A heating system based on solar geothermal energy combined power generation system
By using the steam turbine outlet waste heat in the solar geothermal power generation system to heat water, and achieving energy cascade utilization through multiple heating modes, the problems of instability in energy output and low use efficiency in the existing system are solved, and energy is improved Utilization efficiency and flexibility of heating systems.
Patent Information
- Application Number
- CN202010370246.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-06
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing solar and geothermal power generation systems are independent, and there are problems of instability in energy output and low usage efficiency. The traditional heating methods are difficult to meet the heating requirements in different seasons and temperature ranges, resulting in low energy utilization efficiency.
A heating system based on solar geothermal energy combined power generation system was designed to heat water using the waste heat from the turbine outlet, and to achieve the step-by-step utilization of energy through a variety of heating modes, including solar heat collecting plates, liquid storage tanks, and geothermal water pre- Heaters, gas-liquid separators, steam turbines, circulation systems and heat exchangers achieve heating demands in different temperature ranges through valve control.
It improves energy utilization efficiency, reduces energy loss, meets the heating needs of different seasons and temperature ranges, and realizes the full utilization of waste heat.
Smart Images

Figure CN111442544B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the extended technical field of solar-geothermal combined power generation systems, and in particular relates to a heating system based on the solar-geothermal combined power generation systems. Background Art
[0002] With the rapid development of the industrial economy, the inefficient use of energy has become an important factor restricting economic development. Fully recycling and utilizing solar energy and geothermal energy can not only improve energy utilization, reduce energy consumption, help alleviate the plight of energy shortage, but also reduce pollutant emissions and create higher ecological and economic benefits.
[0003] At present, the application of solar energy is mostly in a separate solar power generation system, and the application of geothermal energy is also limited to an independent geothermal power generation system. Due to the instability of solar energy, the output of energy is very volatile and is greatly affected by external factors. However, due to the low temperature of geothermal fluid, the use of geothermal energy is limited to the thermal efficiency of the system and There are great limitations on efficiency.
[0004] On the other hand, there is also a lot of room for improvement in the collection and conversion of solar energy. Traditional solutions often use sensible heat storage to adapt to the unevenness and instability of solar energy. Specifically, a hot water storage tank is set inside the solar collector. On the one hand, the heat storage capacity of sensible heat storage is low, and as the water temperature rises, more heat is lost; on the other hand, the volume required for hot water storage tanks is generally large, occupies more space, has higher costs, and is difficult to integrate with buildings.
[0005] This places great restrictions on the use of solar energy and geothermal energy. Therefore, solar energy and geothermal energy are coupled in the same system, and solar energy is used as an auxiliary heat source to heat the geothermal fluid to improve efficiency. This not only reduces the impact of the external environment on the stability of the system, but also increases the temperature of the system's heat source, thereby improving the efficiency and feasibility of the system.
[0006] However, in actual indoor heating and power generation systems, in addition to the basic power supply to users, user needs are significantly affected by the seasons. In winter, heating is mainly needed, while in summer, cooling is mainly needed. The degree of heating required is also different in different temperature ranges. In existing clean energy application solutions, in the face of different needs, the same method of collecting thermal energy is often used, and even the energy is first converted into electrical energy and then converted separately when heating or cooling is needed. This reduces the efficiency of energy collection and utilization to a certain extent. Summary of the invention
[0007] The present invention designs and develops a heating system based on a solar geothermal energy combined power generation system. One of the purposes of the present invention is to utilize the waste heat at the outlet of the steam turbine to heat water for heating on the basis of the existing solar geothermal energy combined power generation system, thereby improving the energy utilization efficiency.
[0008] The present invention designs and develops a heating system based on a solar geothermal energy combined power generation system. The second purpose of the present invention is to be able to realize multiple heating modes to meet the heating needs in different situations and realize the cascade utilization of energy.
