A wind guiding and water shielding device for high-position water collection cooling tower
By designing suspended air ducts and water shielding caps in high-level water collection cooling towers, the major investment problems of Hagao Tower are solved, and the effect of reducing investment, energy saving and cold air directly reaching the center of the tower is achieved. At the same time, the cold air flow field is regulated and the reduction of The water pump cavitation is done.
Patent Information
- Application Number
- CN202010301160.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-16
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-04-16
AI Technical Summary
The existing Hargao Tower has large investment and complex installation, easy to leak, making it difficult to reduce the total investment in cooling towers.
A kind of air-guiding and water shielding device for high-level water-receiving cooling tower is designed, including suspended air-guiding ducts and water-guiding caps. The air-guiding ducts are composed of steel pipes and plastic pipes. The water-guiding caps are made of reduced diameter pipes and water-guiding cones. It is composed of a water-shielding ceiling, and has the functions of light weight, air-shielding, water-shielding and controllable cold air flux.
The total investment in the cooling tower is reduced, the advantages of energy saving, noise reduction and cold air reaching the center of the tower are maintained at high levels, and the cold air flow field is regulated, which reduces the cavitation of the water pump, and is light in weight and convenient to install.
Smart Images

Figure CN111473682B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of wet cooling towers in thermal (nuclear) power plants, and in particular relates to a wind guiding and water shielding device for a high-position water collecting cooling tower. Background Art
[0002] The world's first high-level water cooling tower designed by the Belgian company Hamon was put into operation at the Belleville Nuclear Power Plant in France in 1986. This type of cooling tower can be referred to as a "Hamon tower" to distinguish it from the "conventional tower", which is the common natural ventilation hyperbolic reinforced concrete cooling tower.
[0003] Compared with conventional towers, the Harbin High-Power Tower has the advantages of energy saving, noise reduction, direct cold air to the tower core, and significantly reduced pump cavitation. my country's first "Harbin High-Power Tower" was put into operation in March 1996 at the Pucheng Power Plant in Shaanxi.
[0004] Since 2012, my country has put into operation the following thermal power plants with Harmon towers: Anqing, Wanzhou, Laiwu, Shouguang, Jiujiang, Hefei Lujiang, Ruijin, Dabie Mountain, Jurong, Zhongshan and Hunan Pingjiang. However, the nuclear power plant of Jiangxi Pengze Nuclear Power Plant, which introduced the 13,000m3 Harmon technology design, has been put into operation. 2 The Hagao Tower is still under construction. The 19000m 2 The construction of the Haga Tower has not started either.
[0005] The high-pressure tower achieves the goal of high-level water collection by building and installing a very complex water collection device and changing the path of water falling in the rain area of the cooling tower and the path of air rising, but the cost is expensive investment. 2 The high tower has the same cooling effect as 14000m 2 Compared with conventional towers, the initial investment increased by about 38.61 million yuan (calculated based on imported materials); Jiangsu Jurong Power Plant 10200m 2 The cooling efficiency of the Hago Tower is equivalent to 12000m 2 Conventional towers cost an additional 28.5 million yuan (part of the materials are calculated based on domestic materials); the 9500m2 tower of Lujiang Power Plant in Hefei, Anhui 2 The investment in the Hagao Tower is 18 million yuan more than that of a conventional tower (calculated based on domestic materials).
[0006] A newly designed high-level water collection cooling tower is named "Balanceding" cooling tower, abbreviated as "Bagao Tower". The main difference between it and the Hagao tower and conventional tower is reflected in the tower core.
[0007] The Eight-High Tower requires removing the water collecting inclined plate and high-level water collecting trough of the Ha-High Tower, and building a conical bucket water collecting pool and a suspended air guide shaft / air guide duct. That is, under the premise of basically not changing the falling path of the Ha-High Tower, only the rising path of the air of the Ha-High Tower is changed to transform the Ha-High Tower into the Eight-High Tower.
[0008] The cold air of the Ha Gao Tower first passes through the high-level water collecting troughs, and then passes through the gaps between the water collecting inclined plates to reach the bottom of the water sprinkling filler; the cold air of the Ba Gao Tower first rushes out from the air guide shaft / pipe, and then flows around the water shielding cap to reach the bottom of the water sprinkling filler.
