A water meter with an adaptive sealing structure having a non-magnetic sensing distance
By using elastic pressing parts and nano paste sealing technology in the water meter, the problem of detection distance changes caused by ambient temperature is solved, and the detection stability and waterproof performance are improved.
Patent Information
- Application Number
- CN202010037836.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-14
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2040-01-14
AI Technical Summary
The inductor of the inductor of the straight base meter in the existing water meter causes the device to expand and contract due to changes in the ambient temperature, resulting in a change in the detection distance and causing detection failure.
Adaptive sealing structure with no magnetic sensing spacing, including elastic pressing parts and nano paste sealing, the elastic pressing parts automatically adapt to the ambient temperature changes, maintain the detection distance stable, and use the sealing method of nano paste and AB glue. IP68 waterproof rating.
It realizes automatic adaptation to the changes in inductance displacement caused by ambient temperature, ensures detection stability and seal reliability, avoids detection failures, and improves the waterproof performance of the water meter.
Smart Images

Figure CN111141339B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water metering instruments, and in particular relates to a water meter with an adaptive sealing structure having a non-magnetic sensing interval. Background Art
[0002] The water flow measurement is to detect the number of rotations of the metal sensor sheet on the upper part of the impeller through the direct-insert base meter inductor and convert it into the water flow. The distance between the direct-insert base meter inductor and the metal sensor sheet is the premise to ensure the detection accuracy. AB glue is used for the glue sealing of the direct-insert base meter inductor. The method of use is to compress the direct-insert base meter inductor and then fill it with AB glue. After solidification, the direct-insert base meter inductor is sealed and fixed at the same time. Because the distance requirement for the direct-insert base meter inductor is extremely high, the change in ambient temperature causes the device to expand and contract, resulting in different degrees of changes in the detection distance of the front end of the direct-insert base meter inductor, and this distance increase change is irreversible, which directly leads to detection failure. Summary of the invention
[0003] In view of the problem that in the prior art, the direct-plug base meter inductor is sealed and fixed with AB glue, and the change of ambient temperature causes the device to expand and contract, resulting in different degrees of changes in the detection distance of the front end of the direct-plug base meter inductor, which directly leads to detection failure, a water meter with an adaptive sealing structure with non-magnetic sensing spacing is provided.
[0004] A water meter with an adaptive sealing structure having a non-magnetic sensing spacing, comprising an impeller box gland, a direct-insertion base meter inductor, an inductor PCB welding board, an elastic pressing member, a base meter cover plate, a circuit board, a transparent shell and a battery clamp,
[0005] The direct-insert base meter inductor is fixedly mounted on the inductor PCB welding board, the inductor PCB welding board and the direct-insert base meter inductor are mounted on the upper side of the impeller box gland, the base meter cover is mounted on the upper side of the impeller box gland, the elastic pressing member is located between the base meter cover and the impeller box gland, and is in a compressed state, pressing the inductor PCB welding board downward onto the impeller box gland;
[0006] The circuit board is mounted on the upper side of the battery clamp, the transparent shell is a cover with an opening at the bottom, the battery clamp is mounted inside the transparent shell, the upper side of the battery clamp and the upper closed end of the transparent shell form a closed second glue pouring cavity, the circuit board is located in the second glue pouring cavity, the circuit board has an LCD display screen, the upper inner side of the transparent shell protrudes downward to form a seventh annular protrusion, the first annular protrusion forms a accommodating cavity with an opening at the bottom, for accommodating the LCD display screen on the circuit board, the LCD display screen is surrounded in the middle of the seventh annular protrusion, there is a gap between the end of the seventh annular protrusion and the upper end surface of the circuit board, sealant is poured into the second glue pouring cavity, the sealant submerges the circuit board, the liquid level of the sealant entering the accommodating cavity with an opening at the bottom surrounded by the seventh annular protrusion is higher than the end of the seventh annular protrusion and lower than the height of the LCD display screen.
[0007] On the basis of the above scheme, a water meter with an adaptive sealing structure with non-magnetic sensing spacing is provided, wherein the base meter cover plate and the impeller box pressure cover form a closed first glue-filling cavity, the direct-plug base meter inductor and the inductor PCB welding board are located inside the first glue-filling cavity, and nano-paste is poured into the first glue-filling cavity, and the nano-paste immerses and seals the direct-plug base meter inductor and the inductor PCB welding board.
[0008] Preferably, in the water meter with the adaptive sealing structure without magnetic sensing distance, the lower end surface of the base cover plate protrudes downward to form a fourth annular protrusion.
[0009] The upper end surface of the impeller box gland protrudes upward to form a third annular protrusion, and the third annular protrusion surrounds a concave cavity with an upper opening for mounting the inductor PCB board.
