical mechanicsPipe
The invention relates to the technical field of building construction, in particular to a bottom-expanded rotor steel pipe pile and a construction technology thereof.The bottom-expanded rotor steel pipe pile comprises a pile body steel pipe, a bottom-expanded wing ring and a pile top grouting blind plate, one end of the pile top grouting blind plate is a connector end, and the connector end is connected with the power end of a drilling machine; the rotary cutting is performed through the bottom-expanded wing ring; an injection cavity is formed in the pile body steel pipe. According to the bottom-expanded rotor steel pipe pile, the large bearing capacity can be provided under the small diameter. The steel pipe pile can form a larger bearing area in soil, so that the bearing capacity of a single pile is remarkably improved, and the steel pipe pile is suitable for various types of soil and rocks including soft soil, sandy soil, cohesive soil, soft rocks and the like. The rotary cutting mode is adopted for burying, the construction process is relatively simple and rapid, and the construction efficiency can be remarkably improved. And meanwhile, a large amount of slurry treatment and dumping operation are not needed, so that the construction time and cost are further saved.
Owner:TIANJIN BINHAI CONSTRUCTION TECHNOLOGY CO LTD

Control structure for uplift deformation of deep soft rock tunnel

The present invention is a control structure for the uplift deformation of an inverted arch in a deep-buried soft rock tunnel, and relates to the technical field of tunnel construction. The invention comprises: an inverted arch frame, the inverted arch frame at least comprises a lower inverted arch primary support structure and an upper inverted arch primary support structure, the upper inverted arch primary support structure being arranged above the lower inverted arch primary support structure; an anchor pipe, the anchor pipe is driven into the tunnel surrounding rock below the lower inverted arch primary support structure, and one end of the anchor pipe extending out of the tunnel surrounding rock is fixedly connected to the lower inverted arch primary support structure, the number of the anchor pipes is multiple and they are evenly arranged below the lower inverted arch primary support structure, and a volume expansion mechanism is arranged on the anchor pipe. The device is not only simple and fast to construct, but also has good stability. While ensuring the construction speed, the stability of the inverted arch is improved, and the phenomenon of deformation, cracking or even collapse of the inverted arch will not be caused by high stratum pressure, poor geological conditions, large deformation of the surrounding rock, etc., so that while ensuring safe and fast construction of the tunnel, the stability of the inverted arch can also be ensured, and the capital investment during the operation period can be saved.
Owner:BEIJING JIAOTONG UNIV

Fixing device capable of being quickly disassembled and assembled on round rod

The utility model belongs to the field of engineering construction, and particularly relates to a fixing device capable of being quickly assembled and disassembled on a round rod, the device comprises a detachable shell part and an internal assembly part, the detachable shell part comprises a top cover, a conical shell and a detachable bottom cover, and the internal assembly part comprises an upper baffle, a lower baffle, a small ball and an auxiliary spring. The upper baffle and the lower baffle both comprise poking pieces, a longitudinal opening allowing the poking pieces to slide up and down is formed in the conical shell, the round rod is rapidly locked by the small ball through the acting force of the lower baffle and the auxiliary spring, the poking pieces of the upper baffle fluctuate downwards, and the device is rapidly unlocked. The nut is simple in structural design, does not need external tools, is convenient to disassemble and assemble, is suitable for any angle, can be replaced and maintained, can replace the function of a nut in many aspects, is also suitable for a smooth round rod which is not suitable for the nut, greatly saves time, improves the disassembly and assembly efficiency of an operator, and reduces the labor intensity of the operator. And an inexperienced person in daily life can also conveniently use the device.
Owner:ZHONGTIE ELECTRIZATION BUREAU GRP BEIJING CONSTR ENG

Foundation stage waterproof protection layer construction method

The invention relates to the technical field of building engineering, and discloses a foundation stage waterproof protection layer construction method which comprises the following steps: step 1, constructing a foundation raft cushion layer, constructing a waterproof layer, and pouring a planar waterproof protection layer after the waterproof layer construction is accepted and accepted by a supervision unit; secondly, brick forming die construction parts are adopted on the periphery of the foundation raft, and a batch of bricks are arranged on the top of a brick forming die for a top waterproof protection layer; thirdly, the bottom is filled with cement mortar, and cement pressure plates are laid in a staggered joint mode; fourthly, when the foundation raft has an inclined plane, the bottom is underlaid with cement mortar, the top is in lap joint with the plane through anti-crack mortar internal pressure gridding cloth, and it is guaranteed that the cement pressure plate does not fall off. Usually, 1: 2.5 cement mortar hanging nets are adopted for construction on the vertical face of the brick blank film and the vertical face of the bearing platform foundation, a 10 mm cement pressure plate is adopted, the strength is not smaller than 20 Mpa, the strength of a protection layer can be guaranteed, labor is greatly saved, the construction progress is accelerated, and construction is easy and convenient.
Owner:SHANGHAI BAOYE GRP CORP