[0009] The technical solution provided by the present invention is:
[0010] A heating system based on a solar geothermal combined power generation system, comprising:
[0011] Solar thermal panels;
[0012] A liquid storage tank, which is used to store the heat-conducting oil heated by the solar thermal collector panel;
[0013] A geothermal water preheater, whose heat transfer oil inlet is connected to the outlet of the liquid storage tank, is used for heat exchange between the geothermal water and the heat transfer oil flowing into the liquid storage tank;
[0014] a gas-liquid separator, the inlet of which is connected to the geothermal water outlet of the geothermal water preheater;
[0015] a steam turbine, the inlet of which is connected to the steam outlet of the gas-liquid separator;
[0016] The first circulation system comprises a first circulation superheater, a first circulation steam turbine, a first circulation heat exchanger and a first circulation preheater which are circulated and connected in sequence;
[0017] The inlet end of the first circulation system is connected to the hot working medium outlet of the steam turbine; the first circulation steam turbine is provided with a first incompletely worked fluid outlet;
[0018] The second circulation system comprises a second circulation superheater, a second circulation steam turbine, a second circulation heat exchanger and a second circulation preheater which are cyclically connected in sequence;
[0019] Wherein, the inlet end of the second circulation system is connected to the liquid outlet of the gas-liquid separator; the second circulation steam turbine is provided with a second incompletely worked fluid outlet;
[0020] A first heat supply heat exchanger, whose hot fluid inlet is selectively connected to the first incompletely worked fluid outlet;
[0021] Wherein, the cold fluid outlet of the first circulation heat exchanger is selectively connected to the cold fluid inlet of the second circulation heat exchanger or the cold fluid inlet of the first heat supply heat exchanger;
[0022] A second heat supply heat exchanger, whose cold fluid outlet is connected to the user's heating pipeline inlet;
[0023] Wherein, the cold fluid outlet of the second circulation heat exchanger is selectively connected to the cold fluid inlet of the first heat supply heat exchanger or the cold fluid inlet of the second heat supply heat exchanger;
[0024] A third heat supply heat exchanger, whose cold fluid inlet is connected to the cold fluid outlet of the first heat supply heat exchanger, and the cold fluid outlet of the third heat supply heat exchanger is connected to the user's heating pipeline inlet;
[0025] Wherein, the second incompletely worked fluid outlet is selectively connected to the hot fluid inlet of the second heat supply heat exchanger or the hot fluid inlet of the third heat supply heat exchanger.
[0026] Preferably, a first circulation pump is provided between the first circulation heat exchanger and the first circulation preheater; and a second circulation pump is provided between the second circulation heat exchanger and the second circulation preheater.
[0027] Preferably, the hot fluid outlet of the first heat supply heat exchanger is in communication with the inlet of the first circulation pump.
[0028] Preferably, the hot fluid outlet of the second heat supply heat exchanger and the hot fluid outlet of the third heat supply heat exchanger are respectively communicated with the inlet of the second circulation pump.
[0029] Preferably, the heating system based on the solar geothermal energy combined power generation system further comprises:
[0030] A first three-way valve, a first interface of which is connected to the cold fluid outlet of the first circulating heat exchanger, and a second interface of the first three-way valve is connected to the cold fluid inlet of the second circulating heat exchanger;
[0031] a second three-way valve, a first interface of which is connected to the third interface of the first three-way valve, and a second interface of the second three-way valve is connected to the cold fluid inlet of the first heat supply heat exchanger; and
[0032] The third three-way valve has a first interface connected to the cold fluid outlet of the second circulation heat exchanger, and a second interface connected to the third interface of the second three-way valve; the third interface of the third three-way valve is connected to the cold fluid inlet of the second heat supply heat exchanger.
[0033] Preferably, the heating system based on the solar geothermal energy combined power generation system further comprises:
[0034] A first one-way valve is provided on the pipeline between the first incompletely worked fluid outlet and the first heat supply heat exchanger.
