L-shaped node connection structure of prefabricated building wall

By using the combined technology of welding and precast concrete layer of steel mesh skeleton in prefabricated buildings, the problem of insufficient integrity and seismic resistance of the existing L-shaped node structure is solved, and a stronger connection strength is achieved. Construction efficiency.

CN111155678BActive Publication Date: 2024-11-26HENAN LYUJIAN BUILDING TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201811322193.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-11-08
Publication Date
2024-11-26
Estimated Expiration
2038-11-08

AI Technical Summary

Technical Problem

The L-shaped node structure of existing prefabricated buildings is not intact and has poor seismic resistance, resulting in deformation and cracks in the wall, which cannot meet the high-demand functions of modern prefabricated buildings.

Method used

Using the connection method including mutually perpendicular steel concrete composite pipe and rectangular steel plate structure, welded with the rectangular steel plate structure through a reinforced mesh skeleton, and precast concrete layer and tie crack-resistant mesh in the factory, combined with cast-in-place and prefabricated technology, to form L-shaped concrete blocks to enhance connection strength.

Benefits of technology

It significantly improves the connection strength and reliability of L-shaped nodes, meets the overall stress, earthquake resistance and energy-saving requirements of modern prefabricated buildings, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111155678B_ABST
    Figure CN111155678B_ABST
Patent Text Reader

Abstract

The L-shaped node connection structure of the prefabricated building wall includes a first steel-concrete composite pipe and a second steel-concrete composite pipe which are perpendicular to each other, a first rectangular steel plate structure is exposed at one end of the first steel-concrete composite pipe, and a second rectangular steel plate structure is exposed at one end of the second steel-concrete composite pipe, a steel mesh skeleton is arranged between the first rectangular steel plate structure and the second rectangular steel plate structure which are exposed to the outside, the steel mesh skeleton is welded to the first rectangular steel plate structure and the second rectangular steel plate structure as a whole, and a concrete block with an L-shaped cross section is cast outside the steel mesh skeleton. The present invention can greatly improve the connection strength at the L-shaped node between the two steel-concrete composite pipes and ensure the reliability of the connection, and the cast-in-place and prefabrication are combined, which is convenient for construction, has high construction efficiency, and can ensure the construction quality, and fully meets the overall stress, energy saving, earthquake resistance and other use requirements of modern prefabricated buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of prefabricated building construction, and in particular relates to an L-shaped node connection structure of a prefabricated building wall. Background Art

[0002] The steel-concrete composite pipes used in prefabricated buildings are generally rectangular in structure. They are manufactured in the factory and then transported to the construction site for assembly. The biggest problem in the promotion and application of existing prefabricated buildings is the inability to form a stable and unified system. The key to the problem lies in the node connection of the prefabricated wall. The L-shaped node is the most common node in prefabricated buildings. The existing L-shaped node structures mostly have the disadvantages of weak structural integrity and poor seismic resistance, which can easily cause deformation and cracks in the prefabricated wall. The connection form cannot meet the higher requirements of the use function of prefabricated buildings. Summary of the invention

[0003] In order to solve the deficiencies in the prior art, the present invention provides an L-shaped node connection structure for an assembled building wall with balanced force, strong stability, and strong wind and earthquake resistance.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions: an L-shaped node connection structure of an assembled building wall, including a first steel-concrete composite pipe and a second steel-concrete composite pipe that are perpendicular to each other, the first steel-concrete composite pipe exposes a first rectangular steel plate structure at one end adjacent to the second steel-concrete composite pipe, the second steel-concrete composite pipe exposes a second rectangular steel plate structure at one end adjacent to the first steel-concrete composite pipe, a steel mesh skeleton is arranged between the exposed first rectangular steel plate structure and the second rectangular steel plate structure, the steel mesh skeleton is respectively welded to the first rectangular steel plate structure and the second rectangular steel plate structure as a whole, a concrete block with an L-shaped cross-section is cast on the outside of the steel mesh skeleton, and the outer side surfaces of the concrete block are respectively flush with the outer surface of the first concrete layer outside the first steel-concrete composite pipe and the outer surface of the second concrete layer outside the second steel-concrete composite pipe.

[0005] The steel mesh skeleton includes vertical steel bars, first U-shaped shear stirrups, second U-shaped shear stirrups and rectangular shear stirrups. The vertical steel bars are arranged in the vertical direction. The first U-shaped shear stirrups, the second U-shaped shear stirrups and the rectangular shear stirrups are all arranged horizontally. The vertical steel bars are arranged in a rectangular array. The first U-shaped shear stirrups are welded to both sides of the end of the first rectangular steel plate structure after passing through at least four vertical steel bars. The second U-shaped shear stirrups are welded to both sides of the end of the second rectangular steel plate structure after passing through at least four vertical steel bars. The rectangular shear stirrups bind all the vertical steel bars together.

[0006] The first U-shaped shear stirrups, the second U-shaped shear stirrups and the rectangular shear stirrups are all arranged in several layers along the length direction of the vertical steel bars.

