A large-span rectangular underground station and construction method thereof
Through the design of the large-span rectangular underground station structure, the combination of roof panels, cables and connecting rods is used to solve the problem of structural columns during construction, the construction safety and convenience of pedestrian traffic are achieved, and the construction efficiency is improved.
Patent Information
- Application Number
- CN201911418276.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2039-12-31
AI Technical Summary
During the construction process, the underground station with an existing rectangular frame structure has problems such as intermediate structural columns affecting construction safety and pedestrian traffic, and the construction process is complex and difficult to control quality.
Adopting a large-span rectangular underground station structure, through the combination design of the roof plate, cable and connecting rod, a new force structure with multi-channel support + multi-channel cable is formed, reducing the tension and deflection of the roof plate, and eliminating structural columns in the middle of the station to achieve No intermediate column passes.
It improves construction safety and speed, reduces the complexity of construction processes, ensures convenience of pedestrian access, and speeds up project progress through multi-working surface construction.
Smart Images

Figure CN111074942B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rail transit or underground stations, and in particular to a large-span rectangular underground station and a construction method thereof. Background Art
[0002] Existing underground stations generally use concealed arch tunnels or open-cut rectangular frame structures. For the open-cut rectangular structure construction method, the station span is small and there are many structural columns in the middle of the station. On the one hand, it affects the construction work and there is a problem of construction collision and damage to the middle structural columns. On the other hand, it will also affect the use of the station after construction is completed. In particular, the middle structural columns will affect pedestrians and the layout of the pedestrian passage in the station, which may cause pedestrians to detour.
[0003] In addition, its construction is also very troublesome. Specifically, when the forward construction method is used, on the one hand, when the foundation pit is excavated, supports need to be laid, which is difficult to lay, requires many procedures, and takes a long time. Instability of supports is a major safety risk during construction. On the other hand, there are many structural columns in the construction, which have complex construction procedures. When the reverse construction method is used, it is also necessary to construct structural columns from the ground, and the construction procedures are complicated, and the construction quality is difficult to be effectively controlled. Summary of the invention
[0004] The purpose of the present invention is to provide a large-span rectangular underground station and a construction method thereof in order to solve the problem that the construction of underground stations in the form of rectangular frame structures requires intermediate structural columns, which causes construction troubles and difficulty in ensuring construction quality, and causes problems for pedestrians after the station is built.
[0005] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:
[0006] The top of the side wall is connected with the bottom of the side wall to form an extension cable, and the extension cable has two ends, and the two ends are fixedly provided on the extension sections of the two side walls, and each end of the extension cable is connected with the extension cable of the side wall to form an extension section.
[0007] Preferably, a connecting rod is also provided between the upper side of the top plate and the cable located above the top plate.
[0008] Preferably, the connecting rod is V-shaped, the two free ends of the connecting rod are fixedly arranged on the top plate, and the pointed end of the connecting rod is fixedly arranged on the cable.
[0009] Preferably, a connecting rod is arranged in the middle of the top plate and the middle of the cable, and a connecting rod is arranged between the 1 / 4 portion of the top plate and the cable.
[0010] Preferably, a straight threaded sleeve is provided at the connection between the side wall and the top plate, so as to connect the top plate to the side wall through steel bars.
[0011] Preferably, the distance between the cable hole and the nearest side wall is between 0.2L and 0.3L, where L is the span of the station.
[0012] Preferably, the connecting rod is arranged in a telescopic manner.
[0013] The present application discloses a construction method for a large-span rectangular underground station, wherein the large-span rectangular underground station is the large-span rectangular underground station described above, and comprises the following steps:
[0014] S1, excavating a trench for placing the side wall, and forming the side wall by cast-in-place or prefabricated assembly method;
[0015] S2, excavating the soil layer on the top of the station to the height of the top plate, and excavating holes for placing the connecting rods;
[0016] S3, compacting the soil layer, laying the formwork of the top plate, tying the steel bars, arranging the connecting rod on the steel bars and exposing the part of the connecting rod used for connecting the cable;
[0017] S4, after pouring the top plate concrete, curing, after the concrete reaches the required level to form the top plate, excavate the soil below the top plate to a height of 1.5 to 2.5 meters from the lower side of the top plate, pass the cable through the cable hole of the top plate, match it with the connecting rod at the bottom of the top plate and pass it through another cable hole, respectively set the two ends of the cable on the extension sections of the two side walls, tighten and anchor them;
[0018] S5. Continue to excavate the soil below the top plate until the height of the bottom plate, apply a cushion layer, lay a brick membrane, tie steel bars and pour concrete to form the bottom plate.
