Stabilized soil extrusion solidification prefabricated piles and their application in soft foundation treatment methods

By processing the waste soil into stable soil, squeezing and solidifying prefabricated piles, and using vibrating hammers and hydraulic clamps to quickly form holes for grouting, the problems of soil-cement pile pollution and high waste soil disposal costs are solved, and an efficient and environmentally friendly soft foundation is achieved. treatment method, significantly reducing construction costs and environmental impact.

CN111101504BActive Publication Date: 2024-10-22CCCC WUHAN HARBOR ENG DESIGN & RES +2
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201911395117.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-30
Publication Date
2024-10-22
Estimated Expiration
2039-12-30

AI Technical Summary

Technical Problem

Existing cement-soil mixing piles and high-pressure jet grouting piles use a large amount of cement in engineering construction, resulting in pollution and high energy consumption. At the same time, the disposal cost of waste soil is high, and it requires long-distance transportation to occupy land.

Method used

Prefabricated piles are extruded and solidified using stabilized soil. The waste soil is processed into a pile body, and grooves are set up on the upper and lower ends and outer circumference of the pile body. Vibrating hammers and hydraulic clamps are used to quickly drill holes and grout to form a composite foundation, replacing the traditional Piles to reduce cement use and waste soil transportation.

Benefits of technology

It achieves efficient utilization of waste soil, reduces cement use and waste soil transportation costs, improves single pile bearing capacity and economic benefits, and the construction process is simple and fast, with significant environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111101504B_ABST
    Figure CN111101504B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated pile for stable soil extrusion solidification, comprising: a pile body, which is made of waste soil, and the outer circumference size is slightly smaller than that of a steel immersed tube; a pile inner hole, which is formed through the center of the pile body from top to bottom; a pile surface groove, which is formed on the upper and lower end faces of the pile body and extends outward from the pile inner hole in a horizontal direction; a pile circumference groove, which is formed on the outer circumference of the pile body and extends from the upper and lower end faces of the pile body in a vertical direction. The present invention also discloses a soft foundation treatment method using stable soil extrusion solidification prefabricated piles. The stable soil extrusion solidification prefabricated piles of the present invention are made of local materials and waste soil, which is economical and environmentally friendly; the quality of the mixed soil extrusion solidification prefabricated pile body is visible and controllable; the pile body has high compressive strength, can provide a higher single pile bearing capacity, and can replace cement mixing piles and high-pressure rotary jet piles for soft foundation treatment, saving costs and protecting the environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the ground treatment technology in civil engineering. More specifically, the present invention relates to a stabilized soil extrusion and solidification precast pile and its application in soft foundation treatment method. Background Art

[0002] At present, in engineering construction, relatively mature and commonly used are cement-soil mixing piles, high-pressure jet grouting piles and other cement-soil piles. Such piles require a large amount of cement, high energy consumption and heavy pollution. At the same time, in urban engineering construction, a large amount of waste soil is often generated, which needs to be transported over a long distance and occupies a large amount of land for stacking. If the waste soil can be appropriately processed into a pile body with certain strength and water stability, and then the pile body is driven or hoisted into the foundation to form a composite foundation with the foundation soil, the transportation cost of the waste soil and the pollution of the cement-soil pile will be greatly improved. Summary of the Invention

[0003] One object of the present invention is to solve at least the above problems and provide at least the advantages described hereinafter.

[0004] Another object of the present invention is to provide a stabilized soil extrusion and solidification precast pile and its application in soft foundation treatment method, which uses local materials, utilizes waste soil, is economical and environmentally friendly; the quality of the mixed soil extrusion and solidification precast pile body is visible and controllable; the pile body has high compressive strength, can provide a relatively high single pile bearing capacity, can replace the cement mixing pile and the high-pressure jet grouting pile for soft foundation treatment, save costs and protect the environment.

[0005] To achieve these objects and other advantages in accordance with the present invention, there is provided a stabilized soil extrusion and solidification precast pile, comprising:

[0006] A pile body, which is made of waste soil and has an outer dimension slightly smaller than that of the steel sinking pipe;

[0007] A pile inner hole, which is formed through the center of the pile body from top to bottom;

[0008] A pile surface groove, which is recessed on the upper and lower end faces of the pile body and extends outward in the horizontal direction from the pile inner hole;

[0009] A pile circumferential groove, which is recessed on the outer periphery of the pile body and extends in the vertical direction from the upper and lower end faces of the pile body.

