By setting up a feed delivery mechanism, a flip delivery machine and a storage and dispensing machine in the spiral nail production line, the process integration is achieved, and the problems of waste of manpower and material resources and low production efficiency in the traditional production model are solved, and automated production is achieved, efficiency is improved and costs are reduced.

CN111283123BActive Publication Date: 2025-03-18DALIAN TIELIAN RAILWAY EQUIP MFG
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202010214798.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-24
Publication Date
2025-03-18
Estimated Expiration
2040-03-24

AI Technical Summary

Technical Problem

In the traditional spiral nail production model, various processes are discrete, resulting in waste of manpower and material resources, long handling time, low production efficiency and high cost.

Method used

An automated production line of spiral nails was designed, and the process integration is achieved by setting up a raw material feeding and delivery mechanism, a modified material flip conveyor and a material section storage and dispensing machine.

Benefits of technology

All automatic production of spiral nails has been achieved, product quality and production efficiency have been improved, and production costs have been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111283123B_ABST
    Figure CN111283123B_ABST
Patent Text Reader

Abstract

The invention patent belongs to an automatic production line for spiral spikes, including a raw material reforming machine, a cold cutting press, a material section transfer box, a first robot workstation, a cold heading forging press, a second robot workstation, an M24 thread rolling machine, a third robot workstation, an M25.6×6 special thread rolling machine, a fourth robot workstation and a hot degreasing furnace; the invention patent is characterized in that a raw material feeding and advancing mechanism frame is set at the feeding end of the production line, the right end of the raw material feeding and advancing mechanism frame is connected to the raw material reforming machine, and a reformed material turning and delivering machine is installed in parallel with the raw material reforming machine, the reformed material turning and delivering machine is connected to the cold cutting press, and a material section storage and batching machine is installed between the cold cutting press and the first robot workstation and the cold heading forging press. The invention patent realizes the full automation of the rolling M24, M25.6×6 special threaded spike processing and hot degreasing production, greatly improving product quality and production efficiency and reducing costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to a production line, and in particular relates to an automatic production line for spiral spikes. Background Art

[0002] In the production process of spiral spikes, the traditional production model discretizes each process, each process is self-contained, and relevant personnel are assigned to complete the production of this step around a single machine, and then the process is transported and concentrated to the terminal processing equipment for unified processing. This production model consumes a lot of manpower and material resources, and the transportation process consumes a lot of time, which seriously affects production efficiency and is costly. Summary of the invention

[0003] The object of the present invention is to overcome the above technical deficiencies and provide a spiral spike automatic production line in which a feeding and advancing mechanism, a reformed material turning and delivering machine and a material segment storage and batching machine are arranged in the production line, thereby realizing the integration of the spiral spike production process, saving a lot of manpower, improving production efficiency and reducing production costs.

[0004] The technical problem solved by the patent of the present invention is that the technical solution adopted is: an automated production line for spiral spikes, including a raw material reforming machine, a cold cutting press, a material segment transfer box, a first robot workstation, a cold heading and forging press, a second robot workstation, an M24 thread rolling machine, a third robot workstation, an M25.6×6 special thread rolling machine, a fourth robot workstation and a hot degreasing furnace; it is characterized in that a raw material feeding and advancing mechanism frame is arranged at the feeding end of the production line, the right end of the raw material feeding and advancing mechanism frame is connected to the raw material reforming machine, and a reformed material turning and delivering machine is installed in parallel with the raw material reforming machine, the reformed material turning and delivering machine is connected to the cold cutting press, and a material segment storage and batching machine is installed between the cold cutting press and the first robot workstation and the cold heading and forging press.

