Concrete wall concave reserved groove formwork support structure and construction method thereof

By using wooden molds and supporting structures on concrete walls to construct concave reserved grooves, the problems of high construction costs and difficult size control in traditional methods are solved, and an efficient construction process and quality improvement are achieved.

CN111255229BActive Publication Date: 2024-10-29BEIJING QINGHE WATER CONSERVANCY CONSTR GRP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010209526.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-23
Publication Date
2024-10-29
Estimated Expiration
2040-03-23

AI Technical Summary

Technical Problem

The traditional construction method of concave reserved grooves on concrete walls increases costs, reduces safety during construction, and is not conducive to controlling the groove size.

Method used

Wooden molds are used as the supporting structure of the concave reserved groove formwork on the concrete wall. The supporting structure is formed through the combined arrangement of vertical formwork, side formwork and keel, combined with the fixation method of bamboo rubber board and steel nails, and is constructed according to specific construction instructions. Steps for concrete pouring and formwork removal.

Benefits of technology

It achieves reduced construction costs, improved project quality and shortened construction period, ensuring precise control of groove dimensions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111255229B_ABST
    Figure CN111255229B_ABST
Patent Text Reader

Abstract

The present invention provides a concrete wall concave reserved groove template support structure and a construction method thereof. When the concrete wall template is supported, a wooden mold is customized according to the position and size of the reserved groove, and the wooden mold is connected to the concrete wall template, and the whole is poured. After the concrete wall reaches the designed strength, the mold is removed, and the construction of the concrete wall and the concave reserved groove is completed. By adopting the template support structure and the construction method provided by the present invention, the problem of phased construction of the concave reserved groove of the concrete wall can be solved at one time, saving construction costs, improving project quality, and shortening the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction template and method for a concrete wall, and in particular to a template supporting structure for a concave reserved groove on a concrete wall surface and a construction method thereof. Background Art

[0002] With the development and construction of economy, the number of water conservancy and hydropower projects in my country is increasing, and the related technologies are becoming more and more mature. Among the many construction technologies, the application of concave reserved groove construction in concrete walls can significantly promote the improvement of engineering economic benefits and play a very important role in engineering construction.

[0003] In the traditional construction of concave reserved grooves on concrete walls, the wall is first cast as a whole. After the wall reaches the designed strength, the concrete wall is chiseled out for a second time using equipment such as pneumatic picks. The above construction process increases construction costs, reduces construction safety, increases destructiveness to the wall, and is not conducive to controlling the size of the groove. Summary of the invention

[0004] The present invention provides a concrete wall concave reserved groove formwork support structure and a construction method thereof. By filling a wooden mold into the reserved groove, the formwork support structure is arranged and constructed, thereby solving the technical problems in the prior art of damaging the wall and being unfavorable for controlling the groove size.

[0005] The technical solution is as follows:

[0006] A concrete wall concave reserved groove formwork support structure comprises a vertical formwork, and a side formwork and a keel on the upper surface of the vertical formwork. The four sides of the upper surface of the vertical formwork are surrounded by the side formwork, and keels are arranged within the range surrounded by the side formwork, including keels that also surround the four sides of the upper surface of the vertical formwork and are in contact with the side formwork, and keels that are evenly arranged along the horizontal direction.

[0007] The side formwork and the keel have the same height, so that the upper and lower surfaces of the concrete wall concave reserved groove formwork support structure are parallel.

[0008] The vertical mold is formed by splicing bamboo plywood, the width of the splicing seam is no more than 2mm, and the bamboo plywood is fixedly spliced ​​by the bottom mold connecting plate.

[0009] The thickness of the concrete wall concave reserved groove template support structure is equal to the depth of the concave reserved groove of the concrete wall.

[0010] The formwork connecting plate and the bamboo plywood are fixed by steel nails, and the spacing between the steel nails is not more than 500mm.

[0011] The number of keels evenly arranged in the horizontal direction is 2-5.

