A bored pile side grouting device and grouting process
Through the multi-tube segmented grouting process and rotary cylinder depth adjustment, the problem of inconvenient grouting depth adjustment of single-tube grouting is solved, and more efficient pile side soil reinforcement and matrix soil penetration are achieved, improving the flexibility and effect of grouting .
Patent Information
- Application Number
- CN202010360860.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-04-30
AI Technical Summary
In the existing high-pressure grouting technology, the depth adjustment of the single-tube annular grouting method may lead to insufficient grouting pressure, insufficient penetration and reinforcement properties of mud on the mud, and inconvenient operation, and need to be improved.
Two vertical filling sleeves and multiple sets of annular grouting pipes are connected by threaded joints, and the soft inner tube is wrapped around the rotating cylinder. The low-speed motor drives the rotating cylinder to achieve depth adjustment. The spray hole array is sealed through expansion tape to achieve Multi-tube segmented grouting process.
It improves the adjustability and operation ease of the grouting process, enhances the strength of the pile side soil and the permeability of the substrate soil, and ensures uniform spraying treatment on the pile side.
Smart Images

Figure CN111501760B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high-pressure grouting, and in particular to a bored cast-in-place pile side grouting device and a grouting process. Background Art
[0002] High-pressure grouting technical measures refer to the process of using a high-pressure grouting pump to press a certain pressure of cement slurry into the soil layer on the side of the pile through the pre-buried grouting channel after the bored pile is formed, and the slurry penetrates, fills, compacts, splits, and consolidates the mud skin around the pile to enhance the strength of the soil on the side of the pile, thereby eliminating the influence of the mud skin effect on the bearing performance of the bored pile. High-pressure grouting technical measures for bored piles can strengthen the weak layer of the mud wall and improve the strength of the mud skin of the wall; during the high-pressure grouting process of the slurry, the slurry penetrates into the mud skin of the wall, which can improve the properties of the mud wall and increase the side resistance of the single pile.
[0003] However, the existing grouting process generally adopts a single-tube annular grouting method, such as patent CN204491585U "cast-in-place pile single-main tube annular multiple grouting point post-grouting device" and CN10580483A "A grouting pipeline device, conical special-shaped pile and its use method", both adopt a single-tube grouting method, but the depth adjustment during single-point grouting is generally manual pulling, or pre-fixed at different depths, which is inconvenient to use. In addition, single-tube grouting may face the risk of insufficient grouting pressure, resulting in insufficient impact force of mud on mud skin soil and insufficient penetration into matrix soil. In addition, the operation or adjustment of the existing grouting process is relatively inconvenient and needs to be improved. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a bored pile side grouting device and a grouting process.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A bored pile side grouting device comprises two vertical grouting sleeves, a soft inner tube sleeved at the top opening of the grouting sleeves, and multiple groups of annular grouting pipes connected to the pipe wall of the grouting sleeves through threaded joints. The bored pile is surrounded by a steel cage. The grouting sleeve is fixed to the main reinforcement of the steel cage by twisting iron wire. The grouting sleeve is specifically a seamless stainless steel pipe. A grouting stopper is provided at the bottom of the grouting sleeve.