[0005] The raw material feeding and advancing mechanism frame includes five material distribution ramps evenly distributed on the raw material feeding and advancing mechanism frame, and a material blocking block and a material shifting block are fixed at the front end of each material distribution ramp; a material shifting transmission mechanism is installed at the right end of a power pull rod installed in front of the raw material feeding and advancing mechanism frame; the material shifting transmission mechanism includes a power cylinder, a cylinder rear seat of the power cylinder is fixed to the raw material feeding and advancing mechanism frame with bolts, a power connecting arm is fixed to the end of the cylinder piston rod extending from the front cover of the cylinder, and the other end of the power connecting arm is movably connected to the power pull rod; the power pull rod is installed on the power pull rod suspension, and a material shifting rocker pin is fixed on the power pull rod with a nut, the material shifting rocker pin is movably connected to the rocker slideway provided on the material shifting rocker, the upper end of the material shifting rocker is fixedly connected to the material shifting rocker shaft, and the material shifting rocker shaft is movably installed on the material shifting rocker at both ends In the shaft support, a material shifting block is fixed at the right end of the material shifting rocker shaft; six material receiving bodies are installed in front of the raw material feeding and advancing mechanism frame, and the material receiving body includes a pair of right-angled supports with grooves fixed on the raw material feeding and advancing mechanism frame by bolts, a shaft with a baffle on one side is installed in the groove, and a material distribution ramp 2 is installed on the shaft; a FY30-30B clamp is installed on the raw material feeding and advancing mechanism frame, a clamp cylinder is fixed on the clamp support, and two clamp fingers are installed on the cylinder; a feeding and advancing mechanism is installed on the left side of the FY30-30B clamp; the feeding and advancing mechanism includes a feeding power cylinder frame installed on the raw material feeding and advancing mechanism frame; the piston rod end of the feeding power cylinder frame is connected to the clamp support, and sliders with grooves are fixed on both sides below the clamp support, and the grooves of the sliders are slidably connected to the feeding guide rails.

[0006] The modified material turning and conveying machine comprises a turning main bracket, on which a plurality of turning mechanisms and material receiving hooks are evenly distributed; the material receiving hook in the turning mechanism is mounted on a turning power shaft, the turning power shaft is fixedly connected to one end of a turning power link arm, the other end of the turning power link arm is hingedly connected to a connecting block 1 by a pin shaft, the connecting block 1 is fixed to the piston rod end of a turning power cylinder, and the turning power cylinder is fixed to the turning main bracket; the turning power shaft is movably mounted in a turning power shaft support; five material receiving bodies 2 are evenly distributed on the upper rear part of the turning main bracket, and its structure is the same as that of the material receiving body 2. The servo sizing mechanism, FY30-30B clamping pliers 2 and feeding and advancing mechanism 2 are installed in sequence behind the left end of the flip main bracket. The structure of FY30-30B clamping pliers 2 is exactly the same as that of FY30-30B clamping pliers 1. The servo sizing mechanism includes a U-shaped sizing support fixed on the flip main bracket, a servo motor is bolted on the left side of the sizing support, the shaft of the servo motor is connected to the transmission in the sizing support, an active sizing rotating wheel 1 is fixed on the output shaft end of the transmission, and a driven sizing rotating wheel 2 is installed on the sizing rotating wheel 1 with a shaft. The structure of the feeding and advancing mechanism 2 is exactly the same as that of the feeding and advancing mechanism 1.

[0007] The material segment storage batching machine comprises a storage batching machine support, on which a material trough is fixed obliquely, a loosening mechanism is installed in the middle of the material trough, and a pushing mechanism is installed at the left end of the material trough; the pushing mechanism comprises front and rear cylinder vertical plates fixed on the storage batching machine support, a pushing cylinder is fixed on it, and two pushing guide rods are fixed in the front and rear cylinder vertical plates and the waiting area; a pushing pull plate is fixed to the piston rod end of the pushing cylinder with a nut, and the pushing pull plate is provided with through holes on the upper and lower parts and is slidably connected with the pushing guide rod; a waiting area is provided on the left side of the pushing mechanism, and a material segment transfer box is installed on the right end of the material trough; in the middle of the material trough Two trough reinforcement rods are fixed between the two upper side plates; a discharge ramp plate is installed at an angle at the bottom of the trough, and an inner baffle of the trough is installed at the rear end. The angle between the discharge ramp plate and the horizontal plane is α2, and α2=15°~25°; two loose plates are installed in the middle of the discharge ramp plate, and a loose cylinder is installed on the lower loose plate. The piston rod end of the loose cylinder and the upper loose plate are fixed with a connecting block 2 with a groove, and a loose connecting rod is hinged between the two connecting blocks 2 with a pin shaft. The lower connecting block 2 is connected to the piston rod of the loose cylinder; the loose cylinder is installed on the fixed loose plate below.

[0008] The beneficial effect of the patent of the present invention is that the invention realizes the full automation of the rolling M24, M25.6×6 special threaded spike processing and hot degreasing production, greatly improving product quality and production efficiency and reducing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The following is a detailed description of the embodiments with reference to the accompanying drawings.

