Prefabricated building wall T-node connection structure

By employing a T-shaped joint connection structure of three steel-concrete composite pipes in prefabricated buildings, combined with a steel mesh skeleton and precast concrete technology, the seismic resistance and integrity issues of joint connections in prefabricated buildings are solved, achieving a highly efficient and stable connection effect.

CN111155679BActive Publication Date: 2024-11-22HENAN LYUJIAN BUILDING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811322196.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-11-08
Publication Date
2024-11-22
Estimated Expiration
2038-11-08

AI Technical Summary

Technical Problem

The existing T-joint connection structure of prefabricated buildings is insufficient in terms of seismic resistance and integrity, resulting in wall deformation and cracks, and failing to meet the usage requirements of modern prefabricated buildings.

Method used

The T-shaped joint connection structure, composed of three steel-concrete composite pipes, forms a strong connection by prefabricating the steel mesh skeleton and concrete layer in the factory and combining it with cast-in-place technology, ensuring the integrity and shear resistance of the steel mesh skeleton and concrete block.

Benefits of technology

It improves the strength and reliability of T-joint connections, meets the overall stress and seismic resistance requirements of prefabricated buildings, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111155679B_ABST
    Figure CN111155679B_ABST
Patent Text Reader

Abstract

The T-node connection structure of the prefabricated building wall includes a first steel-concrete composite pipe, a second steel-concrete composite pipe and a third steel-concrete composite pipe, wherein the first steel-concrete composite pipe, the second steel-concrete composite pipe and the third steel-concrete composite pipe form an installation space with a T-shaped cross section between the exposed side parts, and a steel mesh skeleton with a T-shaped cross section is arranged in the installation space, and the three sides of the steel mesh skeleton are respectively welded to the first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure as a whole, and a concrete block with a T-shaped cross section is cast outside the steel mesh skeleton. The present invention can greatly improve the connection strength at the T-node between two steel-concrete composite pipes and ensure the reliability of the connection. By combining cast-in-place with prefabrication, the construction is convenient, the construction efficiency is high, and the construction quality can be guaranteed, which fully meets the overall stress, energy saving, earthquake resistance and other use requirements of modern prefabricated buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of prefabricated building construction, and in particular relates to a T-shaped node connection structure of a prefabricated building wall. Background Art

[0002] The steel-concrete composite pipes used in prefabricated buildings are generally rectangular in structure. They are manufactured in the factory and then transported to the construction site for assembly. The biggest problem in the promotion and application of existing prefabricated buildings is the inability to form a stable and unified system. The key to the problem lies in the node connections of prefabricated walls. T-type nodes are the most common nodes in prefabricated buildings. Most of the existing T-type node structures have the disadvantages of weak structural integrity and poor seismic resistance, which can easily cause deformation and cracks in the prefabricated walls. Their connection form cannot meet the higher requirements of prefabricated buildings. Summary of the invention

[0003] In order to solve the deficiencies in the prior art, the present invention provides a T-node connection structure for an assembled building wall with balanced force, strong stability, and strong wind and earthquake resistance.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions: a T-shaped node connection structure of an assembled building wall, comprising a first steel concrete combination pipe, a second steel concrete combination pipe and a third steel concrete combination pipe, the first steel concrete combination pipe and the second steel concrete combination pipe are located on the same vertical plane, the third steel concrete combination pipe is perpendicular to the first steel concrete combination pipe, the first steel concrete combination pipe and the second steel concrete combination pipe are symmetrically arranged about the third steel concrete combination pipe, the first steel concrete combination pipe, the second steel concrete combination pipe and the third steel concrete combination pipe are exposed at adjacent sides respectively. The first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure are exposed at adjacent sides respectively. The first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure form an installation space with a T-shaped cross section between the exposed sides, and a steel mesh skeleton with an overall T-shaped cross section is arranged in the installation space, and three side portions of the steel mesh skeleton are respectively welded to the first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure as a whole, and concrete blocks with a T-shaped cross section are cast outside the steel mesh skeleton, and the outer side surfaces of the concrete blocks are respectively flush with the outer surfaces of the first concrete layer outside the first steel-concrete combination pipe, the second concrete layer outside the second steel-concrete combination pipe and the outer surfaces of the third concrete layer outside the third steel-concrete combination pipe.