[0010] Preferably, the pile body is a quasi-cylindrical structure, the pile surface groove extends radially, and the pile circumferential groove extends axially.

[0011] Preferably, the number of the pile surface grooves is 4, the number of the pile circumferential grooves is 4, and the pile circumferential grooves and the pile surface grooves communicate to form a C-shaped structure.

[0012] Preferably, the outer diameter of the pile body is 400 mm, the diameter of the inner hole of the pile is 133 mm, the length of the pile body is 1300 mm, and the diameters of the pile surface groove and the pile periphery groove are 60 mm.

[0013] Preferably, when preparing the pile body, the waste soil is crushed, the maximum particle size of the crushed clay does not exceed 20 mm, 4-8% of cement, 1-2% of fly ash, 0.1-0.2% of gypsum, 0.05-0.09% of yellow alkali, and 0.001-0.002% of hydrochloric acid are added to the waste soil, mixed, and extruded once, and the compaction degree of the pile body after extrusion is not less than 98%.

[0014] The soft foundation treatment method using the stabilized soil extrusion solidification prefabricated piles comprises:

[0015] Step 1) Level the site to the required construction elevation according to the design requirements;

[0016] Step 2) According to the design requirements, the construction pile position is accurately located and the pile driver is in place;

[0017] Step 3) On the construction pile position accurately located in step 2), a vibratory hammer is suspended by a crawler crane, the vibratory hammer is fixed to a long-stroke hydraulic clamp, the long-stroke hydraulic clamp is connected to a steel sinking pipe, and under the power of the vibratory hammer, the steel sinking pipe is sunk into the soil to quickly form a hole;

[0018] Step 4) Release the connection between the long-stroke hydraulic clamp and the steel immersed tube, replace another steel immersed tube, move to the next pile position, and repeat step 3);

[0019] Step 5) placing the stabilized soil extrusion solidification prefabricated piles in sequence at the bored pile positions until the pile length reaches the design requirement;

[0020] Step 6) grouting is performed in the gap between the inner hole of the pile, the steel immersed pipe and the stabilized soil extrusion solidification prefabricated pile, the slurry flows in the gap and the inner hole, and the grouting is uniform;

[0021] Step 7) Remove the steel immersed tube, clean and recycle it for future use;

[0022] Step 8) Repeat steps 5) to 7) until the construction is completed.

[0023] Preferably, the grouting process of step 6) is specifically as follows:

[0024] A guiding device is provided, comprising a cushion block, a guiding cylinder, and a plurality of guiding tubes, wherein an air bag is arranged in the middle of the guiding tube, one end of the guiding tube is inserted into the guiding cylinder, and the other end is suspended downward;

[0025] The cushion block is placed in the inner hole of the pile, the guide tube is placed on the cushion block, a plurality of guide tubes are arranged along the groove on the pile surface and the groove around the pile, and inserted into the gap, so that one end of the guide tube is higher than the other end;

[0026] Continuously inject grout between the guide tube and the inner hole of the pile, and at the same time, continuously inject grout into the guide tube, so that one end of the guide tube is inserted below the grout surface and the other end is a certain distance away from the lower end surface of the pile body, and the air bag is squeezed to make the grout in the guide tube flow;

[0027] When the slurry surface is about to cover the other end of the guide tube, the guide device is removed, and grouting is continuously injected into the guide tube until the slurry surface is flush with the upper end surface of the pile body.

[0028] The present invention has at least the following beneficial effects:

[0029] The present invention improves the pile body and construction method of the precast pile, and grooves are provided on the upper and lower end faces and the outer periphery of the pile body, so that the cement slurry can flow evenly in the center of the pile and the outer periphery of the pile body, thereby enhancing the quality of the pile body. The method of the present invention uses a crawler crane suspended vibrating hammer with convenient and fast positioning, fixes the vibrating hammer with a large-stroke hydraulic clamp, connects the steel sinking pipe with the vibrating hammer through the hydraulic clamp, and under the power of the vibrating hammer, the pile pipe is sunk into the soil body to form a hole quickly, and a plurality of steel sinking pipes are prepared on the construction site for water flow forming, and the precast pile is placed, grouting is first performed, and the pipe is pulled out after pouring cement slurry, so as to replace cement soil mixing piles and high-pressure rotary jet piles for soft foundation treatment, which can not only reduce the cost of transporting and stacking the slag and reduce the use of cement, but also the quality of the precast pile body squeezed and solidified by the stabilized soil can be visually and controllably, the pile body has high compressive strength (up to 3-8MPa), and can provide a higher single pile bearing capacity, and the economic and social benefits are very obvious.