[0012] The materials used for the vertical formwork, side formwork and keel are all wooden materials.

[0013] A method for supporting a concrete wall concave reserved groove formwork, comprising the following steps:

[0014] S1: Measure and locate, and determine the position of the concave reserved groove according to the drawing;

[0015] S2: concrete wall reinforcement binding;

[0016] S3: Make a wooden mold corresponding to the concave reserved groove as a template support structure for the concave reserved groove of the concrete wall;

[0017] S4: wooden moulds are installed on concrete wall formwork;

[0018] S5: Concrete pouring;

[0019] S6: Removal of concrete wall forms and wooden moulds.

[0020] Furthermore, step S2 includes the following steps:

[0021] 1) Fabrication of bottom plate reinforcement: The surface of the reinforcement is clean, and the main reinforcement spacing is marked on the cushion layer for laying and binding. The reinforcement protection layer used as the cushion layer is made of pads made of 50×50×35mm high-grade mortar, one pad is arranged every 1-1.5 meters, in a plum blossom shape;

[0022] 2) Fabrication of vertical reinforcement for wall panels: Draw the axis of the wall panels on the bottom plate reinforcement, and tie two rows of horizontal reinforcement under the bottom plate according to the wall width as the control line of the wall vertical reinforcement. The vertical reinforcement is inserted into the lower layer of reinforcement on the bottom plate and tied with the horizontal reinforcement on the first row of the bottom plate;

[0023] 3) Production of vertical steel bars at the concave reserved groove position: When tying the vertical steel bars at the concave reserved groove position, the vertical steel bars on the outside of the concave reserved groove are tied normally, and the vertical and horizontal steel bars on the inside of the concave reserved groove are tied concavely toward the outside of the concave reserved groove, and the concave depth is the thickness of the wooden mold.

[0024] By adopting the formwork support structure and the construction method thereof provided by the present invention, the problem of phased construction of the concave reserved groove on the concrete wall can be solved at one time, thereby saving construction costs, improving project quality, and shortening the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is the position relationship between the concave reserved groove and the concrete wall;

[0026] Figure 2 It is a schematic diagram of the reserved slot template installed in the concrete wall;

[0027] Figure 3It is a flow chart of the construction method of the template support for the concave reserved groove of the concrete wall;

[0028] Figure 4 It is a schematic diagram of the mold placement;

[0029] Figure 5 It is a schematic diagram of keel placement;

[0030] Figure 6 It is a schematic diagram of side mold placement;

[0031] Explanation of the reference numerals: 1-concrete wall; 2-concave reserved groove; 3-wooden mold; 4-external wall mold; 5-inner wall mold; 6-vertical mold; 7-steel nails; 8-joint; 9-connecting plate; 10-side mold; 11-keel. DETAILED DESCRIPTION

[0032] like Figure 1 As shown, the concave reserved groove 2 is located perpendicular to the concrete wall 1, and its dimensions are length×width×height=2200×1800×60mm.

[0033] like Figure 2 As shown, during the construction of the concrete wall 1, the two sides of the present invention are defined by the outer wall formwork 4 and the inner wall formwork 5. The combination of the outer wall formwork 4 and the inner wall formwork 5 is referred to as the wall formwork. A concave reserved groove formwork support structure for the concrete wall is reserved at the concave reserved groove 2, thereby achieving convenient operation in the later stage. The concave reserved groove formwork support structure for the concrete wall is realized by a wooden mold 3.

[0034] like Figure 3 As shown, for a concave reserved groove of a concrete wall, a template support construction method for the concave reserved groove of a concrete wall includes the following steps:

[0035] S1: Measurement and positioning: determine the position of the concave reserved groove 2 according to the drawing;

[0036] S2: concrete wall reinforcement binding;

[0037] Before processing the steel bars, the surface must be cleaned first. Adhering oil, dirt, and loose rust must be cleaned before use. There must be no local bends, dead bends, or small waves, and surface scratches must not reduce the cross-section of the steel bar by 5%.

