Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

169results about How to "Flexible construction" patented technology

New energy power prediction method and system based on multi-source meteorological data fusion

The invention belongs to the technical field of power prediction, and discloses a new energy power prediction method and system based on multi-source meteorological data fusion, and the method comprises the steps: obtaining meteorological data from different meteorological data sources in real time or at regular time through a data obtaining module; carrying out preliminary screening and preprocessing on the obtained data by utilizing a data processing module; the data fusion module is used for integrating meteorological data from different sources by adopting an advanced data fusion algorithm to eliminate data redundancy; a mathematical model or a machine learning model suitable for new energy power prediction is constructed by using the prediction model module based on meteorological data of multi-source fusion; and the result output and evaluation module is used for outputting the prediction result to a user in a visual form, and carrying out real-time or regular evaluation on the prediction result. The method has the characteristics of diversified data sources, advanced data fusion technology, flexible prediction model construction, high real-time performance and accuracy, wide application scenarios and the like.
Owner:STATE GRID GANSU ELECTRIC POWER CORP +1

Trusted data space platform fusing multiple trusted environments and data use method

The invention relates to the technical field of credible data space, and provides a credible data space platform fusing multiple credible environments and a data use method, and the platform comprises a data credible circulation environment, a plurality of data credible supply environments and a plurality of data credible use environments. The data credible supply environment and the data credible use environment realize supply-demand link through the data credible circulation environment; the data credible circulation environment comprises a data product credible transaction environment and a data information credible delivery environment; a data operation platform is deployed in the data product trusted transaction environment and is used for shelving, browsing and ordering data products; according to the data information credible delivery environment, a block chain data internet is adopted, an encrypted digital asset account is opened on a block chain for each credible object, issued data information assets are stored, data right confirmation is realized through a multi-party encryption technology, and dynamic authorization of the data information assets is realized through a digital envelope technology. The method is not limited by a specific privacy computing technology architecture and is flexible to construct.
Owner:DAREWAY SOFTWARE

Priority asynchronous processing method and system for network security

According to the priority asynchronous processing method and system for network security, multiple data sources are integrated, the threat level of each data packet is evaluated in real time, and the processing priority of each data packet is dynamically adjusted according to the threat level. Different from a traditional static method, the method provided by the invention utilizes an advanced machine learning algorithm, can perform dynamic evaluation in multiple dimensions, and timely identifies and preferentially processes high-risk data packets. The mechanism obviously improves the response capability of the system to novel and complex attacks. Meanwhile, a multi-node cooperative attack response mechanism is introduced, when a certain node detects abnormal traffic, other nodes can be automatically notified, threat situation information can be shared, and therefore rapid cooperative reaction is achieved. The integrated innovation not only enhances the overall security of the network, but also optimizes the data packet processing efficiency, effectively solves the main defects in the traditional network security system, and provides a new thought for constructing a safer and more flexible network environment.
Owner:BEIJING RUISHA TECHNOLOGY CO LTD

Multi-modal large model automatic evaluation method and system based on Agentic Workflow

The invention discloses a multi-modal large model automatic evaluation method and system based on Agentic Workflow, relates to the technical field of artificial intelligence model evaluation, and solves the technical problems that an existing large model evaluation method lacks image-text evaluation, is relatively high in subjectivity and is easy to cause illusion. The method comprises the following steps that S1, an input task is analyzed, and a structured task template is generated; s2, generating a multi-round multi-modal task flow chart based on the task template generated in the step S1; s3, based on the flow chart in the step S2, distributing the multi-modal large model component to each task node, executing a task and obtaining an intermediate result; s4, performing multi-dimensional scoring on the intermediate and final results in the step S3 by a plurality of scoring Agents, and fusing to generate an evaluation result; and S5, generating a feedback report based on the process data in the steps S1 to S4, identifying a model short plate, and providing an optimization suggestion. The method has the advantages of comprehensive evaluation of multiple modes, real-time feedback optimization and the like.
Owner:SICHUAN XW BANK CO LTD