[0030] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a structural schematic diagram of a technical solution of the present invention;

[0032] Figure 2 It is a front view of a technical solution of the present invention. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0034] It should be understood that terms such as “having”, “including” and “comprising” used herein do not specify the existence or addition of one or more other elements or combinations thereof.

[0035] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial sources unless otherwise specified; in the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected, set, or detachably connected, set, or connected and set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in specific circumstances. The orientation or position relationship indicated by the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.

[0036] like Figure 1-2 As shown, the present invention provides a stabilized soil extrusion solidification prefabricated pile, comprising:

[0037] The pile body 2 is made of waste soil and has an outer circumference slightly smaller than the steel immersed tube 1;

[0038] A pile inner hole 5 is formed through the center of the pile body 2 from top to bottom;

[0039] The pile surface groove 4 is formed on the upper and lower end surfaces of the pile body 2 and extends outward from the pile inner hole 5 in the horizontal direction;

[0040] The pile circumferential groove 3 is formed on the outer circumference of the pile body 2 and extends from the upper and lower end surfaces of the pile body 2 in the vertical direction.

[0041] In the above technical scheme, the pile body 2 is made of crushed and extruded waste soil, which reduces the cost of transporting and stacking the waste soil. Its outer circumference is slightly smaller than the steel immersed tube 1, which is convenient for inserting into the steel immersed tube 1. The center of the pile body 2 forms a pile inner hole 5, which is convenient for pouring cement slurry. The pile surface groove 4 forms a path for flowing around the pile. The shape is not limited, and it can be S-shaped, straight, etc. At the same time, it is only opened on the upper and lower end faces to avoid perforation in the middle section to reduce the strength. The pile periphery groove 3 forms a reinforced space around the pile. The shape is not limited, and it can be S-shaped, straight, etc. The cement slurry is wrapped inside and outside and solidified to form a reinforcing core and shell, thereby improving the quality of the pile body 2 and the bearing capacity of the composite foundation.

[0042] In another technical solution, the pile body 2 has a quasi-cylindrical structure, the pile surface groove 4 extends radially, and the pile circumference groove 3 extends axially. The shape of the pile body 2 is convenient for prefabrication, and the pile surface groove 4 and the pile circumference groove 3 are beneficial to grouting.

[0043] In another technical solution, the number of the pile surface grooves 4 is 4, the number of the pile circumference grooves 3 is 4, and the pile circumference grooves 3 and the pile surface grooves 4 communicate with each other to form a C-shaped structure. The precast pile has uniform stress, high strength, and fast slurry flow velocity.

[0044] In another technical solution, the outer diameter of the pile body 2 is 400 mm, the diameter of the pile inner hole 5 is 133 mm, the length of the pile body 2 is 1300 mm, and the diameters of the pile surface groove 4 and the pile circumference groove 3 are 60 mm. It matches the size of the conventional steel casing 1, makes better use of the waste soil, reduces the cement consumption, and the compressive strength of the precast pile can reach 3 - 8 MPa.

[0045] In another technical solution, when preparing the pile body 2, the waste soil is mashed, and 4 - 8% of cement, 1 - 2% of fly ash, 0.1 - 0.2% of gypsum, 0.05 - 0.09% of yellow alkali, and 0.001 - 0.002% of hydrochloric acid are added to the waste soil, and then they are mixed and extruded into shape. The compressive strength of the precast pile can reach 8 MPa.

