Anti-scouring pile-board combined structure and construction method

Through the combined structure of anti-shock pile plates, the design of combining the upper anti-shock plate and the lower anti-shock pile is solved, and the protection problems in the downstream affected areas during the high-head flood discharge of the hydropower station dam are solved, ensuring slope stability and structural integrity. Effective protection of the geological environment of steep valleys, narrow river channels and deep cover layers has been achieved, reducing construction difficulty and cost.

CN111254879BActive Publication Date: 2024-11-19GEZHOUBA GROUP FOUND ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010244512.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-31
Publication Date
2024-11-19
Estimated Expiration
2040-03-31

AI Technical Summary

Technical Problem

When the water head of the hydropower station dam is discharged from floods, the protection and treatment technology in the affected areas on both sides of the downstream is difficult to cope with complex geological conditions such as steep valleys, narrow river channels, and deep covers. There is a risk of landslides blocking the river channels, affecting the safety of the power station and the safety of residents' lives and property.

Method used

Adopt the combined structure of anti-thrust pile plates, including the upper anti-thrust plate and the lower anti-thrust piles, connected through the pile plate top connecting beam and prestressed anchor cable to form an integral structure, fix the anti-thrust plate and bear the thrust, ensure the stability of the slope, and form Enclose the wall to protect the river slope.

Benefits of technology

It effectively protects the impact areas on both sides of the downstream when the high water head of the hydropower station dam is discharged, ensures the stability of the slope and the integrity of the structure, solves the protection problems under complex geological environment, and has a simple structure for easy construction, which is economical and reasonable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111254879B_ABST
    Figure CN111254879B_ABST
Patent Text Reader

Abstract

A combined structure of anti-collision piles and plates includes a structural whole composed of a plurality of combined units of anti-collision piles and plates, wherein the combined units of anti-collision piles and plates include an upper anti-collision plate and a plurality of protective piles connected to the lower part of the upper anti-collision plate, a construction joint is provided between the upper anti-collision plates of each two combined units of anti-collision piles and plates, and a structural joint is provided on the outer side of the upper anti-collision plates on both sides of the structural whole composed of the plurality of combined units of anti-collision piles and plates, and each upper anti-collision plate on the top of the plurality of combined units of anti-collision piles and plates is connected to form a whole through a plate top connecting beam, and a plurality of prestressed anchor cables passing through the plate top connecting beam and anchored in the bedrock of the mountain body on the slope of the protected river channel are uniformly arranged on the plate top connecting beam. The combined structure of anti-collision piles and plates and the construction method provided by the present invention can solve the technical difficulties of protection treatment under complex geological environment conditions such as steep valleys, narrow river channels, and thick covering layers, and can protect and dissipate energy and prevent scour in the downstream affected areas when the dam of a hydropower station discharges flood water with high water head.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy and hydropower construction, and in particular to a combined structure and construction method of an anti-scouring pile plate for protecting and dissipating energy and preventing scouring of downstream affected areas when a hydropower station dam discharges flood water with high water head. Background Art

[0002] Due to the need for hydropower resource development, hydropower station dams are mostly built in high mountain canyons, with narrow river valleys and thick riverbed cover. Such environmental and geological conditions have complex structures, high technical difficulty, limited environment, difficult construction and high safety risks. Since dam construction must meet the safety level requirements for flood control, flood crossing and flood discharge, it is normal to carry out protective treatment on the affected areas on both sides of the downstream of the high dam. If the protective treatment is not done properly, it may cause large-scale instability and landslides on both sides of the mountain to block the river, which will have catastrophic consequences for the power station and even affect the safety of life and property of downstream residents, causing immeasurable losses to the country. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a combined structure of anti-scouring pile plates and a construction method, which can solve the technical problems of protection treatment under complex geological environment conditions such as steep valleys, narrow river channels, and thick covering layers, and can protect the affected areas on both sides of the downstream when the hydropower station dam discharges flood water with high head, dissipate energy and prevent scouring; the structure is simple, easy to construct, and economical and reasonable.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a combined anti-collision pile-plate structure, including a structural whole composed of multiple anti-collision pile-plate combined units, the anti-collision pile-plate combined unit includes an upper anti-collision plate and multiple anti-collision piles connected to the lower part of the upper anti-collision plate, a construction joint is provided between the upper anti-collision plates of every two anti-collision pile-plate combined units, and structural joints are provided on the outer sides of the upper anti-collision plates on both sides of the structural whole composed of the multiple anti-collision pile-plate combined units. The upper anti-collision plates on the top of the multiple anti-collision pile-plate combined units are connected to form a whole through a pile-plate top connecting beam, and a plurality of prestressed anchor cables that pass through the pile-plate top connecting beam and are anchored in the bedrock of the mountain on the slope of the protected river channel are evenly arranged on the pile-plate top connecting beam.