[0010] Figure 1 It is a three-dimensional diagram of the automatic production line of spiral spikes;

[0011] Figure 2 yes Figure 1 Three-dimensional diagram of the raw material feeding and advancing mechanism;

[0012] Figure 3 yes Figure 2 A partial magnified three-dimensional image at the lower right corner;

[0013] Figure 4 yes Figure 3 Three-dimensional diagram of the transmission mechanism for the middle material transfer;

[0014] Figure 5 yes Figure 3 Three-dimensional diagram of the feeding mechanism;

[0015] Figure 6 yes Figure 5 Three-dimensional diagram of the feeding mechanism;

[0016] Figure 7 yes Figure 6 FY30-30B clamping pliers - 3D diagram;

[0017] Figure 8 yes Figure 1 Three-dimensional diagram of the medium-sized material turning and conveying machine;

[0018] Fig. 9 yes Figure 8 The partial enlarged picture of the middle II;

[0019] Fig.10 yes Figure 8 Three-dimensional diagram of the flip mechanism;

[0020] Fig.11 yes Figure 8 Three-dimensional diagram of the servo sizing mechanism at center III;

[0021] Fig.12 yes Figure 1 Three-dimensional diagram of the storage batching machine in the middle material section;

[0022] Fig.13 yes Fig.12 A three-dimensional partial cross-sectional view;

[0023] Fig.14 yes Fig.12 Three-dimensional diagram of the loose structure;

[0024] Fig.15 yes Fig.12 The local enlarged three-dimensional image of point IV in the figure;

[0025] Fig.16 yes Figure 1 3D illustration of the robot pneumatic gripper mechanism in the robot workbench.

[0026] In the figure: 1-raw material feeding mechanism frame; 1-1-fabricating ramp 1; 1-2-material blocking block; 1-3-material shifting transmission mechanism; 1-3-1-power cylinder; 1-3-2-power link arm; 1-3-3-power pull rod; 1-3-4-power pull rod suspension; 1-3-5-material shifting swing rod pin; 1-3-6-material shifting swing rod; 1-3-7-material shifting swing rod shaft support; 1-3-8-material shifting swing rod shaft; 1-3-9-swing rod slideway; 1-3-10-cylinder rear seat; 1-3-11-cylinder front cover; 1-3-12 cylinder front cavity inlet and outlet holes; 1-3-13-cylinder rear cavity inlet and outlet holes; 1-4-material shifting block; 1-5-material receiving body 1; 1-5-1-support; 1-5-2- axle; 1-5-3-baffle; 1-5-4-fabricating ramp 2; 1-6-FY30-30B clamp 1; 1-6-1-clamp cylinder; 1-6-2-clamp finger; 1-7-feeding progressive mechanism 1; 1-7-1-feeding power cylinder frame; 1-7-2-clamp support; 1-7-3-feeding guide rail; 1-7-4-slider; 2-raw material reforming machine; 3-reformed material turning and delivering machine; 3-1-material receiving hook; 3-2-turning mechanism; 3-2-1-turning power cylinder; 3-2-2-turning power connecting arm; 3-2-3-turning power shaft; 3-2-4-turning power shaft support; 3-2-5-connecting block 1; 3-2-6-pin shaft; 3-2-7-turning power Cylinder upper cavity inlet and outlet holes; 3-2-8-turning power cylinder lower cavity inlet and outlet holes; 3-3-material receiving body 2; 3-4-FY30-30B clamp 2; 3-5-feeding progressive mechanism 2; 3-6-servo fixed length mechanism; 3-6-1-fixed length support; 3-6-2-servo motor; 3-6-3-fixed length rotating wheel 1; 3-6-4-fixed length rotating wheel 2; 3-6-5-transmission; 3-7-turning main bracket; 4-cold cutting press; 5-material section transfer box; 6-material section storage batching machine; 6-1-storage batching machine bracket; 6-1-1-discharging ramp plate; 6-1-2-inner baffle of material trough; 6-2-loosening mechanism; 6-2-1-loosening cylinder; 6-2-2-loosening connecting rod; 6 -2-3-loose plate; 6-2-4-connecting block 2; 6-3-pushing mechanism; 6-3-1-pushing cylinder; 6-3-2-pushing pull plate; 6-3-3-pushing guide rod; 6-3-4-pushing cylinder rear cavity inlet and outlet holes; 6-3-5-pushing cylinder front cavity inlet and outlet holes; 6-3-6-cylinder vertical plate; 6-4-waiting area; 6-5-material trough; 6-5-1-material trough reinforcement rod; 7-cold forging machine; 8-robot workstation; 8-1-pneumatic gripper mechanism; 8-1-1-pneumatic gripper cylinder; 8-1-2-pneumatic gripper; 8-1-3-interface flange; 9-M24 thread rolling machine; 10-M25.6×6 special thread rolling machine; 11-hot degreasing furnace; 12-round steel material. DETAILED DESCRIPTION