[0007] The pipe wall of the grouting sleeve is equidistantly provided with threaded joints from top to bottom, the threaded joint has an arc-shaped appearance, the outer wall of the threaded joint is arc-shaped, the inner wall of the threaded joint is a threaded hole, and one end of the threaded joint is fixedly connected to the pipe wall of the grouting sleeve. The annular grouting pipe includes two semicircular hard pipes, the outer walls of both ends of the semicircular hard pipes are provided with threaded openings sleeved with the threaded joints, and a single semicircular hard pipe connects the two grouting sleeves. The cross intersection of the two semicircular hard pipes, the four threaded joints and the grouting sleeves forms a horizontally placed annular grouting pipe;
[0008] The wall of the annular grouting pipe is provided with an annularly distributed array of grouting holes, and the array of grouting holes is sealed by an expansion tape;
[0009] The lower part of the soft inner tube is movably sleeved in the injection sleeve, and the tube wall near the bottom end of the soft inner tube is provided with a leakproof rubber tube sleeve, and the tube wall near the top end of the soft inner tube is fixedly connected to the wall of the rotating cylinder. The rotating cylinder is placed vertically, and the tube wall near the top end of one soft inner tube is fixedly installed at the upper position of the rotating cylinder wall, and the tube wall near the top end of the other soft inner tube is fixedly installed at the lower position of the rotating cylinder wall. The top opening of the soft inner tube is also provided with a reducer connected to the high-pressure pump slurry machine, and the upper parts of the two soft inner tubes are wound around the rotating cylinder;
[0010] A rotating shaft is fixedly connected to the center of the top surface of the rotating cylinder, and a low-speed motor is connected to the end of the rotating shaft away from the rotating cylinder. The low-speed motor is fixed to the bottom surface of the lifting box through angle irons. A U-shaped lifting lug is provided on the top surface of the lifting box, and the U-shaped lifting lug is connected through a hook of a crane device.
[0011] The height of the top ends and the depth of the bottom ends of the two perfusion sleeves are consistent, and the insertion depths of the bottom ends of the two soft inner tubes are inconsistent.
[0012] Preferably, the annular grouting pipes are specifically 4 to 6 groups equidistantly arranged from top to bottom, and grouting is performed sequentially from bottom to top to ensure that all parts of the bored pile side can be treated with grouting, thereby destroying the mud skin layer adhering to the pile wall, completely improving the mud skin properties, increasing friction and enhancing the strength of the soil on the pile side.
[0013] Preferably, any group of spray hole arrays includes spray holes distributed in a spiral shape along the wall of the annular grouting pipe, and 360° multi-angle spraying can spray all positions such as the pile side wall and the matrix soil layer near the pile side.
[0014] Preferably, there are 3-5 groups of U-shaped lifting ears, which play a fixing role and avoid unnecessary rotation of the lifting box.
[0015] Preferably, the soft inner tube is a stainless steel threaded tube or a steel wire braided rubber tube. The soft inner tube can be wound without affecting the flow of slurry in the tube during winding. At the same time, after a fixed rubber tube sleeve is set at the bottom end of the soft inner tube, it can slide in the injection sleeve without affecting the sealing.
[0016] Preferably, the wall of the rotating drum is lined with an anti-skid rubber layer to increase the friction of the rotating drum, prevent the soft inner tube from sliding too much in the rotating drum, and keep the spiral angle of the soft inner tube winding basically unchanged.
[0017] The present invention also proposes a corresponding bored pile side grouting process, which adopts the aforementioned bored pile side grouting device and comprises the following steps:
[0018] S1. Pre-setting: According to the aforementioned structure, the hoisting box is suspended by a crane, and the grouting sleeve with a grouting plug at the bottom is pre-tied to the main reinforcement of the steel cage, and the annular grouting pipe is set by threaded sleeve, and the low-speed motor is turned on, and the two soft inner pipes are passed to the bottom of the grouting sleeve by rotating the cylinder;
[0019] S2. In-pipe pressure detection: Open the reducers at the top of the two soft inner pipes and the high-pressure pump slurry machine connected to them in turn to test the pressure at the bottom of the bored pile and test whether there is slurry leakage at the top of the grouting casing;
[0020] S3, grouting on the pile side: after checking that there is no abnormality, manually wrap one of the soft inner tubes around the rotating drum and fix it with strong tape to lift it. After fixing it, turn on the low-speed motor to simultaneously wrap the two soft inner tubes around the rotating drum and lift them. When the bottom opening of the higher soft inner tube is lifted to a slightly higher position than the lowest annular grouting pipe, turn on the reducer and the high-pressure pump grouting machine connected to it, and use the slurry to flush the expansion tape on the grouting hole array, and spray the surroundings of the pile side through the gap between the expansion tape and the annular grouting pipe, and grout the lowest annular grouting pipe. Continue to rotate the rotating drum and lift the two soft inner tubes, and grout each group of annular grouting pipes from bottom to top in turn.