[0010] The fourth annular protrusion of the base cover plate and the third annular protrusion of the impeller box pressure cover are adapted to each other and plugged together to form a first glue-filling cavity.
[0011] On the basis of the above scheme, a water meter with an adaptive sealing structure with non-magnetic sensing spacing is provided, wherein material is removed from the outer ring at the lower end of the fourth annular protrusion to form a first step surface, and material is removed from the inner ring at the upper end of the third annular protrusion to form a second step surface; when the fourth annular protrusion and the third annular protrusion are plugged together, the first step surface and the second step surface form an annular cavity for accommodating a second O-ring.
[0012] Preferably, a water meter having an adaptive sealing structure with no magnetic sensing spacing,
[0013] An inductor installation blind hole is provided inside the concave cavity of the impeller box gland, the inductor PCB board is placed in the concave cavity, and a direct-insert base inductor is inserted into the inductor installation blind hole, and the bottom of the direct-insert base inductor contacts the bottom of the blind hole.
[0014] Preferably, in the water meter having an adaptive sealing structure with a non-magnetic sensing distance, the elastic pressing member is a spring.
[0015] Preferably, the water meter with an adaptive sealing structure without magnetic sensing spacing further includes an inductor PCB pressing plate made of insulating material, wherein the inductor PCB pressing plate is located between the elastic pressing member and the inductor PCB welding plate, and the inductor PCB welding plate is pressed under the action of the elastic pressing member, and the upper end surface of the inductor PCB pressing plate protrudes upward to form a sixth annular protrusion.
[0016] The lower end surface of the base cover plate protrudes outward to form a fifth annular protrusion, wherein the fifth annular protrusion is located inside the fourth annular protrusion.
[0017] The upper end of the spring is located in the fifth annular protrusion on the base cover plate, and the lower end is located inside the sixth annular protrusion of the inductor PCB pressing plate.
[0018] On the basis of the above scheme, the circuit board sealing structure, the transparent shell is provided with a second glue filling hole which is communicated with the second glue filling cavity.
[0019] Preferably, in the circuit board sealing structure, the sealant is AB glue.
[0020] Beneficial effects of the present invention:
[0021] 1. The elastic clamping component is used to press the PCB and the inductor tightly into the blind hole of the gland. It can automatically adapt and recover to the change of the inductor displacement caused by the ambient temperature, and realize stable and reliable detection.
[0022] 2. The cavity surrounded by the first annular protrusion surrounds the LCD display in the middle, and the sealant can only enter from the gap between the first annular protrusion and the circuit board to prevent splashing onto the LCD display during glue pouring. The air in the cavity surrounded by the first annular protrusion is in a compressed state as the glue pouring proceeds, effectively preventing the sealant from flooding the LCD display and causing the problem of being unable to read. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 is a cross-sectional view of an embodiment of the present invention;
[0024] Figure 2 is a cross-sectional view of an embodiment of the present invention;
[0025] Figure 3 This is a schematic diagram of the structure of a case according to an embodiment of the present invention;
[0026] Figure 4 This is a schematic diagram of the transparent cover structure according to an embodiment of the present invention;
[0027] Figure 5This is a structural principle diagram of an impeller box gland according to an embodiment of the present invention;
[0028] Figure 6 This is a structural principle diagram of a base cover plate according to an embodiment of the present invention;
[0029] Figure 7 This is a structural principle diagram of a base cover plate according to an embodiment of the present invention;
[0030] Figure 8 This is a structural principle diagram of an inductor PCB pressing plate according to an embodiment of the present invention;
[0031] Fig. 9 This is a structural principle diagram of an inductor PCB pressing plate according to an embodiment of the present invention;
[0032] Fig.10 This is a structural principle diagram of a battery clamp according to an embodiment of the present invention;
[0033] Fig.11 This is a schematic diagram of the structure of a circuit board according to an embodiment of the present invention;
[0034] Fig.12 This is a structural principle diagram of a transparent housing according to an embodiment of the present invention;
[0035] Fig.13 This is a structural principle diagram of a transparent housing according to an embodiment of the present invention;
[0036] Fig.14 This is a schematic diagram of the structure of a watch case according to an embodiment of the present invention;
[0037] Fig.15 This is a structural principle diagram of a clamp according to an embodiment of the present invention;
[0038] Fig.16 This is a schematic diagram of the structure of a transparent cover according to an embodiment of the present invention;
[0039] Fig.17 This is a structural principle diagram of a clamp fixing clip according to an embodiment of the present invention;
[0040] Fig.18 This is a structural principle diagram of the outlet sheath hose bayonet of an embodiment of the present invention;
[0041] Fig.19 This is a structural principle diagram of the outlet sheath hose bayonet of an embodiment of the present invention;
[0042] Fig. 20 This is a glue pouring route map for an embodiment of the present invention;
[0043] Fig.21 The figure is a schematic structural diagram of a cover assembly according to an embodiment of the present invention. DETAILED DESCRIPTION
[0044] The technical solution of the present invention is further described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0045] like Figure 1 As shown, a water meter with an adaptive sealing structure having a non-magnetic sensing spacing includes an impeller box gland 5, a direct-insertion base meter inductor 7, an inductor PCB welding board 8, an elastic pressing member 12, a base meter cover plate 29, a circuit board 25, a transparent shell 17 and a battery clamp 26.
