A steel staircase structure

Through the hinges of the steel staircase structure and the cross-cable connection of chain rods, the problem of traditional concrete stairs being destroyed first under strong earthquakes is solved, the lateral stability of the stairs is achieved, the construction is simple and efficient, and the destruction of the stairs under strong earthquakes is avoided. .

CN111456348BActive Publication Date: 2024-10-15BEIJING INST OF ARCHITECTURAL DESIGN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010428713.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-20
Publication Date
2024-10-15
Estimated Expiration
2040-05-20

AI Technical Summary

Technical Problem

Traditional concrete stairs are prone to damage before the main structure under strong earthquakes, affecting escape safety. Moreover, the existing sliding bearing structure is prone to overlap vertical damage under strong vertical earthquakes, and the nodes fail before the main components.

Method used

The steel staircase structure is adopted, and the hinged end is connected to the main structure through two sets of pins and the chain rod cross-cable connection at the hanging end to ensure that the stair section does not participate in the overall stress of the main structure under strong earthquakes, and is prefabricated in the factory and on-site. After the nodes are installed, they are filled with flexible materials to complete the construction.

Benefits of technology

It achieves a statically determined connection between the staircase and the main structure, preventing the staircase from being destroyed first under strong earthquakes, ensuring the lateral stability of the staircase and making construction simple and efficient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111456348B_ABST
    Figure CN111456348B_ABST
Patent Text Reader

Abstract

The present invention discloses a steel staircase structure, which includes a plurality of stair sections and a main structure. The stair section includes an inclined section of a stair run and a horizontal section of a rest platform. According to the connection method, the two ends of the stair section are divided into a hinged end and a hanging end. The hinged end of each stair section is hingedly connected to the main beam on one side of the main structure through two sets of pins. The hanging end of each stair section is connected to the main beam on the other side of the main structure through a chain rod. The present application realizes a static connection between the staircase and the surrounding main structure in the direction of the stair run by hinged connection at one end of the stair section and chain rod connection at the other end. In this direction, the staircase does not participate in the overall stress of the main structure. The staircase can be prevented from being destroyed before the main structure under a strong earthquake. In addition, since the stair section is hingedly connected to the platform beam with two sets of pins at the hinged end and cross-pulled with two sets of cables at the hanging end, the lateral stability of the stair section can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building structures, in particular to a steel staircase structure. Background Art

[0002] In building structures, concrete stairs and the main structure are generally cast as a whole. However, under the action of an earthquake, the stairs and the main structure jointly participate in resisting horizontal forces, which is equivalent to the diagonal bracing components participating in the structural lateral resistance, providing lateral stiffness for the main structure, and the force is complex. Previous earthquake damage, especially the 2008 Wenchuan earthquake damage survey, showed that the traditional concrete stairs in the frame structure often fail before other components under strong earthquakes, affecting people's escape.

[0003] Therefore, the Code for Seismic Design of Buildings (GB 50011-2010) points out that structural measures should be taken for frame structures to reduce the impact of staircase components on the rigidity of the main structure. The Cast-in-place Concrete Slab Staircase (16G101-2) provides a construction method for setting a sliding support at one end of a concrete structure staircase (e.g. Figure 1 As shown), the stair section 16 is separated from the platform beam column 17, does not participate in the overall stress of the frame, and is not destroyed first in a strong earthquake. Figure 1 The construction method in the embodiment causes the ladder section 16 and the platform ladder beam to be vertically disconnected at the sliding support. Under the action of a strong vertical earthquake, the sliding end is prone to vertical overlap failure, and the node fails before the main component.

[0004] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to those skilled in the art. Summary of the invention

[0005] The purpose of the present invention is to provide a steel staircase structure to solve the technical problems existing in the prior art.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] The present invention provides a steel staircase structure, comprising a plurality of stair sections and a main structure, wherein the stair section comprises an inclined section of stair treads and a horizontal section of a rest platform; according to a connection method, both ends of the stair section are divided into a hinged end and a hanging end; the hinged end of each stair section is hingedly connected to a main beam on one side of the main structure through two groups of pins; and the hanging end of each stair section is connected to a main beam on the other side of the main structure through a chain rod.