[0021] S4. Maintaining pressure and shaping: After grouting is completed, tear off the strong tape on one soft inner tube to make the two soft inner tubes have the same depth, and slightly rotate the rotating cylinder to make the bottom ends of the two soft inner tubes located above all the annular grouting pipes, maintain the pressure for 24-48 hours, and shape for 1-2 hours;
[0022] S5. Cleaning the slurry in the pipe: Use an air compressor to connect the reducer to extract the remaining slurry from the soft inner pipe, grouting sleeve and annular grouting pipe; then use a water pump to connect the reducer to pour clean water into the soft inner pipe, grouting sleeve and annular grouting pipe, extract the turbid liquid in the pipe and clear it out of the pipe, repeat 5-6 times, and you will get a cleaner pipe wall;
[0023] S6. Emergency treatment: When the grouting volume reaches the design requirement, or when the monitoring indicators such as pile settlement and deformation reach the control requirements, or when grouting occurs on the ground in the grouting construction area, stop grouting. However, after 3-4 days of grouting, pay attention to the humidity of the mud skin layer, and inject hot air or clean water into the soft inner pipe, grouting casing and annular grouting pipe to strictly control the environmental conditions inside each pipe. After 5-10 days without any abnormalities, remove the soft inner pipe, and the entire grouting process is completed.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] 1. The present invention uses soft inner tubes of different depths to perform grouting treatment on the annular grouting tubes of each layer, realizing a segmented grouting process of double-tube grouting or even triple-tube grouting, and quickly and simultaneously adjusts the depth of each soft inner tube by rotating the drum, thereby ensuring the smoothness of the grouting process and providing convenience for subsequent grout cleaning and emergency grouting treatment, greatly improving the adjustable flexibility and ease of operation of the pile side grouting process;
[0026] 2. Supported by the pile side grouting device, the present invention proposes a more flexible grouting process, which can detect and better handle the various pipes on the pile side (soft inner pipe, grouting sleeve and annular grouting pipe), and increase the total grouting pressure through multi-tube grouting, further improve the properties of mud skin soil and the permeability and reinforcement of matrix soil, which is worthy of large-scale promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A schematic diagram of the structure of a bored pile side grouting device proposed by the present invention;
[0028] Figure 2 A schematic diagram of the installation structure of a threaded joint of a bored pile side grouting device proposed by the present invention;
[0029] Figure 3 A schematic diagram of sticking an expansion tape of a bored pile side grouting device proposed by the present invention;
[0030] In the figure: grouting casing 1, soft inner pipe 2, threaded joint 3, annular grouting pipe 4, steel cage 5, grouting plug 6, grouting hole array 7, expansion tape 8, rotating cylinder 9, rotating shaft 10, low-speed motor 11, lifting box 12, U-shaped lifting ear 13, reducer 14. DETAILED DESCRIPTION
[0031] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0032] Embodiment 1:
[0033] Reference Figure 1-3 A bored pile lateral grouting device comprises two vertical grouting sleeves 1, a soft inner tube 2 sleeved at the top opening of the grouting sleeve 1, and multiple groups of annular grouting pipes 4 connected to the wall of the grouting sleeve 1 through threaded joints 3. The bored pile is surrounded by a steel cage 5. The grouting sleeve 1 is fixed to the main reinforcement of the steel cage 5 by twisting iron wires. The grouting sleeve 1 is a seamless stainless steel pipe. A grouting stopper 6 is provided at the bottom of the grouting sleeve 1. The wall of the grouting sleeve 1 is equidistantly provided with threaded