[0046] The direct-insert base meter inductor 7 is fixedly mounted on the inductor PCB welding board 8. The inductor PCB welding board 8 and the direct-insert base meter inductor 7 are mounted on the upper side of the impeller box gland 5. The base meter cover plate 29 is mounted on the upper side of the impeller box gland 5. The elastic pressing member 12 is located between the base meter cover plate 29 and the impeller box gland 5 and is in a compressed state, pressing the inductor PCB welding board 8 downward onto the impeller box gland 5.
[0047] The circuit board 25 is mounted on the upper side of the battery clamp 26. The transparent shell 17 is a cover with an opening at the bottom. The battery clamp 26 is mounted inside the transparent shell 17. The upper side of the battery clamp 26 and the upper closed end of the transparent shell 17 form a closed second glue-filling cavity 177. The circuit board 25 is located in the second glue-filling cavity 177. The circuit board 25 has an LCD display screen 251. The upper inner side of the transparent shell 17 protrudes downward to form a seventh annular protrusion 175. The seventh annular protrusion 175 forms a accommodating cavity with an opening at the bottom. The LCD display screen 251 on the accommodating circuit board 25 is enclosed in the middle of the seventh annular protrusion 175, and there is a gap between the end of the seventh annular protrusion 175 and the upper end surface of the circuit board 25. The second glue filling cavity 177 is filled with sealant, and the sealant immerses the circuit board 25. The sealant enters the lower opening accommodating cavity surrounded by the seventh annular protrusion 175 through the gap between the end of the seventh annular protrusion 175 and the circuit board 25. The liquid level in the cavity is higher than the end of the seventh annular protrusion 175 and lower than the height of the LCD display screen 251.
[0048] The base cover plate 29 and the impeller box cover 5 form a closed first glue-filling cavity 295, the lower end surface of the base cover plate 29 protrudes downward to form a fourth annular protrusion 294, and the upper end surface of the impeller box cover 5 protrudes upward to form a third annular protrusion 54. The fourth annular protrusion 294 of the base cover plate 29 and the third annular protrusion 54 of the impeller box cover 5 are adapted to each other and plugged together to form a first glue-filling cavity 295. The direct-insert base inductor 7 and the inductor PCB welding board 8 are located inside the first glue-filling cavity 295. Nano paste is poured into the first glue-filling cavity 295, and the nano paste immerses and seals the direct-insert base inductor 7 and the inductor PCB welding board 8.
[0049] Glue filling operation instructions, such as Fig. 20 As shown, the second glue injection hole 602 passes through the transparent shell 17. When injecting AB glue, the glue gun is inserted into the second glue injection hole 602, and the glue outlet is located at the lower side of the transparent shell 17. The AB glue flows in, covers the circuit board 25 and seals it. The AB glue passes through the gap between the end of the seventh annular protrusion 175 and the circuit board 25, and enters a lower opening accommodating cavity surrounded by the seventh annular protrusion 175, and seals the LCD display screen 251 located therein. As shown in the figure, the upper liquid surface of the AB glue is located at the dotted line position on the lower side of the LCD display screen 251, and the seventh annular protrusion 175 surrounds a lower opening accommodating cavity and seals it into a closed cavity. The AB glue does not cover the LCD display screen 251. The cover assembly 13 is opened, and the LCD display screen 251 can be read from the upper side of the transparent shell 17.
[0050] The cavity surrounded by the seventh annular protrusion 175 is sealed into a closed cavity by the AB glue during the glue pouring process, and the air inside is not discharged. As the AB glue enters, the internal air pressure increases, and the increased air pressure prevents the AB glue from continuing to enter and covering the LCD display screen 251. After the glue pouring is completed, the LCD display screen 251 is completely sealed to prevent erosion by external water vapor and dust.
[0051] The plug-in base inductor 7 is sealed by injecting nano paste, and the circuit board 25 is sealed by injecting AB glue, so that the water meter reaches IP68 waterproof grade.
[0052] like Figure 1 As shown, the small movement impeller assembly 4 is installed in the small movement impeller box assembly 3, and the upper part of the impeller of the small movement impeller assembly 4 is provided with a metal induction sheet 40.