[0005] Preferably, a plurality of anchor cable anchor piers are cast on the outer side surface of the pile-slab top connecting beam.

[0006] Preferably, the depth at which the lower part of the upper anti-collision plate of the anti-collision pile-plate combined unit enters into the intact bedrock is 3 to 5 m.

[0007] A construction method of the above-mentioned anti-collision pile-sheet combined structure, the method comprising:

[0008] First, a support and backfilling operation platform is excavated on the slope at the location; then, artificial well excavation is used to carry out pile-sheet joint excavation and wellhead lock lining construction; then, well excavation of the I-sequence anti-collision pile-sheet joint structure is carried out on the slope on one side of the protected river channel; then, concrete pouring of the I-sequence anti-collision pile-sheet joint structure is carried out; and according to the above steps, concrete pouring of the II-sequence anti-collision pile-sheet joint structure is carried out on the slope on the other side of the protected river channel; then, pile-sheet top connecting beams are installed on multiple anti-collision pile-sheet joint units of the I-sequence anti-collision pile-sheet joint structure and multiple anti-collision pile-sheet joint units of the II-sequence anti-collision pile-sheet joint structure, and then, multiple prestressed anchor cables are installed to complete the construction of the anti-collision pile-sheet joint structure.

[0009] Preferably, the detailed steps of the method are:

[0010] Step 1: Excavate the slope support and backfill the working platform at the location;

[0011] Step 2: Anti-seepage treatment;

[0012] Step 3: Pile-sheet joint excavation, wellhead locking construction and wellhead enclosure:

[0013] Step 3-1: Pile-sheet joint excavation and wellhead lock excavation and lining construction, depth of about 1m;

[0014] Step 3-2: Install the slag vertical lifting system and safety protection device and debug them;

[0015] Step 4: I-series anti-collision pile-sheet combined structure well excavation and acceptance:

[0016] Step 4-1: Excavation and support of the slope cover layer. According to the nature of the stratum, the cover layer is excavated in layers with a thickness of 0.6 to 1.2 m. Concrete lining and steel support are used for support. One layer is excavated and supported, and the steel support is installed immediately after that.

[0017] Step 4-2: Excavation and support of the slope bedrock. According to the nature of the rock layer, the bedrock is excavated in layers with a thickness of 1.5 to 2.0 m. After entering the bedrock, spray anchor support is used, and one layer is excavated and supported;

[0018] Step 4-3: Excavate the pile and sheet together to the designed elevation, conduct joint acceptance, and enter the next construction process after passing the acceptance;

[0019] Step 5: I-series anti-collision pile-slab combined structural concrete construction:

[0020] Step 5-1: The steel bars of the anti-collision piles of each anti-collision pile-sheet joint unit are manufactured and installed using an integral steel cage, which is then hoisted into the well by a truck crane;

[0021] Step 5-2: The upper anti-collision plate reinforcement of each anti-collision pile plate combined unit is installed manually underground;

[0022] Step 5-3: After completing the installation of steel bars and embedded parts, check and accept;

[0023] Step 5-4: Concrete pouring, using a chute to enter the warehouse, pouring the top continuously at one time; some pile wells with water seepage are poured with underwater concrete; that is, the I-series anti-collision pile-slab combined structure concrete construction is completed;

[0024] Step 6: Repeat the above steps 1-5 to complete the I-series anti-collision pile-slab combined structure concrete construction;

[0025] Step 7: Install the pile-sheet top connecting beams on the multiple anti-collision pile-sheet joint units of the I-sequence anti-collision pile-sheet joint structure and the multiple anti-collision pile-sheet joint units of the II-sequence anti-collision pile-sheet joint structure, and then install multiple prestressed anchor cables.

[0026] That is, the construction of the anti-collision pile-sheet combined structure is completed.