[0035] Preferably, the heating system of the solar-geothermal combined power generation system further includes:
[0036] A second check valve, whose inlet is connected to the second incompletely worked fluid outlet; and
[0037] A fourth three-way valve, whose first interface is connected to the outlet of the second check valve, the second interface is connected to the hot fluid inlet of the second heating heat exchanger, and the third interface is connected to the hot fluid inlet of the third heating heat exchanger.
[0038] Preferably, when 5°C < T ≤ 15°C, the first interface and the second interface of the first three-way valve are opened, and the third interface is closed; the first interface and the third interface of the third three-way valve are opened, and the second interface is closed; the first check valve and the second check valve are closed.
[0039] Preferably, when -5°C < T ≤ 5°C, the first check valve is opened; the first interface and the second interface of the first three-way valve are opened, and the third interface is closed; the first interface of the second check valve is closed, and the second interface and the third interface are opened; the first interface and the second interface of the third three-way valve are opened, and the third interface is closed; the second check valve is closed.
[0040] Preferably, when -15°C < T ≤ -5°C, the first check valve and the second check valve are opened; the first interface and the third interface of the first three-way valve are opened, and the second interface is closed; the first interface and the second interface of the second three-way valve are opened, and the third interface is closed; the first interface and the third interface of the third three-way valve are opened, and the second interface is closed; the first interface and the second interface of the fourth three-way valve are opened, and the third interface is closed.
[0041] Preferably, when T ≤ -15°C, the first check valve and the second check valve are opened; the first interface and the third interface of the first three-way valve are opened, and the second interface is closed; the first interface and the second interface of the second three-way valve are opened, and the third interface is closed; the first interface and the third interface of the third three-way valve are opened, and the second interface is closed; the first interface and the third interface of the fourth three-way valve are opened, and the second interface is closed.
[0042] The beneficial effects of the present invention are:
[0043] (1) The heating system of the solar-geothermal combined power generation system provided by the present invention utilizes the waste heat at the outlet of the steam turbine to heat water for heating on the basis of the existing solar-geothermal combined power generation system, thereby improving the energy utilization efficiency.
[0044] (2) The heating system based on the solar-geothermal combined power generation system provided by the present invention can achieve multiple heating modes to meet the heating requirements in different situations, realizing the cascade utilization of energy; thereby further improving the energy utilization efficiency and reducing energy loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 FIG. is a schematic diagram of the overall structure of the heating system based on the solar-geothermal combined power generation system of the present invention.
[0046] Figure 2 FIG. is a simplified schematic diagram of the heating system when the ambient temperature T > 15°C of the present invention.
[0047] Figure 3 FIG. is a simplified schematic diagram of the heating system when 5°C < T ≤ 15°C of the present invention.
[0048] Figure 4 FIG. is a simplified schematic diagram of the heating system when -5°C < T ≤ 5°C of the present invention.
[0049] Figure 5 FIG. is a simplified schematic diagram of the heating system when -15°C < T ≤ -5°C of the present invention.
[0050] Figure 6 FIG. is a schematic diagram of the heating system when the ambient temperature drops below -15°C of the present invention. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0051] The following further describes the present invention in detail with reference to the drawings, so that those skilled in the art can implement it according to the description in the specification.
[0052] As Figure 1 shown, the present invention provides a heating system based on a solar-geothermal combined power generation system, mainly including: a solar collector 110, a liquid storage tank 111, a pump 120, a pump 130, a geothermal water preheater 140, a gas-liquid separator 150, a steam turbine 160, an upper cycle superheater 171, an upper cycle preheater 172, an upper cycle steam turbine 173, an upper cycle heat exchanger 174, an upper cycle pump 175, a lower cycle superheater 181, a lower cycle preheater 182, a lower cycle steam turbine 183, a lower cycle heat exchanger 184, a lower cycle pump 185, an upper heating heat exchanger 210, a lower heating heat exchanger 220, and an upper heating secondary heat exchanger 230.