[0009] The Bagao Tower retains the characteristics of the Hagao Tower with a high-level water collection pool. The rectangular upper mouth of the pool is changed to a circular upper mouth, becoming a conical funnel-shaped pool, and there is an air guide well / pipe passing through the pool from bottom to top. The top of the air guide well / pipe is higher than the highest water level of the pool, and the upper end is equipped with a water-shielding cap (or ventilation cap) to prevent cold water from leaking from the well.
[0010] The Ba Gao Tower is the "core replacement tower" of the Ha Gao Tower.
[0011] The advantage of the eight-high tower is that the total investment is not only lower than that of the Harbin tower, but also lower than that of the conventional tower, and the air distribution is uniform, which improves the cooling efficiency.
[0012] The Eight-High Tower has two core components: one is the high-position conical bucket water pool, and the other is the air guide shaft / pipe rooted in and suspended on the bottom plate of the conical bucket water pool. Summary of the invention
[0013] In order to solve the problem of large investment in existing high-pressure cooling towers and overcome the technical defects of high-pressure cooling towers such as easy water leakage and complex installation, the present invention provides a wind guiding and water shielding device for high-position water-collecting cooling towers, which has the comprehensive functions of light weight, wind guiding, water shielding and the ability to be blocked one by one to control the cold air flux.
[0014] To achieve the above object, the present invention adopts the following technical solutions:
[0015] A wind guiding and water shielding device for a high-position water collecting cooling tower, comprising:
[0016] The suspended air duct comprises a lower section and an upper section of the air duct, the lower section of the air duct is pre-buried and passes through the bottom plate of the cone bucket pool of the high-position water collection cooling tower, and both ends of the lower section of the air duct are provided with a second flange; the lower part of the upper section of the air duct is provided with a first flange; the first flange of the upper section of the air duct is connected to the second flange of the upper part of the lower section of the air duct;
[0017] And a water-shielding cap, the water-shielding cap includes a reducer, a water-shielding top cover and a plurality of water-shielding cone rings; the reducer is installed on the upper part of the upper section of the air duct; the plurality of water-shielding cone rings are stacked and supported in sequence from the smallest to the smallest in terms of the inner diameter of the middle ring; the lowest water-shielding cone ring is supported and arranged above the reducer by a water-shielding ring with ventilation holes; the water-shielding top cover is supported and arranged above the highest water-shielding cone ring by a water-shielding cover with ventilation holes.
[0018] As a further improvement of the present invention, the outer diameter of the upper water-shielding cone ring among the plurality of water-shielding cone rings is larger than the inner diameter of the middle ring of the lower water-shielding cone ring, and the outer diameter of the water-shielding top cover is larger than the inner diameter of the middle ring of the uppermost water-shielding cone ring.
[0019] As a further improvement of the present invention, the lower section of the air guide pipe is a standard steel pipe part, and a water stop wing ring is provided in the middle of the lower section of the air guide pipe in the circumferential direction;
[0020] The upper section of the air guide pipe is a plastic pipe, and the reducer is bonded and fixed to the upper section of the air guide pipe.
[0021] As a further improvement of the present invention, the water-shielding top cover is a spherical surface, and the water-shielding cone ring is a conical surface;
[0022] The upper surfaces of the water-shielding top cover and the water-shielding cone ring are both provided with water-collecting annular grooves and small drainage ditches. The water-collecting annular grooves are arranged circumferentially along the upper surface, and the drainage ditches are arranged radially. The inner side of the drainage ditches is connected to the water-collecting annular grooves, and the outer side is connected to the outer edge of the upper surface.
[0023] As a further improvement of the present invention, the cross-sections of the water collecting ring groove and the drainage ditch are semicircular.
[0024] As a further improvement of the present invention, the suspended air ducts are evenly arranged on the bottom plate of the cone bucket water pool, and the bottom surfaces of all water shielding caps are higher than the water surface in the cone bucket water pool of the high-position water collection cooling tower.
[0025] As a further improvement of the present invention, it also includes a windproof cloth. When the high-position water collection cooling tower is anti-freezing, the windproof cloth is sleeved on the second flange at the lower part of the upper section of the air guide duct.
[0026] As a further improvement of the present invention, the first flange is a plastic flange, and the second flange is a steel flange.