Test method and test system of battery control system

The invention discloses a test method and a test system of a battery control system, and belongs to the technical field of battery testing, the test method of the battery control system is applied to the test system for testing the battery control system, and the test system comprises a hardware-in-the-loop simulation platform, a test control module, a fault injection module and a battery model. Comprising the steps of controlling a battery model to operate, and controlling a fault injection module to inject a fault signal to the battery model to simulate a fault event; in the fault event, the test control module is controlled to obtain operation data of the battery model; judging whether the battery control system detects a fault event and making a response; when a response instruction output by the battery control system in response to the fault event is obtained, a protection measure is taken for the battery model according to the response instruction, and the test control module is controlled to obtain response data of the battery control system; and outputting a test result according to the operation data and the response data. The test efficiency and the test accuracy can be improved.
Owner:CHINA FAW CO LTD

Annular crane bracket mounting, positioning and checking method

The invention discloses a ring crane bracket mounting, positioning and checking method. The method comprises the steps of setting a first datum point on an equipment gate, erecting a total station, positioning an opposite first bracket mounting position, tapping and hoisting. Measuring the axis and the upper surface elevation of the first bracket; setting the upper surface of the first bracket as a second reference point as an elevation reference point; measuring coordinates of a second reference point through a total station at the first reference point, measuring a vertical angle and a distance, and calculating the elevation of an elevation reference point; erecting the total station on the second reference point, looking back the first reference point, and positioning a second bracket mounting position which is one third away from the second reference point from the circumference; and a hole is formed in the mounting position of the second bracket, hoisting is conducted, the axis and the upper surface elevation of the second bracket are measured, the upper surface of the second bracket is set as a third datum point after qualification, a fourth datum point is measured through the third datum point, and then the mounting positions of the other brackets are located respectively. According to the invention, the measurement precision is high, and the problem of high requirements on the mounting elevation and flatness of the bracket is solved.
Owner:CHINA NUCLEAR IND HUAXING CONSTR

Sliding energy consumption node between added elevator module and existing structure and building

The invention relates to the technical field of structural engineering, in particular to a sliding energy consumption node between an added elevator module and an existing structure and a building. The sliding energy consumption node between the added elevator module and the existing structure comprises a connecting beam, a T-shaped plate and a connecting plate; the connecting plate comprises a bottom plate and a side plate which are integrally connected; the bottom plate is perpendicular to the side plates; the T-shaped plate comprises an upper plate and a lower plate which are integrally connected; the upper plate and the lower plate are vertically arranged; a first connecting hole and a second connecting hole are respectively formed in opposite positions of the lower plate and the side plate; a pin shaft penetrates through the first connecting hole and the second connecting hole to connect the connecting plate with the T-shaped plate; a third connecting hole is formed in the upper plate; and fourth connecting holes are formed in the connecting beams. The sliding energy dissipation nodes do not slide under the action of wind loads and small earthquake loads, and the additionally-installed elevator structure and the original structure can work cooperatively in the horizontal direction.
Owner:SHENZHEN YJY BUILDING TECH +1

Prestressed structure construction method

PendingCN118997477Afirmly connectedSufficient bearing capacityFoundation testingProtective foundationPre stressPipe
The invention relates to a prestressed structure construction method which comprises the following steps: leveling the ground of a site so that the characteristic value of the bearing capacity of surface soil meets the requirement of stable work of a piling machine; static pile pressing is conducted through a pile machine, the pressed piles are PHC series prestressed concrete pipe piles, the construction progress of pile pressing is controlled, and the pile pressing sequence principle that the pile pressing is conducted firstly deep and then shallow, the pile pressing is conducted firstly in the middle and then on the periphery, and the pile pressing is conducted firstly on the main building and then on the podium building is followed; after pile sinking is completely completed, foundation pit excavation is conducted in a layered mode, and the height difference should not exceed 1 m; according to the relation between the actual construction height and the design height of each prestressed concrete pipe pile, the connecting structure of each prestressed concrete pipe pile and the bearing platform is determined, and corresponding operation procedures are carried out; accumulated water is drained, virtual soil and construction waste are removed, and cohesive soil, lime soil or plain concrete is adopted for layered tamping for filling. The construction method has the beneficial effects that under the geological condition, the structure constructed through the method serves as a foundation and can have enough bearing capacity, and therefore it is guaranteed that the complex can be smoothly constructed.
Owner:HUBEI IND CONSTR GRP