[0027] Embodiment, referring to the accompanying drawings, a spiral spike automated production line includes a raw material reforming machine 2, a cold cutting press 4, a material segment transfer box 5, a first robot workstation 8, a cold heading and forging press 7, a second robot workstation 8, an M24 thread rolling machine 9, a third robot workstation 8, an M25.6×6 special thread rolling machine 10, a fourth robot workstation 8 and a hot degreasing furnace 11; it is characterized in that a raw material feeding and advancing mechanism frame 1 is provided at the feeding end of the production line, the right end of the raw material feeding and advancing mechanism frame 1 is connected to the raw material reforming machine 2, and a reformed material turning and delivering machine 3 is installed in parallel with the raw material reforming machine 2, the reformed material turning and delivering machine 3 is connected to the cold cutting press 4, and a material segment storage and batching machine 6 is installed between the cold cutting press 4 and the first robot workstation 8 and the cold heading and forging press 7.

[0028] The raw material feeding and advancing mechanism frame 1 (see attached Figure 2 , 3, 4, 5), including five material distribution ramps 1-1 evenly distributed on the raw material feeding and advancing mechanism frame 1, a material blocking block 1-2 and a material shifting block 1-4 are fixed at the front end of each material distribution ramp 1-1; a material shifting transmission mechanism 1-3 is installed at the right end of a power pull rod 1-3-3 installed in front of the raw material feeding and advancing mechanism frame 1; the material shifting transmission mechanism 1-3 includes a power cylinder 1-3-1, a cylinder rear seat 1-3-10 of the power cylinder 1-3-1 is fixed to the raw material feeding and advancing mechanism frame 1 with bolts, and the end of the cylinder piston rod extending from the cylinder front cover 1-3-11 is fixed A power link arm 1-3-2 is fixed, and the other end of the power link arm 1-3-2 is movably connected to the power pull rod 1-3-3; the power pull rod 1-3-3 is installed on the power pull rod suspension 1-3-4, and a material shifting rocker pin shaft 1-3-5 is fixed on the power pull rod 1-3-3 with a nut, and the material shifting rocker pin shaft 1-3-5 is movably connected with the rocker slideway 1-3-9 provided on the material shifting rocker 1-3-6, and the upper end of the material shifting rocker 1-3-6 is fixedly connected with the material shifting rocker shaft 1-3-8, and the material shifting rocker shaft 1-3-8 is movably installed in the material shifting rocker shaft supports 1-3-7 at both ends. A material shifting block 1-4 is fixed at the right end of the material shifting rocker shaft 1-3-8; six material receiving bodies 1-5 are installed in front of the raw material feeding and advancing mechanism frame 1, and the material receiving body 1-5 includes a pair of right-angled supports 1-5-1 with grooves fixed on the raw material feeding and advancing mechanism frame 1 by bolts, and a shaft 1-5-2 with a baffle 1-5-3 on one side is installed in the groove, and a material ramp 1-5-4 is installed on the shaft 1-5-2; an FY30-30B clamp 1-6 is installed on the raw material feeding and advancing mechanism frame 1, and the FY30-30B clamp 1-6 is included in the clamp support 1 -7-2, and two clamping clamp fingers 1-6-2 are installed on the cylinder; a feeding advancement mechanism 1-7 is installed on the left side of the FY30-30B clamping clamp 1-6; the feeding advancement mechanism 1-7 includes a feeding power cylinder frame 1-7-1 installed on the raw material feeding advancement mechanism frame 1; the piston rod end of the feeding power cylinder frame 1-7-1 is connected to the clamping clamp support 1-7-2, and sliding blocks 1-7-4 with grooves are fixed on both sides below the clamping clamp support 1-7-2, and the grooves of the sliding block 1-7-4 are slidably connected to the feeding guide rail 1-7-3.