[0027] Compared with the prior art, the present invention has the following advantages:
[0028] The wind guiding and water shielding device of the present invention comprises a wind guiding pipe and a water shielding and ventilation cap on the pipe top. Such wind guiding pipe not only enables the eight-high tower to maintain the advantages of the high-position water-collecting cooling tower of "energy saving, noise reduction, cold wind can reach the center of the tower and can significantly reduce water pump cavitation", but also regularizes the cold wind flow field of the eight-high tower: guides the cold wind close to the ground into the inner periphery of the cooling tower, and guides the cold wind entering the tower from the upper part to the outer periphery of the tower. In addition, the wind guiding pipe and the water shielding cap also have the comprehensive functions of light weight, wind guiding, water shielding and can be blocked one by one to control the cold wind flux.
[0029] Furthermore, the bottom of the water shielding cap is 200mm higher than the water surface of the eight-high tower cone bucket pool, that is, the air outlet is 400mm higher than the water surface, and the total height of the water shielding cap is 365mm. The edge of the water shielding cap is equipped with a water collection ring groove and a small drainage ditch to organize the flowing water into strands and reduce the wind resistance. When the cooling tower is antifreeze, a windproof cloth is installed on the steel flange at the lower end of the air guide pipe to prevent the air from entering. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 Schematic diagram of the tower shell and pillars of the Eight High Tower;
[0031] Figure 2 Aerial view of the Eight Towers;
[0032] Figure 3 Schematic diagram of the bottom plate and related components of the eight-tower cone-shaped pool;
[0033] Figure 4 A bird's-eye view of the eight tower cones, wind shafts and tower core pillars;
[0034] Figure 5 A cross-section of the eight towers along the radius;
[0035] Figure 6 Large-scale drawings of reinforced concrete air guide shafts and air guide shaft water shielding caps;
[0036] Figure 7 Diagram of wind deflecting and water shielding device;
[0037] Figure 8 Large drawing of water shielding cap;
[0038] Fig. 9 Manufacturing cross-sectional view of the water shielding cap top cover;
[0039] Fig.10 Manufacturing plan of the water shielding cap top cover;
[0040] Fig.11 Manufacturing cross-sectional view of the water shielding cone ring above the water shielding cap;
[0041] Fig.12 Manufacturing plan of the water shielding cone ring above the water shielding cap. The attached parts are described as follows:
[0042] Table 1 Components description table
[0043]
[0044] DETAILED DESCRIPTION
[0045] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0046] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0047] Figure 1 Schematic diagram of the shell and pillars of the Eight-High Tower. The shell and pillars of the Eight-High Tower are exactly the same as those of the Haga Tower; compared with conventional towers, the Eight-High Tower is a little taller and thinner, with a higher top and longer X-shaped pillars than conventional towers (i.e., the air inlet is higher).
[0048] Figure 2 Aerial view of the Eighth Tower. The pillars through the pool in the tower core support the beam system, which supports the brackets on which the water-sprinkling filler is placed; the pillars continue to rise to the highest point, supporting the beam system, which suspends the water distribution pipes and sprinklers, and on which the dewatering device is placed.
[0049] Figure 3 Schematic diagram of the relationship between the bottom plate (water collecting cone) of the eight high towers and other components. The flow direction of hot water into the tower is: water inlet pressure ditch → water distribution shaft → horizontal distribution pipe → nozzle → spray water to the top of the water sprinkling filler; hot water completes heat exchange with cold air in the water sprinkling filler and becomes cold water; the flow direction of cold water out of the tower is: bottom of the water sprinkling filler → falling to the high-position cone water pool → water outlet shaft → water outlet pressure ditch. The outlet well is drawn in the shape of a regular hexagonal column, and the outlet well can also be cylindrical.
[0050] Figure 4 Aerial view of the eight-high tower cone, wind shaft and tower core support. The cone and the shell of the eight-high tower (see Figure 1 ) are completely independent of each other, and their support systems are not related in any way. The water outlet well is drawn in a cylindrical shape. The air guide well is drawn in a suspended form.
[0051] Figure 5 A watering area of 12000m 2 The cross-section of the large eight-high tower along the radius. A reinforced concrete air shaft with a diameter of 2m is used.
