Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

35results about How to "Reduce construction workload" patented technology

Large deep foundation pit rotating trestle and construction method

The invention relates to a large deep foundation pit rotating trestle and a construction method, the large deep foundation pit rotating trestle comprises a trestle body and a supporting body, the supporting body and the trestle body are integrated, the supporting body is arranged below the trestle body, and the trestle body is divided into a straight section, a rotating slope section and a soil slope ramp; the straight sections are arranged on the edge of the top of the foundation pit, between the two rotating slope sections and at the tail ends of the rotating slope sections respectively, the rotating slope sections are arranged between the two straight sections, the tail end of the last straight section is provided with a soil slope ramp, and the soil slope ramp is directly communicated with the bottom of the large deep foundation pit. The trestle has the beneficial effects that the trestle occupies a small area of the deep foundation pit, bottom construction of the deep foundation pit is not affected, the construction difficulty of the deep foundation pit is reduced, the construction efficiency is high, the bearing capacity is high, the construction transportation capacity of the deep foundation pit is improved, the transportation efficiency is improved, and the construction progress of the deep foundation pit is accelerated.
Owner:CHINA THIRD METALLURGICAL GRP

Hanging basket device of large-area inclined glass curtain wall and construction method

The invention relates to the technical field of building construction, and discloses a hanging basket device of a large-area inclined glass curtain wall in order to solve the problems of low installation efficiency and high cost in the prior art, the hanging basket device of the large-area inclined glass curtain wall comprises a roof grid structure and a hanging basket assembly, and the hanging basket assembly comprises a lifting rope and a pulling rope; the lifting rope and the traction rope are connected with the roof grid structure and the ground platform, the hanging basket body is arranged on the lifting rope and the traction rope, and the lower end of the traction rope penetrates through the fixed pulley to be connected with the chain hoist. The construction method comprises the steps that after the hanging basket device is installed, the hanging basket device and indoor glass are hoisted synchronously; the traction rope is straightened through the fixed pulley and the chain hoist and is consistent with the curtain wall in inclination; the pulling rope is adjusted through the lifting rope and the hanging basket direction control equipment until the hanging basket and the indoor inclined glass curtain wall rise obliquely; after installation is completed, the hanging basket is obliquely lifted to another area, and then installation circulation is conducted again till construction is completed; and the platform is dismantled after installation is completed. Compared with a traditional scaffold erecting method, the construction cost is remarkably reduced.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Prefabricated diaphragm wall type fabricated subway entrance and exit structure

The utility model discloses a prefabricated diaphragm wall type assembled subway entrance and exit structure which comprises side wall structures, a prefabricated top plate and a prefabricated bottom plate are arranged between the side wall structures of the entrance and exit, the prefabricated top plate and the prefabricated bottom plate are both connected with the side wall structures through ultrahigh concrete, and the side wall structures are formed by integrating an enclosure structure and a main body structure. The side wall structure comprises prefabricated underground diaphragm walls, and underground diaphragm wall inter-amplitude connecting assemblies are arranged between the adjacent prefabricated underground diaphragm walls. The foundation pit support structure, the waterproof curtain and the side wall of the main body structure are integrated, so that working hours and manufacturing cost are saved. According to the utility model, the connection scheme of the waterstop strip bags, the C / T inter-width connectors and the UHPC concrete wet joints is adopted between the prefabricated underground diaphragm walls, so that the waterproof and guiding effects are achieved. According to the utility model, the longitudinal tensioning connection scheme of the inter-width concave-convex tenons, the elastic sealing gaskets and the prestressed steel bars is adopted between the prefabricated plate widths, so that not only can shearing force be effectively transmitted, but also a water stopping effect can be achieved.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Reusable anchor cable drill hole plugging device