Multifunctional round bulk granary bottom assembly type full-ventilation grain discharging integrated device

The invention relates to the technical field of granary ventilation and grain discharging, in particular to a multifunctional round bulk granary bottom assembly type full-ventilation grain discharging integrated device which is conical and comprises a top plate and a bottom plate connected with the top plate, and a consolidation structure and a full-ventilation system are arranged between the top plate and the bottom plate. The bin bottom is further provided with a discharging auxiliary structure in a matched mode. Wherein the top plate is of a frame structure, the minimum unit is a quadrilateral area defined by every two adjacent radial partition plates and circumferential beams, and a sieve pore plate is laid on the top plate and matched with the minimum unit of the top plate. The consolidation structure comprises radial partition plates and circumferential beams, the radial partition plates and the circumferential beams are arranged between the top plate and the bottom plate, the diameters of the circumferential beams are gradually increased from the center of the silo to the wall of the silo, and the circumferential beams and the radial partition plates are welded in a crossed mode to form a grid-shaped structure; the full ventilation system comprises radial partition plates arranged between the top plate and the bottom plate, circumferential beams and ventilation holes, a main air duct is arranged on the center cylinder, and during ventilation operation, air enters the ventilation holes through the main air duct and is dispersed to the position between every two adjacent radial partition plates, and finally enters the bin through the top plate to form the full ventilation system.
Owner:ZHENGZHOU DITIAN GRANARY FACTORY TECH CO LTD

Concrete retaining wall and construction method thereof

The invention discloses a concrete retaining wall and a construction method thereof.The concrete retaining wall comprises a concrete retaining wall body, and at least one reinforcing rib is embedded in the concrete retaining wall body; the decoration layer covers the outer vertical face of the concrete retaining wall body, the decoration layer comprises at least one prefabricated plate, and all the prefabricated plates are continuously or discontinuously installed on the outer vertical face of the concrete retaining wall body from bottom to top in the height direction of the concrete retaining wall body; each prefabricated slab comprises a consolidation layer and a plurality of decoration pieces, the part, not exceeding two parts of the height, of each decoration piece is embedded in the consolidation layer, and the remaining part of each decoration piece can be embedded in the outer vertical face of the concrete retaining wall body; by means of the precast slabs, the bonding strength between the cobblestones and the concrete retaining wall body is enhanced, the problems that in a traditional construction mode, new and old materials are not firmly bonded and are prone to separation and falling off are solved, the decoration and protection effects of the concrete retaining wall are guaranteed, the requirement for high-altitude operation is reduced, the construction difficulty and potential safety hazards are reduced, and the construction cost is saved; and resource waste is avoided.
Owner:GUANGDONG PROVINCIAL ARCHITECTURAL ENG MACHINERY CONSTR

Aluminum die and cantilever scaffold combined construction structure

The utility model discloses an aluminum formwork and cantilever scaffold combined construction structure which comprises a cantilever beam, an aluminum formwork, a fixing piece, a mounting piece, a scaffold, a pull-up structure and a protective net. The inner end of the cantilever beam is fixedly connected with the floor, and the outer end extends out of the shear wall; the aluminum formwork comprises a side formwork and a hole opening formwork. The side formworks are arranged on the inner side and the outer side of the wall body and comprise main formworks and small formworks, and the small formworks correspond to the cantilever beams and are detachably connected with the main formworks; the hole opening template is arranged at the position of the reserved hole; the fixing piece is fixedly arranged on a floor slab and is connected with the cantilever beam; the mounting piece is arranged at the outer end of the cantilever beam; the scaffold is arranged on the cantilever beam; the pull-up structure comprises a limiting rod, a clamping rod and a pull rope. The aluminum template is divided into the main template and the small template, and the corresponding small template is removed when the cantilever beam corresponds to the floor construction, so that the conflict between the side template and the cantilever beam is avoided. During non-corresponding floor construction, the small formwork is connected with the main formwork for normal pouring construction, and construction is easy, convenient and rapid.
Owner:THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU

Tilt measuring structure for foundation slab of LNG (liquefied natural gas) tank body