[0053] like Figure 3 As shown, the watch case 32 is cast, and the left and right ends are respectively the water outlet and inlet ends, and the upper end is provided with a mounting hole 321 for installing the meter head assembly. The inside of the watch case 32 forms a mounting plane 322, and the upper edge circumference of the mounting hole 321 at the upper end protrudes radially outward to form a first annular protrusion 323. The upper end of the mounting hole 321 is processed with an internal thread, and the watch case 32 is also provided with a first lead sealing hole 324. The upper end surface of the watch case 32 is provided with a fastening screw hole 325.
[0054] like Figure 1As shown, the impeller box gland 5, the sheet-shaped pressing ring 9 and the metal pressing ring 10 are sequentially installed in the mounting hole 321 from top to bottom, wherein the lower part of the impeller box gland 5 presses the small movement impeller box assembly 3 downwardly, the metal pressing ring 10 is a circular ring-shaped part, with an external thread formed on the outer circumference, and an internal thread is provided in the mounting hole 321, the metal pressing ring 10 is threadedly connected with the mounting hole 321, and the sheet-shaped pressing ring 9, the impeller box gland 5, the small movement impeller box assembly 3 and the filter screen 2, and the rubber gasket 1 are pressed downwardly against the inside of the watch case 32. The small movement impeller assembly 4 is installed in the small movement impeller box assembly 3, and its upper rotating shaft is arranged in the blind hole 58 in the middle of the lower side of the impeller box gland 5, and the lower end is sleeved on the shaft 301 buried in the middle of the base of the small movement impeller box assembly 3.
[0055] For sealing purposes, a rubber gasket 1 is provided between the filter screen 2 and the mounting plane 322. The impeller box gland 5 is a disc-shaped part, as shown in the figure, a first O-ring 6 is provided in the mounting hole 321 of the case 32, and the first O-ring 6 is located between the impeller box gland 5 and the sheet-shaped pressure ring 9, and is pressed and sealed by the sheet-shaped pressure ring 9 and the metal pressure ring 10.
[0056] like Figure 5 As shown, the impeller box gland 5 is a disc-shaped part, which has a cylinder 51 adapted to the mounting hole 321, and a pressing plane 52 adapted to the sheet-shaped pressing ring 9 at the upper end. The upper edge of the cylinder 51 removes material to form a first notch 53. When the sheet-shaped pressing ring 9 is pressed against the pressing plane 52, the lower surface of the sheet-shaped pressing ring 9 and the surface of the mounting hole 321 close the first notch 53 to form a closed (annular) cavity to accommodate the first O-ring 6. With such a design, the compression amount of the first O-ring 6 is very accurate, which is completely guaranteed by the design size of the first notch 53, ensuring good sealing performance.
[0057] like Figure 5 As shown, the upper end surface of the impeller box cover 5 is raised upward to form a third annular protrusion 54, and the third annular protrusion 54 surrounds a concave cavity 57 with an upper opening for mounting the inductor PCB board 8. An inductor mounting blind hole 56 is provided on the lower side surface of the concave cavity 57, and a rotating shaft mounting blind hole 58 is provided on the lower end surface of the impeller box cover 5. The direct-inserted base inductor 7 is fixedly installed on the inductor PCB welding board 8, and the inductor PCB board 8 is placed in the concave cavity 57, and the direct-inserted base inductor 7 is inserted into the inductor mounting blind hole 56. After the inductor foot of the direct-inserted base inductor 7 passes through the inductor PCB board 8, the inductor PCB board 8 is pressed, and the inductor foot is pressed, and the inductor foot is welded to the inductor PCB board 8 to become one. At this time, the bottom of the inductor contacts the bottom of the blind hole 56, ensuring that the distance between the direct-inserted base inductor 7 and the metal induction sheet 40 on the upper part of the impeller is minimized.
[0058] like Figure 6 , 7As shown, a slot 292 and a first fastening hole 296 are formed on the upper end surface of the base cover plate 29 , and the lower end surface protrudes outward to form a fourth annular protrusion 291 and a fifth annular protrusion 293 , wherein the fifth annular protrusion 293 is located inside the fourth annular protrusion 291 .
[0059] like Figure 8 , 9 As shown, the inductor PCB pressing plate 11 is pressed on the upper end surface of the inductor PCB board 8, and the inductor PCB board 8 and the direct-insertion base meter inductor 7 below it are pressed downward into the impeller box gland 5 to ensure that the distance between the bottom of the inductor and the metal induction sheet 40 on the upper part of the impeller is kept within 2.5mm. The bottom wall thickness of the blind hole 56 of the impeller box gland 5 at the lower part of the inductor is 1.2mm, and the metal induction sheet 40 on the upper part of the impeller is about 0.8mm from the lower part of the impeller box gland 5, which ensures that the non-magnetic induction signal is stable and normal under the high speed of the impeller. The upper end surface of the inductor PCB pressing plate 11 protrudes upward to form a sixth annular protrusion 111.
