A dovetail ridge structure and construction method thereof

By combining metal dovetail skeletons and reserved fixtures, a modern dovetail ridge structure is formed using cement mortar shaping layer and cover, solving the problem of difficult reproducibility of traditional dovetail ridges and achieving high strength, stability and easy maintenance effects , suitable for the inheritance of the ancient Ming residence of southern Fujian red bricks.

CN111364669BActive Publication Date: 2024-11-22XIAMEN XINTAORAN LANDSCAPE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010307303.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-17
Publication Date
2024-11-22
Estimated Expiration
2040-04-17

AI Technical Summary

Technical Problem

The craftsmanship and materials of the traditional dovetail ridge structure are difficult to reproduce, which makes it difficult to maintain and inherit the dovetail ridge structure of the ancient Mingju in southern Fujian, resulting in the gradual disappearance of this traditional building.

Method used

The metal dovetail skeleton is combined with the reserved fixtures, and a modern dovetail ridge structure is formed through the cement mortar shaping layer and the cover. The strength and stability are improved by copper strips and copper mesh, and the appearance is adjusted through the paint layer. Standard construction is adopted. Method to reduce difficulty.

Benefits of technology

It has achieved a high-strength and stable dovetail ridge structure, extends its service life, facilitates maintenance and replacement, reduces construction difficulty, and meets the inheritance requirements of market value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111364669B_ABST
    Figure CN111364669B_ABST
Patent Text Reader

Abstract

The present invention relates to a dovetail ridge structure and a construction method thereof, comprising a reserved fixing piece made of metal and fixed to a main ridge by ground nails for main connection, a metal dovetail frame made of copper bars and fixed to the reserved fixing piece by bolt locking or welding at one end for main support carrier, a cement mortar shaping layer wrapped on one end of the copper bars away from the reserved fixing piece for forming the main shape of the dovetail ridge structure, and a cement mortar covering part covering the reserved fixing piece for covering the reserved fixing piece; wherein one end of the metal dovetail frame away from the reserved fixing piece is suspended and warped upward. The present invention has the effect of being able to replace the traditional dovetail ridge structure and construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building structures, and in particular to a dovetail ridge structure and a construction method thereof. Background Art

[0002] The swallowtail ridge plays an important role in the traditional architecture of southern Fujian. The main ridge of the red brick ancient Ming houses in southern Fujian is mostly set in an arc curve, and the two ends of the main ridge are curled up, similar to a crescent shape, and the tail is pointed and forked to form a "swallowtail" shape. Therefore, it is called the swallowtail ridge, also known as the main ridge, which is a very important part of the traditional architecture of southern Fujian.

[0003] Although the number of traditional Minnan buildings such as the Minnan red brick ancient Ming houses is decreasing with the development of urbanization, they are still a very important part in Fujian Province, including clan ancestral houses, some tourist buildings, rural homestead buildings, etc. Therefore, the traditional swallowtail ridge structure still has great market value.

[0004] However, with the advancement of urbanization, the craftsmanship and traditional materials of the traditional swallowtail ridge have been forgotten by people. It is difficult to find traditional materials and craftsmanship, resulting in the swallowtail ridge structure of the existing southern Fujian ancient houses being difficult to reproduce. As a result, the southern Fujian red brick ancient Ming residence is gradually disappearing. Therefore, a new swallowtail ridge structure is urgently needed to maintain the market and inheritance of southern Fujian red brick ancient Ming residence. Summary of the invention

[0005] In view of the shortcomings of the prior art, one of the objects of the present invention is to provide a dovetail ridge structure, which has the effect of replacing the dovetail ridge structure of the hull. The second object of the present invention is to provide a construction method of the dovetail ridge structure, which has the effect of completing the construction of the dovetail ridge structure.