The utility model provides an inclination measuring structure for a foundation slab of an LNG (Liquefied Natural Gas) tank body. The inclination measuring structure comprises a horizontally arranged side inclination pipe I, a side inclination pipe II vertical to the side inclination pipe I, a horizontal inclinometer I, a horizontal inclinometer II, a steel pipe, a cable and an acquisition system, the first side-tipping pipe and the second side-tipping pipe are perpendicularly crossed, the first side-tipping pipe is located above the second side-tipping pipe, the first horizontal clinometers are arranged in the first side-tipping pipe according to a certain distance, and the second horizontal clinometers are arranged in the second side-tipping pipe according to a certain distance. And the horizontal clinometer I and the horizontal clinometer II are respectively connected with an acquisition system through cables laid in the steel pipe. The device has the advantages of wide coverage, high test precision, convenience in installation, stable and efficient performance and the like.
Owner:NAT PIPELINE NETWORK GRP NANSHAN (SHANDONG) NATURAL GAS CO LTD

Bidirectional prestress weight reduction assembly type composite floor slab system

The utility model discloses a two-way prestress weight reduction assembly type composite floor slab system. The two-way prestress weight reduction assembly type composite floor slab system comprises a pre-tensioning prestress prefabricated concrete bottom plate, weight reduction blocks, cast-in-place concrete ribs and post-tensioning prestress steel bars. Longitudinal prestressed load-bearing steel bars and transverse distribution steel bars are arranged in the pre-tensioned prestressed precast concrete bottom plate. A concrete reinforcing rib or a steel truss reinforcing rib or a steel and concrete combined structure reinforcing rib is arranged on the concrete bottom plate; the weight reducing blocks are laid on the pre-tensioned pre-stressed precast concrete bottom plate, and the weight reducing blocks are spaced by a certain distance. A plurality of pre-tensioned pre-stressed precast concrete bottom plates are assembled together, and concrete ribs are formed after the weight reducing blocks are cast in place. The prestressed steel bars are post-tensioned in the concrete ribs, and after the concrete reaches the strength, the steel bars are tensioned to form post-tensioned prestressing force to form bonded or unbonded prestressing force. According to the utility model, the bidirectional rigidity of the floor system is consistent, the bidirectional force transmission performance and the bidirectional anti-cracking effect are better, the integrity of the floor system is better, and more steel materials are saved.
Owner:JIANGSU WANDA CONSTR TECH CO LTD

Operating platform for construction of large-span daylighting roof

The utility model discloses an operating platform for construction of a large-span daylighting roof, which comprises a fixed support fixedly mounted on two adjacent parapet walls, an overhanging support arm is fixedly mounted on one side of the fixed support, and the two overhanging support arms are connected through a telescopic connecting arm. A supporting plate is detachably installed on the overhanging supporting arm and the telescopic connecting arm, and a plurality of protective railings are arranged on the left side and the right side of the supporting plate and connected through pull ropes. A safety net is arranged between the two parapet walls and located below the overhanging supporting arms and the telescopic connecting arms. The platform integrally adopts an assembly type building mode, the connection mode is simple and convenient, field installation is facilitated, the overall structure is light and handy, the platform can adapt to a large-span construction scene, and the platform can be repeatedly used and has wide application prospects.
Owner:THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU

A full bolt anti-buckling brace and preparation method thereof

A fully bolted anti-buckling brace and a preparation method thereof, belonging to the technical field of building structure engineering. Two groups of end stiffeners and at least two groups of limiting ribs are provided on the core plate, the two groups of end stiffeners are respectively arranged at the two ends of the core plate, and the limiting ribs are arranged between the two groups of end stiffeners along the axial direction of the core plate; an end constraint unit is provided between the end stiffener and the adjacent limiting ribs; a middle constraint unit is provided between each two adjacent limiting ribs, and the upper end of the end constraint unit and the upper end of the middle constraint unit, as well as the lower end of the end constraint unit and the lower end of the middle constraint unit are respectively connected to the corresponding constraint unit cover plate. The present invention is easy to process and transport, reduces the amount of engineering and resource consumption; realizes the core plate to enter plasticity after buckling in multiple sections, and gives full play to its energy consumption capacity; the construction is simple and quick, which improves the work efficiency while ensuring the safety of the structure; avoids the problem of regular maintenance required for traditional concrete supports, and is green and energy-saving.
Owner:JILIN JIANZHU UNIVERSITY