[0046] Applying the soft foundation treatment method of the stabilized soil extrusion and solidification precast pile includes:

[0047] Step 1) According to the design requirements, level the site to the construction required elevation;

[0048] Step 2) According to the design requirements, use GPS to accurately position the construction pile positions, and move the hole-forming pile driver into place;

[0049] Step 3) At the accurately positioned construction pile positions in Step 2), use a hoist and a crawler crane to suspend a vibratory hammer, fix the vibratory hammer to a large-stroke hydraulic clamp, connect the large-stroke hydraulic clamp to the steel casing 1, and a pile tip can also be added at the lower part of the steel casing 1 (a separate patent application has been made, and a drooping pile tip can be formed by magnetic attraction of multi-lobe blades, and it opens by pulling upward to overcome the magnetic attraction force). Under the driving force of the vibratory hammer, the steel casing 1 is sunk into the soil to quickly form a hole;

[0050] Step 4) Disconnect the connection between the large-stroke hydraulic clamp and the steel casing 1, replace it with another steel casing 1, move it to the next pile position, and repeat Step 3);

[0051] Step 5) Place the stabilized soil extrusion and solidification precast piles at the formed pile positions in sequence until the pile length reaches the design requirements;

[0052] Step 6) grouting is performed in the gap between the pile inner hole 5, the steel immersed tube 1 and the stabilized soil extrusion solidification prefabricated pile, and the slurry flows in the gap and the inner hole, and the grouting is uniform;

[0053] Step 7) Remove the steel immersed tube 1, clean and recycle it for future use;

[0054] Step 8) Repeat steps 5) to 7) until the construction is completed.

[0055] In the above technical scheme, a vibratory hammer is suspended by a crawler crane which is easy and quick to position, the vibratory hammer is fixed to a large-stroke hydraulic clamp, and the steel immersed tube 1 is connected to the vibratory hammer through the hydraulic clamp. Under the power of the vibratory hammer, the pile pipe is sunk into the soil to form a hole quickly, and multiple steel immersed tubes 1 are prepared on the construction site for water flow forming. Prefabricated piles are placed, grouting is performed first, and cement slurry is poured before the pipe is pulled out. Cement soil mixing piles and high-pressure rotary jet piles are used for soft foundation treatment. This not only reduces the cost of transporting and stacking the debris and reduces the use of cement, but also the quality of the prefabricated pile body 2 squeezed and solidified by the stabilized soil is visible and controllable, the pile body 2 has high compressive strength (up to 3-8MPa), and can provide a higher single pile bearing capacity, with very obvious economic and social benefits.

[0056] In another technical solution, the grouting process of step 6) is specifically as follows:

[0057] A guiding device is provided, comprising a cushion block, a guiding cylinder, and a plurality of guiding tubes, wherein an air bag is arranged in the middle of the guiding tube, one end of the guiding tube is inserted into the guiding cylinder, and the other end is suspended downward;

[0058] Place the cushion block in the pile inner hole 5, place the guide tube on the cushion block, arrange multiple guide tubes along the pile surface groove 4 and the pile peripheral groove 3, and insert them into the gap, so that one end of the guide tube is higher than the other end;

[0059] Continuously inject grout between the guide tube and the inner hole 5 of the pile, and at the same time, continuously inject grout into the guide tube, so that one end of the guide tube is inserted below the grout surface and the other end is a certain distance away from the lower end surface of the pile body 2, and the air bag is squeezed to make the grout in the guide tube flow;

[0060] When the slurry surface is about to cover the other end of the guide tube, the guide device is removed, and grouting is continuously injected into the guide tube until the slurry surface is flush with the upper end surface of the pile body 2.

[0061] In the above technical scheme, since the gap between the outer periphery of the pile body 2 and the steel immersed tube 1 is small, direct grouting can easily cause the slurry to be sprayed to the periphery, causing pollution and waste. The height of the guide tube is increased by using a pad block to form a larger height difference between the two ends of the guide tube. By setting an air bag, negative pressure is formed by extrusion to promote the flow of slurry. The capacity of the guide tube is smaller than the inner hole 5 of the pile, which is convenient for quickly forming a slurry surface height higher than one end of the guide tube. The inside and outside of the guide tube are continuously grouted at the same time, which is equivalent to grouting the upper and lower parts of the pile at the same time. In addition, the inner hole 5 of the pile and the pile periphery are continuously grouted at the same time, which greatly shortens the time of grouting and avoids uneven solidification of the slurry inside due to too long time, resulting in the strength of the prefabricated pile not meeting the standard.

[0062] The number of devices and processing scales described here are used to simplify the description of the present invention. Applications, modifications and variations of the present invention will be obvious to those skilled in the art.