[0029] The reformed material turning delivery machine 3 (see attached Figure 1 , 7, 8, 9, 10), including a flip main bracket 3-7, on which a plurality of flip mechanisms 3-2 and material receiving hooks 3-1 are evenly distributed; the material receiving hook 3-1 in the flip mechanism 3-2 is mounted on a flip power shaft 3-2-3, the flip power shaft 3-2-3 is fixedly connected to one end of a flip power link 3-2-2, the other end of the flip power link 3-2-2 is hinged to a connecting block 3-2-5 by a pin shaft 3-2-6, the connecting block 3-2-5 is fixed to the piston rod end of a flip power cylinder 3-2-1, and the flip power cylinder 3-2-1 is fixed to the flip main bracket 3-7; the flip power shaft 3-2-3 is movably mounted in a flip power shaft support 3-2-4; five material receiving bodies 3-3 are evenly distributed on the upper rear part of the flip main bracket 3-7, and their structure is the same as that of the connecting body 3-3. The material body 1-5 is exactly the same; behind the left end of the flip main bracket 3-7, a servo sizing mechanism 3-6, a FY30-30B clamp 2 3-4 and a feeding and advancing mechanism 2 3-5 are installed in sequence. The structure of the FY30-30B clamp 2 3-4 is exactly the same as that of the FY30-30B clamp 1-6. The servo sizing mechanism 3-6 includes a U-shaped sizing support 3-6-1 fixed on the flip main bracket 3-7, a servo motor 3-6-2 is bolted to the left side of the sizing support 3-6-1, the shaft of the servo motor 3-6-2 is connected to the transmission 3-6-5 in the sizing support 3-6-1, and an active sizing rotating wheel 1 3-6-3 is fixed to the output shaft end of the transmission 3-6-5, and a driven sizing rotating wheel 2 3-6-4 is mounted on the sizing rotating wheel 1 3-6-3 with a shaft. The structure of the second feeding and advancing mechanism 3-5 is exactly the same as that of the first feeding and advancing mechanism 1-7.

[0030] The material section storage batching machine 6 (see attached Fig.11 , 12, 13, 14), including a storage batching machine bracket 6-1, on which a material trough 6-5 is fixed obliquely, a loosening mechanism 6-2 is installed in the middle of the material trough 6-5, and a pushing mechanism 6-3 is installed at the left end of the material trough 6-5; the pushing mechanism 6-3 includes a front and rear cylinder vertical plate 6-3-6 fixed on the storage batching machine bracket 6-1, a pushing cylinder 6-3-1 is fixed thereon, and two pushing guide rods 6-3-3 are fixed in the front and rear cylinder vertical plates 6-3-6 and the waiting area 6-4; a pushing pull plate 6-3-2 is fixed to the piston rod end of the pushing cylinder 6-3-1 with a nut, and the pushing pull plate 6-3-2 is provided with through holes at the top and bottom and is slidably connected to the pushing rod; a waiting area 6-4 is provided on the left side of the pushing mechanism 6-3, and a material section transfer box 5 is installed on the right end of the material trough 6-5; two Two trough reinforcement rods 6-5-1 are fixed between the side plates; a discharge ramp plate 6-1-1 is inclined at the bottom of the trough 6-5, and a trough inner baffle 6-1-2 is installed at the rear end. The angle between the discharge ramp plate 6-1-1 and the horizontal plane is α2, α2 = 20°; two loose plates 6-2-3 are installed in the middle of the discharge ramp plate 6-1-1, and a loose cylinder 6-2-1 is installed on the lower loose plate 6-2-3. The piston rod end of the loose cylinder 6-2-1 and the upper loose plate are fixed with a connecting block 6-2-4 with a groove, and a loose connecting rod 6-2-2 is connected between the two connecting blocks 6-2-4 by a pin hinge. The lower connecting block 6-2-4 is connected to the piston rod of the loose cylinder 6-2-1; the loose cylinder 6-2-1 is installed on the fixed loose plate 6-2-3 below.

[0031] The arms of the four M-10iD robots are connected to the interface flange 8-1-3 on the pneumatic clamp mechanism 8-1 of the robot workstation 8, and a pneumatic clamp cylinder 8-1-1 with the same structure as the clamp cylinder 1-6-1 is fixed on the interface flange 8-1-3, and a pneumatic clamp 8-1-2 is fixed to the piston rod of the cylinder. Inlet and outlet air interfaces are provided on both sides of the cylinder, and the power cylinder 1-3-1 in the production line is provided with a cylinder front cavity inlet and outlet air holes 1-3-12, a cylinder rear cavity inlet and outlet air holes 1-3-13, a flip power cylinder upper cavity inlet and outlet air holes 3-2-7, a flip power cylinder lower cavity inlet and outlet air holes 3-2-8, and an air inlet and outlet air interface on the loosening cylinder 6-2-1 are all connected to the solenoid valve in the pneumatic control system through pipelines and controlled.