[0027] The anti-collision pile-sheet combined structure and construction method provided by the present invention adopt a pile-sheet combination form of "upper anti-collision plate + lower circular (anti-collision) pile", in which the anti-collision pile is the main force-bearing structure, and its main function is to fix the anti-collision plate and bear the thrust transmitted by the anti-collision plate to ensure the overall stability of the slope; the anti-collision plate and the anti-collision pile form a closed wall to protect the surface covering layer and strongly weathered rock mass of the river slope from being washed (excavated); the pile-sheet top connecting beam and prestressed anchor cable are arranged on the top of the sheet pile according to the structural design requirements to improve the integrity and stability of the structure; the technical difficulties of protection treatment under complex geological environment conditions such as steep valleys, narrow rivers, and thick covering layers can be solved, and protection treatment, energy dissipation and anti-collision can be carried out on the affected areas on both sides of the downstream when the hydropower station dam discharges floods with high water head; the structure is simple, easy to construct, and economical and reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0029] Figure 1 It is a front view of the combined structure of the present invention;

[0030] Figure 2 The combined structure of the present invention Figure 1 AA section view;

[0031] Figure 3 is a side view of the combined structure of the present invention;

[0032] Figure 4 It is a schematic cross-sectional diagram of the working platform and anti-seepage treatment in step 1 and step 2 of the construction method of the present invention;

[0033] Figure 5 It is a schematic diagram of the plan section of the well excavation and concrete pouring in step 4 and step 5 of the construction method of the present invention;

[0034] Figure 6 It is a schematic longitudinal section diagram of well digging and concrete pouring in step 4 and step 5 of the construction method of the present invention. DETAILED DESCRIPTION

[0035] Embodiment 1

[0036] like Figure 1-Figure 3 As shown, an anti-collision pile-plate combined structure includes a structural whole composed of multiple anti-collision pile-plate combined units, the anti-collision pile-plate combined unit includes an upper anti-collision plate 2 and multiple anti-collision piles 1 connected to the lower part of the upper anti-collision plate 2, a construction joint 6 is provided between the upper anti-collision plates 2 of every two anti-collision pile-plate combined units, and structural joints 7 are provided on the outer sides of the upper anti-collision plates 2 on both sides of the structural whole composed of the multiple anti-collision pile-plate combined units. The upper anti-collision plates 2 on the top of the multiple anti-collision pile-plate combined units are connected to form a whole through a pile-plate top connecting beam 3, and a plurality of prestressed anchor cables 5 that pass through the pile-plate top connecting beam 3 and are anchored in the bedrock of the mountain on the slope of the protected river channel are evenly arranged on the pile-plate top connecting beam 3.

[0037] A plurality of anchor cable anchor piers 4 are cast on the outer side surface of the pile-slab top connecting beam 3 .

[0038] The depth of the lower part of the upper anti-collision plate 2 of the anti-collision pile-plate combined unit entering into the complete slope bedrock 19 is 3 to 5 meters.

[0039] The plane dimensions of the upper anti-collision plate 2 are 8m long and 2m wide, the radius of the anti-collision pile 1 is 1m, and the distance between the piles is 4m;

[0040] A construction joint 6 with a keyway is arranged between two adjacent upper anti-collision plates 2, and the steel bars are connected through the joints. A structural joint 7 with a keyway is arranged every 24 to 32 meters. The structural joint of the pile-sheet top connecting beam 3 is consistent with the structural joint 7 of the upper anti-collision plate 2 and is arranged every 24 to 32 meters.

[0041] Embodiment 2

[0042] like Figure 4-Figure 6 As shown, a construction method of the above-mentioned anti-collision pile-sheet combined structure is as follows:

[0043] First, a support and backfilling operation platform 17 is excavated on the slope at the location; then, artificial well excavation is used to carry out the lining construction of the pile-sheet joint excavation wellhead lock 10; then, the well excavation operation of the I-sequence anti-collision pile-sheet joint structure on the slope on one side of the protected river channel is carried out, and then the concrete pouring of the I-sequence anti-collision pile-sheet joint structure is carried out, and the concrete pouring of the II-sequence anti-collision pile-sheet joint structure on the slope on the other side of the protected river channel is carried out according to the above steps; then, the pile-sheet top connecting beam 3 is installed on multiple anti-collision pile-sheet joint units of the I-sequence anti-collision pile-sheet joint structure and multiple anti-collision pile-sheet joint units of the II-sequence anti-collision pile-sheet joint structure, and then multiple prestressed anchor cables 5 are installed, and the construction of the anti-collision pile-sheet joint structure is completed.