[0052] Figure 6 Large-scale drawing of reinforced concrete air guide shaft (Ф2000mm) and water shielding cap of air guide shaft. Air guide shaft is divided into two types: ground-mounted and suspended. The material of air guide shaft is reinforced concrete.
[0053] Figure 7 The core graphics of the present invention are: a large-scale drawing of a plastic air duct (DN200mm) and a water shielding cap 21.
[0054] The eight-high tower must be equipped with an air guide shaft or an air guide duct (choose one of the two). By reducing the cross-section of the suspended thick air guide shaft and increasing the number, the air guide shaft will be miniaturized and evolved into an air guide duct. The air guide duct only considers the suspended form. Replace one air guide shaft with multiple small air guide ducts. The air guide duct makes the air distribution of the eight-high tower more uniform, and the main material of the air guide duct is PVC plastic with a lower density, which can reduce the load value of the cone bucket support.
[0055] The construction and installation of the air duct is much more convenient than the construction of the air well. The water shielding cap 21 is characterized in that the bottom of the reducer 25 is 200mm higher than the water surface of the eight-high tower cone bucket pool, which is equivalent to the air outlet being 400mm higher than the water surface. Figure 7 As shown, the lower section of the air duct is a short tube with steel flanges at the top and bottom, with a specification of 219×6mm; the upper section of the air duct is a plastic tube with a length of 0.1 to 4.8m, with a plastic water shielding cap bonded to the upper end and a plastic flange bonded to the lower end.
[0056] The air duct is suspended from the bottom plate of the cone tank and penetrates the bottom of the tank. It includes:
[0057] DN200 steel short pipe: with water stop wing ring, pre-buried in the bottom plate of the cone bucket pool, 0.2 meters exposed at the top and bottom, about 0.5 meters long, with flanges welded at the top and bottom. The upper flange is used to connect the plastic air duct; the lower flange has two uses: (1) for anti-freeze. Put on a special windproof cloth during winter operation. Like putting a shower cap on your head, tie the special windproof cloth to the air duct with a rope to prevent air from entering the air duct. (2) Used for plugging leaks. If the plastic air duct is damaged and leaks, the lower flange can be connected to the blind flange plug to tightly seal the air duct to ensure that no air enters or water leaks.
[0058] Air duct: Φ200 national standard finished PVC pipe. The reason for choosing PVC pipe is that its density is 1.19~1.35g / cm 3 , much smaller than the density of steel pipe 7.85g / cm3 , reducing the weight of the air duct and reducing the load on the cone bucket pool.
[0059] The water-shielding cap at the top of the air duct has the dual functions of water-shielding and ventilation.
[0060] The lower section 19 of the air duct, the upper section 20 of the air duct and the water shielding cap 21 of the Eight-High Tower not only enable the Eight-High Tower to maintain the advantages of the high-level water-collecting cooling tower, "energy saving, noise reduction, cold air can reach the center of the tower and can significantly reduce water pump cavitation", but also regulate the cold air flow field of the Eight-High Tower, guiding the cold air entering the tower close to the ground to flow to the inner periphery of the tower, and the cold air entering the tower from the upper part to flow to the periphery. In addition, the lower section 19 of the air duct, the upper section 20 of the air duct and the water shielding cap 21 have the comprehensive functions of light weight, air guiding, water shielding and can be blocked one by one to control the amount of cold air. Including:
[0061] The water shielding cap 21 is composed of a water shielding cap support 27 , a water shielding top cover 29 , a water shielding ring support 26 , a water shielding cone ring 28 and a reducing pipe 25 .
[0062] The upper section 20 of the air guide pipe is a PVC plastic pipe of Φ200, and a water shielding cap 18 can be glued to the top; and a plastic flange 24 is provided at the bottom.
[0063] The lower section 19 of the air guide duct is a DN200 steel pipe pre-buried in the reinforced concrete cone bucket pool bottom plate 3, with a water stop wing ring 23 and steel flanges 22 at both ends.
[0064] In the water shielding cap 21, the bottom of the reducer 25 is 200mm higher than the water surface of the eight-high tower cone bucket pool, the height of the reducer 25 is also 200mm, and the total height of the water shielding cap is 365mm.
[0065] The water shielding top cover 29 is a spherical surface, formed by pressing and trimming a plastic sheet, with a diameter of 219 mm and a height of 15 mm. The water shielding top cover 29 has a water collecting annular groove 30 and a drainage ditch 31. The depth of the water collecting annular groove 30 and the drainage ditch 31 are both 5 mm, and the cross section is semicircular.