[0032] All electrical equipment in the production line, such as servo motors 3-6-2, are connected to the control circuit of the electrical control device in the production line with wires and are automatically controlled by PLC through programming.

[0033] The working principle and operation method of the present invention: The working process of the production line is as shown in the attached Figure 1The process is carried out in the order of arrow A. First, hang the whole bundle of round steel on the raw material feeding and advancing mechanism frame 1, untie the strapping belt, and start from the material blocking block 1-2 along the material distribution ramp 1-1; make the material dispensing transmission mechanism 1-3 move forward to drive the material dispensing block 1-4 to rotate from the preparation posture to the material dispensing posture, and dispensing the round steel material 12 from the material distribution ramp 1-1 to the material receiving body 1-5. The material dispensing transmission mechanism 1-3 moves in the reverse direction to drive the material dispensing block 1-4 to rotate from the material dispensing posture back to the preparation posture, waiting for the next action. At the same time, FY30-30B clamping pliers 1-6 lock the round steel material 12 on the material receiving body 1-5, and the material feeding and advancing mechanism 1-7 drives FY30-30B clamping pliers 1-6 to move forward to send the clamped round steel material 12 into the entrance of the raw material reforming machine 2. The FY30-30B clamp 1-6 is unlocked, and the feeding and advancing mechanism 1-7 drives the FY30-30B clamp 1-6 to work in reverse and return to the original position, waiting for the next action.

[0034] After the round steel material 12 is cold-drawn to the required size by the raw material reforming machine 2 , it freely falls into the material receiving hook 3 - 1 of the reformed material turning and delivering machine 3 .

[0035] When the flipping mechanism 3-2 is working, the material receiving hook 3-1 is lifted up to the dotted line position, and the pneumatic control system sends high-pressure gas to the inlet and outlet holes 3-2-8 of the lower chamber of the flipping power cylinder, and drives the flipping power shaft 3-2-3 to rotate forward (counterclockwise) through the flipping power arm 3-2-2 to flip the round steel material onto the material receiving body 2 3-3, and sends high-pressure gas to the inlet and outlet holes 3-2-7 of the upper chamber of the flipping power cylinder, and drives the flipping power shaft 3-2-3 to reverse (clockwise) through the flipping power connecting arm 3-2-2, so that the material receiving hook 3-1 returns to its original position and waits for the next action. At the same time, the FY30-30B clamping clamp 2 3-4 locks the round steel material 12, and the feeding and advancing mechanism 2 3-5 drives the FY30-30B clamping clamp 2 3-4 to move forward to send the clamped modified round steel material 12 into the servo sizing mechanism 3-6. At the same time, the servo sizing mechanism 3-6 starts to transport the modified round steel material 12 to a specified length into the cold cutting press cutting die in the system to cut the specified length material segment.

[0036] The cut fixed-length material segments slide freely along the ramp of the cutting die into the material segment transfer box 5, and when the box is full, it is transported to the material segment storage batching machine 6 by a forklift or a crane.

[0037] When the material section transfer box 5 opens the bottom, the fixed-length material section freely rolls down along the slope of the discharge ramp plate 6-1-1 to between the two loosening plates 6-2-3, and is throttled by the loosening mechanism 6-2. The loosening cylinder 6-2-1 in the loosening mechanism 6-2 alternately supplies high-pressure gas to the upper and lower inlet and outlet holes of the cylinder by the pneumatic control system, drives the loosening connecting rod 6-2-2, and drives the upper loosening plate 6-2-3 to move forward and backward along the discharge ramp plate 6-1-1. The forward movement rolls the fixed-length material section to the pushing area of ​​the pushing mechanism 6-3; the pushing cylinder 6-3-1 in the pushing mechanism 6-3 enters the high-pressure gas through the inlet and outlet holes 6-3-5 of the front cavity of the pushing cylinder, and the piston rod drives the pushing and pulling plate 6-3-2 to move leftward along the two pushing guide rods 6-3-3, pushing the fixed-length material section to the waiting area 6-4. When high pressure gas enters the inlet and outlet holes 6-3-4 of the rear cavity of the push cylinder, the push plate 6-3-2 returns to its original position and waits for the next work.