[0008] As a further technical solution, the front ends of the ladder beams on both sides of the inclined section of the ladder run are provided with two hinged end ladder beam ear plates, and the two ends of the hanging end platform beam at the rear end of the horizontal section of the rest platform are provided with two hanging end platform beam ear plates; the main beam on one side of the main structure is provided with a main beam hinged end ear plate; the two ends of the chain rod are provided with rod end ear plates; the main beam on the other side of the main structure is provided with a main beam hanging end ear plate; the main beam hinged end ear plate extends into the two hinged end ladder beam ear plates and is hinged through the hinged end pin shaft; the rod end ear plate at the lower end of the chain rod extends into the two hanging end platform beam ear plates and is hinged through the hanging end pin shaft; the rod end ear plate at the upper end of the chain rod is hinged to the main beam hanging end ear plate through a pin shaft.

[0009] As a further technical solution, lower cable lug plates are provided on both sides of the suspension end platform beam, and upper cable lug plates are provided on both sides of the main beam on the other side of the main structure; two cables are cross-shaped and hingedly connected to the lower cable lug plate and the upper cable lug plate respectively through cable pins.

[0010] As a further technical solution, the rear end of the horizontal section of the rest platform of each stair section is hung on the main beam on the other side of the main structure through two chain rods.

[0011] As a further technical solution, the deformation joints between the stair sections are filled with flexible filling materials.

[0012] A construction method for a steel staircase structure, the method comprising the following steps:

[0013] 1) The staircase section is prefabricated in a factory;

[0014] 2) completing the node installation between the staircase section and the frame at the construction site until the designed height;

[0015] 3) The entire staircase construction can be completed by filling the deformation joints between the stair sections with flexible filling materials.

[0016] By adopting the above technical solution, the present invention has the following beneficial effects:

[0017] 1. This application realizes a static connection between the stairs and the surrounding main structure in the direction of the stair run by hinged connection at one end of the stair section and chain rod connection at the other end. In this direction, the stairs do not participate in the overall stress of the main structure, which can prevent the stairs from being damaged before the main structure under strong earthquakes.

[0018] 2. Since the stair section is hingedly connected to the platform beam with two sets of pins at the hinged end and two sets of cables are cross-connected at the hanging end, the overall lateral stability of the stairs can be ensured.

[0019] 3. The accompanying surface layers of each stair section can be prefabricated in the factory. After the construction site is lifted to the designed height and the node installation is completed, the entire staircase construction can be completed by filling the deformation joints between the stair sections with flexible filling materials, which greatly improves the degree of stair prefabrication and simplifies the on-site construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 It is a structural schematic diagram of a sliding support for a concrete slab staircase in the prior art;

[0022] Figure 2 A schematic diagram of the three-dimensional structure of a steel staircase structure provided by an embodiment of the present invention;

[0023] Figure 3 The structural plan and cross-sectional view of the steel staircase structure provided by the embodiment of the present invention;

[0024] Figure 4 for Figure 3 AA section view;

[0025] Figure 5 for Figure 3 BB section view;

[0026] Icons: 1-main beam on one side of the main structure, 2-ear plate at the hinged end of the main beam, 3-ear plate at the hinged end of the ladder beam, 4-pin shaft at the hinged end, 5-ladder beam, 6-stair treads, 7-main beam on the other side of the main structure, 8-platform beam at the hanging end, 9-ear plate at the hanging end of the main beam, 10-ear plate at the hanging end of the platform beam, 11-chain rod, 12-pin shaft at the hanging end, 13-flexible filling material, 14-cable, 15-cable pin shaft, 16-stair section, 17-platform beam column. DETAILED DESCRIPTION

[0027] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0030] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0031] Combination Figure 2-5 As shown, this embodiment provides a steel staircase structure, including a plurality of stair sections and a main structure, wherein the stair section includes an inclined section of a stair run and a horizontal section of a rest platform; according to the connection method, the two ends of the stair section are divided into a hinged end and a hanging end; the hinged end of each stair section is hingedly connected to the main beam 1 on one side of the frame structure through two sets of pins; the hanging end of each stair section is connected to the main beam 7 on the other side of the main structure through a chain rod 11.