joints 3 from top to bottom. The threaded joints 3 are arc-shaped tubular in appearance. The outer wall of the threaded joint 3 is arc-shaped, the inner wall of the threaded joint 3 is a threaded hole, and one end of the threaded joint 3 is fixedly connected to the pipe wall of the grouting sleeve 1. The annular grouting pipe 4 includes two semicircular hard pipes. The outer walls of both ends of the semicircular hard pipes are provided with threaded openings sleeved with the threaded joint 3. A single semicircular hard pipe connects the two grouting sleeves 1. A horizontally placed annular grouting pipe 4 is formed at the cross intersection of the two semicircular hard pipes, the four threaded joints 3 and the grouting sleeve 1; the pipe wall of the annular grouting pipe 4 is provided with a circularly distributed spray nozzle The slurry hole array 7 is sealed by the expansion tape 8; the lower part of the soft inner tube 2 is movably sleeved in the injection sleeve 1, and the tube wall near the bottom end of the soft inner tube 2 is provided with a leak-proof rubber tube sleeve, and the tube wall near the top end of the soft inner tube 2 is fixedly connected to the tube wall of the rotating cylinder 9, and the rotating cylinder 9 is placed vertically, and the tube wall near the top end of one soft inner tube 2 is fixedly installed at the upper position of the tube wall of the rotating cylinder 9, and the tube wall near the top end of the other soft inner tube 2 is fixedly installed at the lower position of the tube wall of the rotating cylinder 9, and the top opening of the soft inner tube 2 is also provided with a high A reducer 14 is connected to the slurry pump, and the upper parts of the two soft inner tubes 2 are wound around the rotating cylinder 9; a rotating shaft 10 is fixedly connected to the center position of the top end surface of the rotating cylinder 9, and a low-speed motor 11 is connected to the end of the rotating shaft 10 away from the rotating cylinder 9. The low-speed motor 11 is fixed to the bottom surface of the lifting box 12 by angle irons, and a U-shaped lifting ear 13 is provided on the top surface of the lifting box 12, and the U-shaped lifting ear 13 is connected by a hook of the crane equipment; the height of the top ends and the depth of the bottom ends of the two grouting casings 1 are consistent, and the insertion depths of the bottom ends of the two soft inner tubes 2 are inconsistent.
[0034] Reference Figure 1 The annular grouting pipe 4 specifically comprises 4 to 6 groups equidistantly arranged from top to bottom. By grouting in sequence from bottom to top, it is ensured that all parts of the bored pile side can be treated by grouting, thereby destroying the mud skin layer adhering to the pile wall, thoroughly improving the mud skin properties, increasing friction and enhancing the strength of the soil on the pile side.
[0035] Reference Figure 3 Any group of spray hole arrays 7 includes spray holes distributed in a spiral pattern along the wall of the annular grouting pipe 4, and 360° multi-angle spraying can spray all positions such as the pile side wall and the matrix soil layer near the pile side.
[0036] Reference Figure 1 There are 3-5 groups of U-shaped lifting ears 13, which play a fixing role and avoid unnecessary rotation of the lifting box 12.
[0037] Reference Figure 1 The soft inner tube 2 is specifically a stainless steel threaded tube or a steel wire braided rubber tube. The soft inner tube 2 can be wound without affecting the flow of slurry in the tube during winding. At the same time, after a fixed rubber tube sleeve is set at the bottom end of the soft inner tube 2, it can slide in the injection sleeve 1 without affecting the sealing performance.
[0038] Reference Figure 1 The wall of the rotating cylinder 9 is lined with an anti-skid rubber layer to increase the friction of the rotating cylinder 9 and prevent the soft inner tube 2 from sliding too much in the rotating cylinder 9, so that the spiral angle of the soft inner tube 2 remains basically unchanged.