[0006] One of the above-mentioned invention objects of the present invention is achieved through the following technical solutions:

[0007] A dovetail ridge structure, comprising:

[0008] A reserved fixing part is arranged on the main ridge;

[0009] A metal dovetail frame, one end of which is fixed to a reserved fixing piece, and the other end of which is warped upward;

[0010] A cement mortar shaping layer, wherein the cement mortar shaping layer is wrapped on a metal dovetail frame, and one end of the metal dovetail frame connected to the reserved fixing piece extends out of the cement mortar shaping layer;

[0011] And a cement mortar covering part, wherein the cement mortar covering part is connected with the main ridge and covers the reserved fixing piece.

[0012] By adopting the above technical scheme, the metal dovetail frame made of metal has high strength and strong bending resistance, so that the fully formed dovetail ridge has high deformation resistance, ensuring the service life of the dovetail ridge, and the metal dovetail frame is fixed on the main ridge by using the reserved fixings reserved on the main ridge. The cement mortar shaping layer can be used as a carving carrier, so that the formed dovetail ridge structure can show different forms according to construction requirements. The cement mortar covering part can cover the metal dovetail frame and the reserved fixings, so that the cement mortar shaping layer and the main ridge can be integrated.

[0013] In a preferred example, the present invention can be further configured as follows: the reserved fixing piece is made of metal, and the reserved fixing piece is fixed to the main ridge by using ground nails.

[0014] By adopting the above technical solution, the reserved fixing parts made of metal can be quickly fixed on the main ridge using ground nails, and the connection strength between the reserved fixing parts and the main ridge can be ensured, effectively ensuring the bearing effect of the dovetail ridge.

[0015] In a preferred example, the present invention can be further configured as follows: the metal dovetail frame is made of bent copper bars.

[0016] By adopting the above technical solution, the copper strip has strong oxidation resistance, is not easy to rust, has strong flexibility and high plasticity, is easy to bend to form a metal dovetail skeleton, and the copper strip is not easy to expand after changing from hot to cold, and will not cause damage to the cement mortar shaping layer.

[0017] In a preferred example, the present invention can be further configured as follows: one end of the metal dovetail frame extending out of the cement mortar shaping layer is connected to a reserved fixing piece by means of bolt locking.

[0018] By adopting the above technical solution, the connection between the metal dovetail frame and the reserved fixing parts can be quickly achieved through bolt locking.

[0019] In a preferred example, the present invention can be further configured as follows: the metal dovetail frame is wrapped with a copper mesh, and the cement mortar shaping layer is wrapped on the copper mesh.

[0020] By adopting the above technical solution, the copper mesh is used to facilitate the hanging of cement mortar to form a cement mortar shaping layer, and the connection stability between the cement mortar shaping layer and the metal dovetail frame is effectively increased.

[0021] In a preferred example, the present invention can be further configured as follows: it also includes a plaster layer, and the plaster layer is applied to the cement mortar shaping layer so that the formed dovetail ridge is coordinated with the color and shape of the cement mortar masking part.

[0022] By adopting the above technical scheme, errors are likely to occur in the size of the cement mortar shaping layer during molding, resulting in color difference and step surfaces between the cement mortar shaping layer and the cement mortar masking part. By using layers of powder puffs, the molded dovetail ridge structure can be coordinated with the main ridge structure in color and shape, ensuring the appearance of the dovetail ridge structure.

[0023] In a preferred example, the present invention can be further configured as follows: it also includes a reinforcement part, which is integrally formed with the cement mortar shaping layer. When the metal dovetail frame is installed on the main ridge, one end of the reinforcement part close to the reserved fixing part is arranged to contact the side of the house.

[0024] By adopting the above technical solution, the reinforcement part that is arranged to contact the side of the house can play the role of a fulcrum, thereby supporting the suspended part of the dovetail ridge structure and effectively improving the overall stability of the dovetail ridge structure.

