Steel frame assembled structure ultra-low energy consumption building exterior wall installation structure and installation method
By installing transverse channel steel and vertical channel steel around the ALC strips of ultra-low energy consumption buildings and using mechanical lifting devices, the installation problem of excessive weight of ALC strips is solved, and a fast and safe installation process is achieved, improving the improvement of the Construction efficiency and safety.
Patent Information
- Application Number
- CN202010056164.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-18
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-01-18
AI Technical Summary
In ultra-low energy consumption construction, the weight of ALC strips is too high, making it difficult for construction personnel to lift and install directly, resulting in cumbersome and dangerous installation process.
A steel frame assembled structure was designed. By installing transverse channel steel and vertical channel steel around the ALC strip, and using mechanical lifting devices and slide rail systems, the construction personnel were assisted in fixing the ALC strip in the overhead area. Reduce the complexity of manual lifting and installation processes.
The rapid and safe installation of ALC strips has been achieved, which reduces the labor intensity and installation time of construction workers, and improves installation efficiency and safety.
Smart Images

Figure CN111119436B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ultra-low energy consumption building steel structure wall panel installation, and in particular to an ultra-low energy consumption building exterior wall installation structure and an installation method thereof. Background Art
[0002] Against the backdrop of global warming and energy shortages, building energy conservation with high energy efficiency and low emissions as the core is playing a vital role in achieving national energy security and sustainable development. Developing and popularizing ultra-low energy consumption buildings (also known as passive houses), combining various passive energy-saving measures such as natural ventilation, natural lighting, solar radiation heat gain and indoor non-heating heat source heat gain with high-efficiency energy-saving technology of building envelope structures, and ensuring the comfort of the indoor environment, by significantly reducing the building heat / cooling load, and getting rid of the dependence on active mechanical heating and cooling systems to the maximum extent, thereby reducing the heating and cooling energy consumption of buildings, and making full use of renewable energy to get rid of the dependence on traditional fossil energy, has become an important means of energy conservation and emission reduction for countries leading international building energy-saving technology.
[0003] However, ultra-low energy consumption buildings are still in their infancy in China, and the design drawings still have many imperfections, especially the design of local nodes, many of which have not yet been standardized.
[0004] like Figure 1 As shown, in a certain ultra-low energy consumption building project, a steel structure frame 7 is arranged as a whole outside the building window, and an overhanging eave 8 is arranged on the top of each floor window. The steel structure frame 7 passes through the overhanging eave 8. An H-shaped steel beam 9 is fixed inside the steel structure frame 7 and below the overhanging eave 8. The H-shaped steel beam 9, the overhanging eave 8 and the steel structure frame 7 form an overhead area above the window. The size of the overhead area above the window is 600mm*7500mm (taking the maximum size as an example), and the ALC strips need to be installed horizontally. The ALC strips of this size weigh about 250kg. The weight is too large for the construction workers to directly lift and install. How to hoist and fix the ALC strips on the overhead area above the window is a problem faced and solved at the construction site. Summary of the invention
[0005] The first object of the present invention is to provide a steel frame assembled structure ultra-low energy consumption building exterior wall installation structure, which can assist on-site construction personnel to stably install the ALC strips in the overhead area, making the ALC strip installation process more time-saving and labor-saving.
[0006] The above object of the present invention is achieved through the following technical solutions:
[0007] A steel frame assembled structure ultra-low energy consumption building exterior wall installation structure is applied to the outdoor overhead area of the ultra-low energy consumption building, including installation components installed around the ALC strip board, and the installation components are directly fixed to the components constituting the outdoor overhead area.
[0008] By adopting the above technical solution, the ALC strips are autoclaved lightweight concrete panels, which cannot be directly connected to other structures after molding. By arranging installation components around the ALC strips, the installation components are bolted to the eaves of the overhead area and welded to the steel structure frame, the ALC strips are fully fixed in the overhead area to complete the layout of the ultra-low energy consumption building exterior wall.
