A kind of construction pile construction equipment and construction method thereof

By designing engineering pile construction equipment, using high-pressure spray cement slurry and rotating soil extrusion hole expansion technology, combined with concrete pouring and lowering of steel cages, the problems of small pile diameter and low bearing capacity in the existing technology have been solved, and high efficiency and quality have been achieved. Good pile foundation construction.

CN111472692BActive Publication Date: 2024-10-01WUHAN NANFANG XUYU TECH ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010407024.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-14
Publication Date
2024-10-01
Estimated Expiration
2040-05-14

AI Technical Summary

Technical Problem

In the existing technology, the strength of the soil reinforced by high-pressure jet grouting piles is limited, the construction speed of the squeeze-expanded piles is slow, the quality of the piles is poor, the diameter of the piles is small, and the bearing capacity of the single pile is not high.

Method used

An engineering method pile construction equipment is designed, including a pile driver, a drilling tool and a linear motion mechanism. The drilling tool is equipped with a drill barrel, a hollow drill pipe, a power drive device and an external thread. It sprays cement slurry with high pressure and rotates to squeeze the soil to expand the hole, forming a The large-diameter pile body is combined with concrete pouring and lowering of the steel cage to achieve a dense pile body.

Benefits of technology

The pile diameter and single pile bearing capacity are increased, the construction speed is accelerated, high-quality large-diameter piles are formed, the soil structure is dense, and the soil reinforcement effect is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111472692B_ABST
    Figure CN111472692B_ABST
Patent Text Reader

Abstract

The present invention proposes a method pile construction equipment and a construction method thereof, including: a pile driver, on which a pile frame is vertically fixed; a drill tool, which is slidably mounted on the pile frame, and includes a drill frame, a drill barrel, a hollow drill rod and a power drive device, an outer wall of the drill barrel is provided with an external thread, a plurality of grouting holes are provided on the bottom side wall of the drill barrel, the hollow drill rod is inserted into the drill barrel, a drill bit is connected to the bottom end of the hollow drill rod, and a plurality of grouting holes are provided on the drill bit, the top end of the hollow drill rod is used to connect a grouting pipe, and the power drive device is used to drive the drill barrel and the hollow drill rod to rotate; a linear motion mechanism is installed at the upper end of the pile frame, and is used to drive the drill tool to move up and down along the drill frame. The method pile construction equipment of the present invention can compact the soil structure, strengthen the soil around the pile, and improve the friction resistance of the soil around the pile. After the mixture of the soil around the pile and cement slurry solidifies, it is tightly embedded and bonded with the concrete of the threaded pile body to form a combined pile body, so that the compression and pull-out bearing capacity of the single pile are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation engineering, and in particular to a method pile construction device and a construction method thereof. Background Art

[0002] High-pressure rotary jet grouting piles and squeezed-hole piles are two traditional foundation construction processes. High-pressure rotary jet grouting piles use high-pressure cement slurry to forcibly mix with reinforced soil. The soil structure is first destroyed, and the cement slurry fills the structural pores in the soil. As the cement slurry solidifies, the strength of the soil and cement slurry mixture is enhanced. This process is widely applicable, but the strength improvement of the reinforced soil is limited, especially in the silty clay layer, there are problems of poor pile quality and uneven pile diameter; traditional squeezed-hole piles use specific drilling tools to force drilling or tamping to squeeze the soil into holes, squeeze out the pile cavity in the soil, and then pour concrete or fill it with crushed stone, brick slag and other materials to form piles. This process does not take soil during the hole forming process, which is environmentally friendly and economical, but the construction speed is slow, the pile quality is poor, the pile diameter is generally small, and the single pile bearing capacity is not high. Summary of the invention

[0003] In view of this, the present invention proposes a construction method pile construction equipment and a construction method thereof, which are used to solve the problems in the prior art that the strength of soil reinforced by high-pressure rotary jet piles is limited, the construction speed of squeezed and expanded piles is slow, the pile quality is poor, the pile diameter is small, and the bearing capacity of a single pile is not high.