[0038] The position and spacing of the steel bars are based on the dimensions of the design drawings. When tying, the main reinforcement spacing is marked on the cushion layer for laying and tying. The steel bar protection layer uses pads made of 50×50×35mm high-grade mortar, one pad is arranged every 1-1.5 meters, in a plum blossom shape. Ensure that the side wall steel bar protection layer meets the design and specification requirements.

[0039] The vertical reinforcement of the wall panel is carried out after the bottom plate reinforcement is completed and checked. First, the axis of the wall panel is marked on the bottom plate reinforcement, and two rows of horizontal reinforcement are tied under the bottom plate according to the wall width (minus the protective layer) as the control line of the wall vertical reinforcement. The vertical reinforcement is inserted into the lower layer of reinforcement of the bottom plate and tied with the horizontal reinforcement of the upper row of the bottom plate. When the reinforcement at the groove position is tied, the outer reinforcement is tied normally, and the inner vertical reinforcement and horizontal reinforcement are tied outwardly with a recessed depth equal to the thickness of the wooden mold.

[0040] S3: Production of wooden mold 3:

[0041] 1. The wooden mold 3 includes a vertical mold 6, a side mold 10 and a keel 11. The vertical mold 6 and the side mold 10 are made of bamboo plywood with a specification of length × width × thickness = 2400 × 1200 × 18 mm, and the keel is made of wooden square with a specification of width × thickness = 90 × 40 mm.

[0042] 2. If Figure 4 As shown, the vertical formwork is made of two pieces of bamboo plywood, with dimensions of length × width = 2200 × 1200mm and length × width = 2200 × 600mm respectively. When splicing, the width of the joint 8 must be less than 2mm, and a vertical formwork connecting plate 9 with a width of length × width = 2200 × 100mm is used for connection. The vertical formwork connecting plate 9 is nailed to the upper sides of the two bamboo plywoods and nailed firmly with steel nails 7. The spacing between the steel nails 7 is not more than 500mm.

[0043] 3. If Figure 5 , Figure 6 As shown, the side form and keel are installed as follows:

[0044] ① The keel 11 is made of wood with a width × thickness = 90 × 40 mm, and is arranged along the upper, lower, left and right sides of the vertical form 6. When nailing, the position of the side form 10 is reserved. The wood on the four sides as the keel is arranged according to Figure 5 After the arrangement is completed, three wooden beams are evenly arranged in the horizontal direction as keels inside, and the wooden beams are connected to the vertical formwork 6 with steel nails 7;

[0045] ② The size of the concave reserved groove 2 of the concrete is length×width×height=1800×60×2200mm, the thickness of the vertical formwork 6 is 18mm, so the width of the side formwork 10 is 42mm, the bottom formwork+side formwork=18+42=60mm, and the side formwork 10 is directly installed on the keels 11 on the four sides of the vertical formwork 6 and connected with steel nails 7;

[0046] ③The spacing between steel nails 7 should not be greater than 500mm;

[0047] ④ When joining the vertical form 6 and the side form 10, ensure that the angles are square, the lines are straight, and the joints are tight;

[0048] ⑤ The upper and lower surfaces of the wood used as the keel 11 must be planed flat and the height must be consistent. Ensure that the vertical formwork 6 and the wall outer formwork 4 fit closely with the wood, so that the bottom elevation of the board is consistent and the surface of the wall formwork is flat.

[0049] 4. The inner wall formwork 5, the outer wall formwork 4, the vertical formwork 6, and the side formwork 10 must be configured with accurate dimensions and cut with spring lines. The cutting edges must be straight, and the straightness and dimensional errors must not exceed 1mm.

[0050] S4: Wooden mould 3 installation:

[0051] After the wooden mold 3 is made, it is nailed together with the wall template. When nailing, pay attention to measuring the position of the reserved groove on the wall and nail it according to the position.