[0009] The present invention is further configured as follows: the installation component includes a transverse channel steel and a vertical channel steel, the transverse channel steel is embedded in the upper and lower ends of the ALC strip board, and the vertical channel steel is embedded in the left and right ends of the ALC strip board.
[0010] By adopting the above technical solution, the eaves and steel structure frames that constitute the overhead area limit the ALC slats in the up, down, left and right directions, and the horizontal and vertical channel steels limit the ALC slats in the front and back directions, thus achieving all-round fixation of the ALC slats.
[0011] The present invention is further configured as follows: it also includes a horizontal transport platform, a vertical support frame and a lifting device, the horizontal transport platform includes a horizontally arranged slide rail and a slide seat slidably installed on the slide rail, one end of the slide rail is overlapped on the component constituting the overhead area, and the other end is supported and fixed on the vertical support frame; the lifting device is installed on the ultra-low energy consumption building and is located above the horizontal transport platform.
[0012] By adopting the above technical solution, the ALC slats are lifted mechanically, and the ALC slats are adjusted manually to place them on the slide. The ALC slats are then pushed to slide to the corresponding installation position, and finally the transverse channel steel and vertical channel steel are welded and fixed to the steel structure frame. The installation of the ALC slats is completed. The entire installation process is quick and convenient, and the process of manually lifting the ALC slats is reduced, making the installation process more time-saving and labor-saving.
[0013] The present invention is further configured as follows: baffles are fixedly provided at both ends of the slide rail, and a support plate is horizontally fixedly connected to one side of the baffle away from the slide rail.
[0014] By adopting the above technical solution, the baffle prevents the slide seat from accidentally falling out of the slide rail, and the support plate and the corresponding baffle form an L-shaped hanging part, and the two cooperate to make the fixed end of the slide rail stably hung on the steel structure frame.
[0015] The present invention is further configured as follows: the vertical support frame includes a top support, a supporting steel pipe and a bottom support, the bottom support is supported and fixed on the ultra-low energy consumption building, the supporting steel pipe is installed on the bottom support, the top support is installed on the supporting steel pipe, and the slide rail support is fixed on the top support.
[0016] By adopting the above technical solution, the slide rail support is fixed on the supporting plate of the top support, and the fixed end of the slide rail is overlapped on the steel structure frame, thereby realizing the horizontal installation of the slide rail.
[0017] The present invention is further configured as follows: the hoisting device includes a winch and a counterweight frame, and a fixed pulley is installed on the ultra-low energy consumption building.
[0018] By adopting the above technical solution, the ALC slats are hoisted by a winch, and the fixed pulley is arranged to reduce the friction force on the wire rope after turning, so that the hoisting process is smoother.
[0019] The present invention is further configured as follows: the installation structure also includes an indoor aerial work platform, and the indoor aerial work platform includes a base, a lifting frame arranged on the base, and a workbench installed on the top of the lifting frame.
[0020] By adopting the above technical solution, construction workers enter the work platform and adjust the height of the work platform through the lifting frame so that the construction workers can operate the ALC strips placed on the horizontal transport platform.
[0021] The present invention is further configured as follows: the installation structure also includes a rectangular transition frame, the vertical pipe of the transition frame is sleeved on the support rod and fixedly connected to the support rod through a top screw; the horizontal pipe of the transition frame is fixedly connected to the workbench through a scaffolding lock.
[0022] By adopting the above technical solution, an indoor aerial work platform is used to assist in fixing the vertical support frame, thereby improving the supporting effect of the vertical support frame on the horizontal transport platform and improving the overall stability of the installation structure.
[0023] The second object of the present invention is to provide a method for installing the exterior wall of an ultra-low energy consumption building with a steel frame assembled structure, which makes the installation process of the ALC strips more standardized and improves the installation speed of the ALC strips.