[0004] On the one hand, in order to solve the above technical problems, the technical solution proposed by the present invention is:

[0005] A method pile construction device, comprising:

[0006] A pile driver, on which a pile frame is vertically fixed;

[0007] A drilling tool, wherein the drilling tool is slidably mounted on a pile frame, the drilling tool comprises a drill frame, the drill frame is provided with a drill barrel with a top opening, a hollow drill rod and a power drive device, an outer wall of the drill barrel is provided with an external thread, a bottom side wall of the drill barrel is provided with a plurality of grouting holes, the hollow drill rod is inserted into the drill barrel, the bottom end of the hollow drill rod extends out of the drill barrel and is connected with a drill bit, and the drill bit is provided with a plurality of grouting holes, the top end of the hollow drill rod is used to connect a grouting pipe, and the power drive device is used to drive the drill barrel and the hollow drill rod to rotate;

[0008] The linear motion mechanism is installed at the upper end of the pile frame and is used to drive the drilling tool to move up and down along the drilling frame.

[0009] On the basis of the above technical solution, preferably, a first slide rail is fixedly mounted on the side wall of the lower section of the pile frame, and a first sliding block connected to the first slide rail is fixedly mounted on the drilling frame.

[0010] On the basis of the above technical solution, preferably, the linear motion mechanism includes a second slide rail, a second slider, a lifting rod, a gear plate and a servo motor, wherein the second slide rail is fixedly mounted on the side wall of the upper section of the pile frame, the second slider is slidably connected to the second slide rail, one end of the lifting rod is fixedly connected to the second slider, and the other end is fixedly connected to the drilling frame, a spur rack is provided on the side wall of the second slider, the servo motor is fixedly mounted on the pile frame, the output shaft of the servo motor is fixedly connected to the central axis of the gear plate, and the gear plate is meshingly connected to the spur rack.

[0011] On the basis of the above technical solution, preferably, the linear motion mechanism is a telescopic hydraulic cylinder, and the piston rod in the telescopic hydraulic cylinder is fixedly connected to the drilling rig.

[0012] On the basis of the above technical scheme, preferably, the drill rig is also provided with a limit ring for sleeved on the drill barrel, and limit flanges are respectively provided on the outer circumferential wall of the drill barrel where the upper end face and the lower end face of the limit ring are located, a first tooth is provided on the outer circumferential wall of the upper end of the drill barrel, and a second tooth is provided on the outer circumferential wall of the upper end of the hollow drill rod, and the power drive device includes a driving motor, a main gear, a rotating seat, a transmission shaft, a first transmission gear and a second transmission gear, wherein one side of the driving motor is fixedly connected to the drill rig, the output shaft of the driving motor is fixedly connected to the main gear, the other side of the driving motor is fixedly connected to the rotating seat, the transmission shaft is rotatably arranged in the rotating seat, the upper end of the transmission shaft is fixedly connected to the second transmission gear, the lower end of the transmission shaft is fixedly connected to the first transmission gear, the first transmission gear is respectively meshed with the main gear and the first teeth, and the second transmission gear is meshed with the second teeth.

[0013] On the basis of the above technical solution, preferably, the drill barrel includes a cylindrical section and a conical section arranged at the bottom of the cylindrical section, the external thread includes a first external thread and a second external thread, the first external thread is arranged on the outer peripheral wall of the cylindrical section below the limit ring, the first tooth is arranged on the outer peripheral wall of the cylindrical section above the limit ring, the second external thread is arranged on the outer surface of the conical section, and the plurality of injection holes are evenly distributed on the outer surface of the conical section.

[0014] Further, preferably, a hinged cover is provided on the injection hole, and the lower end of the hinged cover is hingedly connected to the side wall of the tapered section.

[0015] Further, preferably, the hollow drill rod includes an upper drill rod, a lower drill rod and a locking piece which are plugged into each other, the second teeth are arranged on the outer peripheral wall of the upper end of the upper drill rod, a third external thread is arranged on the outer peripheral wall of the upper drill rod below the second teeth, a fourth external thread is arranged on the outer peripheral wall of the lower drill rod, the locking piece is sleeved between the upper drill rod and the lower drill rod, and an internal thread connected to the third external thread and the fourth external thread is arranged in the locking piece.

[0016] Further, preferably, the drill rig is provided with a mounting hole for inserting the upper drill rod, a pipe joint for connecting a grouting pipe is installed in the mounting hole, and the drill rig is also provided with a fixing frame for fixing a pump pipe.