Frame construction method for ultrahigh ALC wallboard

The invention discloses an ultrahigh ALC wallboard construction method adopting a frame method, and relates to the technical field of construction management, the method comprises the following steps: S1, construction preparation; s2, surveying and setting out; s3, a bearing frame and an operation frame are erected; s4, embedded steel bars and column steel bars are bound, and a formwork is installed; s5, beam bottom formwork installation and steel bar binding; s6, a beam side formwork is installed; s7, concrete pouring; s8, concrete curing; s9, a bottom layer ALC wallboard is installed; s10, an upper-layer ALC wallboard is installed; s11, glass fiber gridding cloth is attached to plate seams; and S12, performing the next process. According to the method, the ultrahigh wallboard is installed in a segmented mode, the installation difficulty caused by the fact that the whole board is too long can be effectively avoided through segmented construction, the precision and perpendicularity of the ALC wallboard are ensured, and the frame structure not only provides a supporting function, but also can play an effective limiting and correcting role in construction; and the mounting stability and accuracy of each section of wallboard are ensured.
Owner:HAIDA CONSTR GRP +1

Self-sealing pipeline connecting device

The utility model relates to a self-sealing pipeline connecting device which comprises a pipe fitting, a plurality of communicated pipeline connectors are arranged on the pipe fitting, pipelines are inserted into the pipeline connectors, installation grooves are formed in the inner walls of the pipeline connectors or the outer walls of the pipelines in the circumferential direction, sealing rings are arranged in the installation grooves, and the sealing rings are arranged between the pipeline connectors and the pipelines for sealing. After liquid is introduced into the pipeline, the liquid acts on the sealing ring, a structure matched with the liquid to increase the extrusion force of the sealing ring is arranged on the corresponding installation groove and / or the sealing ring, a locking mechanism convenient to disassemble and assemble is arranged between the pipeline connector and the pipeline, and the locking mechanism locks the pipeline connector and the pipeline. Liquid introduced into a pipeline is innovatively used as a key part of a sealing structure, sealing and locking structure design is carried out on the basis, the sealing structure has the advantages of being simple and reasonable in structural design, low in cost, convenient to disassemble and assemble, good in sealing effect, reliable in locking and the like, and the pipeline construction efficiency and quality can be improved easily.
Owner:SUAN CLOUD TECH CO LTD

Suspension type floor formwork

The utility model discloses a suspension type floor formwork. The suspension type floor formwork comprises a plurality of metal formworks, a plurality of metal hanging pieces and a plurality of suspension supporting pipes. The metal formworks are strip-shaped, a plurality of through holes are formed in the side faces of the metal formworks, and the multiple metal formworks are installed to form a floor frame. The metal hanging piece comprises an upper connecting part and a lower hanging part, a plurality of through holes are formed in the connecting part, and a plurality of pipe grooves are formed in the hanging part; for any two parallel metal templates, a plurality of metal hanging pieces are installed on the side, facing the other metal template, of each metal template, and the positions of the metal hanging pieces installed on the two metal templates correspond to each other; the two ends of each hanging supporting pipe penetrate through the pipe grooves of the two metal hanging pieces opposite in position and are located below the two metal formworks. A plurality of metal pipes are further placed between the two parallel metal formworks and above the hanging supporting pipes, and wood formworks or rubber formworks are laid above the metal pipes.
Owner:MOTIANXIA (HUBEI) NEW BUILDING MATERIALS TECH CO LTD

Door machine structure of fireproof shielding door

The utility model belongs to the technical field of railway station building construction and fire protection, and particularly relates to a fireproof type shielding door machine structure which comprises a shielding door and a concrete side plate serving as an upper supporting structure, and a steel structure frame and a fireproof door machine top box are fixed on the concrete side plate. Assembly gaps among the concrete side plates, the shielding door and the steel structure frame are blocked through fireproof structures, and each fireproof structure comprises a fireproof combined component and a fireproof cloth felt. The platform screen door system can be suitable for various current railway stations, effectively solves the fireproof safety problem of passengers in the current railway stations on the platform screen door system, and ensures the safety of fire rescue. Especially for an underground atrium type railway station, adverse effects on life safety of passengers and station operation evacuation when a train fire occurs are reduced to the maximum extent.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Server test environment guarantee method and system based on dynamic simulation