[0038] The first robot workstation 8 grabs the fixed-length material section through the pneumatic gripper mechanism 8-1 and sends it to the cold forging die of the cold heading forging machine 7. The robot workstation 8 returns to the original position and waits. The cold heading forging machine 7 moves once, forging the middle round table, and then returns to the original position and waits. The second robot workstation 8 grabs the forged semi-finished product through the pneumatic gripper mechanism 8-1 and sends it to the M24 thread rolling machine 9 to roll the M24 thread. After the M24 thread is rolled, the third robot workstation 8 grabs the rolled semi-finished product through the pneumatic gripper mechanism 8-1 and sends it to the M25.6×6 special thread rolling machine 10 to roll the M25.6×6 special thread. After the M25.6×6 special thread is rolled, the fourth robot workstation 8 grabs the rolled finished spiral spike through the pneumatic gripper mechanism 8-1 and sends it to the hot degreasing furnace 11 for degreasing to complete the processing task.

Claims

1. An automated production line for spiral spikes, comprising a raw material reforming machine (2), a cold cutting press (4), a material section transfer box (5), a first robot workstation (8), a cold heading forging press (7), a second robot workstation (8), an M24 thread rolling machine (9), a third robot workstation (8), an M25.6×6 special thread rolling machine (10), a fourth robot workstation (8) and a hot degreasing furnace (11); characterized in that A raw material feeding and advancing mechanism frame (1) is provided at the feeding end of the production line. The right end of the raw material feeding and advancing mechanism frame (1) is connected to the raw material reforming machine (2), and a reformed material turning and delivering machine (3) is installed in parallel with the raw material reforming machine (2). The reformed material turning and delivering machine (3) is connected to the cold cutting press (4). A material segment storage batching machine (6) is installed between the cold cutting press (4) and the first robot workstation (8) and the cold heading forging press (7). The material segment storage batching machine (6) comprises a storage batching machine bracket (6-1), on which a material trough (6-5) is obliquely fixed, and a loosening mechanism ( 6-2), a pushing mechanism (6-3) is installed at the left end of the material trough (6-5); the pushing mechanism (6-3) includes a front and rear cylinder vertical plate (6-3-6) fixed on the storage batching machine bracket (6-1), a pushing cylinder (6-3-1) fixed thereon, and two pushing guide rods (6-3-3) are fixed in the front and rear cylinder vertical plates (6-3-6) and the waiting area (6-4); a pushing pull plate (6-3-2) is fixed to the piston rod end of the pushing cylinder (6-3-1) with a nut, and the pushing pull plate (6-3-2) is provided with through holes on the upper and lower sides and is slidably connected with the pushing rod; a waiting area (6-4) is provided on the left side of the pushing mechanism (6-3). 6-4), a material section transfer box (5) is installed on the right end of the material trough (6-5); two material trough reinforcement rods (6-5-1) are fixed between the two side plates on the middle of the material trough (6-5); a material discharge ramp plate (6-1-1) is installed at the bottom of the material trough (6-5) in an inclined manner, and a material trough inner baffle (6-1-2) is installed at the rear end, and the angle between the material discharge ramp plate (6-1-1) and the horizontal plane is α2, α2 = 15° to 25°; two loosening plates (6-2-3) are installed in the middle of the material discharge ramp plate (6-1-1), and a loosening cylinder (6-2-1) is installed on the lower loosening plate (6-2-3). The piston rod end of the loosening cylinder (6-2-1) and the upper loosening plate are fixed with a connecting block 2 (6-2-4) with a groove, a loosening connecting rod (6-2-2) is connected between the two connecting blocks 2 (6-2-4) by a pin hinge, and the lower connecting block 2 (6-2-4) is connected to the piston rod of the loosening cylinder (6-2-1); the loosening cylinder (6-2-1) is installed on the loosening plate (6-2-3) fixed below; the modified material turning and conveying machine (3) comprises a turning main bracket (3-7), and a plurality of turning mechanisms (3-2) and material receiving hooks (3-1) are evenly distributed on the turning main bracket (3-7);The material receiving hook (3-1) in the turning mechanism (3-2) is mounted on the turning power shaft (3-2-3), the turning power shaft (3-2-3) is fixedly connected to one end of the turning power link arm (3-2-2), the other end of the turning power link arm (3-2-2) is hingedly connected to a connecting block (3-2-5) by a pin shaft (3-2-6), the connecting block (3-2-5) is fixed to the piston rod end of the turning power cylinder (3-2-1), and the turning power cylinder (3-2-1) is fixed to the turning main bracket (3-7); the turning power shaft (3-2-3) is movably mounted in the turning power shaft support (3-2-4); a plurality of material receiving bodies (3-3) are evenly distributed on the upper rear part of the turning main bracket (3-7), and the structure of the material receiving body (1-5) is completely the same; a servo length setting mechanism (3-6), FY 30-30B clamping clamp 2 (3-4) and feeding and advancing mechanism 2 (3-5), the structure of FY30-30B clamping clamp 2 (3-4) is exactly the same as that of FY30-30B clamping clamp 1 (1-6), the servo sizing mechanism (3-6) includes a U-shaped sizing support (3-6-1) fixed on the turning main bracket (3-7), and a servo motor (3-6-2) is bolted on the left side of the sizing support (3-6-1) The shaft of the servo motor (3-6-2) is connected to the transmission (3-6-5) in the fixed-length support (3-6-1), and an active fixed-length rotating wheel 1 (3-6-3) is fixed to the output shaft end of the transmission (3-6-5), and a driven fixed-length rotating wheel 2 (3-6-4) is mounted on the fixed-length rotating wheel 1 (3-6-3) by a shaft; the structure of the feeding and advancing mechanism 2 (3-5) is completely the same as that of the feeding and advancing mechanism 1 (1-7).