[0017] On the other hand, the present invention further discloses a construction method based on the above-mentioned method pile construction equipment, the steps of which include:

[0018] (1) Determine the center point of the pile position to be constructed, move the pile driver, level it, and prepare for construction;

[0019] (2) Start drilling, and after the drill bit is more than 30 cm into the soil, start the high-pressure grouting pump to spray cement slurry into the soil at high pressure, and rotate the drill with the slurry;

[0020] (3) After drilling to the designed depth, disconnect the upper drill rod and the lower drill rod, rotate the drill tube in the opposite direction and lift it out, leaving the lower drill rod in the pile hole, and pump concrete into the drill tube during the process of rotating and lifting the drill tube;

[0021] (4) After the concrete in the pile hole has been poured to the designed elevation, continue pumping concrete until the concrete surface is about 1m higher than the designed elevation. Stop pumping and continue to lift the drill tube out of the ground and move it away to free up space above the pile position.

[0022] (5) Lift the steel cage and put it on the lower drill rod, use the lower drill rod as the guide shaft for lowering the steel cage, and place it in the pile hole filled with concrete;

[0023] (6) After the steel cage is lowered, the core drill rod is vibrated out to compact the pile concrete;

[0024] (7) Measure the concrete surface elevation. If it is lower than the design elevation, the concrete surface should be raised in time and vibrated to make it dense;

[0025] (8) Move the pile driver to construct the next pile position.

[0026] The present invention has the following beneficial effects compared with the prior art:

[0027] The invention discloses a method pile construction equipment. During the drilling process of the drill bit, high-pressure cement slurry is firstly rotated and sprayed to destroy the soil structure around the pile. Then, the drill tool is given downward pressure through a linear motion mechanism, and the drill tube is rotated to squeeze the soil and expand the hole to form a pile cavity. This is a continuous process. After drilling to a designed depth or meeting the design conditions, the drill tube in the drill tool is reversely rotated and pulled out. At the same time, concrete is pumped into the pile hole by a concrete ground pump. Finally, a steel cage is lowered, and the hollow drill rod is vibrated and pulled out to compact the pile concrete. The pile construction equipment of this method combines the effects of high-pressure rotary jet piles and traditional squeeze-and-expand piles. By setting an external thread on the outer wall of the drill barrel, the drill barrel can be used to squeeze soil and expand the hole using the external thread during rotation. At the same time, threads can be formed on the inner wall of the pile hole, and the process is completed in one step. The high-pressure cement slurry first destroys the soil structure, which helps the drill to squeeze soil and drill down, and is also conducive to squeezing out high-quality large-diameter pile cavities, greatly improving the construction speed and achieving larger diameter piles. At the same time, the squeezing and expanding effects of the cement slurry and the drill can compact the soil structure, strengthen the soil around the pile, and increase the friction resistance of the soil around the pile. After the mixture of the soil around the pile and the cement slurry solidifies, it is tightly embedded and bonded with the concrete of the threaded pile to form a combined pile body, which has the effect of increasing the diameter of the pile body, and greatly improves the compression and pull-out bearing capacity of the single pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 It is a three-dimensional structural schematic diagram of the method pile construction equipment disclosed in the present invention;

[0030] Figure 2 It is a schematic diagram of the three-dimensional structure of the drilling tool disclosed in the present invention;

[0031] Figure 3 It is a three-dimensional schematic diagram of the linear motion mechanism disclosed in the present invention;

[0032] Figure 4 It is a schematic diagram of the three-dimensional structure of the power drive device disclosed in the present invention;

[0033] Figure 5 It is a schematic diagram of the three-dimensional structure of the drill tube disclosed in the present invention;

[0034] Figure 6 This is an assembly diagram of the hollow drill rod disclosed in the present invention. DETAILED DESCRIPTION

[0035] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] like Figure 1 As shown, combined Figure 2 As a first embodiment of the present invention, the present invention discloses a method pile construction device, comprising:

[0037] A pile driver 1, on which a pile frame 11 is vertically fixed;

[0038] The drilling tool 2 is slidably mounted on the pile frame 11. The drilling tool 2 includes a drilling frame 21. The drilling frame 21 is provided with a drill barrel 22 with a top opening, a hollow drill rod 23 and a power drive device 24. An external thread 221 is provided on the outer wall of the drill barrel 22. A plurality of injection holes 222 are provided on the bottom side wall of the drill barrel 22. The hollow drill rod 23 is inserted into the drill barrel 22. The bottom end of the hollow drill rod 23 extends out of the drill barrel 22 and is connected with a drill bit 231. The drill bit 231 is provided with a plurality of grouting holes 232. The top end of the hollow drill rod 23 is used to connect a grouting pipe. The power drive device 24 is used to drive the drill barrel 22 and the hollow drill rod 23 to rotate.