[0039] The present invention also proposes a corresponding bored pile side grouting process, which adopts the aforementioned bored pile side grouting device and comprises the following steps:
[0040] S1, pre-setting: according to the above structure, the hoisting box 12 is suspended by the crane equipment, the grouting sleeve 1 with the grouting plug 6 at the bottom is pre-tied to the main reinforcement of the steel cage 5, the annular grouting pipe 4 is set by threaded sleeve connection, the low-speed motor 11 is turned on, and the two soft inner pipes 2 are passed to the bottom of the grouting sleeve 1 through the rotating cylinder 9;
[0041] S2, pipe pressure detection: open the reducer 14 on the top of the two soft inner pipes 2 and the high-pressure pump slurry machine connected thereto in turn, test the pressure at the bottom of the bored pile, and test whether there is slurry leakage at the top of the grouting casing 1;
[0042] S3, grouting on the pile side: after detecting that there is no abnormality, one of the soft inner tubes 2 is wound around the rotating cylinder 9 by manual winding and fixed with a strong adhesive tape to lift it. After fixing it; turn on the low-speed motor 11, so that the two soft inner tubes 2 are wound around the rotating cylinder 9 at the same time and lifted. When the bottom end opening of the higher soft inner tube 2 is lifted to a slightly higher position than the lowest annular grouting pipe 4, turn on the reducer 14 and the high-pressure pump slurry machine connected to it, and the slurry flushes the expansion tape 8 on the grouting hole array 7, and sprays the surroundings of the pile side from the gap between the expansion tape 8 and the annular grouting pipe 4, and grouts the lowest annular grouting pipe 4; continue to rotate the rotating cylinder 9 and lift the two soft inner tubes 2, and grout each group of annular grouting pipes 4 from bottom to top in turn;
[0043] S4, pressure maintenance and shaping: After the grouting is completed, tear off the strong tape on one soft inner tube 2 to make the two soft inner tubes 2 have the same depth, and slightly rotate the rotating cylinder 9 so that the bottom ends of the two soft inner tubes 2 are located above all the annular grouting pipes 4, maintain the pressure for 24-48 hours, and shape for 1-2 hours;
[0044] S5, cleaning the slurry in the pipe: use an air compressor to connect the reducer 14 to extract the remaining slurry from the soft inner pipe 2, the grouting sleeve 1 and the annular grouting pipe 4; then use a water pump to connect the reducer 14 to pour clean water into the soft inner pipe 2, the grouting sleeve 1 and the annular grouting pipe 4, extract the turbid liquid in the pipe and clear it out of the pipe, repeat 5-6 times, and a cleaner pipe wall is obtained;
[0045] S6. Emergency treatment: When the grouting volume reaches the design requirement, or when the monitoring indicators such as pile settlement and deformation reach the control requirements, or when grouting occurs on the ground in the grouting construction area, stop grouting. However, after 3-4 days of grouting, pay attention to the humidity of the mud skin layer, and inject hot air or clean water into the soft inner pipe 2, the grouting sleeve 1 and the annular grouting pipe 4 to strictly control the environmental conditions in each pipe. After 5-10 days without abnormalities, take out the soft inner pipe 2, and the entire grouting process is completed.