[0060] like Figure 1 As shown, the base cover plate 29 is fixedly mounted on the case 32 and is located above the inductor PCB pressing plate 11. An elastic pressing member 12 is arranged between the base cover plate 29 and the inductor PCB pressing plate 11. Preferably, the elastic pressing member 12 is a spring. The upper end of the spring is located in the fifth annular protrusion 293 on the base cover plate 29, and the lower end is located inside the sixth annular protrusion 111 of the inductor PCB pressing plate 11, which plays a positioning role and prevents the spring from sliding off.
[0061] The fourth annular protrusion 291 of the base cover plate 29 and the third annular protrusion 54 of the impeller box pressure cover 5 are adapted to each other and plugged together, and there is a second O-ring 30 between the first step surface 294 and the second step surface 55, which plays a side sealing role. Thus, a closed first glue-filling cavity 295 is formed, and the elastic pressing member 12, the inductor PCB pressure plate 11, the inductor PCB welding board 8, and the direct-inserted base inductor 7 are located in the first glue-filling cavity 295. The advantage of the side seal over the end face seal is that it is not sensitive to the vertical displacement of the seal. This is because in the end face seal, the change in the displacement of the sealed parts in the vertical direction will cause the change in the compression of the seal ring, thereby affecting the sealing effect; the compression of the seal ring in the side seal is formed by extrusion in the horizontal direction, so the displacement change of the sealing parts in the vertical direction has little effect on the compression of the seal ring.
[0062] In the first glue filling cavity 295, nano paste is poured into the direct plug base inductor 7 to seal it, so as to prevent external water vapor from invading the direct plug base inductor 7 and causing induction failure. The nano paste sealing method and the elastic pressing member 12 are used to cooperate. On the one hand, a good seal can be guaranteed. This sealing method using the water-repellent nano paste is very reliable and easy to operate; on the other hand, while ensuring the seal, the elastic pressing member 12 tightly presses the PCB board 8 and the direct plug base inductor 7 in the blind hole 56 of the impeller box gland 5, with strict distance guarantee, ensuring the detection distance of the direct plug base inductor 7, and realizing stable and reliable detection. The advantage of the sealing of the nano paste is that it has a certain fluidity, and the elastic pressing member 12 still maintains a good seal in the process of pressing the small movement up and down, and the seal will not be damaged. At present, the water meter adopts AB glue for the glue filling seal of the direct plug base inductor 7. The method of use is to press the direct plug base inductor 7 and then pour AB glue. After solidification, the direct plug base inductor 7 is sealed and fixed at the same time. This brings a problem, because the distance requirement for the direct-insertion base inductor 7 is extremely high, so the change in ambient temperature causes the device to expand and contract, resulting in different degrees of changes in the detection distance of the front end of the direct-insertion base inductor 7, and this distance increase change is irreversible, which directly leads to detection failure. For example, under the influence of ambient temperature, ice forms inside the case 32, and the impeller box gland 5 is lifted up from the bottom to deform it, thereby lifting the inductor PCB board 8 up a distance, and after the ice melts, after the impeller box gland 5 is deformed and restored, there is no external force above the inductor PCB board 8 to restore its position, resulting in the upward displacement that cannot be restored. In this way, the displacement will gradually increase due to repeated accumulation, causing detection failure. The elastic clamping member 12 of this case has the ability to adapt to the environment, and can achieve good adaptation to the recovery of the inductor 7 movement caused by the ambient temperature. In this process, for the possible existence of water vapor, the fluidity of the nano paste can cover and protect the objects in the sealed cavity from erosion.
[0063] In order to make the first glue-filling cavity 295 have a good seal and prevent external water from entering and internal nano paste from flowing out, a second O-ring 30 is arranged between the fourth annular protrusion 291 of the base cover plate 29 and the third annular protrusion 54 of the impeller box gland 5. The material of the lower end outer ring of the fourth annular protrusion 291 is removed to form a first step surface 294, and the material of the upper end inner ring of the third annular protrusion 54 is removed to form a second step surface 55. When the fourth annular protrusion 291 and the third annular protrusion 54 are plugged together, the first step surface 294 and the second step surface 55 form an annular cavity for accommodating the second O-ring 30.