The invention discloses a server test environment guarantee method and system based on dynamic simulation, a storage medium and computer equipment. The method comprises the steps that the air inlet temperature, real-time power consumption and heat dissipation strategy signals of a tested server and the actual environment temperature of an incubator are collected in real time; dynamically setting the temperature of the air inlet of the tested server as the target environment temperature of the incubator, and calculating the real-time temperature deviation between the actual environment temperature and the target environment temperature; if the real-time temperature deviation exceeds a preset threshold value, a dynamic PID control algorithm is triggered, a basic control quantity is obtained through calculation according to the real-time temperature deviation through the dynamic PID control algorithm, a dynamic compensation quantity is obtained through calculation according to the target environment temperature, the real-time power consumption and the heat dissipation strategy signal, and the heat dissipation strategy signal is obtained based on the basic control quantity and the dynamic compensation quantity. Generating a temperature control instruction of the incubator; according to the temperature control instruction, a refrigerating or heating device of the incubator is dynamically adjusted so as to guarantee the test environment of the tested server.
Owner:NINGCHANG INFORMATION TECH (HANGZHOU) CO LTD

Ultrahigh concrete outer gutter formwork structure

The utility model discloses an ultrahigh concrete outer gutter formwork structure which comprises a scaffold body arranged on the outer side of a building, a triangular support body capable of being movably and detachably installed is arranged on the outer side of the scaffold body, the movable side of the triangular support body is connected with a first longitudinal beam rod, and the first longitudinal beam rod vertically extends; a supporting bracket is arranged on the first longitudinal beam rod and the scaffold body and used for bearing square timber at the bottom of the bottom formwork. The supporting bracket has the beneficial effects that square timbers at the bottom of a bottom formwork in a gutter and a roof beam can be supported through the supporting bracket, erecting of the formwork is achieved, after the formwork is fixed, the concrete gutter and the roof beam can be poured at the same time, the forming quality of concrete is improved, the integrality of one-time pouring forming is good, and the hidden danger of leakage is reduced; as the gutter is far away from the roof beam, auxiliary supporting can be achieved through the triangular support body, bearing capacity is high, and safety and reliability are achieved.
Owner:BAOYE (ZHENGZHOU) CONSTR ENG CO LTD

Modularized assembly type double-row HU construction method pile supporting structure and construction method thereof

The modular assembly type double-row HU construction method pile supporting structure comprises a front row of parallel HU construction method piles and a rear row of parallel HU construction method piles, each row of HU construction method piles is composed of H-shaped steel piles and U-shaped steel sheet piles, the U-shaped steel sheet piles are meshed with one another through locking openings to form a continuous steel sheet pile wall, the H-shaped steel piles are inserted between the steel sheet pile walls formed by the U-shaped steel sheet piles, and the H-shaped steel piles and the U-shaped steel sheet piles are arranged in parallel. Top beam outer side steel plates are arranged on the outer sides of the tops of the H-shaped steel piles, top beam inner side steel plates and connecting beam modules are arranged on the inner sides of the tops of the front row of H-shaped steel piles and the inner sides of the tops of the rear row of H-shaped steel piles, and soil between piles of the double-row steel plate pile wall and soil in a passive area of the foundation pit are reinforced through double-shaft or three-shaft cement mixing piles. The double-row HU construction method pile enclosure structure is composed of the front row of parallel HU construction method piles, the rear row of parallel HU construction method piles, the prefabricated assembly type top beams, the connecting beams and other main components, the overall stability and bearing capacity of the structure are enhanced, and the double-row HU construction method pile enclosure structure has the advantages of being good in water stopping effect, flexible and rapid in construction, economical, environmentally friendly and the like.
Owner:CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD

Voice-driven virtual scene generation and switching method and implementation system