2. The automatic production line of spiral spikes according to claim 1 is characterized in that A raw material feeding and advancing mechanism frame (1) comprises a plurality of material distribution ramps (1-1) evenly distributed on the raw material feeding and advancing mechanism frame (1), a material blocking block (1-2) and a material shifting block (1-4) being fixed at the front end of each material distribution ramp (1-1); a material shifting transmission mechanism (1-3) being installed at the right end of a power pull rod (1-3-3) installed in front of the raw material feeding and advancing mechanism frame (1); the material shifting transmission mechanism (1-3) comprises a power cylinder (1-3-1), a cylinder rear seat (1-3-10) of the power cylinder (1-3-1) being fixed to the raw material feeding and advancing mechanism frame (1) by bolts, and a cylinder movable member extending from a cylinder front cover (1-3-11) A power link arm (1-3-2) is fixed to the end of the plug rod, and the other end of the power link arm (1-3-2) is movably connected to the power pull rod (1-3-3); the power pull rod (1-3-3) is mounted on the power pull rod suspension (1-3-4), a material shifting swing rod pin shaft (1-3-5) is fixed on the power pull rod (1-3-3) by a nut, the material shifting swing rod pin shaft (1-3-5) is movably connected to a swing rod slideway (1-3-9) provided on the material shifting swing rod (1-3-6), the upper end of the material shifting swing rod (1-3-6) is fixedly connected to the material shifting swing rod shaft (1-3-8), and the material shifting swing rod shaft (1-3-8) is movably mounted on the material shifting swing rod shaft supports (1-3-7) at both ends. ), a material shifting block (1-4) is fixed to the right end of the material shifting rocker shaft (1-3-8); a plurality of material receiving bodies (1-5) are installed in front of the raw material feeding and advancing mechanism frame (1), and the material receiving body (1-5) includes a pair of right-angled supports (1-5-1) fixed on the raw material feeding and advancing mechanism frame (1) by bolts and provided with grooves, a shaft (1-5-2) with a baffle (1-5-3) on one side is installed in the groove, and a material distribution ramp (1-5-4) is installed on the shaft (1-5-2); an FY30-30B clamp (1-6) is installed on the raw material feeding and advancing mechanism frame (1), and the FY30-30B clamp (1-6) is included in the clamp A clamp cylinder (1-6-1) is fixed on a support (1-7-2), and two clamp fingers (1-6-2) are arranged on the cylinder; a feeding and advancing mechanism (1-7) is arranged on the left side of the FY30-30B clamp (1-6); the feeding and advancing mechanism (1-7) comprises a feeding power cylinder frame (1-7-1) arranged on a raw material feeding and advancing mechanism frame (1); the piston rod end of the feeding power cylinder frame (1-7-1) is connected to the clamp support (1-7-2), and slide blocks (1-7-4) with grooves are fixed on both sides below the clamp support (1-7-2), and the grooves of the slide block (1-7-4) are slidably connected to the feeding guide rail (1-7-3).

Citation Information

Patent Citations

  • Screw spike production equipment and screw spike production system

    CN107552716A

  • Low-cost corrosion-resistant spiral spike for railway and preparation process thereof

    CN109487643A

  • Automatic forging production line

    CN110479948A

  • Integrated equipment that high accuracy tubular product scale cut off

    CN207464306U

  • Fixed-length power driving device for bar shearing

    CN209349441U