[0064] like Fig.12 , 4As shown, the transparent housing 17 is a cover with an opening at the bottom, and its lower end protrudes radially outward to form an annular skirt 173, and the lower end surface of the annular skirt 173 protrudes downward to form a second annular protrusion 171. The annular skirt 173 is provided with a second fastening hole 172, and has a first pressing surface 174 and a seventh annular protrusion 175 inside. The seventh annular protrusion 175 surrounds a lower opening accommodating cavity for accommodating the LCD display screen 251 on the circuit board 25. Figure 1 As shown, the LCD display screen 251 is enclosed in the middle of the seventh annular protrusion 175, and there is a certain gap between the end of the seventh annular protrusion 175 and the circuit board 25, and the AB glue can flow through the gap. A wireless antenna placement cavity 176 is formed on the upper part of the transparent shell 17, and when the wireless transmission mode is adopted, the wireless antenna is placed in the wireless antenna placement cavity 176.
[0065] The cross pan head screw with a washer passes through the second fastening hole 172 on the transparent shell 17 and the first fastening hole 296 on the base cover plate 29 and is screwed into the fastening threaded hole 325 opened on the watch case 32, thereby fastening the transparent shell 17, the base cover plate 29 and the watch case 32 together, ensuring the distance between the base cover plate 29 and the impeller box pressure cover 5, so that the elastic pressing piece 12 is in a certain amount of compression state, pressing the inductor PCB welding board 8 downward, and ensuring the detection distance.
[0066] Between the transparent housing 17 and the base cover plate 29, the circuit board 25, the battery clamp plate 26, and the battery 27 are sequentially installed from top to bottom. The upper end surface of the battery clamp plate 26 has a fixing column 261, and the lower end surface has a battery fixing claw 262.
[0067] The battery 27 is located in the middle of the battery fixing claw 262 and is fixed to the lower part of the battery clamp 26 through the battery fixing claw 262. The circuit board 25 has a mounting hole and is tightly mounted on the fixing column 261. The lower part of the first pressing surface 174 positions the battery clamp 26. The outer edge of the battery clamp 26 is tightly matched with the inner side of the transparent shell 17. The seventh annular protrusion 175 surrounds the LCD display screen 251.
[0068] like Fig.15 As shown, the clamp 19 is in the shape of a ring, with one end open, and the opening has a first connection end 191 and a second connection end 192. The inside of the clamp 19 protrudes inward to form a positioning protrusion 193. The first connection end 191 and the second connection end 192 are provided with an insertion hole 194 in the vertical direction, and a connecting hole 195 that passes through the first connection end 191 and the second connection end 192 is provided horizontally. The first connection end 191 and the second connection end 192 are formed with a tongue-pressing accommodating groove 196. The upper end of the clamp 19 protrudes upward to form a step surface 197.
[0069] like Fig.16As shown, the outer cover 14 is cylindrical with openings at the upper and lower parts, and the upper part is rotatably connected to the cover assembly 13 by a hinge without protrusions. The lower edge thereof protrudes downward to form a pressing tongue 141, and the front end of the pressing tongue 141 extends radially outward from the outer edge of the outer cover 14.
[0070] like Fig.21 As shown, the cover assembly 13 includes a flip cover 131 and a hinge plate 132 , wherein the flip cover 131 is rotatably connected to the hinge plate 132 , and the hinge plate 132 is installed in the gap between the outer cover 14 and the transparent shell 17 .
[0071] The inner side of the outer cover 14 protrudes inward to form a fixing column 142 , and the hinge plate 132 is provided with a fixing hole 133 . When the hinge plate 132 is installed between the outer cover 14 and the transparent shell 17 , the fixing column 142 is inserted into the fixing hole 133 .
[0072] The outer circumference of the upper shell 21 is recessed inward to form a mounting groove 177 for accommodating the hinge plate 132. Fig.21 As shown, the hinge plate 132 is roughly rectangular, the mounting groove 177 is a rectangular groove, the hinge plate 132 is engaged between the outer cover 14 and the transparent shell 17, and is located in the mounting groove 177. The outer contour of the entire instrument is a smooth cylindrical surface, without protruding parts or recessed parts, and is beautiful.
[0073] like Fig.17 As shown, the bottom plate of the clamp fixing clip 16 has two legs 161 , the lower ends of the legs 161 form hooks 162 , and a second lead sealing hole 163 is provided.
[0074] like Fig.18 , 19 As shown, the outlet sheath hose bayonet 18 is in a box shape, with a rear opening mounted on the first connection end 191 and the second connection end 192, a round hole 182 is provided on the front side for leading out the outlet sheath hose, a long hole 183 is provided on the upper side for accommodating the bottom plate of the clamp fixing clamp 16, and a small hole 181 is provided on the lower side. The end of the leg 161 of the clamp fixing clamp 16 passes through the small hole 181, and the hook 162 is engaged with the outer end surface of the small hole 181.