The invention discloses a voice-driven virtual scene generation and switching method and an implementation system, which are applied to meta universe VR (virtual reality) glasses equipment, and comprise the steps of recognizing an instruction of a user through voice recognition and natural language processing technologies, generating or switching a virtual scene in real time, and realizing personalized scene creation and object generation. The edge computing node is adopted to process a high-calculation-amount task, the delay of scene generation and switching is remarkably reduced, the data transmission efficiency is improved by dynamically selecting the optimal node, the privacy security of a user is guaranteed, and through frame rate smooth adjustment and a scene fade-out mechanism, the experience of the user for exiting the virtual scene is optimized, the dizziness is reduced, and the user experience is improved. And the interaction fluency and comfort are improved. The method has the characteristics of quick response, convenient operation and strong privacy protection, and is widely applied to the virtual reality application fields of games, education, medical treatment and the like.
Owner:NANJING INST OF MECHATRONIC TECH

A heat exchange method and system for communication equipment based on air cooling and liquid cooling fusion

The present invention discloses a heat exchange method and system for communication equipment based on the fusion of air cooling and liquid cooling, which belongs to the technical field of communication equipment, including: when the outdoor temperature is greater than or equal to the first ambient temperature threshold, the air-liquid heat dissipation module transfers the heat of the communication equipment cabinet to the junction with the heat conduction module, and the heat conduction module enters the hot air discharge mode; when the outdoor temperature is less than the first ambient temperature threshold, the heat conduction module enters the air flow circulation mode, and simultaneously discharges hot air and introduces a cold source; when the outdoor temperature is less than the second ambient temperature threshold, the heat conduction module enters the cold source introduction mode; the heat exchange speed is adjusted according to the difference between the indoor temperature at the heat conduction module and the corresponding ambient temperature threshold. The present invention introduces an air-liquid heat dissipation module and a heat conduction module to achieve efficient heat conduction of communication equipment, and has a dynamic energy-saving advantage; introduces a natural cold source to achieve terminal refrigeration, which provides a suitable working temperature for the communication equipment while having obvious energy-saving advantages.
Owner:HUAXIN CONSULTATING CO LTD

Foaming substrate suitable for three-dimensional greening, manufacturing method and cultivation method

InactiveCN119111365AFast shapingMeet the needs of different shapesGrowth substratesCulture mediaNutritionPlant cultivation
The invention relates to the technical field of plant cultivation. The invention discloses a foaming substrate suitable for three-dimensional greening, a manufacturing method and a cultivation method. The foaming substrate is prepared from the following raw materials: water, turf, a polyurethane prepolymer, stearic acid surface modified nanoscale calcium carbonate, organic silicon, an antibacterial agent and a nutritional agent. The preparation method comprises the following steps: S1, weighing water, turf, stearic acid surface modified nanoscale calcium carbonate, organic silicon, an antibacterial agent and a nutritional agent, and mixing to obtain a prepared material; s2, adding a polyurethane prepolymer into the prepared material, and stirring to obtain a matrix material; and S3, the matrix material is poured into a mold, foaming and demolding are conducted, and the foaming matrix is prepared. The invention discloses a cultivation method of the foaming substrate. The invention further discloses application of the foaming substrate in three-dimensional greening. The foaming matrix prepared by the invention can be flexibly constructed and quickly formed, has high efficiency, is light and portable, and is easy to transfer and transport.
Owner:BEIJING FLORASCAPE CO LTD +1

Hard rock trenching construction method based on small-bore drilling blasting pre-ripping

PendingCN122589054AImprove digging efficiencyAvoid invalid work
This application relates to the field of geotechnical engineering and underground engineering construction technology, and discloses a method for trenching hard rock walls based on small-diameter borehole blasting pre-splitting. The method includes: conducting a geological survey of the construction area to determine whether it belongs to hard rock strata that are difficult to directly trench mechanically; if so, determining the locations of two small-diameter boreholes for a section of the wall to be trenched; drilling small-diameter boreholes at the locations and collecting rock cores during the drilling process; identifying the target hard rock section based on the analysis of the rock cores; blasting explosives at the corresponding borehole depth to create pre-splitting fractures in the hard rock mass between the two small-diameter boreholes; and excavating the hard rock mass with pre-splitting fractures between the two small-diameter boreholes to complete the trenching of the wall section. This application achieves significant optimization of construction economy and operational efficiency while ensuring trenching quality.
Owner:SINOHYDRO BUREAU 11 CO LTD

Hyaluronic acid modified metal coordination albumin nanoparticles as well as preparation method and application thereof