[0025] The second object of the present invention is achieved through the following technical solutions:

[0026] A construction method for the above-mentioned dovetail ridge structure comprises the following steps:

[0027] Step 1: Select copper bars of different diameters according to the shape and size of the dovetail ridge;

[0028] Step 2: Bend the copper strip according to the shape of the dovetail ridge to form a metal dovetail frame, then tie the copper mesh on the surface of the metal dovetail frame, and make the end of the metal dovetail frame connected to the main ridge protrude out of the copper mesh;

[0029] Step 3: Wrap cement mortar on the surface of the copper mesh to form a cement mortar shaping layer, and then perform maintenance to wait for the cement mortar shaping layer to dry;

[0030] Step 4: Weld the metal dovetail frame with a cement mortar shaping layer on the surface to the reserved fixing piece reserved on the main ridge, and then cover the reserved fixing piece with mud mortar to form a cement mortar covering part covering the reserved fixing piece;

[0031] Step 5: Apply multiple layers of cement mortar on the cement mortar shaping layer to form a plaster layer that is coordinated with the shape of the cement mortar masking part.

[0032] By adopting the above technical scheme, a metal dovetail frame that meets the standards can be made through steps one and two, the molding of the cement mortar shaping layer can be completed through step three, the metal dovetail frame with the surface wrapped with the cement mortar shaping layer can be installed on the main ridge through step four, and the morphology of the dovetail ridge structure can be adjusted through step five to ensure that the dovetail ridge structure is coordinated with the main ridge; and, by completing the molding of the cement mortar shaping layer before connecting the metal dovetail frame with the reserved fixings, the length of time that construction workers work at high altitudes can be reduced, which can not only reduce the work intensity of construction workers, but also improve safety and construction efficiency.

[0033] In a preferred example, the present invention can be further configured as follows: Step 1, Step 2 and Step 3 are prefabricated in a factory, and Step 4 and Step 5 are performed on site.

[0034] By adopting the above technical solution, by prefabricating step one, step two and step three in the factory, not only can the construction workers avoid being exposed to the sun for a long time, but also it is convenient for the construction workers to take materials.

[0035] In a preferred example, the present invention can be further configured as follows: when the step three is performed, a mold having an appearance shape similar to that of the cement mortar shaping layer can be made, and the step three starts molding by mold casting.

[0036] By adopting the above technical scheme and using a mold to assist in the molding of the cement mortar plastic layer, not only can the rapid molding of the cement mortar plastic layer be improved, but also the standardized and industrialized construction of the cement mortar plastic layer is facilitated, thereby achieving the effect of getting rid of dependence on the technology of the construction personnel.

[0037] In a preferred example, the present invention can be further configured as follows: in step 4, when the main ridge structure is formed, gaps are reserved at both ends of the main ridge structure for use in the installation of reserved fixings.

[0038] By adopting the above technical solution, a gap is reserved on the main ridge to facilitate the installation of the fixing parts, and damage to the main ridge can be avoided.

[0039] In summary, the present invention includes at least one of the following beneficial technical effects:

[0040] The structure is simple and easy to construct, and it can replace the traditional dovetail ridge structure, making the ancient Ming residences in southern Fujian easier to inherit;

[0041] High strength and good stability, not only can the service life be guaranteed, but also it is easy to replace and maintain;

[0042] The construction steps can be standardized and industrialized, eliminating the technical requirements for construction workers, effectively reducing the difficulty of construction and making it more in line with market value. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a schematic diagram of the structure of this embodiment.

[0044] Figure numerals: 1. Metal dovetail frame; 2. Reserved fixings; 3. Copper mesh; 4. Cement mortar shaping layer; 5. Reinforcement part; 6. Cement mortar covering part; 7. Main ridge; 8. Plaster layer. DETAILED DESCRIPTION

[0045] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0046] Reference Figure 1 , which is a dovetail ridge structure disclosed in the present invention, including a reserved fixing piece 2 made of metal and fixed to a main ridge 7 by means of ground nails for main connection, a metal dovetail frame 1 made of a copper bar and fixed to the reserved fixing piece 2 at one end by bolt locking or welding for main support carrier, a cement mortar shaping layer 4 wrapped on one end of the copper bar away from the reserved fixing piece 2 for forming the main shape of the dovetail ridge structure, and a cement mortar covering part 6 covering the reserved fixing piece 2 for covering the reserved fixing piece 2; wherein, one end of the metal dovetail frame 1 away from the reserved fixing piece 2 is suspended and warped upward.