[0075] The clamp 19 is mounted on the watch case 32, and the positioning protrusion 193 is located on the lower side of the first annular protrusion 323 of the watch case 32, which plays a positioning role and prevents the clamp 19 from sliding off the watch case 32. The outer cover 14 is installed on the step surface 197 on the clamp 19, and the pressing tongue 141 is located in the pressing tongue accommodating groove 196. The clamp 19 is fastened by screws and nuts, and a cross pan head washer screw can be used, and the nut is embedded in the first connecting end 191. After fastening, the lower side of the clamp 19 clamps the watch case 32, and the step surface 197 clamps the lower edge of the outer cover 14 along the circumferential direction. Then, the outlet sheath hose bayonet 18 is mounted on the first connecting end 191 and the second connecting end 192, and its upper end surface presses the pressing tongue 141, and the lead wire is led out from the gap between the first connecting end 191 and the second connecting end 192, and enters the sheath hose installed in the outlet sheath hose bayonet 18. Then the clamp fixing clip 16 is inserted from the long hole 183, through the insertion hole 194 on the clamp 19, and the end of the leg 161 passes through the small hole 181. The lead seal wire passes through the first lead seal hole 324 on the watch case 32 and the second lead seal holes 163 on the two legs, and is sealed. This installation method is convenient and reliable, without exposed bolts and nuts, and has a simple and elegant appearance. The plug-in installation method is easy to disassemble and install, and has high installation efficiency.
[0076] Glue filling operation instructions, such as Fig. 20 As shown, the first glue filling hole 601 penetrates the transparent housing 17, the circuit board 25 and the battery clamp 26, and a through hole is also provided on the base cover plate 29. When filling the nano paste, the glue outlet of the glue gun extends into the first glue filling hole 601, and the end of the glue outlet extends to the lower side of the battery clamp 26, and the nano paste begins to be injected. The nano paste will flow into the first glue filling cavity 295 along the through hole on the base cover plate 29, and the direct-inserted base inductor 7 will be completely submerged to complete the sealing. The liquid level of the nano paste reaches the lower side end face of the battery clamp 26, as shown in the dotted line position, and the battery at the lower part of the battery clamp 26 is also submerged and sealed.
[0077] The second glue injection hole 602 passes through the transparent shell 17 and the circuit board 25. When injecting AB glue, the glue gun is inserted into the second glue injection hole 602, and the glue outlet is located at the lower side of the transparent shell 17. The AB glue flows in, covers the circuit board 25 and seals it. The AB glue passes through the gap between the end of the seventh annular protrusion 175 and the circuit board 25, and enters the accommodating cavity with a lower opening surrounded by the seventh annular protrusion 175, and seals the LCD display screen 251 located therein. As shown in the figure, the upper liquid surface of the AB glue is located at the dotted line position on the lower side of the LCD display screen 251, and the accommodating cavity with a lower opening surrounded by the seventh annular protrusion 175 is sealed into a closed cavity. The AB glue does not cover the LCD display screen 251. The cover assembly 13 is opened, and the LCD display screen 251 can be read from the upper side of the transparent shell 17.
[0078] The cavity surrounded by the seventh annular protrusion 175 is sealed into a closed cavity by the AB glue during the glue pouring process, and the air inside is not discharged. As the AB glue enters, the internal air pressure increases, and the increased air pressure prevents the AB glue from continuing to enter and covering the LCD display screen 251. After the glue pouring is completed, the LCD display screen 251 is completely sealed to prevent erosion by external water vapor and dust.
[0079] Since the specific gravity of AB glue is smaller than that of nano paste, when AB glue is poured in after the lower side is filled with nano paste, the AB glue on the upper side will not flow into the lower side of the battery clamp 26 .
[0080] At present, the glue sealing of water meters is mostly done by first filling the glue, and then waiting for the AB glue to solidify before the next step of assembly can be carried out. However, the solidification time of the AB glue is relatively long, and a long time of waiting is required, which is very inconvenient for the arrangement of the entire process flow. The present application adopts structural design so that the glue filling operation is carried out after the overall assembly is completed. The internal glue filling operation can be carried out by opening the meter cover assembly 13. After the glue filling is completed, it becomes a finished product and is directly put into storage. The time of waiting for the solidification of the AB glue is omitted in the process flow, which makes the arrangement of the entire process flow more flexible and improves production efficiency.
[0081] Among them, nano paste refers to Parylene, which is a general name for a family of thermoplastic polymers synthesized from p-dimethylbenzene. It is also called water-repellent paste and Parylene.
