Diversion blasting construction method of intertidal zone blasting displacement bank
A technique of blasting silt squeeze and construction method, which is applied in blasting and other directions, and can solve problems such as difficulty in construction of silt bag, interference of rock riprap construction, short operation time, etc., and achieve high construction efficiency, reduced construction workload, and flexible construction Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1, construction method of water diversion blasting for embankment construction by blasting in the intertidal zone. refer to figure 1 :
[0027] (1) For the design and calculation of the blasting operation, the calculation formula for the quantity of silt-filling and rock-filling charge for blasting shall be converted into the thickness of silt or the overlying water depth in the calculation formula for the amount of charge in Chapter 4.3. Loads to calculate the local upward resistance line and minimum resistance line direction:
[0028] q' L =q o L H h mw
[0029] H mw = H m + ( γ w γ m ) H w
[0030] where q' L - Line distribution charge (kg / m), i.e. the charge distribution per...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com