[0047] Among them, the part of the metal dovetail frame 1 extending out of the reserved fixing part 2 is wrapped with a copper mesh 3 for improving the cement mortar hanging ability to ensure the stability and connection strength of the cement mortar shaping layer 4, and the cement mortar shaping layer 4 is coated on the copper mesh 3; wherein, the metal dovetail frame 1 can be welded with different numbers of copper bars according to the specifications of the dovetail ridge structure to ensure the overall strength of the metal dovetail frame 1.

[0048] Among them, a reinforcing part 5 is provided at a position of the cement mortar shaping layer 4 near the reserved fixing part 2, which is located below the cement mortar shaping layer 4 and is integrally formed with the cement mortar shaping layer 4 to improve the overall stability of the dovetail ridge structure; wherein, when the metal dovetail frame 1 is installed on the reserved fixing part 2 located on the main ridge 7 (that is, the upper surface of the house), the reinforcing part 5 is against the side of the house. In this process, the reinforcing part 5 can provide a lateral support effect on the suspended and upwardly warped part of the dovetail ridge structure, so that the suspended part of the dovetail ridge structure is more stable.

[0049] Among them, a plaster layer 8 formed by multiple coats of cement mortar puffing is also provided on the outer surface of the cement mortar shaping layer 4. During the prefabrication process of the cement mortar shaping layer 4, it is difficult to ensure that the color of the cement mortar shaping layer 4 is consistent with the color of the cement mortar masking part 6, and a step surface is easily formed between the connecting parts of the two. Therefore, the plaster layer 8 formed by puffing cement mortar can modulate the surface color of the dovetail ridge structure and eliminate the step surface between the cement mortar shaping layer 4 and the cement mortar masking part 6.

[0050] A construction method for the above-mentioned dovetail ridge structure comprises the following steps:

[0051] Step 1: Select copper bars of different diameters according to the shape and size of the dovetail ridge;

[0052] Step 2: Bend the copper strip according to the shape of the dovetail ridge to form a metal dovetail frame 1, then tie the copper mesh 3 on the surface of the metal dovetail frame 1, and make the end of the metal dovetail frame 1 connected to the main ridge 7 protrude from the copper mesh 3;

[0053] Step 3: Wrap cement mortar on the surface of the copper mesh 3 to form a cement mortar shaping layer 4, and then perform maintenance to wait for the cement mortar shaping layer 4 to dry;

[0054] Step 4: Weld the metal dovetail frame 1 with the cement mortar shaping layer 4 on the reserved fixing piece 2 reserved on the main ridge 7, and then cover the reserved fixing piece 2 with mud mortar to form a cement mortar covering part 6 covering the reserved fixing piece 2;

[0055] Step 5: Apply multiple layers of cement mortar on the cement mortar shaping layer 4 to form a plastering layer 8 that is coordinated with the shape of the cement mortar masking part 6.

[0056] Among them, steps one, two and three are carried out in shaded places (such as inside houses) in factories and construction sites to avoid construction workers being exposed to the sun for a long time, and before step five is carried out, the cement mortar required for the plaster layer 8 and the cement mortar masking part 6 needs to be prepared, and the preparation of this part of the cement mortar can be carried out simultaneously with the installation of the reserved fixings 2.

[0057] Among them, when step three is carried out, a mold with an appearance similar to that of the cement mortar shaping layer 4 can be made. Step three starts molding by mold casting. The mold casting direction can make the two dovetail ridge structures located at both ends of the main ridge 7 very close in size and shape, and can achieve standardized production of dovetail ridge structures, thereby reducing the difficulty of dovetail ridge construction.