[0052] S5: Concrete pouring;

[0053] S6: Removal of wall formwork and wooden molds:

[0054] After the concrete wall 1 reaches the designed strength, the wall formwork and the wooden mold 3 are removed.

[0055] By adopting the formwork support structure and the construction method thereof provided by the present invention, the problem of phased construction of the concave reserved groove on the concrete wall can be solved at one time, thereby saving construction costs, improving project quality, and shortening the construction period.

Claims

1. A method for supporting the template of a concave reserved groove on a concrete wall, characterized in that: The following steps are involved: S1: Measure and locate, and determine the position of the concave reserved groove according to the drawing; S2: concrete wall reinforcement binding; S3: Make a wooden mold corresponding to the concave reserved groove as a template support structure for the concave reserved groove of the concrete wall; S4: Wooden formwork installed on concrete wall formwork: The concrete wall formwork includes an outer wall formwork and an inner wall formwork, the outer wall formwork and the inner wall formwork are combined into a wall formwork, and the wooden mold is installed on the outer wall formwork and the inner wall formwork to reserve a concave reserved groove on the concrete wall; S5: Concrete pouring; S6: Removal of concrete wall formwork and wooden moulds; The concrete wall concave reserved groove formwork support structure includes a vertical formwork, a side formwork and a keel on the upper surface of the vertical formwork, the four sides of the upper surface of the vertical formwork are surrounded by the side formwork, and the keel is arranged within the range surrounded by the side formwork, including keels that also surround the four sides of the upper surface of the vertical formwork and contact the side formwork, and keels that are evenly arranged along the horizontal direction; the materials used for the vertical formwork, the side formwork and the keel are all wooden materials; The height of the side formwork and the keel is the same, so that the upper and lower surfaces of the concrete wall concave reserved groove formwork support structure are parallel; The vertical formwork is formed by splicing bamboo plywood, the width of the splicing seam is no more than 2 mm, and the bamboo plywood is fixedly spliced ​​by the vertical formwork connecting plate.

2. The method for supporting the concrete wall concave reserved groove formwork according to claim 1 is characterized in that: The thickness of the concrete wall concave reserved groove template support structure is equal to the depth of the concave reserved groove of the concrete wall.

3. The method for supporting the concrete wall concave reserved groove formwork according to claim 1 is characterized in that: The formwork connecting plate and the bamboo plywood are fixed by steel nails, and the spacing between the steel nails is not more than 500mm.

4. The method for supporting the concrete wall concave reserved groove formwork according to claim 1 is characterized in that: The number of keels evenly arranged in the horizontal direction is 2-5.

5. The method for supporting the concrete wall concave reserved groove formwork according to claim 1 is characterized in that: Step S2 includes the following steps: 1) Fabrication of bottom plate reinforcement: The surface of the reinforcement is clean, and the main reinforcement spacing is marked on the cushion layer for laying and binding. The reinforcement protection layer used as the cushion layer is made of pads made of 50×50×35mm high-grade mortar, one pad is arranged every 1-1.5 meters, in a plum blossom shape; 2) Fabrication of vertical reinforcement for wall panels: Draw the axis of the wall panels on the bottom plate reinforcement, and tie two rows of horizontal reinforcement under the bottom plate according to the wall width as the control line of the wall vertical reinforcement. The vertical reinforcement is inserted into the lower layer of reinforcement on the bottom plate and tied with the horizontal reinforcement on the first row of the bottom plate; 3) Production of vertical steel bars at the concave reserved groove position: When tying the vertical steel bars at the concave reserved groove position, the vertical steel bars on the outside of the concave reserved groove are tied normally, and the vertical and horizontal steel bars on the inside of the concave reserved groove are tied concavely toward the outside of the concave reserved groove, and the concave depth is the thickness of the wooden mold.

Citation Information

Patent Citations

  • Concrete reserved hole formwork installing method

    CN107366299A

  • Concrete template easy to assemble and assembly method of concrete template

    CN107513945A

  • Concrete wall concave preformed groove template supporting structure

    CN212336713U