[0046] Embodiment 2:
[0047] A grouting sleeve 1, a soft inner pipe 2, a threaded joint 3, an annular grouting pipe 4, a steel cage 5, a grouting stopper 6, a grouting hole array 7, an expansion tape 8, a rotating cylinder 9, a rotating shaft 10, a low-speed motor 11, a lifting box 12, a U-shaped lifting lug 13, and a reducer 14 are used similar to those in Example 1, except that: three grouting sleeves 1 are used, the annular grouting pipe 4 is composed of three 1 / 3 arc-shaped pipes, the depths of the three soft inner pipes 2 are also increased successively, and the upper, middle, and lower parts of the rotating cylinder 9 are connected with the three soft inner pipes 2 in sequence;
[0048] The grouting process thereof is different from that of Example 1 in that, during grouting, the highest soft inner tube 2 is located above the annular grouting tube 4, a set of threaded joints 3 on the grouting sleeve 1 is opened, and the grouting range of the annular grouting tube 4 is 2 / 3 of the arc; then the middle soft inner tube 2 is raised, and the crossed 2 / 3 of the arc is grouted; then the lowest soft inner tube 2 is raised, and the crossed 2 / 3 of the arc is grouted, thereby completing the segmented or staged grouting;
[0049] Comparing Example 2 with Example 1, the difference between three-tube grouting and two-tube grouting is that the pressure of three sets of high-pressure pump slurry machines is greater, easier to control, and improves the flushing of mud skin soil and the penetration of nearby matrix soil. Therefore, it can also be extended to add more grouting sleeves 1 and soft inner tubes 2, as well as longer rotating cylinders 9, to achieve four-tube grouting or even five-tube grouting, but too many joints are likely to cause leakage and difficulty in installation, so grouting methods above four-tube grouting are not recommended.
[0050] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A bored pile side grouting process, using a bored pile side grouting device, comprising two vertical grouting sleeves (1), a soft inner tube (2) sleeved at the top opening of the grouting sleeves (1), and a plurality of annular grouting pipes (4) connected to the wall of the grouting sleeves (1) through threaded joints (3), characterized in that: The bored pile is surrounded by a steel cage (5), the cast-in-place casing (1) is fixed to the main reinforcement of the steel cage (5) by twisting iron wires, the cast-in-place casing (1) is specifically a seamless stainless steel pipe, and a grout stopper (6) is provided at the bottom end of the cast-in-place casing (1); The wall of the grouting sleeve (1) is provided with threaded joints (3) equidistantly from top to bottom, the threaded joints (3) are in the shape of an arc tube, the outer wall of the threaded joint (3) is in the shape of an arc, the inner wall of the threaded joint (3) is a threaded hole, and one end of the threaded joint (3) is fixedly connected to the wall of the grouting sleeve (1), the annular grouting pipe (4) comprises two semicircular hard pipes, the outer walls of both ends of the semicircular hard pipes are provided with threaded openings sleeved with the threaded joints (3), a single semicircular hard pipe connects the two grouting sleeves (1), and a horizontally placed annular grouting pipe (4) is formed at the cross intersection of the two semicircular hard pipes, the four threaded joints (3) and the grouting sleeve (1); The wall of the annular grouting pipe (4) is provided with an annularly distributed array of grouting holes (7), and the array of grouting holes (7) is sealed by an expansion tape (8); The lower part of the soft inner tube (2) is movably sleeved in the injection sleeve (1), and the tube wall near the bottom end of the soft inner tube (2) is provided with a leakproof rubber tube sleeve, and the tube wall near the top end of the soft inner tube (2) is fixedly connected to the tube wall of the rotating cylinder (9), and the rotating cylinder (9) is placed vertically, wherein the tube wall near the top end of one of the soft inner tubes (2) is fixedly installed at the upper position of the tube wall of the rotating cylinder (9), and the tube wall near the top end of the other soft inner tube (2) is fixedly installed at the lower position of the tube wall of the rotating cylinder (9), and the top opening of the soft inner tube (2) is also provided with a reducer (14) connected to the high-pressure pump slurry machine, and the upper parts of the two soft inner tubes (2) are wound around the rotating cylinder (9); A rotating shaft (10) is fixedly connected to the center position of the top end surface of the rotating cylinder (9); a low-speed motor (11) is connected to the end of the rotating shaft (10) away from the rotating cylinder (9); the low-speed motor (11) is