Combined composite foundation

The utility model discloses a combined type composite foundation which sequentially comprises a natural soil layer, a composite soil layer, a mattress layer and a non-flexible foundation layer from bottom to top, the composite soil layer comprises a plurality of variable cross-section screw piles which are evenly distributed, and a gravel pile is arranged between every two adjacent variable cross-section screw piles. The variable cross-section screw piles and the gravel piles are alternately arranged, so that uniform bearing of the foundation can be realized, settlement caused by uneven bearing of the foundation can be reduced, the bearing capacity of the foundation can be improved, and meanwhile, the overall construction cost is reduced.
Owner:SICHUAN RONGKUNYUAN GEOTECHNICAL ENGINEERING CO LTD

Construction method suitable for suspended splicing rapid construction of UHPC composite beam segments

The invention discloses a construction method suitable for suspended splicing rapid construction of UHPC (Ultra High Performance Concrete) composite beam segments and a construction method thereof, which are applied to connection construction of the composite beam segments consisting of a composite bridge deck slab and a steel main beam, and the composite bridge deck slab at least consists of an upper UHPC bridge deck slab and a lower bridge deck slab steel bottom plate. Welding and connecting a side web plate of the steel main beam, a bottom plate of the steel main beam, a middle web plate of the steel main beam and the bridge deck slab steel bottom plate at the joint of each composite beam section to form an annular welding joint of the composite beam sections; the circumferential welding joints of the adjacent composite beam sections are welded and connected through the PBL steel structure inlaying sections to form a complete closed steel box. The wet joint lagging construction can be realized.
Owner:GUANGDONG PROVINCE COMM PLANNING & DESIGN INST

Continuous structure of composite beam structure using UHPC beam-steel end plate with studs and its construction method

The present invention relates to a continuous structure of a steel-concrete composite beam structure and a construction method thereof, wherein the structure comprises a first steel beam and a second steel beam whose first ends are close to each other, a temporary support arranged below the first end, a permanent support and a lower structure. Vertical bolts are arranged on the upper surfaces of the first steel beam and the second steel beam, steel end plates are respectively fixed to the first ends of the first steel beam and the second steel beam, horizontal bolts are respectively arranged on the opposite surfaces of the two steel end plates, and a UHPC crossbeam is cast in the space surrounded by the opposite surfaces of the two steel end plates and the upper end surface of the permanent support. A section of a UHPC bridge deck layer is cast on the upper part of the UHPC crossbeam extending toward the upper surfaces of the first steel beam and the second steel beam, respectively, and reinforced concrete bridge deck layers are cast on the upper surfaces of the first steel beam and the second steel beam, respectively, and located beside the UHPC bridge deck layer; the present invention solves the problem of easy cracking of concrete slabs in the negative bending moment area of ​​continuous beams and facilitates construction, thereby improving economy.
Owner:FUZHOU UNIV

Member type curtain wall roof-exiting water cut-off system

The utility model provides a component type curtain wall out-of-roof water cut-off system which does not need to apply sealant to abutted seams and holes on all surfaces of the inner side and the outer side of an out-of-roof curtain wall, an extending stand column core sleeve is installed in an upper end cavity of a lower-layer stand column, and an end sealing plate covers the upper end of the stand column core sleeve in a sealing mode. A weather-proof sealant is applied to the periphery of a gap between the stand column core sleeve and the upper end of the lower-layer stand column, a coping waterproof plate is installed at the position of an inserting seam between the lower-layer stand column and the upper-layer stand column, and a horizontal through complete water cut-off system is formed through installation and construction of the lower-layer stand column, the stand column core sleeve, the end sealing plate, the upper-layer panel, the coping waterproof plate and the weather-proof sealant. The water cut-off system has the remarkable advantages of being high in universality, simple and reliable in construction process, convenient and fast to construct, small in workload, excellent in waterproof performance, good in durability, simple and feasible in quality control, economical in manufacturing cost and the like, and has very wide application and popularization prospects in the field of building curtain walls.
Owner:NANJING JINZHONGJIAN CURTAIN WALL DECORATION

A glass magnesium board installation structure for indoor assembled floor paving

The present invention belongs to the technical field of glass magnesium board, and in particular, is a glass magnesium board installation structure for indoor assembled floor paving, including a straight plate and a dovetail groove, the straight plate is provided with a screw hole inside, the dovetail groove is installed inside the first board surface, the left side of the key is provided with a second board surface, a pad is provided above the mounting plate, a screw is installed inside the screw hole, a limit block is fixed on the left side of the connecting rod, a through hole is provided outside the nut, a positioning hole is provided inside the key, a spring is connected to the right side of the bayonet, and a mounting hole is installed below the square key. Compared with the existing glass magnesium board assembly structure, the glass magnesium board assembly structure is provided with a dovetail groove and a key, which makes assembly convenient and quick, and is provided with a screw, a connecting rod, a limit block and a nut, which makes construction simple and stable, and is also provided with a groove, a square key and a mounting plate, which saves working time and avoids thread drilling.
Owner:GUANGXI WEIZHIWANG INTELLECTUAL PROPERTY CO LTD