[0053] The solar collector panel 110 heats the heat transfer oil by focusing solar energy. The heated heat transfer oil flows through the liquid storage tank 111 and then enters the geothermal water preheater 140 to exchange heat with the geothermal fluid. The pump 130 is used to pump the geothermal fluid into the geothermal water preheater 140, and the pump 120 is used to pump the heat transfer oil discharged from the geothermal water preheater 140 (after heat exchange with the geothermal fluid) into the solar collector panel 110. The heat transfer oil is then heated and circulated again.
[0054] The geothermal fluid is pressurized by the pump 130, absorbs heat in the geothermal water preheater 140, and then enters the gas-liquid separator 150. The outlet of the gas-liquid separator 150 is divided into two paths, one is high-temperature and high-pressure steam, and the other is high-temperature liquid. Among them, the high-temperature and high-pressure steam enters the steam turbine 160 to work for power generation, and then enters the upper circulation system (composed of the upper circulation superheater 171, the upper circulation preheater 172, the upper circulation steam turbine 173, the upper circulation heat exchanger 174 and the upper circulation pump 175). The high-temperature fluid discharged from the steam turbine 160 enters the upper circulation steam turbine 173 through the upper circulation superheater 171 to perform work for power generation; the waste heat medium discharge port of the upper circulation steam turbine 173 is connected to the hot fluid inlet of the upper circulation heat exchanger 174, and the waste heat medium of the upper circulation steam turbine 173 enters the upper circulation heat exchanger 174 to heat the normal temperature water (entering from the cold fluid inlet of the upper circulation heat exchanger 174). The high-temperature liquid discharged from the gas-liquid separator 150 enters the lower circulation system (composed of the lower circulation superheater 181, the lower circulation preheater 182, the lower circulation steam turbine 183, the lower circulation heat exchanger 184 and the lower circulation pump 185), and the high-temperature liquid enters the lower circulation steam turbine 183 to perform work for power generation. The waste heat medium outlet of the lower circulation steam turbine 183 is connected to the hot fluid inlet of the lower circulation heat exchanger 184, and the waste heat medium of the lower circulation steam turbine 183 enters the lower circulation heat exchanger 184 to heat the normal temperature water (entering from the cold fluid inlet of the lower circulation heat exchanger 184).
[0055] The upper circulation system and the lower circulation system are connected via a one-way valve 310 , a three-way valve 320 , a three-way valve 330 , a three-way valve 340 , a one-way valve 350 and a three-way valve 360 , respectively.
[0056] An incompletely worked fluid outlet 173a is provided in the middle of the upper circulation steam turbine 173 to lead out incompletely worked fluid (temperature is about 120°C). The incompletely worked fluid outlet 173a is connected to the hot fluid inlet of the upper heat supply heat exchanger 210 through a pipeline, and a one-way valve 310 is installed on the pipeline. The cold fluid outlet of the upper circulation heat exchanger 174 is connected to the interface 320a of the three-way valve 320, and the interface 320b of the three-way valve 320 is connected to the cold fluid inlet of the lower circulation heat exchanger 184. The interface 330a of the three-way valve 330 is connected to the interface 320c of the three-way valve 320, and the interface 330b is connected to the cold fluid inlet of the upper heat supply heat exchanger 210. The interface 340a of the three-way valve 340 is connected to the cold fluid outlet of the lower circulation heat exchanger 184, the interface 340b is connected to the interface 330c of the three-way valve 330, and the interface 340c is connected to the cold fluid inlet of the lower heating heat exchanger 220. An incomplete working fluid outlet 183a is provided in the middle of the lower circulation steam turbine 183 to lead out the incomplete working fluid (temperature is about 130°C), the inlet of the one-way valve 350 is connected to the incomplete working fluid outlet 183a, the outlet of the one-way valve 350 is connected to the interface 360a of the three-way valve 360, and the interfaces 360b and 360c of the three-way valve 360 are respectively connected to the hot fluid inlets of the lower heating heat exchanger 220 and the upper heating secondary heat exchanger 230. The cold fluid outlet of the upper heat supply heat exchanger 210 is connected