[0024] The above object of the present invention is achieved through the following technical solutions:
[0025] A method for installing an exterior wall of a steel frame assembled structure ultra-low energy consumption building comprises the following steps:
[0026] Step 1: Install the horizontal transport platform and the vertical support frame on the ultra-low energy consumption building, the indoor aerial work platform is connected to the vertical support frame through a transition frame, the lifting device is installed on the top of the ultra-low energy consumption building, and the wire rope of the lifting device is lowered along the fixed pulley to the bottom floor of the ultra-low energy consumption building;
[0027] Step 2: Install the transverse channel steel and the vertical channel steel on the ALC strip, drill holes on the ALC strip to install eyebolts, and tie and fix the steel wire rope of the lifting device to the eyebolts;
[0028] Step 3: Start the lifting device and lift the ALC slats to the slide rail. Use the wire rope to manually place the ALC slats on the slide. Remove the wire rope and eye bolts, push the ALC slats to slide to the corresponding installation position, and finally fix the horizontal channel steel, vertical channel steel and the components that make up the overhead area to complete the installation of the ALC slats.
[0029] The present invention is further configured as follows: in step three, the ALC slats are divided into blocks, and after the ALC slats are divided, the vertical channel steels are only installed on the first and last blocks, and the transverse channel steels are installed on the ALC slats except the last block; after the block-shaped ALC slats are successively hoisted and installed in the overhead area, the vertical channel steels are fixedly connected to the components constituting the overhead area, the transverse channel steels are translated as a whole, and are installed between two adjacent ALC slat blocks, and finally the transverse channel steels are fixedly connected to the components constituting the overhead area.
[0030] By adopting the above technical solution, the ALC slats are hoisted in blocks, which avoids excessive load on the installation structure and improves the safety of the hoisting process.
[0031] In summary, the present invention has the following beneficial effects:
[0032] 1. By arranging installation components around the ALC strips, bolting or welding the installation components to the components in the overhead area, the ALC strips are fixed in the overhead area in all directions to complete the layout of the ultra-low energy consumption building exterior wall;
[0033] 2. By setting up the corresponding installation structure for the ALC strips and using the manual assisted mechanical mode to hoist the ALC strips, the traditional manual lifting installation process is avoided, making the installation process of the ALC strips safer and faster. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a structural schematic diagram of the outdoor overhead area of an ultra-low energy consumption building in the prior art;
[0035] Figure 2 is a schematic diagram of the installation position of the installation component in the embodiment;
[0036] Figure 3 is a schematic diagram of the matching state of the mounting component and the ALC strip in the embodiment;
[0037] Figure 4 is a schematic diagram of the installation state of the installation structure in the embodiment;
[0038] Figure 5 is an axonometric view of the mounting structure in the embodiment;
[0039] Figure 6 Schematic diagram of the structure of the lifting device in the embodiment.
[0040] In the figure, 1. installation components; 11. horizontal channel steel; 12. vertical channel steel; 2. horizontal transport platform; 21. slide rail; 22. slide seat; 23. baffle; 24. support plate; 25. connecting rod; 26. fixed pulley; 3. vertical support frame; 31. top support; 32. support steel pipe; 33. bottom support; 4. indoor aerial work platform; 41. base; 42. lifting frame; 43. work platform; 5. lifting device; 51. winch; 52. counterweight frame; 6. transition frame; 61. vertical pipe; 62. horizontal pipe; 63. top screw; 64. scaffolding lock; 7. steel structure frame; 8. cantilever eaves; 9. H-shaped steel beam; 10. ALC strip board. DETAILED DESCRIPTION
[0041] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0042] Embodiment: A steel frame assembled structure ultra-low energy consumption building exterior wall installation structure, such as Figure 2 , Figure 3 As shown, it includes a mounting component 1, which includes a transverse channel steel 11 and a vertical channel steel 12. The number of the transverse channel steel 11 and the vertical channel steel 12 are both set to an even number, wherein the transverse channel steel 11 is installed to the upper and lower ends of the ALC strip 10 in the horizontal direction, and the vertical channel steel 12 is installed to the left and right ends of the ALC strip 10 in the vertical direction. The ALC strip 10 is installed in the overhead area outside the building window through the mounting component 1; the overhead area is composed of a steel structure frame 7, an eaves 8 and an H-shaped steel beam 9.