The utility model relates to the technical field of slope support, in particular to a reusable anchor cable drill hole plugging device which comprises a bottom plate, a fixing rod and a clamping assembly. When a drill hole of a slope support design experiment hole is plugged, an anchor cable extending out of the drill hole penetrates through the clamping assembly, the bottom plate is anchored to a slope through the fixing rod, and after anchoring is completed, single-strand anchor cable wire harnesses are clamped and fixed through the clamping assembly; the fixing rod can be used as a fulcrum to be matched with the hanging belt to pull the whole fixing device in the slope direction, so that the mounting stability of the fixing device is ensured, the drilling hole is blocked, the anchor cable extending out of the drilling hole is fixed, and the situation that in the prior art, an experiment pier formed by pouring reinforcing steel bars and concrete in a matched mode is used for blocking the drilling hole is replaced; the experiment construction period is shortened, the use of reinforcing steel bars and concrete is reduced, the construction cost is saved, and the fixing device can be disassembled and reused after the experiment is finished, and is more convenient to assemble and disassemble.
Owner:NINGHUA DADA BUILDING MATERIALS CO LTD

Power divider, intelligent power distribution system and power distribution method

The invention relates to a power divider, an intelligent electric power distribution system and a power distribution method. The power divider comprises a current transformer, a PLC, a relay module, a power supply module and a man-machine interaction module. The current transformer is used for carrying out current detection on an incoming line current value of the power utilization system. The PLC is used for generating a control signal based on the incoming line current value and the current set value of the power utilization system. And the relay module is used for respectively controlling each path of power utilization unit based on the control signal. The man-machine interaction module is used for setting a current set value and displaying an incoming line current value. The intelligent power distribution system comprises a strong current cabinet and the power divider arranged in the strong current cabinet, and an air switch and a leakage protection device are further arranged in the strong current cabinet. The power distribution method is applied to the power divider. The power distribution function is realized based on the strong electric signal of the PLC, so that the construction scheme is simplified, the construction workload is reduced, the construction material and labor cost is reduced, the safety is improved, and butt joint with an intelligent system is facilitated.
Owner:SUZHOU HANANO MATERIALS TECH LTD

A jacking device and method for a ship roll-on / roll-off device

PendingCN122102021AThe installation process is quickly advancedReduce assembly and weldingSafety devices for lifting equipmentsServomotorsMarine engineeringHydraulic pressure
The application discloses a jacking device and a jacking method for a ship roll-on / roll-off device, and relates to the technical field of lifting of a ship roll-on / roll-off device. The jacking device for the ship roll-on / roll-off device comprises a plurality of support tools, a plurality of hydraulic jacking devices and a master control device. The plurality of tool supports are arranged at intervals on the two sides of the roll-on / roll-off device to be jacked up, the tool supports are fixedly connected with the roll-on / roll-off device, and the bottom of each tool support is provided with a positioning structure. The plurality of hydraulic jacking devices are arranged below each tool support, the top of each hydraulic jacking device is matched with the positioning structure, and each hydraulic jacking device is used for jacking up the roll-on / roll-off device. The master control device is used for controlling the synchronous jacking of the plurality of hydraulic jacking devices. The jacking device provided by the application can realize the jacking of the roll-on / roll-off device without welding temporary lifting lugs or opening process holes on the movable deck, effectively reduces the processes of lifting lug welding, removal, repair welding and process hole opening and plugging, significantly reduces the construction workload, and improves the ship manufacturing efficiency.
Owner:GUANGZHOU SHIPYARD INTERNATIONAL LTD

Industrial building based on DFMA design method

The industrial building based on the DFMA design method comprises a floor slab, a wall plate and hollow pipes arranged in the floor slab and the wall plate, pipelines can be arranged in the hollow pipes, and the ends of the hollow pipes extend to the side faces or the side edges of the floor slab and the wall plate and are perpendicular to the side faces or the side edges of the floor slab and the wall plate; a locking device is arranged between the ends of the adjacent hollow pipes and comprises a sliding locking pipe and a magnetic control assembly, the sliding locking pipe is connected to the inner walls of the hollow pipes in a sliding mode, and the magnetic control assembly can control the sliding locking pipe to move to the position between the adjacent hollow pipes so that the adjacent hollow pipes can be connected and locked through the sliding locking pipe. The magnetic control assembly can control the sliding locking pipe to completely move into one hollow pipe so that the floor slab and the wall plate can move in the direction perpendicular to the axis of the hollow pipe. The assembly process can be simplified, the workload of site construction is reduced, and the construction speed and safety are improved.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD

H-shaped steel positioning device and positioning method for SMW method pile

PendingCN122236107AReduce construction workloadImprove construction efficiencyBulkheads/piles
This invention discloses an H-beam positioning device and method for SMW (Self-Mixed Mixing) piles. A guide trench is formed in the soil at the top of the SMW pile, with its centerline aligned with the centerline of the SMW pile. The SMW pile includes multiple mixing piles evenly distributed in the soil at the bottom of the guide trench for inserting H-beams. The H-beam positioning device comprises multiple positioning device bodies, each including a positioning frame, at least two markers, and at least two observation points. This invention uses variable-length connecting rods and fixing bolts to connect multiple positioning device bodies into a single unit, accommodating various H-beam insertion methods. The observation points, in conjunction with the markers, monitor the position of the H-beams during insertion, reducing the probability of eccentricity. It eliminates the need to move individual positioning device bodies to the next H-beam insertion point after the current H-beam is completed, thus improving construction efficiency.
Owner:CHINA CONSTR EIGHTH ENG BUREAU TECH CONSTR CO LTD

Protective closed gate valve for through-wall air duct and its sealing method

The present invention relates to the field of engineering protection technology, and discloses a protective closed gate valve for a through-wall air duct and a sealing method thereof. The present invention includes a box body, a closed cover plate assembly arranged in the box body, and a driving assembly for driving the closed cover plate assembly to open or close; the box body includes a connecting pipe body and an equipment box that are interconnected, and the openings at both ends of the connecting pipe body are respectively connected and sealed with the through-wall pipe fittings and the air duct pre-buried in the wall, and the equipment box is located on one side of the connecting pipe body, and the closed cover plate assembly includes a closed gate plate that matches the pipe opening of the through-wall pipe fitting and a sliding member located on the surface of the closed gate plate, and the sliding member is slidingly arranged in a high-position slideway or a low-position slideway on both sides, and the closed gate plate is connected to the driving assembly through a connecting rod; the driving assembly includes a transmission assembly for outputting power and a guide assembly for adjusting the direction of power. The present invention does not require installation or disassembly, is convenient to use, saves time and effort, and has good sealing performance.
Owner:CHINA INST OF BUILDING STANDARD DESIGN & RES

Tunnel assembly type lining structure supporting system with rapid laying function

The invention relates to a tunnel assembly type lining structure supporting system with a rapid laying function, which comprises an inverted arch box type lining precast block arranged at the bottom of a tunnel, curved wall lining precast blocks arranged on two side walls of the tunnel and an arc-shaped lining precast block arranged at the top of the tunnel, and the end parts of the inverted arch box type lining precast blocks, the end parts of the curved wall lining precast blocks and the end parts of the arc-shaped lining precast blocks are respectively connected through concave-convex tenon connecting structures, bolt connecting joint structures and socket joint structure connecting pieces, are sequentially paved along the longitudinal direction of the tunnel and are connected through longitudinal prestress fastening structures. Compared with cast-in-place construction, the standardization degree of tunnel construction is improved, the quality is more reliable, the construction workload in the tunnel is reduced, and the construction efficiency is improved.
Owner:CHINA RAILWAY DESIGN GRP CO LTD +2