[0005] The steel mesh skeleton includes vertical steel bars, first U-shaped shear stirrups, second U-shaped shear stirrups, third U-shaped shear stirrups and rectangular shear stirrups. The vertical steel bars are arranged in the vertical direction. The first U-shaped shear stirrups, second U-shaped shear stirrups, third U-shaped shear stirrups and rectangular shear stirrups are all arranged horizontally. The vertical steel bars are arranged in a rectangular array. The first U-shaped shear stirrups are welded to both sides of the end of the first rectangular steel plate structure after passing through at least four vertical steel bars. The second U-shaped shear stirrups are welded to both sides of the end of the second rectangular steel plate structure after passing through at least four vertical steel bars. The third U-shaped shear stirrups are welded to both sides of the end of the third rectangular steel plate structure after passing through at least four vertical steel bars. The rectangular shear stirrups bind all the vertical steel bars between the first rectangular steel plate structure and the second rectangular steel plate structure as one.

[0006] The first U-shaped shear stirrup, the second U-shaped shear stirrup, the third U-shaped shear stirrup and the rectangular shear stirrup are all arranged in several layers along the length direction of the vertical steel bars.

[0007] A first tie-tie anti-cracking mesh is embedded in the first concrete layer outside the first steel-concrete composite pipe, and one side of the first tie-tie anti-cracking mesh is located outside the exposed first rectangular steel plate structure and flush with the end of the first rectangular steel plate structure.

[0008] A second tie-tie anti-cracking mesh is embedded in the second concrete layer outside the second steel-concrete composite pipe, and one side edge of the second tie-tie anti-cracking mesh is located outside the exposed second rectangular steel plate structure and flush with the end of the second rectangular steel plate structure.

[0009] A third tie-tie anti-cracking mesh is embedded in the third concrete layer outside the third steel-concrete composite pipe, and one side edge of the third tie-tie anti-cracking mesh is located outside the exposed third rectangular steel plate structure and flush with the end of the third rectangular steel plate structure.

[0010] By adopting the above technical solution, the first concrete layer and the embedded first tie-tie anti-cracking mesh outside the first steel-concrete composite pipe, the second concrete layer and the embedded second tie-tie anti-cracking mesh outside the second steel-concrete composite pipe, and the third concrete layer and the embedded third tie-tie anti-cracking mesh outside the third steel-concrete composite pipe in the present invention are all prefabricated in a factory. When prefabricated in the factory, the first rectangular steel plate structure, the second rectangular steel plate structure, and the third rectangular steel plate structure are all exposed.

[0011] The first steel concrete combined pipe, the second steel concrete combined pipe and the third steel concrete combined pipe are transported to the construction site and then assembled so that the first steel concrete combined pipe and the second steel concrete combined pipe are in the same straight line, the third steel concrete combined pipe is located between the first steel concrete combined pipe and the second steel concrete combined pipe, the third steel concrete combined pipe is arranged vertically to the first steel concrete combined pipe, the first rectangular steel plate structure, the second rectangular steel plate structure and the second rectangular steel plate structure are adjacent to one side portion exposed to the outside, a steel mesh skeleton is arranged in the installation space with a T-shaped cross section, the first U-shaped shear stirrup welds part of the vertical steel bars to the first rectangular steel plate structure as a whole, the second U-shaped shear stirrup welds part of the vertical steel bars to the second rectangular steel plate structure as a whole, and the third U-shaped shear stirrup welds part of the vertical steel bars to the third rectangular steel plate structure as a whole,