The invention relates to the technical field of biological medicines, and discloses hyaluronic acid modified metal coordination albumin nanoparticles as well as a preparation method and application thereof. The hyaluronic acid modified metal coordination albumin nanoparticle comprises a core and a hyaluronic acid shell layer, wherein the core is formed by self-assembly of an albumin-drug compound, poly-L-aspartic acid and ferric ions through coordination, and the hyaluronic acid shell layer is connected to the surface of the core through coordination or adsorption. According to the hyaluronic acid modified metal coordination albumin nanoparticles as well as the preparation method and the application thereof, the preparation method is simple, convenient and rapid, does not need complex covalent modification, is mild in condition and is easy for large-scale production, and the prepared nanoparticles are uniform in particle size, good in stability and high in stability. In addition, due to the fact that the hyaluronic acid is modified on the surface, the active targeting capacity on CD44 receptor high-expression tumor cells is achieved, the enrichment and treatment effects of the medicine on the tumor site are remarkably improved, and the application prospect in preparation of the anti-tumor medicine is wide.
Owner:ZHEJIANG CANCER HOSPITAL

Anti-electromagnetic pulse composite shielding bridge system

The utility model discloses an anti-electromagnetic pulse composite shielding bridge frame system which comprises an upper cover plate and a box buckle, a bridge frame inner cover plate upper shielding layer copper surface is fixedly installed on the bottom end face of the upper cover plate, a bridge frame inner upper cover plate flame-retardant wear-resistant material is fixedly installed in the upper cover plate, and an outer wrapping upper shell is fixedly installed on the top end face of the upper cover plate. An upper edge beryllium copper sheet is fixedly installed on one side of the upper cover plate, an outer wrapping upper shell beryllium copper sheet is fixedly installed at one end of the outer wrapping upper shell, a copper column is fixedly installed in the upper cover plate, and a copper pipe is fixedly installed on the copper column. According to the utility model, the shielding bridge frame is made of a material which can better protect electromagnetic pulses, the whole shielding bridge frame is free of maintenance, the electromagnetic pulses can be better shielded by the material which is integrally adopted, and the shielding bridge frame can be used in various environments and severe conditions in civil air-raid shelters, so that the shielding bridge frame can be widely applied to civil air-raid shelters. The unique high strength, corrosion resistance, ultraviolet resistance, friction resistance of the inner layer and the outer layer, no dirt sticking, easiness in wiping, fire prevention, flame retardance, good conductivity, sealing performance and multi-layer electromagnetic pulse prevention performance can be better shown.
Owner:JIANGSU OUTE ELECTRONICS TECH

Water spraying device for glass reinforced plastic pipe of cooling tower

The cooling tower glass reinforced plastic pipe water spraying device comprises a metal rotating head and glass reinforced plastic water distribution pipes, the glass reinforced plastic water distribution pipes are circumferentially and evenly distributed and connected to the periphery of the metal rotating head, and a plurality of water outlet holes are formed in one side of the bottom of each glass reinforced plastic water distribution pipe. A plurality of external thread sleeves which horizontally extend out are uniformly distributed on the periphery of the metal rotating head, an annular blocking table is arranged in the middle of the lining pipe, a round pipe section and a taper pipe section are arranged at the two ends of the blocking table, the round pipe section is inserted into inner holes of the external thread sleeves, and the outer conical surface of the taper pipe section is tightly supported and inserted into the inner end of the glass fiber reinforced plastic water distribution pipe; the compression nut is a lock nut with a pocket edge, the compression nut is sleeved on the glass fiber reinforced plastic water distribution pipe, and the inner wall of the pocket edge of the compression nut is a conical surface matched with the outer conical surface of the conical pipe section; the sealing gasket is arranged between the inner side wall of the blocking table and the end face of the external thread sleeve. The low-cost non-flange glass fiber reinforced plastic water distribution pipe is connected with the rotating head to spray and distribute water, the sealing performance is good, and water leakage is not prone to occurring.
Owner:HEBEI DAYOU FRP CO LTD

Algorithm library management system supporting visual arrangement of algorithm model construction process