[0039] The linear motion mechanism 3 is installed at the upper end of the pile frame 11 and is used to drive the drilling tool 2 to move up and down along the drilling frame 21.

[0040] By adopting the above technical solution, the drilling tool 2 can move up and down along the pile frame 11 under the drive of the linear motion mechanism 3, thereby enabling the drilling tool 2 to obtain a certain downward pressure and upward pulling force. The power drive device 24 can drive the drill tube 22 and the hollow drill rod 23 to rotate synchronously. When the pile position construction is carried out, while the drill tube 22 and the hollow drill rod 23 rotate, the drill tool 2 is subjected to a certain downward pressure from the linear motion mechanism 3. The drill bit 231 at the bottom of the hollow drill rod 23 first extends into the soil, and the grouting pipe is connected to the top of the hollow drill rod 23 and high-pressure cement slurry is injected. When the drill bit 231 rotates, high-pressure cement slurry is sprayed out through the grouting hole 232 on the drill bit 231 to destroy the soil structure around the pile. Then, the linear motion mechanism 3 continuously gives the drill tool 2 downward pressure, and the drill tube 22 rotates to squeeze the soil and expand the hole to form a pile cavity. This is a continuous process. After drilling to the designed depth or meeting the design conditions, the drill tube 22 in the drill tool 2 is reversely rotated and taken out. At the same time, a concrete ground pump is used to pump concrete into the top opening of the drill tube 22. The concrete flows back into the pile hole evenly through the grouting hole 222 on the bottom side wall of the drill tube 22 to improve the density of the concrete. Finally, the steel cage is lowered, and the hollow drill rod 23 is vibrated to remove the concrete of the pile body. The pile construction equipment of this method combines the effects of high-pressure jet grouting piles and traditional extrusion and expansion piles. By setting an external thread 221 on the outer wall of the drill tube 22, it is convenient to use the external thread 221 to squeeze soil and expand the hole during the rotation of the drill tube 22, and at the same time, threads can be formed on the inner wall of the pile hole, which can be completed in one step. The high-pressure cement slurry first destroys the soil structure, which helps the drill 2 to squeeze the soil and drill down, and is also conducive to squeezing out high-quality large-diameter pile cavities, greatly improving the construction speed, and also realizing a pile body with a larger diameter. At the same time, the squeezing and expansion effects of the cement slurry and the drill 2 can both compact the soil structure, strengthen the soil around the pile, and increase the friction resistance of the soil around the pile. After the mixture of the soil around the pile and the cement slurry solidifies, it is tightly embedded and bonded with the threaded pile concrete to form a combined pile body, which has the effect of increasing the diameter of the pile body, and greatly improves the compression and pull-out bearing capacity of the single pile.

[0041] The present invention is further implemented through the following technical solutions.

[0042] Preferably, a first slide rail 12 is fixedly mounted on the side wall of the lower section of the pile frame 11, and a first slider 13 connected to the first slide rail 12 is fixedly mounted on the drill frame 21. With such a structural arrangement, the drill frame 21 can slide up and down on the first slide rail 12 through the first slider 13, so that the drilling tool 2 can slide up and down on the pile frame 11.

[0043] See attached Figure 3As shown, in this embodiment, the linear motion mechanism 3 includes a second slide rail 31, a second slider 32, a lifting rod 33, a gear plate 34 and a servo motor 35, wherein the second slide rail 31 is fixedly mounted on the upper side wall of the pile frame 11, the second slider 32 is slidably connected to the second slide rail 31, one end of the lifting rod 33 is fixedly connected to the second slider 32, and the other end is fixedly connected to the drilling frame 21, a spur rack 321 is provided on the side wall of the second slider 32, and the servo motor 35 is fixedly mounted on the pile frame 11, and the output shaft of the servo motor 35 is fixedly connected to the central axis of the gear plate 34, and the gear plate 34 is meshed with the spur rack.

[0044] By adopting the above technical solution, the servo motor 35 drives the gear plate 34 to rotate, and the gear plate 34 engages with the spur rack 321 during the rotation process, so that the second slider 32 moves up and down on the second slide rail 31, and then the lifting rod 33 drives the drilling tool 2 to move up and down along the pile frame 11.