[0012] Since the third steel concrete composite pipe is generally an inner wall, and the first steel concrete composite pipe and the second steel concrete composite pipe are outer walls, the connection between the first steel concrete composite pipe and the second steel concrete composite pipe needs to be more secure, so all the vertical steel bars between the first rectangular steel plate structure and the second rectangular steel plate structure are tied together. After the steel mesh skeleton is arranged, the support formwork is used to pour concrete in the installation space with a T-shaped cross section to solidify into a concrete block, so that the first steel concrete composite pipe, the second steel concrete composite pipe and the third steel concrete composite pipe are securely connected as a whole. The first tie-tie anti-cracking mesh, the second tie-tie anti-cracking mesh and the third tie-tie anti-cracking mesh are also poured into the concrete block, so as to ensure that the surface of the first concrete layer and the concrete block at the connection, and the second concrete layer and the concrete block at the connection does not crack.

[0013] In summary, the present invention can greatly improve the connection strength at the T-node between two steel-concrete composite pipes and ensure the reliability of the connection. By combining cast-in-place with prefabrication, it is easy to construct, has high construction efficiency, and can ensure construction quality, fully meeting the overall stress, energy saving, earthquake resistance and other use requirements of modern prefabricated buildings. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the plane layout of the present invention;

[0015] Figure 2 yes Figure 1 Schematic diagram of the connection between the first steel-concrete composite pipe and the first U-shaped shear stirrup;

[0016] Figure 3 yes Figure 1 Schematic diagram of the connection between the second steel-concrete composite pipe and the second U-shaped shear stirrup;

[0017] Figure 4 yes Figure 1 Schematic diagram of the connection between the third steel-concrete composite pipe and the third U-shaped shear stirrup

[0018] Figure 5yes Figure 1 Schematic diagram of the rectangular shear stirrups. DETAILED DESCRIPTION

[0019] like Figure 1-Figure 5 As shown, the T-node connection structure of the prefabricated building wall of the present invention comprises a first steel concrete combination pipe, a second steel concrete combination pipe and a third steel concrete combination pipe, the first steel concrete combination pipe and the second steel concrete combination pipe are located on the same vertical plane, the third steel concrete combination pipe is perpendicular to the first steel concrete combination pipe, the first steel concrete combination pipe and the second steel concrete combination pipe are symmetrically arranged about the third steel concrete combination pipe, the first steel concrete combination pipe, the second steel concrete combination pipe and the third steel concrete combination pipe are respectively exposed at adjacent side portions of the first rectangular steel plate structure 4, the second rectangular steel plate structure 5 and the third rectangular steel plate structure 6, the first rectangular steel plate structure 4, the second rectangular steel plate structure 5 and the third rectangular steel plate structure 6 are respectively exposed at adjacent side portions of the first rectangular steel plate structure 4, the second rectangular steel plate structure 5 and the third rectangular steel plate structure 6. The steel plate structure 6 forms an installation space 7 with a T-shaped cross section between the exposed side portions, and a steel mesh skeleton with an overall T-shaped cross section is arranged in the installation space 7. The three side portions of the steel mesh skeleton are respectively welded to the first rectangular steel plate structure 4, the second rectangular steel plate structure 5 and the third rectangular steel plate structure 6 as a whole, and a concrete block with a T-shaped cross section (not shown in the figure) is cast on the outside of the steel mesh skeleton, and the outer side surfaces of the concrete block are respectively flush with the outer surfaces of the first concrete layer 8 outside the first steel-concrete composite pipe, the second concrete layer 9 outside the second steel-concrete composite pipe and the outer surfaces of the third concrete layer 10 outside the third steel-concrete composite pipe.