[0043] After the ALC strips 10 are installed in the overhead area, the facades of the transverse channel steels 11 and the vertical channel steels 12 are flush with the facades of the steel structure frame 7. The transverse channel steels 11 installed at the upper end of the ALC strips 10 are fixed to the eaves 8 by expansion bolts, and the transverse channel steels 11 installed at the lower end of the ALC strips 10 and the vertical channel steels 12 installed at the left and right ends of the ALC strips 10 are fixed to the steel structure frame 7 of the overhead area by spot welding, thereby realizing the stable installation of the ALC strips 10 in the overhead area.
[0044] like Figure 4 , Figure 5 As shown, the steel frame assembled structure ultra-low energy consumption building exterior wall installation structure also includes a horizontal transportation platform 2, a vertical support frame 3, an indoor aerial work platform 4 and a lifting device 5. The horizontal transportation platform 2 includes two parallel and spaced slide rails 21, on which a slide seat 22 is slidably mounted. Baffles 23 are fixed at both ends of the length of the slide rail 21 to prevent the slide seat 22 from accidentally falling off the slide rail 21. The length of the slide rail 21 is longer than the length of the cantilever 8.
[0045] One end of the slide rail 21 is set as a fixed end, and a support plate 24 is horizontally fixed to the upper end of the baffle 23 of the fixed end. The support plate 24 and the corresponding baffle 23 form an L-shaped hanging piece, and the two cooperate to stably hang the fixed end of the slide rail 21 on the steel structure frame 7. The other end of the slide rail 21 is set as a connecting end, and a connecting rod 25 is horizontally arranged between the connecting ends of the two slide rails 21. The two ends of the connecting rod 25 are respectively fixed to the two slide rails 21, so that the two slide rails 21 are fixedly connected as a whole; the middle part of the connecting rod 25 is installed with a fixed pulley 26 distributed toward the outside.
[0046] The vertical support frame 3 includes two groups of top supports 31, supporting steel pipes 32 and bottom supports 33 which are distributed in sequence from top to bottom. The top supports 31 and the bottom supports 33 are both composed of a support plate, a lead screw and an adjusting nut. The support plate of the bottom support 33 is supported and fixed on the top surface of the lower eaves 8, and its lead screw is distributed vertically upward. The supporting steel pipe 32 is vertically sleeved on the lead screw of the bottom support 33, supported and pressed against the adjusting nut of the bottom support 33; the lead screw of the top support 31 is passed through the upper end of the supporting steel pipe 32, and its adjusting nut is pressed against the supporting steel pipe 32. The support plate is located at the upper end of the lead screw, and the connecting ends of the two slide rails 21 are respectively supported on the support plates of the two top supports 31. The slide rails 21 and the support plates can be bolted or welded; the fixed end of the slide rail 21 is overlapped on the steel structure frame 7, thereby realizing the horizontal installation of the slide rail 21.
[0047] The indoor aerial work platform 4 includes a base 41, a lifting frame 42 driven electrically or hydraulically on the base 41, and a work platform 43 installed on the top of the lifting frame 42. The indoor aerial work platform 4 is a mature product, and conventional equipment can be used. When the indoor aerial work platform 4 is working, the construction personnel enter the work platform 43 and adjust the height of the work platform 43 through the lifting frame 42, so that the construction personnel can operate the ALC strips 10 placed on the horizontal transport platform 2.
[0048] like Figure 6 As shown, the hoisting device 5 is installed on the top floor of the building, including a winch 51 and a counterweight frame 52 for counterweighting the winch 51, and a fixed pulley 26 for steering the wire rope of the winch 51 is installed on the parapet of the building.