[0058] Among them, in step four, when the main ridge 7 structure is formed, gaps are reserved at both ends of the main ridge 7 structure for the installation of the reserved fixing parts 2. When the metal dovetail frame 1 is installed, the gap reserved in the main ridge 7 is covered with concrete to form a cement mortar covering part 6 for covering the reserved fixing part 2.

[0059] When replacing the dovetail ridge structure in the original southern Fujian red brick ancient Ming residence, it is only necessary to break up the part of the main ridge 7 connected to the old dovetail ridge structure to leave a space for the reserved fixing member 2 to be installed.

[0060] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A dovetail ridge structure, characterized in that: include: A reserved fixing piece (2), wherein the reserved fixing piece (2) is arranged on the main ridge (7); A metal dovetail frame (1), wherein one end of the metal dovetail frame (1) is fixed to a reserved fixing piece (2), and the other end of the metal dovetail frame (1) is warped upward; A cement mortar shaping layer (4), wherein the cement mortar shaping layer (4) is wrapped on the metal dovetail frame (1), and one end of the metal dovetail frame (1) connected to the reserved fixing piece (2) extends out of the cement mortar shaping layer (4); And a cement mortar covering part (6), wherein the cement mortar covering part (6) is connected to the main ridge (7) and covers the reserved fixing part (2).

2. The dovetail ridge structure according to claim 1, characterized in that: The reserved fixing piece (2) is made of metal and is fixed on the main ridge (7) by means of ground nails.

3. The dovetail ridge structure according to claim 1, characterized in that: The metal dovetail frame (1) is made by bending a copper bar.

4. The dovetail ridge structure according to claim 1, characterized in that: One end of the metal dovetail frame (1) extending out of the cement mortar shaping layer (4) is connected to the reserved fixing piece (2) by means of bolt locking.

5. The dovetail ridge structure according to claim 1, characterized in that: The metal dovetail frame (1) is wrapped with a copper mesh (3), and the cement mortar shaping layer (4) is wrapped on the copper mesh (3).

6. The dovetail ridge structure according to claim 1, characterized in that: It also includes a plaster layer (8), which is applied to the cement mortar shaping layer (4) so ​​that the formed dovetail ridge is coordinated in color and shape with the cement mortar masking part (6).

7. The dovetail ridge structure according to claim 1, characterized in that: It also includes a reinforcing part (5), which is integrally formed with the cement mortar shaping layer (4). When the metal dovetail frame (1) is installed on the main ridge (7), one end of the reinforcing part (5) close to the reserved fixing part (2) is arranged to abut against the side of the house.

8. A construction method for a dovetail ridge structure as claimed in any one of claims 1 to 7, characterized in that: The following steps are involved: Step 1: Select copper bars of different diameters according to the shape and size of the dovetail ridge; Step 2: Bend the copper strip according to the shape of the dovetail ridge to form a metal dovetail frame (1), then tie the copper mesh (3) on the surface of the metal dovetail frame (1), and make the end of the metal dovetail frame (1) connected to the main ridge (7) protrude outside the copper mesh (3); Step 3: Wrapping cement mortar on the surface of the copper mesh (3) to form a cement mortar shaping layer (4), and then performing maintenance to wait for the cement mortar shaping layer (4) to dry; Step 4: Weld the metal dovetail frame (1) with a cement mortar shaping layer (4) on the surface to the reserved fixing piece (2) reserved on the main ridge (7), and then cover the reserved fixing piece (2) with mud mortar to form a cement mortar covering part (6) covering the reserved fixing piece (2); Step 5: Apply multiple layers of cement mortar on the cement mortar shaping layer (4) to form a plastering layer (8) that is coordinated with the shape of the cement mortar masking part (6).

9. The construction method according to claim 7, characterized in that: The steps 1, 2 and 3 are prefabricated in a factory, and the steps 4 and 5 are performed on site.

10. The construction method according to claim 7, characterized in that: When the step three is carried out, a mold similar in appearance to the cement mortar shaping layer (4) can be made, and the step three begins to shape by casting the mold.