The invention discloses an algorithm library management system supporting visual arrangement of an algorithm model construction process. The algorithm library management system comprises an algorithm component management module, an algorithm component configuration module, an algorithm process arrangement module, an algorithm process operation module and an algorithm process log management module. The algorithm component management module is used for constructing and managing a full-process model algorithm component; the algorithm component configuration module is used for responding to a request of a user for setting specific parameters for each algorithm component in an algorithm model construction process; the algorithm process arrangement module provides a visual arrangement interaction mode, responds to the operation that a user drags algorithm components into a canvas, and connects the algorithm components according to a logic sequence through connecting lines to achieve data communication and transmission between the algorithm components. The algorithm process operation module is used for automatically executing algorithm components and resource scheduling according to the arranged logic sequence and completing execution of the whole algorithm model construction process; according to the method, a developer can construct and manage the algorithm model more efficiently and flexibly.
Owner:ZHEJIANG UNIV HIGH-END EQUIP RES INST

Data prediction method and device, electronic equipment, storage medium and product

The invention relates to the technical field of communication, and particularly provides a data prediction method and device, electronic equipment, a storage medium and a product. The method comprises the steps of obtaining target project data; and processing the target project data by using the trained data prediction model to obtain target decision data output by the data prediction model. According to the invention, after the target project data is obtained, the target project data is processed by the trained data prediction model, so that the target decision data is output. In the training process of the data prediction model, parameters in the iteration process of the data prediction model can be dynamically adjusted by using the search agent, errors are reduced, and therefore the training prediction result output by the data prediction model is closer to the actual situation. In the training process, the data prediction model can be directly and flexibly constructed according to the dimension of the training data, associated data does not need to be selected, and therefore human resources are saved.
Owner:CHINA MOBILE GROUP DESIGN INST +1

Large-span bridge steel guardrail hoisting equipment and method

The invention discloses a large-span bridge steel guardrail hoisting device and method, and belongs to the field of bridge steel guardrail transportation and installing.The large-span bridge steel guardrail hoisting device comprises a lever lifting device, the lever lifting device comprises a center shaft, and walking wheels are arranged at the two ends of the center shaft; a lifting frame and a main shaft with a rotating function are arranged on the center shaft, the main shaft is connected with the center shaft through a rotating assembly, the lifting frame is connected with the main shaft through a positioning rod, the bottom end of the lifting frame is rotationally connected with the main shaft, a hoisting assembly used for hoisting is arranged at the top end of the lifting frame, and an auxiliary wheel assembly with a height adjusting function is arranged on a main shaft shaft. The auxiliary wheel assembly is movably connected with the main shaft, a telescopic pipe with a telescopic function is arranged in the main shaft, and a handrail for a worker to push and pull is arranged at the top end of the telescopic pipe. On-site rapid installation of the large-span steel guardrail can be completed through the simple walking type hoisting equipment and a small number of workers, a crane is not needed, convenience and flexibility are achieved, the number and loads of the workers are reduced, and the installation efficiency and accuracy of the steel guardrail are improved.
Owner:SHAANXI TRAFFIC CONTROL TECH DEV GRP CO LTD

Pipe network flow resistance rapid calculation method based on Modelica

The invention provides a pipe network flow resistance rapid calculation method based on Modelica, and relates to the technical field of system modeling and simulation. The pipe network flow resistance rapid calculation method based on Modelica comprises the following steps: step 1, flow resistance node decomposition; 2, constructing a characteristic flow resistance unit model; step 3, constructing a flow resistance system model; 4, calibrating and verifying experimental data; and 5, carrying out simulation analysis and application. According to the method, through establishment and accumulation of the characteristic flow resistance unit model library, firstly, characteristic flow resistance unit models can be flexibly constructed by using multiple methods, such as a mechanism model, a mechanism data fusion model and an integrated external model, modeling is carried out on the flow resistance unit in multiple modes, and the modeling modes are flexible and diversified; and meanwhile, the accumulated flow resistance unit model can be reused and applied to multiple objects, the applicability is wider, the calculation efficiency can be greatly improved in the mode that the unified solver is used for generating code operation and the mode is achieved through Modelica language programming, and the calculation efficiency is higher.
Owner:BEIJING GONGGONG DIGITAL TECHNOLOGY CO LTD