[0044] The detailed steps of the above method are:

[0045] Step 1: Excavate and support the slope at the location and backfill the work platform 17, check whether the construction road and the construction work platform 17 are completed, ensure that the construction road is unobstructed and the platform surface is flat; then conduct measurement and layout, and arrange wind, water, and electricity pipelines.

[0046] Step 2: Anti-seepage treatment: Use a high-pressure rotary jet grouting pipe 15 to perform high-pressure rotary jet grouting treatment on the slope cover layer 18, and use a curtain grouting pipe 16 to perform curtain grouting on the slope bedrock 19.

[0047] Step 3: Pile-sheet joint excavation, wellhead lock 10 construction and wellhead enclosure:

[0048] Step 3-1: Pile-sheet joint excavation and wellhead lock 10 excavation and lining construction, depth of about 1m;

[0049] Step 3-2: Install the slag vertical lifting system 8 and the safety protection device 9 and debug them:

[0050] The slag vertical lifting system 8 is custom-made with a combination of square steel and channel steel, and consists of a base, a support frame, a winch, a wire rope, a pulley, and a boom, of which the boom can swing within a range of 180°; the lifting system is installed and fixed at the wellhead, the winch is started to lift the hopper to transport materials (or slag), and the swinging boom can enable the hopper to load and unload materials inside and outside the well.

[0051] The safety protection device 9 is a purchased finished limiter, which is installed at the front end of the boom and sleeved on the steel wire to prevent the winch from over-lifting and breaking the steel wire rope to cause an accident.

[0052] Step 3-3: Do a good job of well-protecting the wellhead. Since the side facing the slag discharge needs to be frequently moved, a safe and reliable telescopic movable railing 11 is used to facilitate workers' operation. The other three sides are all fixed railings, and the height of the railings and railings is not less than 1.2m.

[0053] Step 4: I-series anti-collision pile-sheet combined structure well excavation and acceptance:

[0054] Step 4-1: Excavation and support of the slope cover layer 18. According to the nature of the stratum, the cover layer is excavated in layers with a thickness of 0.6 to 1.2 m. Concrete lining and steel support are used for support. One layer is excavated and supported, and the steel support is installed immediately after the excavation.

[0055] Step 4-2: Excavation and support of the slope bedrock 19. According to the nature of the rock layer, the bedrock is excavated in layers with a thickness of 1.5 to 2.0 m. After entering the bedrock, spray anchor support is adopted, and one layer is excavated and supported;

[0056] Step 4-3: Excavate the pile and sheet together to the designed elevation, conduct joint acceptance, and enter the next construction process after passing the acceptance;

[0057] The support form for excavation in the slope covering layer 18 is "wall concrete 12 + horizontal steel support 13 and vertical steel support 14". The horizontal steel support 13 is I20a I-steel, and the vertical steel support 14 is I16 channel steel. After the excavation enters the complete bedrock, it is adjusted to the sprayed anchor support form to ensure safe operation.

[0058] Step 5: I-series anti-collision pile-slab combined structural concrete construction:

[0059] Step 5-1: The steel bars of the anti-collision piles 1 of each anti-collision pile-sheet combined unit are manufactured and installed by integrally manufacturing the steel cage and lifting it into the well by a truck crane;

[0060] Step 5-2: The upper anti-collision plate reinforcement of each anti-collision pile plate combined unit is installed manually underground;

[0061] Step 5-3: After completing the installation of steel bars and embedded parts, check and accept;

[0062] Step 5-4: Concrete pouring, using a chute to enter the warehouse, and pouring the top continuously at one time; some pile wells with water seepage are poured with underwater concrete; that is, the I-series anti-collision pile-slab combined structure concrete construction is completed.

[0063] Step 6: Repeat the above steps 1-5 to complete the I-series anti-collision pile-slab combined structure concrete construction.

[0064] Step 7: Install the pile-sheet top connecting beam 3 on the multiple anti-collision pile-sheet joint units of the I-sequence anti-collision pile-sheet joint structure and the multiple anti-collision pile-sheet joint units of the II-sequence anti-collision pile-sheet joint structure, and then install multiple prestressed anchor cables 5.

[0065] That is, the construction of the anti-scouring pile-slab combined structure is completed, forming a river channel energy dissipation and anti-scouring system.