to the cold fluid inlet of the upper heat supply secondary heat exchanger 230, and the cold fluid outlet of the upper heat supply secondary heat exchanger 230 is connected to the inlet of the user's heating pipeline (not shown in the figure); the cold fluid outlet of the lower heat supply heat exchanger 220 is connected to the inlet of the user's heating pipeline (not shown in the figure). In addition, the hot fluid outlet of the upper heat supply heat exchanger 210 is connected to the port of the upper circulation pump 175, so that the hot fluid discharged from the hot fluid outlet of the upper heat supply heat exchanger 210 enters the upper circulation system again; the hot fluid outlets of the lower heat supply heat exchanger 220 and the upper heat supply secondary heat exchanger 230 are respectively connected to the inlet of the lower circulation pump 185, so that the hot fluid discharged from the hot fluid outlets of the lower heat supply heat exchanger 220 and the upper heat supply secondary heat exchanger 230 enters the lower circulation system again.
[0057] The heating system based on the solar geothermal energy combined power generation system provided by the present invention can realize multiple heating modes according to the change of ambient temperature, which are as follows:
[0058] (1) This is the heating distribution plan when the heating demand of users is at its lowest, used for heating in summer (T > 15°C, where T represents the ambient temperature). Close the one-way valves 310 and 350; open the interfaces 320a and 320c of the three-way valve 320, and close the interface 320b; open the interfaces 330a and 330b of the one-way valve 330, and close the interface 330c; open the interfaces 340a and 340c of the three-way valve 340, and close the interface 340b, and open the one-way valve 370. At this time, the upper heating heat exchanger 210, the lower heating heat exchanger 220, and the upper heating secondary heat exchanger 230 in the system all only act as pipelines. Therefore, the heating system diagram is simplified to Figure 2 . The normal temperature water enters the upper circulation heat exchanger 174 and the lower circulation heat exchanger 184 from the cold fluid inlets of the upper circulation heat exchanger 174 and the lower circulation heat exchanger 184 respectively; the waste heat working fluids discharged from the upper circulation steam turbine 173 and the lower circulation steam turbine 183 are respectively introduced into the upper circulation heat exchanger 174 and the lower circulation heat exchanger 184, so that they exchange heat with the normal temperature water in the heat exchanger. The temperature of the waste heat working fluid of the upper circulation steam turbine 173 is about 80°C, and the temperature of the waste heat working fluid of the lower circulation steam turbine 183 is about 100°C; the hot water discharged from the cold fluid outlet of the upper circulation heat exchanger 174 at a temperature of about 50°C and the hot water discharged from the cold fluid outlet of the lower circulation heat exchanger 184 at a temperature of about 60°C are respectively used to supply heat to users, thus making full use of the waste heat in the solar geothermal power generation system.
[0059] (2) When 5°C < T ≤ 15°C, close the one-way valves 310 and 350; open the interfaces 320a and 320b of the three-way valve 320, and close the interface 320c; open the interfaces 340a and 340c of the three-way valve 340, and close the interface 340b; and close the one-way valve 370 on the pipeline where the normal temperature water enters the lower circulation heat exchanger 184. At this time, the upper heating heat exchanger 210 and the upper heating secondary heat exchanger 230 in the system are in an idle state, and the lower heating heat exchanger 220 only acts as a pipeline. Therefore, the heating system diagram is simplified to Figure 3 . Since the temperature of the waste heat working fluid discharged from the steam turbine 173 in the upper cycle is lower than the temperature of the waste heat working fluid discharged from the steam turbine 183 in the lower cycle, the normal temperature water heated in the upper circulation heat exchanger 174 is introduced into the lower circulation heat exchanger 184 (through the cold fluid inlet of the lower circulation heat exchanger 184), so that the normal temperature water that has been heated in the upper circulation heat exchanger 174 is reheated in the lower circulation heat exchanger 184 to increase the temperature of the water. Then, the hot water discharged from the cold fluid outlet of the lower circulation heat exchanger 184 is supplied to users together to meet the increasing heating demand of users.