[0066] The upper cone ring 28 is a cone surface, formed by pressing and trimming a plastic sheet, with a top diameter of 122 mm, a bottom diameter of 316 mm, and a height of 26 mm. The cone ring 28 has a water collection groove 30 and a drainage ditch 31. The depth of the water collection groove 30 and the drainage ditch 31 are both 5 mm, and the cross section is semicircular.
[0067] The lower cone ring 28 is a cone surface, formed by pressing and trimming a plastic sheet, with a top diameter of 218 mm, a bottom diameter of 412 mm, and a height of 26 mm. The cone ring 28 has a water collection groove 30 and a drainage ditch 31. The depth of the water collection groove 30 and the drainage ditch 31 are both 5 mm, and the cross section is semicircular.
[0068] The water shielding cover support 27, the water shielding top cover 29, the water shielding ring support 26, the water shielding cone ring 28 and the reducer 25 are all transported to the installation site as separate parts, and then bonded and assembled into finished products on site.
[0069] The DN200, PN0.6 steel flange 22 at the lower end of the lower section 19 of the air duct can be covered with a special windproof cloth during winter operation. The special windproof cloth can be tied to the air duct with a rope, just like putting a shower cap on the head, to prevent air from entering the air duct. When the plastic air duct 20 leaks, the lower end flange 22 can be connected to the blind flange plug to tightly seal the air duct, ensuring that the bottom plate 3 of the cone bucket pool does not leak along the air duct 19, thereby saving waiting time for replacing or repairing the air duct 20.
[0070] The air outlet area of the water shielding cap 21 is 557cm 2 , the air inlet area of the air duct is 336cm 2 .
[0071] Figure 8 Large drawing of water shielding cap.
[0072] The height of the reducer 25 is 200 mm, and the total height of the water shielding cap is 365 mm. Figure 6 The water shielding cap shown has the functions of water shielding and ventilation. The spherical top cover 29, the water shielding cone ring 28, the reducer 25 and the support 26 are transported to the installation site as separate parts and bonded on site to form the water shielding cap 21.
[0073] The reducer 25 is a sleeve with different inner and outer diameters at the top and bottom, and the inner and outer diameters of the lower part are larger than those of the upper part. The lower part is used to be sleeved with the suspended air duct, and the upper part is used to support the water shielding cap 21.
[0074] Fig. 9 , Fig.10 Manufacturing drawing of water shielding cap top cover. Fig. 9 is a cross-sectional view, Fig.10 The water shielding cover 29 is a spherical surface, formed by pressing and trimming a plastic sheet, with a diameter of 219 mm and a height of 15 mm. The water shielding cover 29 has a water collecting ring groove 30 and a drainage ditch 31. The depth of the water collecting ring groove 30 and the drainage ditch 31 are both 5 mm, and the cross section is semicircular.
[0075] Fig.11 , Fig.12 Manufacturing drawing of the water shielding cone ring above the water shielding cap. Fig.11 is a cross-sectional view, Fig.12The cone ring 28 is a conical surface, formed by pressing and trimming a plastic sheet, with a top diameter of 122 mm, a bottom diameter of 316 mm, and a height of 26 mm. The cone ring 28 has a water collection groove 30 and a drainage ditch 31. The depth of the water collection groove 30 and the drainage ditch 31 are both 5 mm, and the cross section is semicircular. The cone ring below is manufactured using the same method.
[0076] The present invention is described in detail below with reference to specific embodiments.
[0077] Example
[0078] If a single 1000MW generator set in Guangdong Heyuan Power Plant adopts eight-high towers, the data is shown in the following table:
[0079] Table 2 Data of Eight Towers of Guangdong Heyuan Power Plant
[0080]
[0081]
[0082] Table 2 is an embodiment of the present invention. Heyuan Power Plant currently intends to use the mature Haga tower. If it uses the eight-high tower instead, and adopts the air duct and water shielding cap provided by this patent application, each cooling tower can save 31.58 million yuan. The cost of the high-position cone bucket water tank of the eight-high tower is 9.33 million yuan, while the cost of the conventional tower sunken cylindrical water tank (the diameter is 4 meters larger than the bottom diameter of the tower) is 18.17 million yuan. Therefore, the eight-high tower is also more cost-effective than building a 12,000m high tower in Heyuan Power Plant. 2 The conventional tower saves investment of 8.84 million yuan.