Gob-side entry retaining prefabricated wall structure and construction method

The invention relates to the technical field of coal mining, and provides a gob-side entry retaining prefabricated wall structure and a construction method.The wall structure comprises wall units, splicing faces are arranged on the side portions of the wall units, lock catch structures are arranged on the splicing faces, and the multiple wall units are spliced through the lock catch structures to form a wall; the lock catch structure comprises a male tenon and a female groove which are respectively arranged on the splicing surfaces of the adjacent wall body units, and the male tenons and the female grooves of the adjacent wall body units are embedded; at least part of the wall body units are provided with connecting positions, and the flexible mold bags can be connected with the connecting positions so that the flexible mold bags and the wall body units can be assembled into a whole. Through the arrangement, the wall surfaces of the adjacent wall body units are kept aligned under the constraint of the embedded male tenons and female grooves, subsequent manual adjustment is not needed, and the construction difficulty and workload are reduced; the flexible mold bag installed in advance avoids underground climbing operation, reduces workload, eliminates potential safety hazards caused by the underground climbing operation, and enables construction to be simpler, quicker and safer.
Owner:CHINA COAL SCIENCE & TECHNOLOGY (XIAN) MINING ENGINEERING TECHNOLOGY CO LTD +1

Rapidly deployed photovoltaic inverter data collector based on wireless communication

The utility model relates to a wireless communication-based rapid deployment photovoltaic inverter data collector, which comprises a master device and a slave device, and the slave device is installed at a 4G communication rod of an original monitoring device of a photovoltaic inverter, takes electricity through a communication interface of the photovoltaic inverter and is provided with a battery. The slave device uploads the collected data to the master device in a wireless mode; the main device is installed at a three-phase line and is supplied with power after three-phase line alternating current is subjected to voltage stabilization through the power supply module. The main device gathers data to the transformer area intelligent fusion terminal in a carrier wave mode. The transformer area intelligent fusion terminal is connected with the transformer area transformer through a three-phase line; the system has the advantages that the structure is reasonable, a wireless communication mode is adopted, a master-slave equipment mode is adopted, and flexible deployment can be realized.
Owner:ZHENGZHOU XINGONG INTELLIGENT SYST CO LTD

Prefabricated cabin rack

ActiveCN222072462UShorten the trace distanceReduce construction workloadBus-bar/wiring layoutsSubstation/switching arrangement casingsStructural engineeringMachine
The utility model discloses a prefabricated cabin rack, a plurality of intervals for placing equipment are arranged in the rack, all the intervals are arranged in n rows and m columns, and m and n are integers and mgt; n > = 1; vertical wiring structures used for penetrating through the intervals located in the same column are arranged in the rack; a horizontal wiring structure is arranged in the machine frame and used for penetrating through the intervals located in the same row. According to the prefabricated cabin rack, by arranging the horizontal wiring structure, the problems that the wiring distance between racks in a prefabricated cabin is long, the construction amount is large, and loop switching is redundant at present can be solved.
Owner:ECONOMIC & TECHNOLOGICAL RESEARCH INSTITUTE STATE GRID INNER MONGOLIA EASTERN ELECTRIC POWER CO LTD +1

Extra-large art glass design structure for wall surface of high area of hall

ActiveCN222183984Ueasy to useReduce construction workloadWallsCorniceMechanical engineering
The utility model discloses an oversized art glass design structure for a wall surface of a high area of a hall, which comprises art glass arranged in guide grooves in opposite surfaces of stone upright posts on two sides; the hangers are used for clamping and fixing the top of the art glass; and the clamping groove sectional material is embedded into a drawing groove in a suspended ceiling cornice below the lower-layer wall surface, and the clamping groove sectional material is used for supporting the bottom of the art glass. Compared with a common glass fixing mode, according to the design structure, the hanging piece is clamped and matched with the bottom of the clamping groove profile to bear force, so that the work load of a building below the art glass is reduced, the art glass does not need to be completely arranged on the ground, and the application range is widened. The hanging piece is convenient to install and use, and is suitable for assembling art glass with different textures and sizes. And the square steel supporting frame, the clamping groove profile and the flexible filler are used, so that the bearing capacity of the supporting structure at the bottom of the art glass is improved.
Owner:SUZHOU GOLD MANTIS EXHIBITION DESIGN ENG