[0060] (3) As the weather gradually gets colder, when -5°C < T ≤ 5°C, the one-way valve 310 opens, and the one-way valve 350 closes; the interfaces 320a and 320b of the three-way valve 320 open, and the interface 320c closes; the interface 330a of the one-way valve 330 closes, and the interfaces 330b and 330c open; the interfaces 340a and 340b of the three-way valve 340 open, and the interface 340c closes; the one-way valve 370 closes. At this time, the upper part of the heating secondary heat exchanger 230 in the system only acts as a pipeline, and the lower heating heat exchanger 220 is in an idle state. Therefore, the heating system diagram is simplified to Figure 4 . The heated normal temperature water in the upper circulation heat exchanger 174 is introduced into the lower circulation heat exchanger 184 (through the cold fluid inlet of the lower circulation heat exchanger 184). After the water that has been heated in the upper circulation is reheated in the lower circulation, it is then discharged from the cold fluid outlet of the lower circulation heat exchanger 184 to the cold fluid inlet of the upper heating heat exchanger 210; at the same time, a part of the fluid that has not fully done work (with a temperature of about 120°C) is led out from the middle section of the steam turbine 173 in the upper circulation as a heat source to heat the cold fluid in the upper heating heat exchanger 210, and hot water with a temperature of about 80°C can be obtained and discharged from the cold fluid outlet of the upper heating heat exchanger 210 to supply users, so as to meet the heating demand of users.
[0061] (4) When -15°C < T ≤ -5°C, the one-way valve 310 and the one-way valve 350 open; the interfaces 320a and 320c of the three-way valve 320 open, and the interface 320b closes; the interfaces 330a and 330b of the three-way valve 330 open, and the interface 330c closes; the interfaces 340a and 340c of the three-way valve 340 open, and the interface 340b closes; the interfaces 360a and 360b of the three-way valve 360 open, and the interface 360c closes, and the one-way valve 370 opens. At this time, the upper part of the heating secondary heat exchanger 230 in the system only acts as a pipeline. Therefore, the heating system diagram is simplified to Figure 5In the upper circulation system, the normal temperature water heated in the upper circulation heat exchanger 174 enters the upper heat supply heat exchanger 210 from the cold fluid inlet of the upper heat supply heat exchanger 210; at the same time, a part of the incompletely worked fluid (temperature of about 120°C) is drawn out from the middle section of the upper circulation turbine 173 as a heat source to heat the cold fluid in the upper heat supply heat exchanger 210. In the lower circulation system, the normal temperature water heated in the lower circulation heat exchanger 184 enters the lower heat supply heat exchanger 220 from the cold fluid inlet of the lower heat supply heat exchanger 220; at the same time, a part of the incompletely worked fluid (temperature of about 130°C) is drawn out from the middle section of the lower circulation turbine 183 as a heat source to heat the cold fluid in the lower heat supply heat exchanger 220. The upper heat exchanger 210 and the lower heat exchanger 220 can respectively obtain hot water with a temperature of about 70°C and 80°C and supply it to users, which increases both the water temperature and the water flow rate, thereby meeting the increased heating requirements of users.