[0049] The exterior wall mounting structure is installed on the ultra-low energy consumption building. Before hoisting the ALC slats 10, first determine the size and weight of the ALC slats 10. When the size and weight are within the load range of the indoor aerial work platform 4 and the indoor aerial work platform 4 is operated normally, you can choose to directly hoist the entire slat; specifically, drill holes on the ALC slats 10 to install eyebolts, and install the transverse channel steel 11 and the vertical channel steel 12 around the ALC slats 10. The steel wire rope of the winch 51 is placed on the fixed pulley 26 in turn, and its end is lowered to the bottom layer and tied and fixed with the eyebolts.
[0050] Start the hoist 51, lift the ALC strip 10 to the slide rail 21, manually pull the wire rope to place the ALC strip 10 on the slide seat 22, then disassemble the wire rope and the eye bolts, push the ALC strip 10 to slide to the corresponding installation position, and finally weld the horizontal channel steel 11 and the vertical channel steel 12 to the steel structure frame 7 to complete the installation of the ALC strip 10. The bolt installation holes of the ALC strip 10 are repaired with special repair materials, and the gaps between the ALC strip 10 and the bottom of the beam or floor slab are filled with special bonding mortar.
[0051] When the weight of the ALC strip 10 is too large, the ALC strip 10 needs to be cut and then hoisted and installed in blocks. After the ALC strip 10 is divided, the vertical channel steel 12 is only installed on the first and last blocks, and the transverse channel steel 11 is installed on the ALC strips 10 except the last block. After the ALC strips 10 are hoisted and installed in the overhead area, the vertical channel steel 12 can be directly welded to the steel structure frame 7, and the transverse channel steel 11 needs to be moved horizontally as a whole and installed between two adjacent ALC strips 10 blocks (refer to Figure 2 ), and finally the transverse channel steel 11 is also welded to the steel structure frame 7. ALC strips 10 joints and bolt installation holes are repaired with special repair materials, and the gaps between the ALC strips 10 and the beams or floor bottoms are filled with special bonding mortar.
[0052] In the exterior wall installation structure of the steel frame prefabricated structure ultra-low energy consumption building, the connections between the horizontal transportation platform 2 and the steel structure frame 7, between the horizontal transportation platform 2 and the vertical support frame 3, and between the vertical support frame 3 and the lower eaves 8 are all temporary fixed connections. When the ALC slats 10 placed on the horizontal transportation platform 2 are too heavy, the stability of these connection nodes will be affected, that is, there are certain safety hazards.
[0053] To this end, a transition frame 6 is arranged between the indoor aerial work platform 4 and the vertical support frame 3. The overall shape of the transition frame 6 is rectangular, and it is spliced with four steel pipes, two horizontal and two vertical. The two vertical pipes 61 are radially threaded with top screws 63 at the pipe mouths. The two vertical pipes 61 are respectively sleeved on the two support rods of the vertical support frame 3 and fixed on the support rods by the top screws 63; the height of the transition frame 6 is the same as the height of the workbench in the working state, and the two horizontal pipes 62 of the transition frame 6 are provided with scaffolding locks 64, which are fixed together with the guardrail of the workbench through the scaffolding locks 64, thereby connecting the indoor aerial work platform 4 and the vertical support frame 3 together; in this way, the indoor aerial work platform 4 can be used to assist in fixing the vertical support frame 3, thereby improving the supporting effect of the vertical support frame 3 on the horizontal transport platform 2, and improving the overall stability of the installation structure.
[0054] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.