A split conductor based on small-section optical fiber composite sub-conductor

The present invention provides a split conductor based on a small-section optical fiber composite sub-conductor, comprising: an optical fiber composite sub-conductor with an optical fiber unit and at least two sub-conductors without an optical fiber unit; the cross-sectional area of ​​the optical fiber composite sub-conductor is smaller than the cross-sectional area of ​​each sub-conductor; when the number of sub-conductors is two, the optical fiber composite sub-conductor and the two sub-conductors are arranged in parallel in a plane according to a preset spacing, and the spacing between the optical fiber composite sub-conductor and the two sub-conductors is equal; when the number of sub-conductors is greater than two, each sub-conductor is arranged in parallel according to a preset spacing and passes through each vertex of a regular polygon vertically respectively, and the optical fiber composite sub-conductor passes through the center of the regular polygon and is parallel to each sub-conductor. The present application has the beneficial effects of significantly reducing the size of the excess cable reel and the joint box of the optical fiber composite sub-conductor and the occupied insulation space, reducing the number of excess cable reels and joint boxes, reducing the difficulty of engineering design and construction, and improving the safety of optical fiber communication under harsh conditions such as rain, snow and ice.
Owner:NORTH CHINA ELECTRICAL POWER RES INST +2

Modularized multifunctional concentrated cable branch box

PendingCN119231405Aavoid wastingReduce duplication of investmentElectrical apparatusPower gridControl theory
The invention belongs to the technical field of power grids, and particularly relates to a modular multifunctional concentrated cable branch box which comprises at least two cable branch boxes, a fixed part is mounted on one side of each cable branch box, a movable part is mounted on the other side of each cable branch box, and every two adjacent cable branch boxes are connected together through the corresponding fixed part and the corresponding movable part. The branching function of the cable branch box is integrated into the wire inlet switch chamber of the electric energy metering box, so that resource waste is avoided, and repeated investment of equipment is reduced.
Owner:NINGHE POWER SUPPLY BRANCH OF STATE GRID TIANJIN ELECTRIC POWER CO +2

Thermal insulation structure of low-temperature tank container

The utility model discloses a heat preservation structure of a low-temperature tank container. The low-temperature tank container comprises a tank body, a frame, a skirt and a pipeline. The tank body is arranged in the frame, two ends of the tank body are connected with the frame through skirts, and the pipeline is communicated with the tank body; the heat preservation structure comprises a heat preservation layer, a protective cover, a skin layer, a skin fixing belt and a skin patching box. The thermal insulation layer is sprayed or poured on the surfaces of the tank body and the skirt, and the pipeline is embedded in the thermal insulation layer; the pipeline comprises an instrument liquid-phase pipeline, the instrument liquid-phase pipeline is led out from the bottom of the tank body, and a protective cover surrounds a spiral part of the instrument liquid-phase pipeline; the skin layer is tightly attached to and wraps the heat preservation layer and is formed by splicing a plurality of sections of skins, and the longitudinal lap joint positions of the skins are arranged at the bottom of the tank body and riveted and fixed through rivets. The circumferential lap joint position of the skin is fastened through a skin fixing belt. A heat-bridge-free structure is adopted in the heat preservation design of the tank body, no supporting structure is arranged at the tank body and the end socket, and the construction workloads such as welding are reduced while the heat preservation performance is improved.
Owner:XI AN RAILWAY TRANSPORTATION EQUIP

Permanent and temporary combined protection mechanism of fabricated concrete building