[0062] (5) When the ambient temperature drops below -15°C, the user's heating demand reaches the highest. One-way valve 310 and one-way valve 350 are opened; interface 320a and interface 320c of three-way valve 320 are opened, and interface 320b is closed; interface 330a and interface 330b of three-way valve 330 are opened, and interface 330c is closed; interface 340a and interface 340c of three-way valve 340 are opened, and interface 340b is closed; interface 360a and interface 360c of three-way valve 360 are opened, and interface 360b is closed; one-way valve 370 is opened. At this time, the lower heat exchanger 220 is used only as a pipeline, and the heating system diagram is simplified to Figure 6In the upper circulation system, the normal temperature water heated in the upper circulation heat exchanger 174 enters the upper heat supply heat exchanger 210 from the cold fluid inlet of the upper heat supply heat exchanger 210; at the same time, a part of the incompletely worked fluid (temperature is about 120°C) is drawn out from the middle section of the upper circulation turbine 173 as a heat source to heat the cold fluid in the upper heat supply heat exchanger 210; the cold fluid heated in the upper heat supply heat exchanger 210 enters the upper heat supply secondary heat exchanger 230 from the cold fluid inlet of the upper heat supply secondary heat exchanger 230. In the lower circulation system, the normal temperature water is heated in the lower circulation heat exchanger 184 (by the waste heat of the lower circulation steam turbine 183) to obtain water at about 60°C, which is directly supplied to the users; at the same time, a part of the incompletely worked fluid (temperature is about 130°C) is drawn out from the middle section of the lower circulation steam turbine 183 as a heat source to heat the cold fluid of the upper heating secondary heat exchanger 230, which is equivalent to the heated cold fluid discharged from the upper heating heat exchanger 210 being heated again in the upper heating secondary heat exchanger 230 to obtain water at 90°C to 100°C, which is supplied to the users. This is equivalent to producing both high temperature water (90°C to 100°C) and medium temperature water (about 60°C) in the heating system, which meets both the demand for higher heating temperature and the demand for larger heating quantity.
[0063] In the existing solar geothermal combined power generation system, the waste heat at the turbine outlet is discarded. The present invention utilizes the waste heat at the turbine outlet to provide heating to users, which not only meets the needs of users but also improves energy utilization efficiency and realizes the cascade utilization of energy.
[0064] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A heating system based on a solar geothermal combined power generation system, characterized in that: include: Solar thermal panels; A liquid storage tank, which is used to store the heat-conducting oil heated by the solar thermal collector panel; A geothermal water preheater, whose heat transfer oil inlet is connected to the outlet of the liquid storage tank, is used for heat exchange between the geothermal water and the heat transfer oil flowing into the liquid storage tank; a gas-liquid separator, the inlet of which is connected to the geothermal water outlet of the geothermal water preheater; a steam turbine, the inlet of which is connected to the steam outlet of the gas-liquid separator; The first circulation system comprises a first circulation superheater, a first circulation steam turbine, a first circulation heat exchanger and a first circulation preheater which are circulated and connected in sequence; Wherein, the inlet end of the first circulation system is connected to the hot working medium outlet of the steam turbine; the first circulation steam turbine is provided with a first incompletely worked fluid outlet; The second circulation system comprises a second circulation superheater, a second circulation steam turbine, a second circulation heat exchanger and a second circulation preheater which are cyclically connected in sequence; Wherein, the inlet end of the second circulation system is connected to the liquid outlet of the gas-liquid separator; the second circulation steam turbine is provided with a second incompletely worked fluid outlet; A first heat supply heat exchanger, whose hot fluid inlet is selectively connected to the first incompletely worked fluid outlet; Wherein, the cold fluid outlet of the first circulation heat exchanger is selectively connected to the cold fluid inlet of the second circulation heat exchanger or the cold fluid inlet of the first heat supply heat exchanger; A second heat supply heat exchanger, whose cold fluid outlet is connected to the user's heating pipeline inlet; Wherein, the cold fluid outlet of the second circulation heat exchanger is selectively connected to the cold fluid inlet of the first heat supply heat exchanger or the cold fluid inlet of the second heat supply heat exchanger; A third heat supply heat exchanger, whose cold fluid