fixedly mounted to the bottom surface of a hoisting box (12) via angle irons; a U-shaped lifting lug (13) is provided on the top surface of the hoisting box (12); and the U-shaped lifting lug (13) is connected via a hook of a crane device; The height of the top ends and the depth of the bottom ends of the two perfusion sleeves (1) are consistent, and the insertion depths of the bottom ends of the two soft inner tubes (2) are inconsistent; The following steps are involved: S1, pre-setting: hang the hoisting box (12) by means of a crane, tie the grouting sleeve (1) with a grouting stopper (6) at the bottom to the main reinforcement of the reinforcement cage (5) in advance, set the annular grouting pipe (4) by means of a threaded sleeve, start the low-speed motor (11), and pass the two soft inner pipes (2) to the bottom of the grouting sleeve (1) by means of a rotating cylinder (9); S2, pipe pressure detection: open the reducers (14) at the top of the two soft inner pipes (2) and the high-pressure pump slurry machine connected thereto in turn, test the pressure at the bottom of the bored pile, and test whether there is slurry leakage at the top of the grouting casing (1); S3, grouting on the pile side: after checking that no abnormality is found, one of the soft inner tubes (2) is manually wound around the rotating drum (9) and fixed with a strong adhesive tape to be lifted and fixed; the low-speed motor (11) is turned on to simultaneously wind the two soft inner tubes (2) around the rotating drum (9) and lift them; when the bottom opening of the higher soft inner tube (2) is lifted to a position slightly higher than the lowest annular grouting pipe (4), the reducer (14) and the high-pressure pump grouting machine connected thereto are turned on, the grouting liquid flushes the expansion tape (8) on the grouting hole array (7), and grouting is performed around the pile side through the gap between the expansion tape (8) and the annular grouting pipe (4), and grouting is performed on the lowest annular grouting pipe (4); the rotating drum (9) is continued to rotate and lift the two soft inner tubes (2), and grouting is performed on each group of annular grouting pipes (4) in sequence from bottom to top; S4, pressure maintenance and shaping: after the grouting is completed, tear off the strong adhesive tape on one soft inner tube (2) to make the two soft inner tubes (2) have the same depth, and slightly rotate the rotating cylinder (9) so that the bottom ends of the two soft inner tubes (2) are located above all the annular grouting pipes (4), maintain the pressure for 24-48 hours, and shape for 1-2 hours; S5, cleaning the slurry inside the pipe: using an air compressor connected to the reducer (14), extracting the remaining slurry from the soft inner pipe (2), the grouting sleeve (1) and the annular grouting pipe (4); then using a water pump connected to the reducer (14), injecting clean water into the soft inner pipe (2), the grouting sleeve (1) and the annular grouting pipe (4), extracting the turbid liquid inside the pipe and clearing it out of the pipe, repeating this process 5-6 times, and finally obtaining a relatively clean pipe wall; S6. Emergency treatment: When the grouting volume reaches the design requirements, or when the pile settlement and deformation monitoring indicators reach the control requirements, or when grouting occurs on the ground in the grouting construction area, grouting shall be stopped; however, after 3-4 days of grouting, attention shall be paid to the humidity of the mud skin layer, and hot air or clean water shall be injected into the soft inner pipe (2), the grouting sleeve (1) and the annular grouting pipe (4) to strictly control the environmental conditions in each pipe; after 5-10 days without abnormalities, the soft inner pipe (2) shall be removed, and the entire grouting process shall be completed.
2. A bored pile side grouting process according to claim 1, characterized in that: The annular grouting pipes (4) specifically consist of 4 to 6 groups that are equidistantly arranged from top to bottom.
3. A bored pile side grouting process according to claim 1, characterized in that: Any group of the grouting hole arrays (7) comprises grouting holes distributed in a spiral pattern along the wall of the annular grouting pipe (4).
4. A bored pile side grouting process according to claim 1, characterized in that: There are 3 to 5 groups of U-shaped lifting ears (13).
5. A bored pile side grouting process according to claim 1, characterized in that: The soft inner tube (2) is specifically a stainless steel threaded tube or a steel wire braided rubber tube.
6. A bored pile side grouting process according to claim 1, characterized in that: The wall of the rotating cylinder (9) is lined with an anti-slip rubber layer.