[0007] A first tie-tie anti-cracking mesh is embedded in the first concrete layer outside the first steel-concrete composite pipe, and one side of the first tie-tie anti-cracking mesh is located outside the exposed first rectangular steel plate structure and flush with the end of the first rectangular steel plate structure.

[0008] A second tie-tie anti-cracking mesh is embedded in the second concrete layer outside the second steel-concrete composite pipe, and one side edge of the second tie-tie anti-cracking mesh is located outside the exposed second rectangular steel plate structure and flush with the end of the second rectangular steel plate structure.

[0009] By adopting the above technical solution, the first concrete layer and the embedded first tie-crack resistant mesh outside the first steel-concrete composite pipe and the second concrete layer and the embedded second tie-crack resistant mesh outside the second steel-concrete composite pipe in the present invention are all prefabricated in a factory. When prefabricated in the factory, one side of the first rectangular steel plate structure and the second rectangular steel plate structure are exposed.

[0010] After the first steel concrete composite pipe and the second steel concrete composite pipe are transported to the construction site, they are assembled so that the first steel concrete composite pipe and the second steel concrete composite pipe are arranged vertically, a steel mesh skeleton is arranged in the space between the first rectangular steel plate structure and the second rectangular steel plate structure exposed to the outside, the first U-shaped shear stirrup connects part of the vertical steel bars with the first rectangular steel plate structure as a whole, the second U-shaped shear stirrup connects part of the vertical steel bars with the second rectangular steel plate structure as a whole, and the rectangular shear stirrup connects all the vertical steel bars as a whole, and finally the concrete is poured and solidified into a concrete block, so that the first steel concrete composite pipe and the second steel concrete composite pipe are firmly connected as a whole. The first tie-tie anti-cracking mesh and the second tie-tie anti-cracking mesh are also poured into the concrete block, so as to ensure that the surface of the first concrete layer and the concrete block at the connection, and the second concrete layer and the concrete block at the connection does not crack.

[0011] In summary, the present invention can greatly improve the connection strength at the L-shaped node between two steel-concrete composite pipes and ensure the reliability of the connection. It combines cast-in-place with prefabrication, is easy to construct, has high construction efficiency, and can ensure construction quality, fully meeting the overall stress, energy saving, earthquake resistance and other use requirements of modern prefabricated buildings. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the plane layout of the present invention;

[0013] Figure 2 yes Figure 1 Schematic diagram of the connection between the first steel-concrete composite pipe and the first U-shaped shear stirrup;

[0014] Figure 3 yes Figure 1 Schematic diagram of the connection between the second steel-concrete composite pipe and the second U-shaped shear stirrup;

[0015] Figure 4 yes Figure 1 Schematic diagram of the rectangular shear stirrups. DETAILED DESCRIPTION

[0016] like Figure 1-Figure 4 As shown, the L-shaped node connection structure of the prefabricated building wall of the present invention includes a first steel concrete composite pipe and a second steel concrete composite pipe which are perpendicular to each other, the first steel concrete composite pipe exposes a first rectangular steel plate structure 1 at one end adjacent to the second steel concrete composite pipe, the second steel concrete composite pipe exposes a second rectangular steel plate structure 2 at one end adjacent to the first steel concrete composite pipe, a steel mesh skeleton is arranged between the exposed first rectangular steel plate structure 1 and the second rectangular steel plate structure 2, the steel mesh skeleton is welded to the first rectangular steel plate structure 1 and the second rectangular steel plate structure 2 as a whole, a concrete block with an L-shaped cross-section (not shown in the figure) is cast outside the steel mesh skeleton, and the outer side surfaces of the concrete block are flush with the outer surface of the first concrete layer 3 outside the first steel concrete composite pipe and the outer surface of the second concrete layer 4 outside the second steel concrete composite pipe.

[0017] The steel mesh skeleton includes vertical steel bars 5, first U-shaped shear stirrups 6, second U-shaped shear stirrups 7 and rectangular shear stirrups 8. The vertical steel bars 5 are arranged in the vertical direction, the first U-shaped shear stirrups 6, the second U-shaped shear stirrups 7 and the rectangular shear stirrups 8 are all arranged horizontally, and the vertical steel bars 5 are arranged in a rectangular array. The first U-shaped shear stirrups 6 are welded to both sides of the end of the first rectangular steel plate structure 1 after passing through at least four vertical steel bars 5. The second U-shaped shear stirrups 7 are welded to both sides of the end of the second rectangular steel plate structure 2 after passing through at least four vertical steel bars 5. The rectangular shear stirrups 8 bind all the vertical steel bars 5 together.

[0018] The first U-shaped shear stirrups 6, the second U-shaped shear stirrups 7 and the rectangular shear stirrups 8 are all arranged in several layers along the length direction of the vertical steel bars.