Claims
1. A steel frame assembled structure ultra-low energy consumption building exterior wall installation structure, applied to the outdoor overhead area of the ultra-low energy consumption building, characterized by: The invention comprises a mounting member (1) mounted on the periphery of an ALC strip (10), wherein the mounting member (1) is directly fixedly connected to a member constituting an outdoor overhead zone, wherein the mounting member (1) comprises a transverse channel steel (11) and a vertical channel steel (12), wherein the mounting structure further comprises a horizontal transport platform (2), a vertical support frame (3) and a lifting device (5), wherein the horizontal transport platform (2) comprises a horizontally arranged slide rail (21) and a slide seat (22) slidably mounted on the slide rail (21), wherein one end of the slide rail (21) is overlapped on a member constituting the overhead zone, and the other end is supported and fixed on the vertical support frame (3); wherein the lifting device (5) is mounted on an ultra-low energy consumption building and is located above the horizontal transport platform (2), wherein the vertical support frame (3) comprises a top support (31), a supporting steel pipe (32) and a bottom support (3 ... The bottom bracket (33) is supported and fixed on the ultra-low energy consumption building, the supporting steel pipe (32) is installed on the bottom bracket (33), the top bracket (31) is installed on the supporting steel pipe (32), and the slide rail (21) is supported and fixed on the top bracket (31). The installation structure also includes an indoor aerial work platform (4), and the indoor aerial work platform (4) includes a base (41), a lifting frame (42) arranged on the base (41), and a workbench (43) installed on the top of the lifting frame (42). The installation structure also includes a rectangular transition frame (6), and the vertical pipe (61) of the transition frame (6) is sleeved on the supporting steel pipe (32) and fixedly connected to the supporting steel pipe (32) through a top screw (63); the horizontal pipe (62) of the transition frame (6) is fixedly connected to the workbench (43) through a scaffolding lock (64).
2. The steel frame assembled structure ultra-low energy consumption building exterior wall installation structure according to claim 1 is characterized by: The transverse channel steel (11) is installed at the upper and lower ends of the ALC strip plate (10), and the vertical channel steel (12) is installed at the left and right ends of the ALC strip plate (10).
3. The steel frame assembled structure ultra-low energy consumption building exterior wall installation structure according to claim 1 is characterized by: Baffles (23) are fixedly provided at both ends of the slide rail (21), and a support plate (24) is horizontally fixedly connected to one side of the baffle (23) away from the slide rail (21).
4. The steel frame assembled structure ultra-low energy consumption building exterior wall installation structure according to claim 1 is characterized by: The hoisting device (5) comprises a winch (51) and a counterweight frame (52), and a fixed pulley (26) is installed on the ultra-low energy consumption building.
5. A method for installing an outer wall of an ultra-low energy consumption building with a steel frame assembly structure, using the outer wall installation structure of an ultra-low energy consumption building with a steel frame assembly structure as described in any one of claims 1 to 4, characterized in that: The following steps are involved: Step 1: Install the horizontal transport platform (2) and the vertical support frame (3) on the ultra-low energy consumption building, the indoor aerial work platform (4) is connected to the vertical support frame (3) via a transition frame (6), the lifting device (5) is installed on the top of the ultra-low energy consumption building, and the steel wire rope of the lifting device (5) is lowered along a fixed pulley (26) to the bottom floor of the ultra-low energy consumption building; Step 2: Install the transverse channel steel (11) and the vertical channel steel (12) on the ALC strip (10), drill holes on the ALC strip (10) to install eyebolts, and tie and fix the steel wire rope of the lifting device (5) to the eyebolts; Step 3: Start the lifting device (5), lift the ALC slat (10) to the slide rail (21), manually pull the steel wire rope to place the ALC slat (10) on the slide seat (22), disassemble the steel wire rope and the eye bolts, push the ALC slat (10) to slide to the corresponding installation position, and finally fix the transverse channel steel (11) and the vertical channel steel (12) to the components that constitute the overhead area to complete the installation of the ALC slat (10).
6. The method for installing the exterior wall of a steel frame assembled structure ultra-low energy consumption building according to claim 5 is characterized in that: In step three, the ALC slats (10) are divided into blocks. For the divided ALC slats (10), the vertical channel steels (12) are only installed on the first and last blocks, and the transverse channel steels (11) are installed on the ALC slats (10) except the last block. After the block-shaped ALC slats (10) are successively hoisted and installed in the overhead area, the vertical channel steels (12) are fixedly connected to the components constituting the overhead area, and the transverse channel steels (11) are translated as a whole and installed between two adjacent ALC slats (10) blocks. Finally, the transverse channel steels (11) are fixedly connected to the components constituting the overhead area.