Three-dimensional heterogeneous formation water control oil extraction multi-parameter synchronous simulation experiment device

PendingCN121993163Aflexible constructionRealize Quantitative ControlSurveyControl engineeringOil production
The invention relates to a three-dimensional heterogeneous formation water control oil extraction multi-parameter synchronous simulation experiment device which comprises a device body, a plug, a production pipe column and a sensor unit. The device body is of a coaxial multi-layer nested structure, a plurality of independent simulation units are constructed in an internal annular sand filling area through replaceable sieve pore partition plates, and heterogeneous stratum reconstruction of fluid communication and sand body isolation is achieved. The production pipe column adopts a modular water control short section series connection structure, a replaceable fluid sensitive valve and a tracer agent storage cabin are integrated, and performance evaluation and fluid traceability of multiple types of water control tools are achieved; the sensor unit synchronously acquires outlet, wall surface and radial gradient pressure through three-dimensional arrangement of mandrels with various lengths, and realizes multi-dimensional data collaborative analysis in combination with flow and water content monitoring. The problems that an existing device is difficult to restore complex fluid channeling physical characteristics and is single in monitoring dimension are solved, full-process high-fidelity simulation from stratum seepage to tool water control is achieved, and key technical support is provided for water control strategy optimization.
Owner:SOUTHWEST PETROLEUM UNIV

An engineering building installation support set

The utility model discloses an engineering building mounting support group belongs to the building engineering technical field, and this support group includes main support, support mechanism and fixed establishment, is equipped with the connecting hole on the main support, and the support mechanism includes the T shape connecting joint of slidable connection in the main support and has the platform subassembly of inclined support, is used for the flexible construction support frame, and the fixed establishment includes the bottom plate of being connected with the bottom of main support and is used for the fixed bolt of fixing bottom plate in the preformed part, and is equipped with the gasket between bottom plate and preformed part. The utility model solves the inconvenient combination of the existing support group, the poor problem of commonality through the modularization's support mechanism, realizes the nimble erection and quick dismounting, and through the fixed establishment of cooperation with the preformed part, solves the defect that the ground uneven leads to the installation instability, has the advantages such as support stability, strong anti -topple ability, high security.
Owner:HEILONGJIANG LONGYING CONSTRUCTION ENGINEERING DEVELOPMENT CO LTD

Cantilever light structure cast-in-place suspension bracket and use method thereof

The present invention discloses a cantilever light structure cast-in-place suspension bracket and a use method thereof. According to the special form of the top angle of the U-beam, an L-shaped load-bearing pipe sleeve is designed and arranged on a tripod as a support system of the entire suspension bracket, which plays a role of limiting and supporting the tripod and transmits the forces in the vertical and horizontal directions to the U-beam. The tripod is detachably fixed to the outer side of the web of the U-beam for laying the bottom mold and casting the bridge deck. After the casting of the bridge deck is completed, the L-shaped load-bearing pipe and the tripod can be removed by only unscrewing the limit bolts and cutting the connecting ribs. The overall material and equipment investment is small. At the same time, a suspension rope is introduced to protect the tripod during the installation process and to pull and recover the tripod during disassembly. The entire construction process is convenient, flexible and efficient. It also specifically solves the legal requirements of countries such as Malaysia that do not allow the use of hanging baskets for high-altitude operations. It can adapt to bridge construction in complex and dangerous terrains and significantly improves the safety of construction operations.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD

A ground and tunnel joint full-time domain induced polarization advance detection method and system

The present invention belongs to the field of full-time domain induced polarization detection, and provides a ground and tunnel joint full-time domain induced polarization advance detection method and system, which obtains geological survey data of the target detection area; determines the layout scheme of the ground and tunnel joint full-time domain induced polarization device based on the acquired geological survey data of the target detection area; obtains actual observation data based on the arranged ground and tunnel joint full-time domain induced polarization device; performs full-time domain induced polarization inversion in combination with the actual observation data, obtains the polarizability, resistivity and relaxation time distribution of the target area in front of the tunnel face, and then obtains the position and morphology information of the water-bearing geological structure. It solves the problems of limited layout of small electrodes in the tunnel space and inconvenient movement of large-volume transmitters.
Owner:SHANDONG UNIV +1