[0045] In the embodiment of the present invention, the servo motor 35 can control the speed and position with high accuracy, and can convert the voltage signal into torque and speed to drive the control object. The rotor speed of the servo motor 35 is controlled by the input signal and can respond quickly. In the automatic control system, it is used as an actuator and has the advantages of small electromechanical time constant and high linearity.

[0046] It is worth noting that since the outer wall of the drill barrel is provided with an external thread, when the drill barrel is unscrewed from the pile hole in the opposite direction, in order to ensure that the thread on the inner wall of the pile hole is intact, the rotation speed of the servo motor is consistent with the rotation speed of the drive motor described below, ensuring that the rotation rate of the drill barrel and the speed at which the servo motor drives the gear rack to drive the drill frame to move upward are consistent, so that the external thread on the outer wall of the drill barrel can be smoothly removed from the pile hole without the risk of damaging the thread on the inner wall of the pile hole.

[0047] As some optional embodiments, the linear motion mechanism 3 is a telescopic hydraulic cylinder, and the piston rod in the telescopic hydraulic cylinder is fixedly connected to the drill rig 21. The order of extending the pistons in the telescopic hydraulic cylinder is from large to small, while the order of retracting when unloaded is generally from small to large. The telescopic cylinder can achieve a longer stroke, and the length is shorter when retracted, and the structure is more compact. This type of hydraulic cylinder is often used in engineering machinery, and has multiple pistons that move at one time. When each piston moves successively, its output speed and output force are both variable. Therefore, while giving the drilling tool 2 a sufficient lifting stroke, the force loading can be satisfied.

[0048] See attached Figure 4 and 5As shown, in this embodiment, a limiting ring 211 for sleeve-connecting the drill barrel 22 is further provided on the drill rig 21, and limiting flanges 223 are respectively provided on the outer peripheral wall of the drill barrel 22 where the upper end surface and the lower end surface of the limiting ring 211 are located. Through the limiting ring 211, the drill barrel 22 can be sleeved in the limiting ring 211, so that the drill barrel 22 cannot move horizontally. By providing the limiting flange 223, the drill barrel 22 cannot move up and down along the limiting ring 211, thereby further maintaining the relative position of the drill barrel 22 and the drill rig 21 unchanged. A first tooth 224 is provided on the outer peripheral wall of the upper end of the drill tube 22, and a second tooth 233 is provided on the outer peripheral wall of the upper end of the hollow drill rod 23. The power drive device 24 includes a drive motor 241, a main gear 242, a rotating seat 243, a transmission shaft 244, a first transmission gear 245 and a second transmission gear 246, wherein one side of the drive motor 241 is fixedly connected to the drill frame 21, the output shaft of the drive motor 241 is fixedly connected to the main gear 242, the other side of the drive motor 241 is fixedly connected to the rotating seat 243, the transmission shaft 244 is rotatably arranged in the rotating seat 243, the upper end of the transmission shaft 244 is fixedly connected to the second transmission gear 246, and the lower end of the transmission shaft 244 is fixedly connected to the first transmission gear 245, the first transmission gear 245 is meshed with the main gear 242 and the first tooth 224 respectively, and the second transmission gear 246 is meshed with the second tooth 233.

[0049] By adopting the above technical solution, the driving motor 241 rotates, driving the main gear 242 to rotate. The main gear 242 meshes with the first tooth 224 through the first transmission gear 245, thereby driving the drill barrel 22 to rotate around its axis. While the first transmission gear 245 rotates, it drives the second transmission gear 246 to rotate through the transmission shaft 244. The second transmission gear 246 meshes with the second tooth 233, thereby driving the hollow drill rod 23 to rotate around the axis of the drill barrel 22.

[0050] For further information, see Attachment Figure 5 As shown, the drill barrel 22 includes a cylindrical section 225 and a conical section 226 arranged at the bottom of the cylindrical section 225, the external thread 221 includes a first external thread 2211 and a second external thread 2212, the first external thread 2211 is arranged on the outer peripheral wall of the cylindrical section 225 below the limiting ring 211, the first tooth 224 is arranged on the outer peripheral wall of the cylindrical section 225 above the limiting ring 211, the second external thread 2212 is arranged on the outer surface of the conical section 226, and a plurality of injection holes 222 are evenly distributed on the outer surface of the conical section 226.