[0083] It should be understood that the above description is for illustration and not for limitation. Many embodiments and many applications beyond the examples provided will be apparent to those skilled in the art upon reading the above description. Therefore, the scope of the present teachings should not be determined with reference to the above description, but rather with reference to the foregoing claims and the full scope of equivalents to which such claims are entitled. For the purpose of comprehensiveness, all articles and references, including disclosures of patent applications and publications, are incorporated herein by reference. The omission of any aspect of the subject matter disclosed herein in the foregoing claims is not intended to be a waiver of such subject matter, nor should it be considered that the applicant has not considered such subject matter to be part of the disclosed inventive subject matter.
Claims
1. A wind guiding and water shielding device for a high-level water collection cooling tower, characterized in that: include: A suspended air duct, the suspended air duct comprising a lower air duct section (19) and an upper air duct section (20), the lower air duct section (19) being pre-buried and passing through the cone bucket water pool bottom plate (3) of the high-position water collection cooling tower, and both ends of the lower air duct section (19) being provided with a second flange (22); the lower portion of the upper air duct section (20) being provided with a first flange (24); the first flange (24) of the upper air duct section (20) being connected to the second flange (22) at the upper portion of the lower air duct section (19); and a water shielding cap (21), the water shielding cap (21) comprising a reducing pipe (25), a water shielding top cover (29) and a plurality of water shielding cone rings (28); the reducing pipe (25) is mounted on the upper part of the upper section (20) of the air guide pipe; the plurality of water shielding cone rings (28) are stacked and supported in the order of the inner diameter of the middle ring from the smallest to the smallest through a water shielding cover support (27) with ventilation holes; the lowest water shielding cone ring (28) is arranged above the reducing pipe (25) through a water shielding circle support (26) with ventilation holes; the water shielding top cover (29) is arranged above the highest water shielding cone ring (28) through a water shielding cover support (27) with a ventilation hole; The outer diameter of the upper water-shielding cone ring (28) among the plurality of water-shielding cone rings (28) is larger than the inner diameter of the middle circle of the lower water-shielding cone ring (28), and the outer diameter of the water-shielding top cover (29) is larger than the inner diameter of the middle circle of the uppermost water-shielding cone ring (28); The water-shielding top cover (29) is a spherical surface, and the water-shielding cone ring (28) is a cone surface; The upper surfaces of the water shielding top cover (29) and the water shielding cone ring (28) are both provided with a water collecting annular groove (30) and a small drainage groove (31), wherein the water collecting annular groove (30) is arranged along the circumference of the upper surface, and the small drainage groove (31) is arranged along the radial direction, and the inner side of the small drainage groove (31) is connected to the water collecting annular groove (30), and the outer side is connected to the outer edge of the upper surface; It also includes a windproof cloth, which is sleeved on the second flange (22) at the lower part of the upper section (20) of the air guide pipe when the high-position water collection cooling tower is anti-freezing.
2. The wind guiding and water shielding device for a high-position water collection cooling tower according to claim 1, characterized in that: The lower section (19) of the air guide pipe is a standard steel pipe part, and a water stop wing ring (23) is provided in the middle of the lower section (19) of the air guide pipe in the circumferential direction; The upper section (20) of the air guide pipe is a plastic pipe, and the reducing pipe (25) is bonded and fixed to the upper section (20) of the air guide pipe.
3. The wind guiding and water shielding device for a high-position water collection cooling tower according to claim 1, characterized in that: The cross-sections of the water collecting annular groove (30) and the small drainage ditch (31) are semicircular.
4. The wind guiding and water shielding device for a high-position water collection cooling tower according to claim 1, characterized in that: The suspended air ducts are evenly arranged on the bottom plate (3) of the cone bucket water pool, and the bottom surfaces of all water shielding caps (21) are higher than the water surface in the cone bucket water pool of the high-position water collection cooling tower.
5. The wind guiding and water shielding device for a high-position water collection cooling tower according to claim 1, characterized in that: The first flange (24) is a plastic flange, and the second flange (22) is a steel flange.