[0082] It is to be understood that although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water meter with an adaptive sealing structure without magnetic sensing spacing, characterized in that: It includes an impeller box pressure cover (5), a direct-insertion base meter inductor (7), an inductor PCB welding board (8), an elastic pressing member (12), a base meter cover plate (29), a circuit board (25), a transparent shell (17) and a battery clamp (26), The direct-insert base meter inductor (7) is fixedly mounted on the inductor PCB welding board (8); the inductor PCB welding board (8) and the direct-insert base meter inductor (7) are mounted on the upper side of the impeller box pressure cover (5); the base meter cover plate (29) is mounted on the upper side of the impeller box pressure cover (5); the elastic pressing member (12) is located between the base meter cover plate (29) and the impeller box pressure cover (5) and is in a compressed state, pressing the inductor PCB welding board (8) downward onto the impeller box pressure cover (5); The circuit board (25) is mounted on the upper side of the battery clamp (26); the transparent shell (17) is a cover with an opening at the bottom; the battery clamp (26) is mounted inside the transparent shell (17); the upper side of the battery clamp (26) and the upper closed end of the transparent shell (17) form a closed second glue-filling cavity (177); the circuit board (25) is located in the second glue-filling cavity (177); the circuit board (25) has an LCD display screen (251); the upper inner side of the transparent shell (17) protrudes downward to form a seventh annular protrusion (175); the seventh annular protrusion (175) is The seventh annular protrusion (175) is surrounded by a lower opening accommodating chamber for accommodating an LCD display screen (251) on the circuit board (25); the LCD display screen (251) is surrounded by the middle of the seventh annular protrusion (175); a gap is formed between the end of the seventh annular protrusion (175) and the upper end surface of the circuit board (25); a sealant is poured into the second glue pouring chamber (177) to immerse the circuit board (25); the liquid level of the sealant in the lower opening accommodating chamber surrounded by the seventh annular protrusion (175) is higher than the end of the seventh annular protrusion (175) and lower than the height of the LCD display screen (251); The lower end surface of the base cover plate (29) protrudes downward to form a fourth annular protrusion (291). The upper end surface of the impeller box pressure cover (5) protrudes upward to form a third annular protrusion (54), and the third annular protrusion (54) surrounds a concave cavity (57) with an upper opening for mounting an inductor PCB welding board (8). The fourth annular protrusion (291) of the base cover plate (29) and the third annular protrusion (54) of the impeller box gland (5) are adapted to each other and plugged together to form a first glue-filling cavity (295); The outer ring of the lower end of the fourth annular protrusion (291) is removed by material to form a first step surface (294), and the inner ring of the upper end of the third annular protrusion (54) is removed by material to form a second step surface (55). When the fourth annular protrusion (291) and the third annular protrusion (54) are plugged together, the first step surface (294) and the second step surface (55) form an annular cavity for accommodating a second O-ring (30); An inductor mounting blind hole (56) is provided inside the concave cavity (57) of the impeller box gland (5), the inductor PCB welding board (8) is placed in the concave cavity (57), and the direct-insert base meter inductor (7) is inserted into the inductor mounting blind hole (56), and the bottom of the direct-insert base meter inductor (7) contacts the bottom of the blind hole (56).
2. The water meter with an adaptive sealing structure having a non-magnetic sensing distance as claimed in claim 1, characterized in that: The base meter cover plate (29) and the impeller box pressure cover (5) form a sealed first glue-filling cavity (295); the direct-insertion base meter inductor (7) and the inductor PCB welding board (8) are located inside the first glue-filling cavity (295); nano-paste is poured into the first glue-filling cavity (295); the nano-paste immerses and seals the direct-insertion base meter inductor (7) and the inductor PCB welding board (8).
3. The water meter with an adaptive sealing structure having a non-magnetic sensing distance as claimed in claim 1, characterized in that: The elastic pressing member (12) is a spring.
4. The water meter with an adaptive sealing structure having a non-magnetic sensing interval as claimed in claim 3, characterized in that: It also includes an inductor PCB pressing plate (11) made of insulating material, the inductor PCB pressing plate (11) being located between the elastic pressing piece (12) and the inductor PCB welding plate (8), the upper end surface of the inductor PCB pressing plate (11) protruding upward to form a sixth annular protrusion (111), The lower end surface of the base cover plate (29) protrudes outward to form a fifth annular protrusion (293), wherein the fifth annular protrusion (293) is located inside the fourth annular protrusion (291). The upper end of the spring is located in the fifth annular protrusion (293) on the base cover plate (29), and the lower end is located inside the sixth annular protrusion (111) of the inductor PCB pressing plate (11).
5. The water meter with an adaptive sealing structure having a non-magnetic sensing interval as claimed in claim 1, characterized in that: The transparent housing (17) is provided with a second glue injection hole (602) which is in communication with the second glue injection cavity (177).
6. The water meter with an adaptive sealing structure having a non-magnetic sensing interval as claimed in claim 1, characterized in that: The sealant is AB glue.