[0063] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. Soft foundation treatment method using stabilized soil extrusion and solidification precast piles, characterized in that: The stabilized soil extrusion and solidification precast pile includes: A pile body, which is made of waste soil and has an outer dimension slightly smaller than that of a steel casing pipe; A pile inner hole, which is formed through the center of the pile body from top to bottom; Pile surface grooves, which are recessed on the upper and lower end surfaces of the pile body and extend outward horizontally from the pile inner hole; Pile peripheral grooves, which are recessed on the outer periphery of the pile body and extend vertically from the upper and lower end surfaces of the pile body; Specifically: the pile body is a quasi-cylindrical structure, the pile surface grooves extend radially, and the pile peripheral grooves extend axially; The soft foundation treatment method includes: Step 1) Level the site to the construction required elevation according to the design requirements; Step 2) Accurately position the construction pile position according to the design requirements and position the pile driver; Step 3) At the construction pile position accurately positioned in Step 2), use a crawler crane to suspend a vibrating hammer, fix the vibrating hammer to a large-stroke hydraulic clamp, connect the large-stroke hydraulic clamp to the steel casing pipe, and under the power action of the vibrating hammer, sink the steel casing pipe into the soil to quickly form a hole; Step 4) Disconnect the connection between the large-stroke hydraulic clamp and the steel casing pipe, replace another steel casing pipe, move it to the next pile position, and repeat Step 3); Step 5) Place the stabilized soil extrusion and solidification precast piles at the formed hole positions in sequence until the pile length reaches the design requirements; Step 6) Grout the voids between the pile inner hole, the steel casing pipe and the stabilized soil extrusion and solidification precast pile, and the grout flows in the voids and the inner hole, and the grouting is uniform; The specific process of grouting in Step 6) is: Provide a guiding device, including a cushion block, a guiding cylinder, and a plurality of guiding pipes. An airbag is provided in the middle of the guiding pipe, and one end of the guiding pipe is inserted into the guiding cylinder and the other end is suspended downward; Place the cushion block in the pile inner hole, place the guiding cylinder on the cushion block, arrange the plurality of guiding pipes along the pile surface grooves and pile peripheral grooves, and insert them into the voids so that one end of the guiding pipe is higher than the other end; Continuously grout between the guiding cylinder and the pile inner hole, and at the same time, continuously grout into the guiding cylinder so that one end of the guiding pipe is inserted below the grout surface and the other end is at a certain length from the lower end surface of the pile body, and squeeze the airbag to make the grout in the guiding pipe flow; When the grout surface is about to cover the other end of the guiding pipe, remove the guiding device and continuously grout into the guiding cylinder until the grout surface is flush with the upper end surface of the pile body; Step 7) Pull out the steel casing pipe, clean and recycle it for standby; Step 8) Repeat Steps 5) to 7) until the construction is completed.

2. The soft foundation treatment method of stabilized soil extrusion solidification prefabricated piles according to claim 1 is characterized in that: The number of pile surface grooves is 4, the number of pile peripheral grooves is 4, and the pile peripheral grooves and the pile surface grooves penetrate to form a C-shaped structure.

3. The soft foundation treatment method of stabilized soil extrusion solidification prefabricated piles according to claim 2 is characterized in that: The outer diameter of the pile body is 400 mm, the diameter of the pile inner hole is 133 mm, the length of the pile body is 1300 mm, and the diameter of the pile surface grooves and pile peripheral grooves is 60 mm.

4. The soft foundation treatment method of stabilized soil extrusion solidification prefabricated piles according to claim 1, characterized in that: When preparing the pile body, the waste soil is crushed, the maximum particle size of the crushed clay does not exceed 20mm, 4-8% of cement, 1-2% of fly ash, 0.1-0.2% of gypsum, 0.05-0.09% of yellow alkali, and 0.001-0.002% of hydrochloric acid are added to the waste soil, mixed, and extruded once, and the compaction degree of the pile body after extrusion is not less than 98%.

Citation Information

Patent Citations

  • Bi-layer plastic-bushing inverted-arch cambered hollow special-shaped pile and construction method

    CN103485334A

  • Extrusion formed precast pile stiffness core and cement soil combined Y-shaped pile and construction method thereof

    CN104141304A

  • Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method

    CN105421446A

  • Tunnel secondary lining arch crown back filling grouting process and grouting pipe

    CN109707401A

  • Stabilized soil extrusion solidification precast pile

    CN211773580U