Prefabricated concrete component structure

The utility model discloses a precast concrete component structure, which relates to the technical field of building construction and comprises a first precast concrete component and a second precast concrete component. The first concrete prefabricated part and the second concrete prefabricated part are movably connected through a connecting piece; the first concrete prefabricated part rotates along the periphery of the second concrete prefabricated part through the connecting piece and forms an included angle a, wherein a is larger than or equal to 0 degree and smaller than or equal to 180 degrees. According to the concrete prefabricated part structure, the first concrete prefabricated part and the second concrete prefabricated part are connected together through the connecting piece, the position relation between the first concrete prefabricated part and the second concrete prefabricated part can be adjusted, later installation operation is facilitated, the construction process becomes simple and convenient, and the construction efficiency is improved. The labor intensity is further reduced and the working efficiency is improved.
Owner:CCCC FOURTH HIGHWAY ENG CO LTD +2

Novel reinforced concrete gate tower

The utility model discloses a novel reinforced concrete gate tower, which relates to the technical field of buildings and comprises double stand columns, fixing components arranged at the bottoms of the double stand columns, mounting components arranged at the top ends of the double stand columns, reinforcing components arranged on the upper portions of the mounting components, supporting components arranged on the double stand columns, and the supporting components arranged on the lower portions of the mounting components. The double stand columns serve as main bearing structures, concrete is poured in the double stand columns, and the strength and stability of the stand columns are remarkably enhanced. Through the synergistic effect of the supporting assembly, the mounting assembly and the reinforcing assembly, a multi-layer and multi-direction supporting system is formed, and the overall stability of the gate tower is effectively improved. The supporting inclined rods are obliquely connected with the double stand columns and the supporting transverse rods, so that the anti-overturning capacity is enhanced, and the gate tower is more stable under the action of external factors such as wind power. Due to the design of the fixing assemblies, especially the arrangement of the fixing needles, it is ensured that the double stand columns are firmly fixed to the ground, and the collapse risk caused by an unstable foundation or external force is reduced.
Owner:XUZHOU JIULAIFU DOORS & WINDOWS CO LTD

Photovoltaic medium-voltage cable landing device floating on water

The utility model relates to a water floating photovoltaic medium-voltage cable landing device. The utility model is suitable for the field of photovoltaic technology. According to the technical scheme, the system comprises a water surface S-bent section cable floating body 1 and a cable support; the water surface S-bent section cable floating body is led out from the medium-voltage outgoing line side of the water surface box-type transformer floating boat and extends to the designed highest water level; the plurality of cable loops are linearly arranged on the water surface S-bent section cable floating body; the cable support comprises an A-type support, a B-type support and a C-type support which are all located above the designed highest water level elevation. The water surface S-bent section cable floating body is fixed with the A-shaped bracket through a steel strand, and the A-shaped bracket is used for supporting a cable loop on the water surface S-bent section cable floating body; the B-type bracket is used for layering the cable loop on the A-type bracket; the C-shaped bracket is used for layering a cable loop on the B-shaped bracket; and the cable loop on the C-shaped bracket is connected with the medium-voltage switch cabinet through a cable trench in the booster station.
Owner:POWERCHINA HUADONG ENG CORP LTD

Construction method of super high-rise high-altitude large-span cantilever concrete structure

A kind of construction method of super high layer high altitude large-span cantilever concrete structure, including the following steps: step one, the structure optimization and construction drawing design of cantilever concrete structure;Step two, the deepening design of measure support, measure support includes support frame and hanging basket;Step three, main body first construction;Step four, precast concrete beam section field prefabrication;Step five, the manufacture and installation of support frame;Step six: the hoisting of precast concrete beam section;Step seven: the construction of cast-in-place concrete section;Step eight: the installation of upper pull rod and lower support rod;Step nine: in turn remove hanging basket, hanging platform and support frame.The present application solves the technical problems of complex construction technology, long construction period and high construction risk of large-span cantilever structure.
Owner:CHINA CONSTR FIRST GRP SOUTHCHINA CORP CO LTD GUANGDONG PROVINCE +1