The utility model relates to a permanent and temporary combined protection mechanism of an assembly type concrete building. The permanent and temporary combined protection mechanism comprises an embedded part, a temporary handrail, a permanent handrail and a protection chain. The embedded part is poured into a base body of the fabricated concrete building, and a first inner threaded hole communicating with the exterior of the base body is formed in the top of the embedded part. A first screw rod arranged at the bottom of the temporary handrail can be inserted into and in threaded connection with the interior of the first internal threaded hole, so that the temporary handrail is connected to the embedded part; or the bottom of the permanent handrail can be inserted and fixed in the first inner threaded hole, so that the permanent handrail is connected to the embedded part. And connecting rings are fixedly arranged on the two sides of the temporary railings, and after the temporary railings are connected to the embedded parts, the two ends of the protective chains are detachably connected to the connecting rings of the two adjacent temporary railings correspondingly. The permanent and temporary combined protection mechanism for the matched concrete building has the beneficial effects that the construction operation of a temporary handrail and a permanent handrail can be conveniently and quickly realized, and the construction workload can be greatly reduced.
Owner:CHINA STATE CONSTR HAILONG TECH CO LTD +1

Data center cold source system and data center

The embodiment of the utility model provides a data center cold source system and a data center. The data center cold source system comprises a plurality of cold source containers, a plurality of cooling towers, a pipeline container, a first connecting pipeline, a second connecting pipeline and a cold storage tank. Each cooling tower corresponds to one cold source container and is connected with the water chilling unit through a pipeline; the first chilled water inlet pipeline is connected with the second chilled water inlet pipeline; the first chilled water outlet pipeline is connected with the second chilled water outlet pipeline; the first connecting pipeline is connected with the second chilled water outlet pipeline and the machine room; the second connecting pipeline is connected with the second chilled water inlet pipeline and the machine room; the cold storage tank is arranged on the chilled water branch pipeline connected with the first connecting pipeline in parallel. According to the technical scheme, the data center installation period can be shortened, and the labor cost is reduced.
Owner:SHENZHEN YAODE DATA SERVICES CO LTD

A film-covered coal storage shed

The present invention relates to a membrane-covered coal storage shed, comprising a supporting foundation, a steel cable truss structure arranged on the supporting foundation, and a PVC membrane waterproof cloth for covering the steel cable truss structure, wherein the steel cable truss structure comprises a main structure welded by N1 arch trusses and N2 longitudinal trusses, forming N1*N2 connection points ZH; the lower left and lower right parts of the arch trusses are respectively provided with steel cable connection nodes ZG, adjacent steel cable connection nodes ZG are connected by side main steel cables, and the lower left and lower right ends are respectively provided with steel cable connection nodes ZD; adjacent connection nodes ZH form a rectangular array A, adjacent connection nodes ZH and steel cable connection nodes ZG form a rectangular array B, and adjacent steel cable connection nodes ZG and steel cable connection nodes ZD form a rectangular array C; the diagonals of each matrix are connected by inclined cables; the first arch truss and the N1 arch truss are both connected to the supporting foundation by a plurality of steel cables. The technical solution has good structural stability, low cost, and short construction period.
Owner:COAL IND JINAN DESIGN & RES

Efficient wall surface ash scraping device for house building construction

An efficient wall surface ash scraping device for house building construction comprises a movable base; the ash scraping assembly is integrally arranged on the side, facing the construction wall surface, of the top of the movable base in a lifting mode; the ash scraping assembly is provided with an ash scraping piece and a material collecting piece which are arranged up and down, the material collecting piece and the ash scraping piece are fixed together and can synchronously move in the direction parallel to the width of the construction wall face, and the material collecting piece is used for receiving waste falling during ash scraping operation of the ash scraping piece. According to the dust scraping device, dust scraping waste can be dynamically and effectively collected, the cleaning problem caused by falling of the waste and the problems of pollution and health damage caused by flying dust can be solved, and the construction workload can be greatly reduced.
Owner:ANHUI CONSTR ENG XINANJIANG CONSTR INVESTMENT CO LTD

Integrated air-water cooling unit for air circulation cooling and heat dissipation in special cabinet for frequency conversion