[0020] The steel mesh skeleton includes vertical steel bars 11, first U-shaped shear stirrups 12, second U-shaped shear stirrups 13, third U-shaped shear stirrups 14 and rectangular shear stirrups 15. The vertical steel bars 11 are arranged in the vertical direction, the first U-shaped shear stirrups 12, the second U-shaped shear stirrups 13, the third U-shaped shear stirrups 14 and the rectangular shear stirrups 15 are all arranged horizontally, and the vertical steel bars 11 are arranged in a rectangular array. The first U-shaped shear stirrups 12 are welded to both sides of the end of the first rectangular steel plate structure 4 after bypassing at least four vertical steel bars 11, the second U-shaped shear stirrups 13 are welded to both sides of the end of the second rectangular steel plate structure 5 after bypassing at least four vertical steel bars 11, the third U-shaped shear stirrups 14 are welded to both sides of the end of the third rectangular steel plate structure 6 after bypassing at least four vertical steel bars 11, and the rectangular shear stirrups 15 bind all the vertical steel bars 11 between the first rectangular steel plate structure 4 and the second rectangular steel plate structure 5 as a whole.

[0021] The first U-shaped shear stirrup 12 , the second U-shaped shear stirrup 13 , the third U-shaped shear stirrup 14 and the rectangular shear stirrup 15 are all arranged in several layers along the length direction of the vertical steel bar 11 .

[0022] A first tie-tie anti-cracking mesh 16 is embedded in the first concrete layer 8 outside the first steel-concrete composite pipe. One side of the first tie-tie anti-cracking mesh 16 is located outside the exposed first rectangular steel plate structure 4 and is flush with the end of the first rectangular steel plate structure 4.

[0023] A second tie-tie anti-cracking mesh 17 is embedded in the second concrete layer 9 outside the second steel-concrete composite pipe. One side of the second tie-tie anti-cracking mesh 17 is located outside the exposed second rectangular steel plate structure 5 and is flush with the end of the second rectangular steel plate structure 5.

[0024] A third tie-tie anti-cracking mesh 18 is embedded in the third concrete layer 10 outside the third steel-concrete composite pipe. One side of the third tie-tie anti-cracking mesh 18 is located outside the exposed third rectangular steel plate structure 6 and is flush with the end of the third rectangular steel plate structure 6.

[0025] The first concrete layer 8 and the embedded first tie-cracking mesh 16 on the outside of the first steel-concrete composite pipe, the second concrete layer 9 and the embedded second tie-cracking mesh 17 on the outside of the second steel-concrete composite pipe, and the third concrete layer 10 and the embedded third tie-cracking mesh 18 on the outside of the third steel-concrete composite pipe in the present invention are all prefabricated in a factory. When prefabricated in the factory, the first rectangular steel plate structure 4, the second rectangular steel plate structure 5, and the third rectangular steel plate structure 6 are all exposed.

[0026] The first steel concrete composite pipe, the second steel concrete composite pipe and the third steel concrete composite pipe are transported to the construction site and then assembled so that the first steel concrete composite pipe and the second steel concrete composite pipe are in the same straight line, the third steel concrete composite pipe is located between the first steel concrete composite pipe and the second steel concrete composite pipe, the third steel concrete composite pipe is arranged vertically to the first steel concrete composite pipe, the first rectangular steel plate structure 4, the second rectangular steel plate structure 5 and the exposed side of the second rectangular steel plate structure 5 are adjacent, a steel mesh skeleton is arranged in the installation space 7 with a T-shaped cross section, the first U-shaped shear stirrup 12 welds part of the vertical steel bar 11 to the first rectangular steel plate structure 4 as a whole, the second U-shaped shear stirrup 13 welds part of the vertical steel bar 11 to the second rectangular steel plate structure 5 as a whole, and the third U-shaped shear stirrup 14 welds part of the vertical steel bar 11 to the third rectangular steel plate structure 6 as a whole,

[0027] Since the third steel concrete composite pipe is generally an inner wall, and the first steel concrete composite pipe and the second steel concrete composite pipe are outer walls, the connection between the first steel concrete composite pipe and the second steel concrete composite pipe needs to be more secure, so all the vertical steel bars 11 between the first rectangular steel plate structure 4 and the second rectangular steel plate structure 5 are tied together. After the steel mesh skeleton is arranged, the support formwork is poured into the installation space 7 with a T-shaped cross section to solidify into a concrete block, so that the first steel concrete composite pipe, the second steel concrete composite pipe and the third steel concrete composite pipe are securely connected as a whole. The first tie-tie anti-cracking mesh 16, the second tie-tie anti-cracking mesh 17 and the third tie-tie anti-cracking mesh 18 are also poured into the concrete block, so as to ensure that the surface of the first concrete layer 8 and the concrete block at the connection, and the second concrete layer 9 and the concrete block at the connection does not crack.