[0051] By adopting the above technical solution, by setting the conical section 226, it is convenient to penetrate into the soil for hole expansion, and by setting the cylindrical section 225, the effect of large pile diameter can be obtained. By setting the second external thread 2212 on the outer surface of the conical section 226, the efficiency of the drill tube 22 penetrating into the soil for hole expansion is further improved. By setting the first external thread 2211 on the cylindrical section 225, it is beneficial to improve the efficiency of the drill tube 22 squeezing the soil and expanding the hole. At the same time, threads can be formed on the inner wall of the pile hole. After solidification, the mixture of soil and cement slurry around the pile is tightly embedded and bonded with the threaded pile concrete to form a combined pile body, which has the effect of increasing the pile diameter and greatly improving the compression and pull-out bearing capacity of the single pile. By setting the first external thread 2211 on the outer peripheral wall of the cylindrical section 225 below the limiting ring 211, the outer peripheral wall of the cylindrical section 225 adapted to the limiting ring 211 is smooth, so as to avoid the drill tube 22 and the limiting ring 211 being stuck due to the adhesion of concrete and affecting their rotation. In this embodiment, there is a clearance fit between the stop ring 211 and the drill tube 22. By evenly distributing a plurality of pouring holes 222 on the outer surface of the tapered section 226, when the drill tube 22 in the drilling tool 2 is reversely rotated and withdrawn, the concrete pumped into the drill tube 22 can evenly flow out from the pouring holes 222 and fill the pile hole.

[0052] Furthermore, a loose-leaf cover plate 2221 is provided on the pouring hole 222, and the lower end of the loose-leaf cover plate 2221 is hingedly connected to the side wall of the tapered section 226. With such a structural arrangement, when the drill tube 22 is used to squeeze the soil and expand the hole, the loose-leaf cover plate 2221 will block the pouring hole 222, preventing the soil in the pile hole from entering the drill tube 22 through the pouring hole 222, thereby blocking the pouring hole 222 and affecting the subsequent concrete pouring. When the drill tube 22 rotates in the opposite direction and escapes from the pile hole, concrete is poured into the drill tube 22, and the concrete, under the action of high pressure, pushes open the loose-leaf cover plate 2221, so that the concrete is evenly filled into the pile hole.

[0053] For further information, see Attachment Figure 6 As shown, the hollow drill rod 23 includes an upper drill rod 234, a lower drill rod 235 and a locking piece 236 which are plugged into each other. The second teeth 233 are arranged on the outer peripheral wall of the upper end of the upper drill rod 234. A third external thread 2341 is arranged on the outer peripheral wall of the upper drill rod 234 below the second teeth 233. A fourth external thread 2351 is arranged on the outer peripheral wall of the lower drill rod 235. The locking piece 236 is sleeved between the upper drill rod 234 and the lower drill rod 235, and an internal thread 2361 connected to the third external thread 2341 and the fourth external thread 2351 is arranged in the locking piece 236.

[0054] By adopting the above technical solution, after the soil is squeezed and the hole is enlarged, the upper drill rod 234 is disengaged from the lower drill rod 235 by rotating the locking piece 236, and the drill tool 2 is driven to move upward by the linear drive mechanism. At the same time, the power drive device 24 drives the drill barrel 22 to rotate in the opposite direction, and at the same time, concrete is pumped into the top opening of the drill barrel 22. While the drill barrel 22 rotates, the concrete evenly fills the pile hole through the pouring hole 222. Since the lower drill rod 235 has a certain self-weight, and the concrete fills the pile hole and buries the lower drill hole, the drill barrel 22 is finally separated from the pile hole, leaving the lower drill rod 235 in the pile hole, so that when the steel cage is placed later, the lower drill rod 235 can be used as the central axis of the pile hole to avoid eccentric placement of the steel cage.

[0055] Of course, in the embodiment of the present invention, the drill rod 235 may not be left in the pile hole. While the pile hole is being filled with concrete, the drill barrel 22 and the hollow drill rod 23 on the drilling tool 2 are synchronously moved downward, thereby completely leaving the pile hole. Other methods can be used for center alignment when placing the steel cage later.