The utility model belongs to the technical field of frequency converter cooling and heat dissipation, and provides an integrated air-water cooling unit for air circulation cooling and heat dissipation in a special frequency conversion cabinet, which comprises an air-water cooling unit combined with a frequency converter cabinet and a fan cover covering the air-water cooling unit and the top of the frequency converter cabinet. The air-water cooling unit comprises a unit cabinet body, an air inlet formed in the top of the unit cabinet body, a fan arranged at the air inlet, cooling fins arranged in the unit cabinet body, a water inlet connector and a water outlet connector, wherein the water inlet connector and the water outlet connector are connected with the cooling fins. An air outlet communicated with the frequency converter cabinet is formed in the cabinet combination surface of the unit cabinet body, the cooling fins are obliquely arranged, the upper ends of the cooling fins incline rightwards and are close to the cabinet combination surface, and an air return channel corresponding to the air inlet is formed between the lower ends of the cooling fins and the left sides of the upper ends of the cooling fins. According to the utility model, the construction period of equipment installation and construction is short, and the construction workload is greatly reduced.
Owner:GUANGDONG NENGHUAN ELECTROMECHANICAL EQUIP CO LTD

Compressor pipeline device

The invention provides a compressor pipeline device. The compressor pipeline device comprises two pipeline structures and a supporting mechanism. Wherein the two pipeline structures are detachably arranged on an inlet pipe nozzle and an outlet pipe nozzle of the compressor respectively; the supporting mechanism is arranged on the two pipeline structures and used for supporting the two pipeline structures. According to the compressor, the two pipeline structures are detachably arranged on the inlet pipe nozzle and the outlet pipe nozzle of the compressor correspondingly, so that pipeline installation at the inlet pipe nozzle and the outlet pipe nozzle of the compressor is achieved, a large door-shaped steel structure does not need to be arranged for supporting, the compressor is simple and convenient to use, the height and span of the pipeline structures are reduced, and the construction difficulty and workload are reduced; moreover, the supporting mechanism supports the two pipeline structures, a spring support hanger is not needed, and the safety and reliability of long-time operation of the pipeline structures are ensured.
Owner:CHINA NAT PETROLEUM CORP +1

Frame type track foundation

The utility model discloses a frame type track foundation. Adjacent concrete sleepers in the track foundation are connected through simple and super connecting seats. The simple and super connecting seat comprises a bottom support blocking beam and a bridge seat; the bridge seat comprises a bridge seat middle section and side sections arranged on the two sides of the bridge seat middle section, the bridge seat middle section and the two bridge seat side sections form a downwards-concave section in a semi-surrounding mode to form a riding pillow groove, and the shape of the riding pillow groove is matched with that of a common sleeper. The bottoms of the side sections extend outwards to form supporting foot plates, and vertical plates are arranged on the vertical outer edges of the side sections. In the assembled state, the bottom support blocking beams are placed on the lower bottom faces of the ends of the adjacent sleepers, the bridge seats are arranged on the sleepers in a riding mode, the bottom support blocking beams and the bridge seats are connected in a fastened mode through bolt assemblies, and the adjacent bridge seats are connected in a fastened mode through connecting assemblies. The frame type track foundation meets the use requirements, and is convenient to install and use and low in manufacturing cost.
Owner:LIUZHOU TIEKE TECH CO LTD

Anchor structure and construction method suitable for excavation-free foundation pit in medium-weathered rock strata

The present invention discloses an anchoring structure and construction method suitable for excavation-free foundation pits in medium-weathered rock formations. A circular interlocking pile is provided as a pile foundation, and a shaft-type ground-connected wall is formed by overlapping a rectangular interlocking pile and a circular interlocking pile. The ground-connected wall is embedded in the medium-weathered rock. A plurality of longitudinal moment interlocking piles and circular interlocking piles are overlapped to form a longitudinal ground-connected wall. A plurality of transverse moment interlocking piles are rigidly connected to form a transverse ground-connected wall. A cell is formed by interlacing the longitudinal ground-connected wall and the transverse ground-connected wall. The cell and the front end area of ​​the cell front wall are reinforced by grouting. A cap and an anchor body are sequentially provided on the top of the ground-connected wall. The structure of the present invention has good control over the settlement and deformation of the soil in the construction area, and can provide a large vertical and horizontal bearing capacity. By performing grouting construction in the cell, there is no need to construct and cast the bottom plate and lining like the traditional ground-connected wall structure, and there is no need to excavate the soil in the cell of the shaft-type ground-connected wall. The construction workload is reduced, the construction period is short, and the scheme has good economic efficiency.
Owner:广西容梧高速公路有限公司 +3