[0028] This embodiment does not impose any formal limitation on the shape, material, structure, etc. of the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the technical solution of the present invention.

Claims

1. A T-node connection structure for a prefabricated building wall, comprising a first steel-concrete composite pipe, a second steel-concrete composite pipe and a third steel-concrete composite pipe, wherein the first steel-concrete composite pipe and the second steel-concrete composite pipe are located on the same vertical plane, the third steel-concrete composite pipe is perpendicular to the first steel-concrete composite pipe, and the first steel-concrete composite pipe and the second steel-concrete composite pipe are symmetrically arranged about the third steel-concrete composite pipe, characterized in that: The first steel-concrete composite pipe, the second steel-concrete composite pipe and the third steel-concrete composite pipe respectively expose the first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure at adjacent sides, and the first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure form an installation space with a T-shaped cross section between the exposed sides, and a steel mesh skeleton with a T-shaped cross section as a whole is arranged in the installation space, and the three sides of the steel mesh skeleton are respectively welded to the first rectangular steel plate structure, the second rectangular steel plate structure and the third rectangular steel plate structure as a whole, and a concrete block with a T-shaped cross section is cast outside the steel mesh skeleton, and the outer side surface of the concrete block is flush with the outer surface of the first concrete layer outside the first steel-concrete composite pipe, the second concrete layer outside the second steel-concrete composite pipe and the outer surface of the third concrete layer outside the third steel-concrete composite pipe; The steel mesh skeleton includes vertical steel bars, first U-shaped shear stirrups, second U-shaped shear stirrups, third U-shaped shear stirrups and rectangular shear stirrups. The vertical steel bars are arranged in a vertical direction. The first U-shaped shear stirrups, second U-shaped shear stirrups, third U-shaped shear stirrups and rectangular shear stirrups are all arranged horizontally. The vertical steel bars are arranged in a rectangular array. The first U-shaped shear stirrups are welded to both sides of the end of the first rectangular steel plate structure after bypassing at least four vertical steel bars. The second U-shaped shear stirrups are welded to both sides of the end of the second rectangular steel plate structure after bypassing at least four vertical steel bars. The third U-shaped shear stirrups are welded to both sides of the end of the third rectangular steel plate structure after bypassing at least four vertical steel bars. The rectangular shear stirrups bind all the vertical steel bars between the first rectangular steel plate structure and the second rectangular steel plate structure into one. A first tie-tie anti-cracking mesh is embedded in the first concrete layer outside the first steel-concrete composite pipe, and one side of the first tie-tie anti-cracking mesh is located outside the exposed first rectangular steel plate structure and flush with the end of the first rectangular steel plate structure.

2. The T-node connection structure of the assembled building wall according to claim 1 is characterized in that: The first U-shaped shear stirrup, the second U-shaped shear stirrup, the third U-shaped shear stirrup and the rectangular shear stirrup are all arranged in several layers along the length direction of the vertical steel bars.

3. The T-node connection structure of the assembled building wall according to claim 1 is characterized in that: A second tie-tie anti-cracking mesh is embedded in the second concrete layer outside the second steel-concrete composite pipe, and one side edge of the second tie-tie anti-cracking mesh is located outside the exposed second rectangular steel plate structure and flush with the end of the second rectangular steel plate structure.

4. The T-node connection structure of the assembled building wall according to claim 1 is characterized in that: A third tie-tie anti-cracking mesh is embedded in the third concrete layer outside the third steel-concrete composite pipe, and one side of the third tie-tie anti-cracking mesh is located outside the exposed third rectangular steel plate structure and flush with the end of the third rectangular steel plate structure.