[0056] The drill frame 21 is provided with a mounting hole 212 for inserting the upper drill rod 234, and a pipe joint 2121 for connecting the grouting pipe is installed in the mounting hole 212. The drill frame 21 is also provided with a fixing bracket 213 for fixing the pump pipe. With the above technical solution, by setting the mounting hole 212 on the drill frame 21, the upper drill rod 234 is conveniently inserted into the mounting hole 212, and can be rotated in the mounting hole 212. The pipe joint 2121 is installed on the mounting hole 212, and can be used to connect the grouting pipe. At the same time, the pipe joint 2121 can seal the mounting hole 212. By setting the fixing bracket 213 on the drill frame 21, it is convenient to install the concrete pump pipe, so that the opening of the pump pipe is aligned with the top opening of the drill barrel 22. At the same time, when the drill frame 21 moves up and down, the relative position of the pump pipe and the opening of the drill barrel 22 does not change.

[0057] The invention also discloses a construction method, the steps of which include:

[0058] (1) Determine the center point of the pile position to be constructed, move the pile driver 1, adjust the level and position, and prepare for construction;

[0059] (2) Start the drilling tool 2 to drill down, and after the drill bit 231 is inserted into the soil for more than 30 cm, start the high-pressure grouting pump to spray cement slurry into the soil under high pressure, and the drilling tool 2 rotates to drill down with the slurry;

[0060] (3) After drilling to the designed depth, disconnect the upper drill rod 234 and the lower drill rod 235, rotate the drill tube 22 in the opposite direction and lift it out, leaving the lower drill rod 235 in the pile hole, and pump concrete into the drill tube 22 during the process of rotating and lifting the drill tube 22;

[0061] (4) After the concrete in the pile hole is poured to the design elevation, continue pumping concrete until the concrete surface is about 1m higher than the design elevation, stop pumping, continue to lift the drill tube 22 out of the ground, and move it away to free up space above the pile position;

[0062] (5) Lift the steel cage and put it on the lower drill rod 235, use the lower drill rod 235 as a guide shaft for lowering the steel cage, and place it in the pile hole filled with concrete;

[0063] (6) After the steel cage is lowered, the core drill rod is vibrated out to compact the pile concrete;

[0064] (7) Measure the concrete surface elevation. If it is lower than the design elevation, the concrete surface should be raised in time and vibrated to make it dense;

[0065] (8) Move the pile driver 1 to construct the next pile position.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method pile construction equipment, characterized in that: include: A pile driver (1), wherein a pile frame (11) is vertically fixedly arranged on the pile driver (1); A drilling tool (2), wherein the drilling tool (2) is slidably mounted on a pile frame (11), the drilling tool (2) comprises a drilling frame (21), the drilling frame (21) is provided with a drill barrel (22) with a top opening, a hollow drill rod (23) and a power drive device (24), an outer wall of the drill barrel (22) is provided with an external thread (221), a bottom side wall of the drill barrel (22) is provided with a plurality of grouting holes (222), the hollow drill rod (23) is inserted into the drill barrel (22), the bottom end of the hollow drill rod (23) extends out of the drill barrel (22) and is connected to a drill bit (231), and the drill bit (231) is provided with a plurality of grouting holes (232), the top end of the hollow drill rod (23) is used for connecting a grouting pipe, and the power drive device (24) is used for driving the drill barrel (22) and the hollow drill rod (23) to rotate; A linear motion mechanism (3) is mounted on the upper end of the pile frame (11) and is used to drive the drilling tool (2) to move up and down along the drilling frame (21); The drill frame (21) is also provided with a limit ring (211) for sleeve-engaging the drill tube (22); the upper end surface and the lower end surface of the limit ring (211) are respectively provided with limit flanges (223) on the outer peripheral wall of the drill tube (22); the upper end outer peripheral wall of the drill tube (22) is provided with a first tooth (224); the upper end outer peripheral wall of the hollow drill rod (23) is provided with a second tooth (233); the power drive device (24) comprises a drive motor (241), a main gear (242), a rotating seat (243), a transmission shaft (244), a first transmission gear (245) and a second transmission gear (246); wherein the drive motor One side of the machine (241) is fixedly connected to the drilling frame (21), the output shaft of the driving motor (241) is fixedly connected to the main gear (242), the other side of the driving motor (241) is fixedly connected to the rotating seat (243), the transmission shaft (244) is rotatably arranged in the rotating seat (243), the upper end of the transmission shaft (244) is fixedly connected to the second transmission gear (246), the lower end of the transmission shaft (244) is fixedly connected to the first transmission gear (245), the first transmission gear (245) is meshedly connected to the main gear (242) and the first teeth (224), and the second transmission gear (246) is meshedly connected to the second teeth (233); The drill tube (22) comprises a cylindrical section (225) and a conical section (226) arranged at the bottom of the cylindrical section (225); the external thread (221) comprises a first external thread (2211) and a second external thread (2212); the first external thread (2211) is arranged on the outer peripheral wall of the cylindrical section (225) below the limiting ring (211); the first teeth (224) are arranged on the outer peripheral wall of the cylindrical section (225) above the limiting ring (211); the second external thread (2212) is arranged on the outer surface of the conical section (226); and the plurality of injection holes (222) are evenly distributed on the outer surface of the conical section (226); The pouring hole (222) is provided with a hinged cover plate (2221), and the lower end of the hinged cover plate (2221) is hingedly connected to the side wall of the tapered section (226); The hollow drill rod (23) comprises an upper drill rod (234), a lower drill rod (235) and a locking piece (236) which are plugged into each other; the second teeth (233) are arranged on the outer peripheral wall of the upper end of the upper drill rod (234); a third external thread (2341) is arranged on the outer peripheral wall of the upper drill rod (234) below the second teeth (233); a fourth external thread (2351) is arranged on the outer peripheral wall of the lower drill rod (235); the locking piece (236) is sleeved between the upper drill rod (234) and the lower drill rod (235); and an internal thread (2361) connected to the third external thread (2341) and the fourth external thread (2351) is arranged inside the locking piece (236).