[0019] A first tie-tie anti-cracking mesh 9 is embedded in the first concrete layer 3 outside the first steel-concrete composite pipe. One side of the first tie-tie anti-cracking mesh 9 is located outside the exposed first rectangular steel plate structure 1 and is flush with the end of the first rectangular steel plate structure 1.

[0020] A second tie-tie anti-cracking mesh 10 is embedded in the second concrete layer 4 outside the second steel-concrete composite pipe. One side of the second tie-tie anti-cracking mesh 10 is located outside the exposed second rectangular steel plate structure 2 and is flush with the end of the second rectangular steel plate structure 2.

[0021] The first concrete layer 3 and the embedded first tie-tie anti-cracking mesh 9 on the outside of the first steel-concrete composite pipe and the second concrete layer 4 and the embedded second tie-tie anti-cracking mesh 10 on the outside of the second steel-concrete composite pipe in the present invention are all prefabricated in a factory. When prefabricated in the factory, one side of the first rectangular steel plate structure 1 and the second rectangular steel plate structure 2 are exposed.

[0022] After the first steel concrete composite pipe and the second steel concrete composite pipe are transported to the construction site, they are assembled so that the first steel concrete composite pipe and the second steel concrete composite pipe are arranged vertically, and a steel mesh skeleton is arranged in the space between the first rectangular steel plate structure 1 and the second rectangular steel plate structure 2 exposed to the outside, and the first U-shaped shear stirrup 6 connects part of the vertical steel bars 5 with the first rectangular steel plate structure 1 as a whole, and the second U-shaped shear stirrup 7 connects part of the vertical steel bars 5 with the second rectangular steel plate structure 2 as a whole, and the rectangular shear stirrup 8 connects all the vertical steel bars 5 as a whole, and finally pours concrete to solidify into a concrete block, so that the first steel concrete composite pipe and the second steel concrete composite pipe are firmly connected as a whole. The first tie-tie anti-cracking mesh 9 and the second tie-tie anti-cracking mesh 10 are also poured into the concrete block, so as to ensure that the surface of the first concrete layer 3 and the concrete block at the connection, and the second concrete layer 4 and the concrete block at the connection does not crack.

[0023] This embodiment does not impose any formal limitation on the shape, material, structure, etc. of the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the technical solution of the present invention.

Claims

1. An L-shaped node connection structure of an assembled building wall, comprising a first steel-concrete composite pipe and a second steel-concrete composite pipe perpendicular to each other, characterized in that: The first steel concrete composite pipe exposes a first rectangular steel plate structure at one end adjacent to the second steel concrete composite pipe, and the second steel concrete composite pipe exposes a second rectangular steel plate structure at one end adjacent to the first steel concrete composite pipe. A steel mesh skeleton is provided between the exposed first rectangular steel plate structure and the second rectangular steel plate structure, and the steel mesh skeleton is welded to the first rectangular steel plate structure and the second rectangular steel plate structure as a whole. A concrete block with an L-shaped cross section is cast outside the steel mesh skeleton, and the outer side surface of the concrete block is flush with the outer surface of the first concrete layer outside the first steel concrete composite pipe and the outer surface of the second concrete layer outside the second steel concrete composite pipe. The steel mesh skeleton includes vertical steel bars, first U-shaped shear stirrups, second U-shaped shear stirrups and rectangular shear stirrups, the vertical steel bars are arranged in a vertical direction, the first U-shaped shear stirrups, the second U-shaped shear stirrups and the rectangular shear stirrups are all arranged horizontally, the vertical steel bars are arranged in a rectangular array, the first U-shaped shear stirrups are welded to both sides of the end of the first rectangular steel plate structure after bypassing at least four vertical steel bars, the second U-shaped shear stirrups are welded to both sides of the end of the second rectangular steel plate structure after bypassing at least four vertical steel bars, and the rectangular shear stirrups bind all the vertical steel bars together; A first tie-tie anti-cracking mesh is embedded in the first concrete layer outside the first steel-concrete composite pipe, and one side of the first tie-tie anti-cracking mesh is located outside the exposed first rectangular steel plate structure and flush with the end of the first rectangular steel plate structure; A second tie-tie anti-cracking mesh is embedded in the second concrete layer outside the second steel-concrete composite pipe, and one side edge of the second tie-tie anti-cracking mesh is located outside the exposed second rectangular steel plate structure and flush with the end of the second rectangular steel plate structure.

2. The L-shaped node connection structure of the assembled building wall according to claim 1 is characterized in that: The first U-shaped shear stirrups, the second U-shaped shear stirrups and the rectangular shear stirrups are all arranged in several layers along the length direction of the vertical steel bars.

Citation Information

Patent Citations

  • Prefabricated assembly type and hidden-support-equipped superposed plate type reinforced concrete core wall

    CN105040816A

  • Factory prefabricated steel-concrete combined pipe on-site construction shear wall T-shaped horizontal connecting structure

    CN108487476A

  • L type veneer connected node

    CN206157920U

  • Precast shear wall standard module

    CN207063231U

  • L-shaped joint connecting structure of fabricated building wall

    CN209353517U