Containers and hydrogen production systems

ActiveCN224280482USave constructionsave workCellsMechanical engineeringHydrogen production
This application relates to a container and a hydrogen production system. The container includes: a frame; a first side panel located on one side of the frame along a first direction, the first side panel including an upper door panel and a lower door panel, the upper end of the upper door panel being rotatably connected to the top of the frame about an axis in a second direction, and the lower door panel being rotatably connected to the bottom of the frame about an axis in a second direction; and a driving device, the driving device being used to drive the upper door panel to rotate, so that the upper door panel switches between an open position and a closed position, and the driving device being used to drive the lower door panel to rotate, so that the lower door panel switches between an open position and a closed position; when both the upper and lower door panels are in the open position, the upper and lower door panels are opposite each other along a third direction, so that the upper door panel forms a light-shielding and rain-shielding panel, and the lower door panel forms an operating platform, eliminating the need to build an additional operating platform and a light-shielding and rain-shielding canopy, thus reducing the amount of construction work.
Owner:JIANGSU TRINA GREEN HYDROGEN TECHNOLOGY CO LTD +1

Ancient building foundation reinforcing structure

The utility model discloses an ancient building foundation reinforcing structure, and particularly relates to the technical field of ancient building reinforcement, the ancient building foundation reinforcing structure comprises a building foundation pillar and two reinforcing arc plates, a plurality of stabilizing assemblies are jointly connected between the two reinforcing arc plates and the building foundation pillar, and the stabilizing assemblies are connected end to end to form a stabilizing base. Each stabilizing assembly comprises a stabilizing frame and a lug plate fixedly connected to one end of the stabilizing frame. Through the arrangement of the stabilizing assembly, the reinforcing arc plate and the building foundation pillar, contact points of the stabilizing assembly and the ground can be evenly distributed, loads of the reinforcing arc plate and the building foundation pillar on the stabilizing assembly can be evenly transmitted to the ground, and the stabilizing assembly and the ground are fully attached through adjustment. Load can be dispersed to the ground with a larger area, ground subsidence or foundation damage caused by overlarge local pressure is avoided, and the stability of the overall structure of the historic building is guaranteed.
Owner:JINLING INST OF TECH

Ultra-large oil tanker bilge construction method

According to the ultra-large oil tanker bilge construction method, bilge section parts are welded into four small assemblies in different areas, namely a bilge arc plate small assembly, a rib plate plane small assembly, an inner bottom three-dimensional small assembly, a horizontal truss three-dimensional small assembly and two middle assemblies, namely a broadside outer plate middle assembly and an inclined inner shell three-dimensional middle assembly. A strut mould plate is formed in the project of the strut mould, the inner bottom three-dimensional small assemblage and the horizontal truss three-dimensional small assemblage, and then the rib plate plane small assemblage is installed to form the inclined inner shell three-dimensional middle assemblage. And in the large group site, firstly, the small bilge arc slab assemblage is assembled, then, the inclined inner shell three-dimensional middle assemblage is turned over and then installed on the bed mould, finally, the broadside outer plate middle assemblage is hoisted, and construction of the whole bilge section is completed. Compared with the same type of segmented construction method, the construction method has the technical advantages of being short in construction period, high in part integration, low in construction difficulty and low in safety risk.
Owner:DALIAN SHIPBUILDING INDUSTRY CO LTD