2. The method pile construction equipment according to claim 1, characterized in that: A first slide rail (12) is fixedly mounted on the side wall of the lower section of the pile frame (11), and a first slide block (13) connected to the first slide rail (12) is fixedly mounted on the drilling frame (21).

3. The method pile construction equipment according to claim 2, characterized in that: The linear motion mechanism (3) comprises a second slide rail (31), a second slider (32), a lifting rod (33), a gear plate (34) and a servo motor (35), wherein the second slide rail (31) is fixedly mounted on the side wall of the upper section of the pile frame (11), the second slider (32) is slidably connected to the second slide rail (31), one end of the lifting rod (33) is fixedly connected to the second slider (32), and the other end is fixedly connected to the drilling frame (21), a spur rack (321) is provided on the side wall of the second slider (32), the servo motor (35) is fixedly mounted on the pile frame (11), the output shaft of the servo motor (35) is fixedly connected to the central axis of the gear plate (34), and the gear plate (34) is meshingly connected to the spur rack (321).

4. The method pile construction equipment according to claim 2, characterized in that: The linear motion mechanism (3) is a telescopic hydraulic cylinder, and a piston rod in the telescopic hydraulic cylinder is fixedly connected to the drilling frame (21).

5. The method pile construction equipment according to claim 1, characterized in that: The drill frame (21) is provided with a mounting hole (212) for inserting the upper drill rod (234), a pipe joint (2121) for connecting a grouting pipe is installed in the mounting hole (212), and the drill frame (21) is also provided with a fixing frame (213) for fixing a pump pipe.

6. A construction method using the construction method pile construction equipment according to any one of claims 1 to 5, characterized in that: The steps include: (1) Determine the center point of the pile position to be constructed, move the pile driver (1), adjust the level and position, and prepare for construction; (2) Start the drilling tool (2) to drill down, and after the drill bit (231) is inserted into the soil for more than 30 cm, start the high-pressure grouting pump to spray cement slurry into the soil under high pressure, and the drilling tool (2) rotates to drill down with the slurry; (3) After drilling to the designed depth, disconnect the upper drill rod (234) and the lower drill rod (235), rotate the drill tube (22) in the opposite direction and lift it out, leave the lower drill rod (235) in the pile hole, and pump concrete into the drill tube (22) during the process of rotating and lifting the drill tube (22); (4) After the concrete in the pile hole is poured to the designed elevation, continue pumping concrete until the concrete surface is about 1 m higher than the designed elevation, then stop pumping, and continue to lift the drill tube (22) out of the ground and move it away to free up space above the pile position; (5) Lift the steel cage and put it on the lower drill rod (235), use the lower drill rod (235) as a guide shaft for lowering the steel cage, and place it in the pile hole filled with concrete; (6) After the steel cage is lowered, the core drill rod is vibrated out to compact the pile concrete; (7) Measure the concrete surface elevation. If it is lower than the design elevation, the concrete surface should be raised in time and vibrated to make it dense; (8) Move the pile driver (1) to construct the next pile position.