inlet is connected to the cold fluid outlet of the first heat supply heat exchanger, and the cold fluid outlet of the third heat supply heat exchanger is connected to the user's heating pipeline inlet; Wherein, the second incompletely worked fluid outlet is selectively connected to the hot fluid inlet of the second heat supply heat exchanger or the hot fluid inlet of the third heat supply heat exchanger; a first three-way valve, a first interface of which is connected to the cold fluid outlet of the first circulating heat exchanger, and a second interface of which is connected to the cold fluid inlet of the second circulating heat exchanger; a second three-way valve, a first interface of which is connected to the third interface of the first three-way valve, and a second interface of the second three-way valve is connected to the cold fluid inlet of the first heat supply heat exchanger; and A third three-way valve, wherein the first interface of the third three-way valve is connected to the cold fluid outlet of the second circulating heat exchanger, and the second interface of the third three-way valve is connected to the third interface of the second three-way valve; the third interface of the third three-way valve is connected to the cold fluid inlet of the second heat supply heat exchanger; A first one-way valve is arranged on the pipeline between the first incompletely worked fluid outlet and the first heat supply heat exchanger; a second one-way valve, the inlet of which is connected to the second incompletely worked fluid outlet; and A fourth three-way valve has a first interface connected to the outlet of the second one-way valve, a second interface connected to the hot fluid inlet of the second heat supply heat exchanger, and a third interface connected to the hot fluid inlet of the third heat supply heat exchanger.
2. The heating system based on the solar geothermal energy combined power generation system according to claim 1 is characterized in that: A first circulation pump is provided between the first circulation heat exchanger and the first circulation preheater; a second circulation pump is provided between the second circulation heat exchanger and the second circulation preheater.
3. The heating system based on the solar geothermal energy combined power generation system according to claim 2 is characterized in that: The hot fluid outlet of the first heat supply heat exchanger is communicated with the inlet of the first circulation pump.
4. The heating system based on the solar geothermal energy combined power generation system according to claim 3 is characterized in that: The hot fluid outlets of the second heat supply heat exchanger and the third heat supply heat exchanger are respectively communicated with the inlet of the second circulation pump.
5. The heating system based on the solar geothermal energy combined power generation system according to claim 4 is characterized in that: When -5°C < T ≤ 5°C, the first one-way valve opens; the first and second interfaces of the first three-way valve open, and the third interface closes; the first interface of the second one-way valve closes, and the second and third interfaces open; the first and second interfaces of the third three-way valve open, and the third interface closes; the second one-way valve closes.
6. The heating system based on the solar geothermal energy combined power generation system according to claim 5 is characterized in that: When -15°C < T ≤ -5°C, the first one-way valve and the second one-way valve open; the first and third interfaces of the first three-way valve open, and the second interface closes; the first and second interfaces of the second three-way valve open, and the third interface closes; the first and third interfaces of the third three-way valve open, and the second interface closes; the first and second interfaces of the fourth three-way valve open, and the third interface closes.
7. The heating system based on the solar geothermal energy combined power generation system according to claim 6 is characterized in that: When T ≤ -15°C, the first one-way valve and the second one-way valve open; the first and third interfaces of the first three-way valve open, and the second interface closes; the first and second interfaces of the second three-way valve open, and the third interface closes; the first and third interfaces of the third three-way valve open, and the second interface closes; the first and third interfaces of the fourth three-way valve open, and the second interface closes.
Citation Information
Patent Citations
Solar / ground source heat integrated electricity generation / cold / heating co-supply device
CN102338051A
Carbon dioxide capture system assisted by combination of solar energy and geothermal energy
CN105561742A
Solar energy and geothermal energy coupling power generation system device based on organic Rankine cycle
CN109139157A
Geothermal energy and solar energy coupling power generation device and method
CN109268224A
Heat supply system based on solar geothermal energy combined power generation system
CN212132923U