[0019] The present application also discloses a method for constructing a large-span rectangular underground station, wherein the large-span rectangular underground station is a large-span rectangular underground station in which the connecting rod can be retracted. The construction steps are the same as the above-mentioned construction steps, and in the step S4, the size of the connecting rod is adjusted so that the distance between the cable and the top plate reaches the preset requirement; and after step S5, other buildings required for the station are constructed.
[0020] Compared with the prior art, the beneficial effects of the present invention are as follows: multiple connecting rod supports and multiple cables are provided at the bottom of the structural top plate of a conventional underground station, thereby forming a new type of force-bearing structure of top plate + multiple supports + multiple cables, while reducing the tension and deflection of the lower surface in the center of the top plate and the tensile stress of the upper surface near the end of the top plate. At the same time, the formed top plate + multiple supports + multiple cables force-bearing structure can ensure the safe construction of processes such as excavation and pouring of the bottom plate below the top plate. Because it is a large span, generally in this field, a span greater than 25 meters is considered a large span. Due to the large span, multi-operation surface construction can be achieved, thereby speeding up the construction speed. In addition, since there is no intermediate structural column under the top plate after completion, it will not hinder the passage of pedestrians. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a structural diagram of a large-span rectangular underground station for this application;
[0022] Figure 2 for Figure 1 A partial enlarged view of middle C;
[0023] Figure 3 This is a schematic cross-sectional view of the large-span rectangular underground station in this application;
[0024] Figure 4 for Figure 3 A partial enlarged view of the middle A;
[0025] Figure 5 This is a schematic diagram of the structure of the connecting rod of this application;
[0026] Markings in the figure: 1. Top plate; 3. Side wall; 31. Extended end of side wall; 32. Connection between side wall and top plate; 33. Connection between side wall and bottom plate; 34. Foundation of side wall; 4. Bottom plate; 5. Cable; 6. Connecting rod under the top plate; 7. Anchoring end of anchor cable; 8. Cable hole; 61. Free end of connecting rod, 62. Pointed end of connecting rod, 63. Screw, 64. Grommet, 65. Through hole. DETAILED DESCRIPTION
[0027] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0028] like Figure 1-4 As shown, a large-span rectangular underground station includes a top floor, side walls and a bottom floor. The top floor, the bottom floor and two side walls are arranged in a "mouth" shape. The top floor includes a top floor, cables and connecting rods. A row of cable holes are arranged at intervals on both sides of the middle of the top floor along the driving direction. Each cable hole in a row of cable holes corresponds to a cable hole in another row one by one. Two corresponding cable holes form a group for a cable to pass through. Specifically, a cable passes through a cable hole from top to bottom on the top floor and is placed under the top floor. The cable then passes through another cable hole in the same group corresponding to the cable hole from bottom to top and is placed on the top floor. A cable corresponds to A group of cable holes, and the positions of the two cable holes in each group of cable holes are the same in the driving direction. In addition, the top of the side wall is extended out of the top plate to form an extension section. The two ends of a cable are respectively fixed on the extension sections of the two side walls. Every two cable holes correspond to a cable, so that multiple cables are arranged in the driving direction of the station, and a connecting rod is arranged between the cable and the top plate. Specifically, a connecting rod is arranged between the lower side of the top plate and the cable under the top plate, one end of the connecting rod is fixed to the lower side of the top plate, and the other end of the connecting rod is fixedly connected to the cable; a connecting rod is also arranged between the upper side of the top plate and the cable above the top plate.