[0066] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A method for construction using an anti-collision pile-board combined structure, the anti-collision pile-board combined structure comprising a structural whole composed of a plurality of anti-collision pile-board combined units, the anti-collision pile-board combined unit comprising an upper anti-collision board (2) and a plurality of anti-collision piles (1) connected to the lower part of the upper anti-collision board (2), a construction joint (6) being provided between the upper anti-collision boards (2) of every two anti-collision pile-board combined units, structural joints (7) being provided on the outer sides of the upper anti-collision boards (2) on both sides of the structural whole composed of the plurality of anti-collision pile-board combined units, the upper anti-collision boards (2) at the top of the plurality of anti-collision pile-board combined units being connected to form a whole through a pile-board top connecting beam (3), a plurality of prestressed anchor cables (5) passing through the pile-board top connecting beam (3) and anchored in the bedrock of the mountain body on the slope of the protected river channel being evenly arranged on the pile-board top connecting beam (3); Features: Step 1: Excavate the slope support and backfill the working platform (17) at the location; Step 2: Anti-seepage treatment; Step 3: Pile-sheet joint excavation, wellhead lock (10) construction and wellhead enclosure: Step 3-1: Pile-sheet joint excavation and wellhead lock (10) excavation and lining construction, depth of about 1m; Step 3-2: Install the slag vertical lifting system (8) and the safety protection device (9) and debug them; Step 4: I-series anti-collision pile-sheet combined structure well excavation and acceptance: Step 4-1: Excavation and support of the slope cover layer (18). The cover layer is excavated in layers with a thickness of 0.6 to 1.2 m according to the nature of the stratum. Concrete lining and steel support are used for support. One layer is excavated and supported, and the steel support is installed immediately afterwards. Step 4-2: Excavation and support of the slope bedrock (19). According to the nature of the rock layer, the bedrock is excavated in layers with a thickness of 1.5 to 2.0 m. After entering the bedrock, spray anchor support is used, and each layer is supported after excavation. Step 4-3: Excavate the pile and sheet together to the designed elevation, conduct joint acceptance, and enter the next construction process after passing the acceptance; Step 5: I-series anti-collision pile-slab combined structural concrete construction: Step 5-1: The steel bars of the anti-collision piles (1) of each anti-collision pile-sheet combined unit are manufactured and installed by integrally manufacturing the steel cage and lifting it into the well by a truck crane; Step 5-2: The upper anti-collision plate reinforcement of each anti-collision pile plate combined unit is installed manually underground; Step 5-3: After completing the installation of steel bars and embedded parts, check and accept; Step 5-4: Concrete pouring, using a chute to enter the warehouse, and pouring the top continuously at one time; some pile wells with water seepage are poured with underwater concrete; that is, the I-series anti-collision pile-slab combined structure concrete construction is completed; Step 6: Repeat the above steps 1-5 to complete the I-series anti-collision pile-slab combined structure concrete construction; Step 7: Install the pile-sheet top connecting beam (3) on the multiple anti-collision pile-sheet joint units of the I-sequence anti-collision pile-sheet joint structure and the multiple anti-collision pile-sheet joint units of the II-sequence anti-collision pile-sheet joint structure, and then install multiple prestressed anchor cables (5). That is, the construction of the anti-collision pile-sheet combined structure is completed.

2. The method according to claim 1, characterized in that: A plurality of anchor cable anchor piers (4) are cast on the outer side surface of the pile-slab top connecting beam (3).

3. The method according to claim 1, characterized in that: The lower part of the upper anti-collision plate (2) of the anti-collision pile-plate combined unit enters into the intact bedrock (19) to a depth of 3 to 5 m.

4. The method according to claim 1, 2 or 3, characterized in that The method is: First, a support and backfilling operation platform (17) is excavated on the slope at the location; then, an artificial well excavation is used to perform pile-sheet joint excavation wellhead lock (10) lining construction, and then a well excavation operation of the I-sequence anti-collision pile-sheet joint structure is performed on the slope on one side of the protected river channel, and then concrete pouring of the I-sequence anti-collision pile-sheet joint structure is performed. According to the above steps, concrete pouring of the II-sequence anti-collision pile-sheet joint structure is performed on the slope on the other side of the protected river channel; then, a pile-sheet top connecting beam (3) is installed on multiple anti-collision pile-sheet joint units of the I-sequence anti-collision pile-sheet joint structure and multiple anti-collision pile-sheet joint units of the II-sequence anti-collision pile-sheet joint structure, and then a plurality of prestressed anchor cables (5) are installed, thereby completing the construction of the anti-collision pile-sheet joint structure.