[0032] In this embodiment, as a further technical solution, the front ends of the ladder beams 5 on both sides of the inclined section of the ladder run are provided with two hinged end ladder beam ear plates 3, and the two ends of the hanging end platform beam 8 at the rear end of the horizontal section of the rest platform are provided with two hanging end platform beam ear plates 10; the main beam hinged end ear plates 2 are provided on the main beam 1 on one side of the frame structure; the two ends of the chain rod 11 are provided with rod end ear plates; the main beam hanging end ear plates 9 are provided on the main beam 7 on the other side of the main structure; the main beam hinged end ear plates 2 extend into the two hinged end ladder beam ear plates 3 and are hinged through the hinged end pin shaft 4; the rod end ear plates at the lower end of the chain rod 11 extend into the two hanging end platform beam ear plates 10 and are hinged through the hanging end pin shaft 12; the rod end ear plates at the upper end of the chain rod 11 are hinged with the main beam hanging end ear plates 9 through the pin shaft. A plurality of stair steps 6 are provided between the ladder beams 5 on both sides of the stair section.

[0033] In this embodiment, lower cable lugs are provided on both sides of the platform beam 8 at the hanging end, and upper cable lugs are provided on both sides of the main beam 7 at the other side of the main structure; two cables 14 are cross-shaped and hingedly connected to the lower cable lugs and the upper cable lugs respectively through cable pins 15. The staircase section is connected to the platform beam at the hinged end with two sets of pins to achieve a hinged connection, and two sets of cables are cross-connected at the hanging end, which can ensure the overall lateral stability of the staircase section and the comfort requirements during the use stage.

[0034] In this embodiment, as a further technical solution, the rear end of the horizontal section of the rest platform of each stair section is hung on the main beam 7 on the other side of the main structure through two chain rods 11.

[0035] In this embodiment, as a further technical solution, the deformation joints between the stair sections are filled with flexible filling material 13 (such as asphalt hemp).

[0036] A construction method for a steel staircase structure, the method comprising the following steps:

[0037] 1) The staircase section is prefabricated in a factory;

[0038] 2) Complete the node installation between the staircase section and the main structure at the construction site until the designed height;

[0039] 3) The entire staircase construction can be completed by filling the deformation joints between the stair sections with flexible filling materials.

[0040] In summary, the present invention has the following beneficial effects:

[0041] 1. This application realizes a static connection between the stairs and the surrounding main structure in the direction of the stair run by hinged connection at one end of the stair section and chain rod connection at the other end. In this direction, the stairs do not participate in the overall stress of the main structure, which can prevent the stairs from being damaged before the main structure under strong earthquakes.

[0042] 2. Since the stair section is hingedly connected to the platform beam with two sets of pins at the hinged end and two sets of cables are cross-connected at the hanging end, the overall lateral stability of the stairs can be ensured.

[0043] 3. The accompanying surface layers of each stair section can be prefabricated in the factory. After the construction site is lifted to the designed height and the node installation is completed, the entire staircase construction can be completed by filling the deformation joints between the stair sections with flexible filling materials, which greatly improves the degree of stair prefabrication and simplifies the on-site construction process.

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A steel staircase structure, characterized in that: The staircase comprises a plurality of stair sections and a main structure, wherein the stair section comprises an inclined section of stair treads and a horizontal section of a rest platform; according to the connection mode, the two ends of the stair section are divided into a hinged end and a hanging end; the hinged end of each stair section is hingedly connected to the main beam on one side of the main structure through two sets of pins; the hanging end of each stair section is connected to the main beam on the other side of the main structure through a chain rod; The front ends of the ladder beams on both sides of the inclined section of the ladder run are provided with two hinged end ladder beam ear plates, and the two ends of the hanging end platform beam at the rear end of the horizontal section of the rest platform are provided with two hanging end platform beam ear plates; the main beam on one side of the main structure is provided with a main beam hinged end ear plate; the two ends of the chain rod are provided with rod end ear plates; the main beam on the other side of the main structure is provided with a main beam hanging end ear plate; the main beam hinged end ear plate extends into the two hinged end ladder beam ear plates and is hinged through the hinged end pin shaft; the rod end ear plate at the lower end of the chain rod extends into the two hanging end platform beam ear plates and is hinged through the hanging end pin shaft; the rod end ear plate at the upper end of the chain rod is hinged to the main beam hanging end ear plate through the pin shaft; Lower cable lug plates are provided on both sides of the platform beam at the hanging end, and upper cable lug plates are provided on both sides of the main beam on the other side of the main structure; two cables are cross-shaped and hingedly connected to the lower cable lug plates and the upper cable lug plates respectively through cable pins; The deformation joints between the stair sections are filled with flexible filling materials.

2. The steel staircase structure according to claim 1, characterized in that: The rear end of the horizontal section of the rest platform of each stair section is hung on the main beam on the other side of the main structure through two chain rods.