[0029] Through the above scheme, multiple connecting rod supports and multiple cables are set at the bottom of the structural top plate of the conventional underground station, thereby forming a new force-bearing structure of top plate + multiple supports + multiple cables, while reducing the tension and deflection of the lower surface of the center of the top plate and the tensile stress of the upper surface near the end of the top plate. At the same time, the formed top plate + multiple supports + multiple cables force-bearing structure can ensure the safe construction of processes such as excavation and pouring of the bottom plate below the top plate. Because it is a large span, generally a span greater than 25 meters in this field is considered a large span. Due to the large span, multi-operation surface construction can be achieved, thereby speeding up the construction speed. In addition, since there is no intermediate structural column under the top plate after completion, it will not hinder the passage of pedestrians.
[0030] In addition, the connecting rod of the present application is V-shaped, and the two free ends of the connecting rod are fixedly set on the top plate. The pointed end of the connecting rod cooperates with the cable. Specifically, the pointed end of the connecting rod is provided with a through hole allowing the cable to pass through. As long as the cable is tensioned, the connecting rod can play a supporting role. Preferably, the connecting rod can be in the shape of a support rod, or other shapes, as long as it can support the cable. More preferably, the connecting rod is arranged in a telescopic manner. There are many schemes for telescopic rods. As long as they can be telescopic, the present application will not go into details about the telescopic method of the connecting rod. Arranging the connecting rod in a telescopic manner can adjust the tension of the cable. Most importantly, it can change the stress of the entire top layer, especially the stress of the top plate, and has better adaptability. See Figure 5The connecting rod is V-shaped, and in particular, the two free ends of the connecting rod cooperate to form an isosceles trapezoidal structure, or the entire connecting rod is arranged in the form of an equilateral triangle, thereby better stress-bearing. For the telescopic method, a grommet is arranged at the sharp end of the connecting tube, and the grommet and the sharp end of the connecting rod are matched in the form of a hexahedron to allow the grommet to be able to telescope relative to the connecting rod but not to rotate. At the same time, the connecting rod and the grommet are connected by screws, and the screws, the grommet and the connecting rod are all threaded, so that the height of the grommet can be adjusted by turning the screw.
[0031] In order to better bear the gravity, in the span direction of the station, that is, Figure 1 In the left and right directions, Figure 3 In the up and down directions, connecting rods are arranged between the middle of the top plate and the middle of the cable, and between the 1 / 4 part of the top plate and the cable. Of course, connecting rods can also be arranged between the upper side of the top plate and the cable at the upper part of the top plate to withstand the tension brought by the compression of the top plate.
[0032] Preferably, the distance between the cable hole and the nearest side wall is between 0.2L and 0.3L, where L is the span of the station. Preferably, the cable hole is set at 0.25L from the nearest side wall. Generally, there is an inflection point after the top plate is compressed, which is generally at 0.25L, but it moves slightly according to the slight change of material or force. Setting it at this position can make the entire top layer bear better force. A straight threaded sleeve is set at the connection between the side wall and the top plate to connect the top plate to the side wall through steel bars.
[0033] A construction method for the above-mentioned large-span rectangular underground station comprises the following steps:
[0034] S1. Dig a trench for placing the side wall, and form the side wall by cast-in-place or prefabricated assembly method;
[0035] S2, excavate the soil layer on the top of the station to the height of the top plate, and excavate holes for placing connecting rods;
[0036] S3, compact the soil layer, lay the formwork of the top plate, tie the steel bars, arrange the connecting rods on the steel bars and expose the part of the connecting rods used to connect the cables. Specifically, the top of the bottom support of the slab is tied to the steel bars and the bottom is exposed to the bottom surface of the top plate; the support on the top plate is tied to the steel bars and the top is exposed to the top surface of the top plate; and the cable holes for passing the cables are arranged at the inflection points of the slab;
[0037] S4. After pouring the top plate concrete, curing is performed. After the concrete reaches the required height to form the top plate, the soil below the top plate is excavated to a height of 1.5 to 2.5 meters from the lower side of the top plate. The size of the connecting rod is adjusted so that the distance between the cable and the top plate after the cable is set meets the preset requirements. Then, the cable is passed through the cable hole of the top plate, matched with the connecting rod at the bottom of the top plate and passed through another cable hole. The two ends of the cable are respectively set on the extension sections of the two side walls, and anchored after being tightened.
[0038] S5. Continue to excavate the soil below the top plate until the bottom plate height is reached, construct a cushion layer, lay brick membrane, tie steel bars and pour concrete to form the bottom plate, and adjust the size of the connecting rod so that the distance between the cable and the top plate meets the preset requirements.
Claims
1. A large-span rectangular underground station, comprising a top layer, side walls and a bottom slab. The top layer, the bottom slab and the two side walls are arranged in a "mouth" shape. Characterized in that, The top layer includes a top plate, stay cables and connecting rods. On both sides of the middle of the top plate, a row of cable holes are arranged at intervals along the driving direction. Each cable hole in one row of cable holes corresponds to one in the other row. The stay cable passes through a cable hole from above the top plate downward and is placed below the top plate, and then passes upward through the cable hole corresponding to this one cable hole and is placed above the top plate. The top of the side wall extends beyond the top plate to form an extended section. The two ends of the stay cable are respectively fixedly arranged on the extended sections of the two side walls. Every two cable holes correspond to one stay cable, so that a plurality of stay cables are arranged in the driving direction of the station. A connecting rod is arranged between the lower side surface of the top plate and the stay cable below the top plate. One end of the connecting rod is fixed to the lower side surface of the top plate, and the other end of the connecting rod is fixedly connected to the stay cable; The distance between the cable hole and the nearest side wall is between 0.2L - 0.3L, where L is the span of the station; The connecting rod is arranged in a telescopic manner; The connecting rod is in a V shape. The two free ends of the connecting rod are fixedly arranged on the top plate, and the pointed end of the connecting rod is fixedly arranged on the stay cable.
2. The large-span rectangular underground station according to claim 1, Characterized in that, A connecting rod is also arranged between the upper side surface of the top plate and the stay cable above the top plate.
3. The large-span rectangular underground station according to claim 1, Characterized in that, Connecting rods are arranged at the middle of the top plate and the middle of the stay cable, and connecting rods are arranged between the 1 / 4 part of the top plate and the stay cable.
4. The large-span rectangular underground station according to claim 1, Characterized in that, A straight thread sleeve is arranged at the connection between the side wall and the top plate for connecting the top plate to the side wall through steel bars.
5. A construction method for a large-span rectangular underground station, Characterized in that, The large-span rectangular underground station is the large-span rectangular underground station according to any one of claims 1 - 4, and includes the following steps: S1. Excavate the trench for placing the side wall, and use the cast-in-place or prefabricated assembly method to construct the side wall; S2. Excavate the soil layer at the top of the station to the height where the top plate is located, and excavate the hole for placing the connecting rod; S3. Compact the soil layer, lay the formwork of the top plate, tie the steel bars, and the connecting rod is arranged on the steel bars and the part of the connecting rod for connecting the stay cable is exposed; S4. After pouring the top plate concrete and curing, when the concrete meets the requirements to form the top plate, excavate the soil below the top plate until it is 1.5 meters to 2.5 meters above the lower side surface of the top plate. Pass the stay cable through the cable hole of the top plate, cooperate with the connecting rod at the bottom of the top plate and then pass through another cable hole. Set the two ends of the stay cable on the extended sections of the two side walls respectively, and tighten and anchor after tensioning; S5. Continue to excavate the soil below the top plate until the height of the bottom slab, and construct the cushion layer, lay the brick membrane, tie the steel bars and pour the concrete to form the bottom slab.
Citation Information
Patent Citations
Large-span two-arch two-cable subway station structure constructed through open-cut method
CN105971005A
Non-column large-span repairable prestressed cable-arch combined structure of open-cut subway station
CN106049661A
Open-cut type non-column large-span arched subway station structure as well as design and construction method
CN106869170A
Prestressed fish belly sill with length-adjustable stay bars for retaining and protecting for deep foundation excavation
CN108560562A
Open-cut construction method for assembly type arch crown large-span column-free underground structure
CN110080288A